Loading...
HomeMy WebLinkAbout2005-180 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2005-180 Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Roadmaster Construction, Weston, Ontario to enter into agreement for the Crack Sealing Program. THE COPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOllOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between Roadmaster Construction, Weston, Ontario and said Corporation; and 2. THAT the contract attached hereto as Schedule "An form part of this By-law. By-law read a first and second time this 12 day of September , 2005. day of September , 2005. By-law read a third time and finally passed this 12 (7)a~4~ J~~n _ -'. _ Mayor. _ _- - . I I I I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARINGTON 2005 CRACK SEALING PROGRAM VARIOUS LOCATIONS CONTRACT NO. CL2005-27 JUNE 2005 ~~ architects planners TSH NO. 12-29383 I I I I I I I I I I I I I I I I I I I AGREEMENT THIS AGREEMENT made in quadruplicate BETWEEN: ROADMASTER ROAD CONSTRUCTION & SEALING LTD. of the City of Toronto and Province of Ontario hereinafter called the .Contractor" THE PARTY OF THE FIRST PART -and- THE CORPORATION OF THE MUNICIPALITY OF CLARlNGTON hereinafter called the "Purchaser" THE PARTY OF THE SECOND PART WITNESSETH, that the party of the first part, for and in consideration of the payment or payments specified in the tender for this work hereby agrees to furnish all necessary machinery, tools, equipment, supplies, labour, and other means of construction and, to the satisfaction of the Engineer, to do all the work as described hereafter, furnish all the materials except as herein otherwise specified, and to complete such works in strict accordance with the plans, specifications and tender therefore, all of which are to be read herewith and form part of this present agreement as fully and completely to all intents and purposes as though all the stipulations thereof have been embodied herein. Page lof3 II I I I I I I I I I I I I I I I I I I DESCRIPTION OF mE WORK AND LIST OF DOCUMENTS 2005 Crack Sealing Program, Various Locations, Contract No. CL2005-27 Addendum No.1, dated August 8,2005 A. TENDER FORM: General Itemized Bid Bonds Schedule of Tender Data B. STANDARD TERMS AND CONDITIONS C. INSTRUCTIONS TO TENDERERS D. SPECIAL PROVISIONS - GENERAL E. SPECIAL PROVISIONS - TENDER ITEMS F. STANDARDS G. PLANS: Map No.1 H. STANDARD SPECIFICATIONS: It shall be the Contractor's responsibility to obtain the applicable edition of the following Ontario Provincial Standard Specifications. OPSS No, Date OPSS No. Date OPSS No. Date 127 Current 310 Nov. 2004 510 Nov. 2004 ]28 Current 341 Nov. 2004 12]2 Nov. 2003 1. GENERAL CONDITIONS: OPS General Conditions of Contract (September 1999) J. QUANTITY BREAKDOWN SHEETS All Plans and Documents referred to in the Specifications. The Contractor further agrees that he will deliver the whole of the works completed in accordance with this agreement on or before September 30, 2005. IN CONSIDERATION WHEREOF said party of the second part agrees to pay to the Contractor for all work done, the unit prices on the Tender. This agreement shall enure to the benefit of and be binding upon the heirs, executors, administrators and assigns of the Contractor and on the heirs and successors of the Purchaser. Page 2 of3 I I I I I I I I I I I I I I I I I I I IN WITNESS WHEREOF, the Contractor and the Purchaser have hereunto signed their names and set their seals on the day first above written. SIGNED and sealed by the Contractor ROADMASTER ROAD CONSTRUCTION & SEALING LTD. I).. . fjakcvu in the presence of ~v 2005 ) ) ) ) ) ) ) ) ) ) ) Sept. 12, Date -:;:: 117 ~'1\ CuJ-. IL , ( Sept. 12, 2005 Date ) ) ) ) ) Date ) ) ) ) ) ) THE CORPORATION OF THE MUNICIPALITY OF ?IN ~1V(I.~ John Mutton, Mayor 'Se.t>-j. . SIGNED and sealed by the Purchaser in the presence of P129383/Specsl AGR.doc - - - ~ -- .......-- Date ( 5e-r.\-' "z"'lo, =os- . --: Page 3 of 3 I I I I I I I I I I I I I I I I I I I PROJECT: AUTHORITY: CONTRACT ADMINISTRATOR: TENDERER: TENDERS RECEIVED BY: Pfl2.29J8J/Spec:sI20984- TF-SianDoa.doc TENDER FOR CONTRACT NO. CL2005-27 2005 CRACK SEALING PROGRAM, VARIOUS LOCATIONS CORPORATION OF THE MUNICIPALITY OF CLARINGTON TSH ENGINEERS, ARCHITECTS and PLANNERS 513 DIVISION STREET COBOURG, ONTARIO. K9A 5G6 Telephone: 905-372-2121 Fax: 905-372-3621 Roadmaster Road Construction & SeaIinf! Ltd. Name 200 PeIlatt Avenue Toronto. Ontario M9N 2P6 Address (include Postal Code) Tel: 416-243-0455 Fax: 416-243-0934 Telephone and Fax Numbers Patricia Rvder Name of Person Signing Secretarv - Treasurer Position of Person Signing Mrs. Patti Barrie, Clerk Corporation of the Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario. LiC 3A6 Page 1 of 5 pages I I I I I I I I I I I I I I I I I I I TENDER CONTRACT NO. CL2005-27 To: The Mayor and Members of Council Corporation of the Municipality of Clarington Re: Contract No. CL2005-27 2005 Crack Sealing Program, Various Locations Dear Mayor and Members of Council: The Contractor has carefully examined the Plans, Provisions, Specifications and Conditions described herein as part of the work to be done under this Contract. The Contractor understands and accepts the said Plans, Provisions, Specifications and Conditions, and, for the prices set forth in this Tender, hereby offers to furnish all machinery, tools, apparatus and other means of construction, furnish all materials, except as otherwise specified in the Contract, and to complete the work in strict accordance with the said