Loading...
HomeMy WebLinkAboutCOD-012-19Clarftwn Corporate Services Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: June 17, 2019 Report Number: COD -012-19 Resolution: GG -407-19 File Number: CL2019-18 By-law Number: Report Subject: GBRRC Roof Refurbishment and SCA Roof /Sealant Replacement Recommendations: That Report COD -012-19 be received; 2. That Industrial Roofing Services Limited with a total bid amount of $ 421,468.00 (Net HST Rebate) being the lowest compliant bidder meeting all terms, conditions and specifications of Tender CL2019-18 be awarded the contract for the GBRRC Roof Refurbishment and SCA Roof /Sealant Replacement, as required by the Community Services Department; 3. That the funds required for this project in the amount of $449,548.00 (Net HST Rebate) which includes the construction cost of $421,468.00 (Net HST Rebate) engineering design and testing/inspection be funded by the Municipality from the approved budget allocations as follows: GBRRC - Roof 110-42-421-84256-7401 $250,000.00 SCA - Roof 110-42-421-84259-7401 SCA -Exterior Window Control Joints 110-42-421-84259-7401 $150,000.00 $30,000.00 Community Services Capital Reserve Fund 518-00-000-00000-7418 $19,548.00 4. That all interested parties listed in Report COD -012-19 and any delegations be advised of Council's decision by the Corporate Services Department. Municipality of Clarington Report COD -012-19 Report Overview Page 2 To request authorization from Council to award the contract for the completion of the roof refurbishment over Pad A at the Garnet B. Rickard Recreation Complex and the roof and exterior control joint seal replacement at the South Courtice Arena. 1. Background 1.1 Tender specifications for roof refurbishment over Pad A at the Garnet B. Rickard Recreation Complex (GBRRC) and roof and exterior control joint seal replacement at South Courtice Arena (SCA) were prepared by the Community Services Department and Moon Matz Ltd. and provided to the Purchasing Services Division. 1.2 Tender CL2019-18 was issued by the Purchasing Services Division and advertised electronically on the Municipality's website. Notification of the availability of the document was also posted on the Ontario Public Buyer's Association website. Seventeen (17) Companies downloaded the tender document three of which were Construction Associations. 1.3 The Tender closed May 24, 2019. 2. Analysis 2.1 Five (5) Companies attended the mandatory site meeting held at both facilities on May 15. 2.2 One (1) submission was received at the close of the tender call. The bid was reviewed for compliancy and tabulated by the Purchasing Services Division (see Attachment 1). The submission received was deemed compliant. 2.3 The results were forwarded to the Community Services Department for their review and consideration. 2.4 After review and analysis of the submissions by the Community Services Department and the Purchasing Services Division, it was mutually agreed to remove the optional work for the lower portion of the roof at GBRRC, due to budget constraints, and recommend award to the low bidder, Industrial Roofing Services Limited. 2.5 Industrial Roofing Services Limited has not worked for the Municipality in the past therefore, reference checks were completed and were deemed satisfactory. Municipality of Clarington Resort COD -012-19 3. Financial Page 3 3.1 The funds required for this project in the amount of $449,548.00 (Net HST Rebate) which includes the construction cost of $421,468.00 (Net HST Rebate), engineering costs and testing/inspection be funded by the Municipality from the approved budget allocations as follows: GBRRC - Roof 110-42-421-84256-7401 $250,000.00 SCA - Roof 110-42-421-84259-7401 $150,000.00 SCA - Exterior Window Control Joints 110-42-421-84259-7401 $ 30,000.00 Community Services Capital Reserve Fund 518-00-000-00000-7418 $ 19,548.00 3.2 The value of the total project cost is over the allocated budget from the various funding sources and is utilizing the Community Services Capital Reserve Fund to make up the deficit. 4. Concurrence This report has been reviewed by the Manager of Facilities, Community Services who concurs with the recommendations. 5. Conclusion It is respectfully recommended that Industrial Roofing Services Limited being the lowest compliant bid be awarded the contract for the GBRRC Roof Refurbishment and SCA Roof /Sealant Replacement in accordance with all terms, conditions, specifications and drawings of Tender CL2019-18. 6. Strategic Plan Application Not applicable. Submitted by: Reviewed by: Mane Marano, H.B. Sc., C.M.O., Andrew C. Allison, B. Comm, LL.B Director of Corporate Se ' es CAO revor Pin�CP,A. Director of Finance/Treasurer Staff Contact: David Ferguson, Purchasing Manager, 2209 or dfergusion@clarington.net Attachments: 1- Bid Summary List of interested parties to be notified of Council's decision is on file in the Corporate Services Department. Attachment 1 to Municipality of Clarington Report COD -012-19 Bid Summary CL2019-18 — GBRRC Roof Refurbishment and SCA Roof /Sealant Replacement BIDDER Total Bid* Total Bid (including HST) (Net HST Rebate) Industrial Roofing Services Ltd. $476,258.84 $421,468.00 *Note the above values have been adjusted to reflect the removal of the optional pricing received for the completion of the lower roof section of Garnet B. Rickard Recreation Complex.