Plans, Provisions, Specifications and Conditions. The Contractor understands and accepts that the quantities shown are approximate only, and are subject to increase, decrease, or deletion entirely if found not to be required. Attached to this tender is a bid deposit in the amount specified in Clause 3 of the Instructions to Tenderers, made payable to the Authority. This cheque or bid bond shall constitute a deposit which shall be forfeited to the Authority if the successful Contractor fails to file with the Authority a 100% Performance Bond, and a 100% Labour and Material Payment Bond, satisfactory to the Authority within ten (10) calendar days from the date of receipt of Notice of Acceptance of the Tender. Notification of acceptance may be given and delivery of the form of Agreement made by prepaid post, addressed to the Contractor at the address contained in this Tender. Page 2 of 5 pages I ITEMIZED BID CONTRACT NO. CL2005-27 I In accordance with the first paragraph of this Tender, the Contractor hereby offers to complete the work specified for Contract No. CL2005-27 for the following unit prices. I Spec. No. The numbers in this column refer to the applicable issue of the Ontario Provincial Standard Specifications SP Refers to Special Provisions I (Pl Plan Quantity Payment Item Item < ,....... ;, .... . ..? NI1. SpeGj\ljj'f. .. ..... .. .~riptillll ...... Unit . Quantity Unit Price ..._.~. ... 2005 CRACK SEALING PROGlUM - VARIOUS LOCA nONS 1 341, 1212 Rout and Seal Cracks in Hot Mix m 25,355 1 .29 32,707.95 SP Asphalt 2 310 Grind and Fill Crack Repair with m 60 30.00 1,800.00 SP H.L.-3 (40 mm x 150 mm to 300 mm) Suh- Total 34,507.95 SUMMARY: Total (excluding GST) $ 34,507.95 GST (7% of Total) $ 2,415.56 ><..c<j.i ...............:..:....;.:....--;.::..;.....,,:: . . ....... C. $. ~~i.~lliil iT .... .....? 1'Q'I:'.tt TENJ)1ij{Ai\{oUNt II... ... .. I I I I I I I I I Tenderer's GST Registration No. Rl04565254 I PIl2-29383/SpecoI29383-ltemIlid-SignD<xs.xb I I I I I Page 3 of 5 pages .......- I I I I I I I I I I I I I I I I I I 1 AGREEMENT TO BOND (to be comDleted bv Bondin!! ComDanv) CONTRACT NO. CL2005-27 Bond No.: TS8000574-16 WE, the Undersigned, HEREBY AGREE to become bound as Surety for Roadmaster Road Construction & Sealin!! Ltd. in a Performance Bond totalling ONE HUNDRED PERCENT (100%) of the Total Tender amount, and a Labour and Material Payment Bond totalling ONE HUNDRED PERCENT (100%) of the Total Tender amount, and conforming to the Instruments of Contract attached hereto, for the full and due performance of the works shown or described herein, if the Tender for Contract No.CL2005-27 is accepted by the Authority. IT IS A CONDITION of this Agreement that if the above mentioned Tender is accepted. application for a Performance Bond and a Labour and Material Payment Bond must be made to the Undersigned within TEN (10) DAYS of Notice of Contract Award, otherwise the Agreement shall be null and void. DATED AT Toronto this 16'" 2005 day of June The Guarantee Comoanv of North America Name of Bonding Company Kim Grant Signature of Authorized Person Signing for Bonding Company (BONDING COMPANY SEAL) Attornev-In-Fact Position (This Form shall be completed and attached to the Tender Submitted). Page 4 of 5 pages I I I I I I I I I I I I I I I I I I I SCHEDULE OF TENDER DATA CONTRACT NO. CL2005-27 The work specified in the Contract shall be performed in strict accordance with the following Schedule: A. TENDER FORM: General Pages I and 2 Itemized Bid Page 3 Agreement to Bond Page 4 Schedule of Tender Data Page 5 B. STANDARD TERMS AND CONDITIONS C. INSTRUCTIONS TO TENDERERS Pages I to 5 D. SPECIAL PROVISIONS - GENERAL Pages I to 11 E. SPECIAL PROVISIONS - TENDER ITEMS Pages I and 3 F. STANDARDS G. PLANS: Map No. I H. STANDARD SPECIFICATIONS: It shall be the Contractor's responsibility to obtain the applicable edition of the following Ontario Provincial Standard Specifications. OPSS No. Date OPSS No.. Date n OPSS No. Date 127 Current 310 Noy. 2004 510 Noy. 2004 128 Current 341 Noy. 2004 1212 Noy. 2003 I. GENERAL CONDITIONS: OPS General Conditions of Contract (September 1999) J. QUANTITY BREAKDOWN SHEETS The Contractor, by this Tender, offers to complete the work of this Contract in strict accordance with the terms contained herein. The bidder certifies that it has met all of its obligations to comply with the Provincial Retail Sales Tax requirements, so that it is able to do business in Ontario. Yes x No By my/our signature hereunder, I1we hereby identify this as the Schedule of Tender Data, Plans and Specifications, for Contract No. CL2005-27, executed by me/us bearing date the 22"" day of June we have fully read al!.~ documents t~ te ata as listed above. '1) i 2005 and SIGNATURE: 0:: POSITION Secretary-Treasr~er - (COMfANY SEAL) NAME OF FIRM Roadmaster Road Construction & Sealing Ltd. ~ Privacv Le2is1ation Federal legislation governs the collection and use of personal information from individuals. We represent and warrant to the owner that we have obtained the CONSENT of any and all employees whose personal information we have supplied to the owner in this lender. This personal information, which includes. but is not limited to, the employees' names, education, work and project history. professional designations and qualifications. This CONSENT permits the owner to disclose this personal information to the Engineer (owner or agent) for the purpose of evaluating our bid. In the event that the tender is successful, this personal information may also be used in project administration. for contact purposes. This is Page 5 of 5 Pages to be submitted as the Tender Submission for Contract No. CL2005-27. I I I I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARINGTON CONTRACT NO. CL2005-27 STANDARD TERMS AND CONDITIONS II I I I I I I I I I I I I I I I I I I STANDARD TERMS AND CONDITIONS The Municipality of Clarington's "Standard Terms and Conditions" shall apply to this Contract except where noted below. . Clause 8 of the "Standard Terms and conditions" shall be superceded by Clause 7, "Payments" of the "Special Provisions - General" Section of the Contract. . Clause 15 ofthe "Standard Terms and conditions" shall be superceded by Clause 1, "Guaranteed Maintenance" of the "Special Provisions - General" Section of the Contract. . Clause 16 of the "Standard Terms and Conditions" is not applicable to this Contract. . Clause 23 of the "Standard Terms and Conditions" shall be superceded by Clause 6.03.02 of the OPS General Conditions of Contract (September 1999) which requires a $5,000,000.00 liability coverage. . Clause 26 of the "Standard Terms and Conditions" shall be superceded by Clause 17, "Workplace Hazardous Materials Information System (WHMIS)" of the "Special Provisions - General" Section of the Contract. P/12-293831Specsl20985- T&C.doc I I I I I I I I I I I I I I I I I I I STANDARD TERMS AND CONDITIONS 1. DEFINITIONS Municipality - The Corporation of the Municipality of Clarington, its successors and assigns. Bidder - The person, firm or corporation submitting a bid to the Municipality. Company - The person, contractor, finn or corporation to whom the Municipality has awarded the contract, it successors and assigns. Contract - The purchase order authorizing the company to perfonn the work, purchase order aRerations, the document and addenda, the bid, and surety. Subcontractor - A person, finn or corporation having a contract with the company for, or any part of, the work. Document - The document(s) issued by the Municipality in response to which bids are invited to perfonn the work in accordance with the specifications contained in the document. Bid - An offer by a Bidder in response to the document issued by the Municipality. Work - All labour, materials, products, articles, fixtures, services, supplies, and acts required to be done, furnished or perfonned by the company, which are subject to the Contract. 2. SUBMISSION OF BID Bid invitation shall be in accordance with the Municipality of Clarington Purchasing By-law #94-129 and will apply for the calling, receiving, and opening of bids. The Municipality will be responsible for evaluating bids, awarding and administering the contract in accordance with the Purchasing By-law. The bid must be submitted on the form(s) and in the envelope supplied by the Municipality unless otherwise provided herein. The envelope must not be covered by any outside wrappings, I.e. courier envelopes or other coverings. The bid must be signed by a designated signing officer of the Bidder. If a joint bid is submitted, n must be signed on behalf of each of the Bidders. The bid must be legible, written in ink, or typewritten. Any form of erasure, strikeout or over-writing must be initialled by the Bidder's authorized signing officer. The bid must not be restricted by a covering letter, a statement added, or by alterations to the document unless otherwise provided herein. Failure to return the document or invitation may result in the removal of the Bidder from the Municipality's bidder's list. A bid received after the closing date and time will not be considered and will be returned, unopened. Should a dispute arise from the terms and conditions of any part of the contract, regarding meaning, intent or ambiguity, the decision of the Municipality shall be final. I I I I I I I I I I I I I I I I I I I STANDARD TERMS AND CONDITIONS (continued) 3. CONTRACT The contract consists of the documents aforementioned. The contract and portions thereof take precedence in the order in which they are named above, notwithstanding the chronological order in which they are issued or executed. The intent of the contract is that the Company shall supply work which is fit and suitable for the Municipality's intended use and complete for a particular purpose. None of the conditions contained in the Bidder's standard or general cond~ions of sale shall be of any effect unless explicitiy agreed to by the Municipality and specifically referred to in the purchase order. 4. CLARIFICATION OF THE DOCUMENT Any clarification of the document required by the Bidder prior to submission of its bid shall be requested through the Municipality's contact identified in the document. Any such clarification so given shall not in any way aller the document and in no case shall oral arrangements be considered. Every notice, advice or other communication pertaining thereto will be in the form of a written addendum. No officer, agent or employee of the Municipality is authorized to alter orally any portion of the document. 5. PROOF OF ABILITY The bidder may be required to show, in terms of experience and facilmes, evidence of its ability, as well as that of any proposed subcontractor, to perform the work by the specified delivery date. 6. DELIVERY Unless otherwise stated, the work specified in the bid shall be delivered or completely performed by the Company as soon as possible and in any event w~hin the period set out herein as the guaranteed period of delivery or completion after receipt of a purchase order therefor. A deta~ed delivery ticket or piece tally, showing the exact quantity of goods, materials, articles or equipment, shall accompany each delivery thereof. Receiving by a foreperson, storekeeper or other such receiver shall not bind the Municipality to accept the work covered thereby, or the particulars of the delivery ticket or piece tally thereof. Work shall be subject to further inspection and approval by the Municipality. The Company shall be responsible for arranging the work so that completion shall be as specified in the contract. Time shall be of the essence of the contract. I I I I I I I I I I I I I I I I I I I STANDARD TERMS AND CONDITIONS (continued) 7. PRICING Prices shall be in Canadian Funds, quoted separately for each item stipulated, F.O.B. destination. Prices shall be firm for the duration of the contract. Prices bid must include all incidental costs and the Company shall be deemed to be satisfied as to the full requirements of the bid. No claims for extra work will be entertained and any additional work must be authorized in writing prior to commencement. Should the Company require more information or clarification on any point, it must be obtained prior to the submission of the bid. Payment shall be full compensation for all costs related to the work, including operating and overhead costs to provide work to the satisfaction of the Municipality. All prices quoted shall include applicable customs duty, excise tax, freight, insurance, and all other charges of every kind attributable to the work. Goods and Services Tax and Provincial Sales Tax shall be extra and not shown, unless otherwise specified herein. If the Bidder intends to manufacture or fabricate any part of the work outside of Canada, it shall arrange its shipping procedures so that its agent or representative in Canada is the importer of record for customs purposes. Should any additional tax, duty or any variation in any tax or duty be imposed by the Government of Canada or the Province of Ontario become directly applicable to work specified in this document subsequent to its submission by the Bidder and before the delivery of the work covered thereby pursuant to a purchase order issued by the Municipality appropriate increase or decrease in the price of work shall be made to compensate for such changes as of the effective date thereof. 8. TERMS OF PAYMENT Where required by the Construction Lien Act appropriate monies may be held back until 60 days after the completion of the work. Payments made hereunder, including final payment shall not relieve the company from its obligations or liabilities under the contract. Acceptance by the company of the final payment shall constitute a waiver of claims by the company against the Municipality, except those previously made in wr~ing in accordance w~h the contract and still unsettled. The Municipality shall have the right to withhold from any sum otherwise payable to the company such amount as may be sufficient to remedy any defect or deficiency in the work, pending correction of it. Payment may be made 30 days after delivery pursuant to the Bidder submitting an invoice, contract requirements being completed and work being deemed satisfactory. 9. PATENTS AND COPYRIGHTS The company shall, at its expense, defend all claims, actions or proceedings against the Municipal~ based on any allegations that the work or any part of the work constitutes an infringement of any patent, copyright or other proprietary right, and shall pay to the Municipality all costs, damages, charges and expenses, including its lawyers' fees on a solicitor and his own client basis occasioned to the Municipality by reason thereof. The company shall pay all royalties and patent license fees required for the work. I I I I I I I I I I I I I I I I I I I 15. STANDARD TERMS AND CONDITIONS (continued) 9. PATENTS AND COPYRIGHTS- conl'd If the work or any part thereof is in any action or proceeding held to constitute an infringement, the company shall forthwith either secure for the Municipality the right to continue using the work or shall at the company's expense, replace the infringing work with non-infringing work or modify it so that the work no longer infringes. 10. AL TERNA TES Any opinion with regard to the use of a propesed alternate determined by the Municipality shall be final. Any bid propesing an alternate will not be considered unless otherwise specified herein. 11. EQUIVALENCY Any opinion determined by the Municipality wnh respect to equivalency shall be final. 12. ASSIGNMENT AND SUBCONTRACTING The company shall not assign or subcontract the contract or any portion thereof without the prior written consent of the Municipality. 13. FINANCING INFORMATION REQUIRED OF THE COMPANY The Municipalijy is entitled to request of the Company to furnish reasonable evidence that financial arrangements have been made to fulfill the Municipalijy's obligations under the Contract. 14. LAWS AND REGULATIONS The company shall comply with relevant Federal, Provincial and Municipal statutes, regulations and by-laws pertaining to the work and ns performance. The company shall be respensible for ensuring similar compliance by suppliers and subcontractors. The contract shall be governed by and interpreted in accordance wnh the laws of the Province of Ontario. CORRECTION OF DEFECTS If at any time prior to one year after the actual delivery date or completion of the work (or specified warranty/guarantee period if longer than one year) any part of the work becomes defective or is deficient or fails due to defect in design, material or workmanship, or otherwise fails to meet the requirements of the contract, the company, upon request, shall make good every such defect, deficiency or failure without cost to the Municipality. The company shall pay all transportation costs for work both ways between the company's factory or repair depot and the pelnt of use. I I I I I I I I I I I I I I I I I I I 18. STANDARD TERMS AND CONDITIONS (continued) 16. BID ACCEPTANCE The Municipality reserves the right to award by item, or part thereof, groups of items, or parts thereof, or all items of the bids and to award contracts to one or more bidders submitting identical bids as to price; to accept or reject any bids in whole or in part; to waive irregularities and omissions, if in so doing, the best interests of the Municipality will be served. No liability shall accrue to the Municipality for its decision in this regard. Bids shall be irrevocable for 90 days after the official closing time. The placing in the mail or delivery to the Bidder's shown address given in the bid of a notice of award to a bidder by the Municipality shall constitute notice of acceptance of contract by the Municipality to the extent described in the notice of award. 17. DEFAULT BY COMPANY a. If the company: commits any act of bankruptcy; or if a receiver is appointed on account of its insolvency or in respect of any of its property; or if the company makes a general assignment for the benefit of its crednors; then, in any such case, the Municipality may, without notice: terminate the contract. b. If the company: fails to comply with any request, instruction or order of the Municipality; or fails to pay its accounts; or fails to comply with or persistently. disregard statutes, regulations, by-laws or directives of relevant authorities relating to the work; or fails to prosecute the work with skill and diligence; or assigns or sublets the contract or any portion thereof without the Municipality's prior written consent; or refuses to correct defective work; or is otherwise in default in carrying out its part of any of the terms, condnions and obligations of the contract, then, in any such case, the Municipality may, upon expiration of ten days from the date of written notice to the company, terminate the contract. c. Any termination of the contract by the Municipalny, as aforesaid, shall be without prejudice to any other rights or remedies the Municipality may have and without incurring any liability whatsoever in respect thereto. d. If the Municipality terminates the contract, it is enmled to: i) take possession of all work in progress, materials and construction equipment then at the project site (at no additional charge for the retention or use of the construction equipment), and finish the work by whatever means the Municipality may deem appropriate under the circumstances; ii) withhold any further payments to the company until the completion of the work and the expiry of all obligations under the Correction of Defects section; Iii) recover from the company loss, damage and expense incurred by the Municipality by reason of the company's default (which may be deducted from any monies due or becoming due to the company, any balance to be paid by the company to the Municipality). CONTRACT CANCELLATION The Municipality shall have the right, which may be exercised from time to time, to cancel any uncompleted or unperformed portion of the work or part thereof. In the event of such cancellation, the Municipality and the Company may negotiate a settlement. The Municipality shall not be liable to the Company for loss of anticipated profit on the cancelled portion or portions of the work. I. . . . I I I I . I I I I I I I I I I 21. 22. STANDARD TERMS AND CONDITIONS (continued) 19. QUANTITIES Unless otherwise specified herein, quantities are shown as approximate, are not guaranteed to be accurate, are furnished without any liability on behalf of the Municipality and shall be used as a basis for comparison only. Payment will be by the unit complete at the bid price on actual quantities deemed acceptable by the Municipality. 20. SAMPLES Upon request, samples must be submitted strictly in accordance with instructions. If samples are requested subsequent to opening of bids, they shall be delivered within three (3) working days following such request, unless additional time is granted. Samples must be submitted free of charge and will be returned at the bidde(s expense, upon request, provided they have not been destroyed by tests, or are not required for comparison purposes. The acceptance of samples by the Municipality shall be at its sole discretion and any such acceptance shall in no way be construed to imply relief of the company from its obligations under the contract. Samples submitted must be accompanied by current Material Safety Data Sheets (MSDS) where applicable. SURETY The successful tenderer shall, if the Municipality in ~s absolute discretion so desires, be required to satisfy surety requirements by providing a deposit in the form of a certified cheque, bank draft or money order or other form of surety, in an amount determined by the Municipality. This surety may be held by the Municipality until 60 days after the day on which all work covered by the contract has been completed and accepted. The surety may be retumed before the 60 days have elapsed providing satisfactory evidence is provided that all liabilities incurred by the company in carrying out the work have expired or have been satisfied and that a Certificate of Clearance from the (WSIB) Workplace Safety and Insurance Board Board has been received. The company shall, if the Municipality in its absolute discretion so desires, be required to satisfy fidelity bonding requirements by providing such bonding in an amount and form determined by the Municipality. Failure to fumish required surety within two weeks from date of request thereof by the Municipality shall make the award of the Contract by the Municipality subject to withdrawal. WORKPLACE SAFETY AND INSURANCE BOARD All of the Company's personnel must be covered by the insurance plan under the Workplace Safety and Insurance Act, 1997. Upon request by the Municipality, an original Letter of Good Standing for the Workplace Safety and Insurance Board shall be provided prior to the commencement of Work indicating all payments by the Company to the Board have been made. Prior to final payment, a Certificate of Clearance must be issued indicating all payments by the Company to the Board in conjunction with the subject Contract have been made and that the Municipality will not be liable to the Board for Mure payments in connection ~h the Company's fulfilment of the contract. Further Certificates of Clearance or other types of certificates shall be provided upon request. I I I I I I I I I I I I I I I I I I I 25. 26. STANDARD TERMS AND CONDITIONS (continued) 23. INSURANCE The company shall maintain and pay for Comprehensive General Liability insurance including premises and all operations. This insurance coverage shall be subject to limits of not less than $3,000,000.00 inclusive per occurrence for third party Bodily Injury and Property Damage or such other coverage or amount as may be requested. The policy shall include the Municipality as an additional insured in respect of all operations performed by or on behalf of the Company. A certified copy of such policy or certificate shall be provided to the respective participant prior to commencement of the work. Further certified copies shall be provided upon request. 24. LIABILITY The company agrees to defend, fully indemnify and save harmless the Municipality from all actions, suits, claims, demands, losses, costs, charges and expenses whatsoever for all damage or injury including death to any person and all damage to any property which may arise directly or indirectly by reason of a requirement of the contract, save and except for damage caused by the negligence of the Municipality or Ks employees. The Company agrees to defend, fully indemnify and save harmless the Municipality from any and all charges, fines, penalties and costs that may be incurred or paid by the Municipality if the Municipality or any of its employees shall be made a party to any charge under the Occupational Health and Safety Act in relation to any violation of the Act arising out of this contract. VISITING THE SITE The Company shall carefully examine the site and existing building and services affecting the proper execution of the work, and obtain a clear and comprehensive knowledge of the existing condKions. No claim for extra payment will be allowed for work or difficulties encountered due to conditions of the sKe which were visible or reasonably inferable, prior to the date of submission of Tenders. Bidders shall accept sole responsibility for any error or neglect on their part in this respect. SAFETY The Company shall obey all Federal, Provincial and Municipal Laws, Act, Ordinances, Regulations, Orders-in-Council and By-laws, which could in any way pertain to the work outlined in the Contract or to the Employees of the Company. Without limiting the generality of the foregoing, the Company shall satisfy all statutory requirements imposed by the Occupational Health and Safety Act and Regulations made thereunder, on a contractor, a Constructor and/or Employer with respect to or arising out of the performance of the Company's obligations under this Contract. The Company shall be aware of and conform to all goveming regulations including those established by the Municipality relating to employee heaRh and safety. The Company shall keep employees and subcontractors informed of such regulations. The Company shall provide Material Safety Data Sheets (MSDS) to the Municipality for any supplied Hazardous Materials. I I I I I I I I I I I I I I I I I I I 30. 31. STANDARD TERMS AND CONDITIONS (continued) 27. UNPAID ACCOUNTS The company shall indemnify the Municipality from all claims arising out of unpaid accounts relating to the work. The Municipality shall have the right at any time to require satisfactory evidence that the work in respect of which any payment has been made or is to be made by the Municipality is free and clear of liens, attachments, claims, demands, charges or other encumbrances. 28. SUSPENSION OF WORK The Municipality may, without invalidating the contract, suspend perfonnance by the company from time to time of any part or all of the work for such reasonable period of time as the Municipality may detennine. The resumption and completion of work after the suspension shall be govemed by the schedule established by the Municipality. 29. CHANGES IN THE WORK The Municipality may, without invalidating the contract, direct the Company to make changes to the work. When a change causes an increase or decrease in the work, the contract price shall be increased or decreased by the application of unit prices to the quantum of such increase or decrease, or in the absence of applicable unit prices, by an amount to be agreed upon between the Municipality and the Company. All such changes shall be in writing and approved by the Municipality. CONFLICT OF INTEREST No employee or member of Council of the Municipality shall sell goods or services to the Municipality in accordance with the Municipality of Clarington Policy or have a direct or indirect interest in a Company or own a Company which sells goods or services to the Municipality. MUNICIPAL FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY ACT (MFIPPA\ All correspondence, documentation, and infonnation provided to staff of the Municipality of Clarington by every offerer, including the submission of proposals, shall become the property of the Municipality, and as such, is subject to the Municipal Freedom of Infonnation and Protection of Privacy Act, and may be subject to release pursuant to the Act. Offerers are reminded to identify in their proposal material any specific scientific, technical, commercial, proprietary, or similar confidential infonnation, the disclosure of which could cause them injury. Complete proposals are not to be identifred as confidential. II I I I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARINGTON CONTRACT NO. CL2005-27 INSTRUCTIONS TO TENDERERS P/12-29493/Spel;:sJ20986-IT.doc I. I I I I I I I I I I I I I I I I I I INDEX INSTRUCTIONS TO TENDERERS CONTRACT NO. CL2005-27 CLAUSE SUBJECT PAGE 1. GENERAL .................................................................................................................... 1 2. BLANK FORM OF TENDER............................................................................................. 1 3. TENDER DEPOSITS................................................................................... .................... 1 4. BONDS........................................................................................................................ 2 5. RiGHT TO ACCEPT OR REJECT TENDERS ........................................................................ 2 6. - UNACCEPTABLE TENDERS.................. .............................................. ............................ 2 7. ABILITY AND EXPERiENCE OF TENDERER...................................................................... 2 8. PROVINCIAL SALES TAX............................................................................................... 2 9. GOODS AND SERVICES TAX (GST).................................................................................3 10. EXECUTE CONTRACT DOCUMENTS ............................................................................... 3 11. COMMENCEMENT OF WORK............................ .......................... ...................... ............. 3 12. LOCATION................... ................................................................................................ 3 13. SOILS INFORMATION AND CROSS-SECTiONS................................................................... 3 14. TENDERERS TO INVESTIGATE .......................................................................................3 15. INQUIRiES DURiNG TENDERiNG .................................................................................... 4 16. AWARD OF THE CONTRACT ..........................................................................................4 17. DEFINITION OF OWNER/AUTHORITY AND ENGINEER/CONTRACT ADMINISTRATOR........... 4 18. ADDENDA..................... ..... ......................................................................................... 4 19. UTILITIES.................................... .............. ..................................... ....... ...................... 4 20. TENDER OPENING MEETING ......................................................................................... 5 I I I I I I I I I I I I I I I I I I I PAGE ONE INSTRUCTIONS TO TENDERERS CONTRACT NO. CL2005-27 1. GENERAL SEALED Tenders plainly marked "Contract No. CL2005-27 " will be received until: 2:00:00 P.M., LOCAL TIME, FRIDAY, JUNE 24, 2005 and shall be addressed to: Mrs. Patti Barrie, Clerk Corporation of the Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario. LIC 3A6 2. BLANK FORM OF TENDER One copy of the Tender, on the forms provided, shall be submitted. All information requested shall be shown in the tender, in the space provided. 3. TENDER DEPOSITS All tenders shall be accompanied by a certified cheque or a bid bond in the minimum amount defined below, made payable to the Authority, as a guarantee for the execution of the Contract. Total Tender Amount Minimum Deposit Required $ 20,000.00 or less $1,000.00 20,000.01 to 50,000.00 2,000.00 50,000.01 to 100,000.00 5,000.00 100,000.01 to 250,000.00 10,000.00 250,000.01 to 500,000.00 25,000.00 500,000.01 to 1,000,000.00 50,000.00 1,000,000.01 to 2,000,000.00 100,000.00 2,000,000.01 and over 200,000.00 All deposits will be returned within ten days after the Tenders have been opened except those which the Authority elects to retain until the successful tenderer has executed the Contract Documents. The retained tender deposits will be returned when the successful Tenderer has fully complied with the conditions outlined in the Contract Documents. I I I I I I I I I I I I I I I 8 I I I INSTRUCTIONS TO TENDERERS CONTRACT NO. CL2005-27 2. 4. BONDS The Contractor is required to provide a Performance Bond, and a Labour and Material Payment Bond, each in an amount equal to 100 percent of the Total Tender Amount, to guarantee his faithful performance of this Contract and his fulfillment of all obligations in respect of maintenance and payment for labour and materials used on this work. Each Bond shall be with a satisfactory Guarantee Surety Company, resident in Canada or authorized to carry on business in Canada. An Agreement to Bond must be submitted with the tender bid. Bonding company standard . Agreement to Bond" forms are acceptable. 5. RIGHT TO ACCEPT OR REJECT TENDERS The Authority reserves the right to reject any or all tenders or to accept any tender should it be deemed to be in its best interest to do so. Tenders which are incomplete, conditional or obscure, or which contain additions not called for, erasures, alterations, or irregularities of any kind, may be rejected as informal. Tenders will not be accepted unless submitted in the envelopes provided. 6. UNACCEPTABLE TENDERS Each item in the Tender Form shall include a reasonable price for such item. Under no circumstances will an unbalanced tender be considered. The Authority and the Contract Administrator will be the sole judge of such matters, and should any tender be considered to be unbalanced, then it will be rejected by the Authority. 7. ABILITY AND EXPERIENCE OF TENDERER The Authority reserves the right to reject any tender where satisfactory evidence of sufficient capital, plant and experience to successfully prosecute and complete the work in the specified time, is not furnished by the Tenderer. 8. PROVINCIAL SALES TAX Provincial Retail Sales Tax shall be included in tendered prices for material supplied under this Contract. I I I I I I I I I I I I I I I I I I I INSTRUCTIONS TO TENDERERS CONTRACT NO. CL200S-27 3. 9. GOODS AND SERVICES TAX (GST) The Tenderer shall NOT include any amount in his tender unit prices for the Goods and Services Tax. The GST will be shown on each payment certificate and will be paid to the Contractor in addition to the amount certified for payment and will therefore not affect the Contract unit prices. 10. EXECUTE CONTRACT DOCUMENTS Tenders shall be open for acceptance for a period of 30 days after the closing date. After this time the tender may only be accepted with the consent of the successful Tenderer. The successful Tenderer shall execute the Contract Documents and furnish the required bonds within 10 calendar days of receipt of notification of Acceptance of Tender. Failure by the successful Tenderer to meet the above requirements will entitle the Authority to cancel the award of the Contract and to retain the tender deposit as compensation for damages sustained due to the successful Tenderer's default. The Authority may then award the Contract to one of the other Tenderers or take such other action as it chooses. 11. COMMENCEMENT OF WORK The successful Tenderer shall commence work at the site within 7 calendar days of the official commencement date as specified in the written order issued in accordance with GC7. 0 1. 02 of the General Conditions. 12. LOCATION The location for works for this contract is scattered throughout the Municipality, but the majority of the work is in Courtice, Bowmanville, Newcastle and Orono. All sites are identified on Map No. I. 13. SOILS INFORMATION AND CROSS-SECTIONS No geotechnical investigation or design cross-sections have been prepared for this Contract. 14. TENDERERS TO INVESTIGATE Tenderers must satisfy themselves by personal examination of the site and by such other means as they may prefer as to the actual conditions and requirements of the work. I I I I I I I I I I I I I I I I I I I INSTRUCTIONS TO TENDERERS CONTRACT NO. CL2005-27 4. The Tenderer shall carefully examine all plans and profiles so that the unit prices tendered are commensurate with the nature of the work. It shall be the Contractor's responsibility to thoroughly inspect the site of the proposed works, determine the location of any buried or obstructing services and make satisfactory arrangements for interference with such service with the proper jurisdictional agency. 15. INQIDRlES DURING TENDERING The Tenderer is advised that inquiries regarding the interpretation of the plans or specifications, shall be directed to the Contract Administrator, TSH, Telephone: 905-372-2121, attention: Ron Albright, P.Eng. 16. AWARD OF THE CONTRACT The award of this Contract is subject to the approval of Municipality of Clarington. 17. DEFINITION OF OWNER/AUTHORITY AND ENGINEER/CONTRACT ADMINISTRATOR Wherever the word "Owner" or "Authority" or "Corporation" appears in this Contract, it shall be interpreted as meaning the "Corporation of the Municipality of Clarington" . Wherever the word "Ministry", "M.T.C." or "M.T.O" appears it shall be deemed to mean the "Ministry of Transportation, Ontario" or the "Corporation of the Municipality of Clarington". Wherever the word "Contract Administrator" or "Engineer" appears in this Contract it shall be deemed to mean the Consultants, Totten Sims Hubicki Associates, or such other officers, as may be authorized by the Authority to act in any particular capacity. 18. ADDENDA The Contractor shall ensure that all addenda issued during the tendering period are attached as part of the submitted bid. Failure to do so will result in disqualification of the bid. 19. UTILITIES For additional information regarding existing utilities the Contractor may contact the following personnel: Vendian Hydro: Mr. Peter Petriw, P.Eng. Tel: (888)-445-2881 I I I I I I I I I I I I I I I I I I I INSTRUCTIONS TO TENDERERS CONTRACT NO. CL2005-27 5. Bell Canada: Ms. Kimberly MacLellan Tel: (905) 433-3034 Enbridge/Consumers Gas: Mr. Frank Cholewa Tel: 800-361-0621 Ext: 2672 Cable TV Ms. Cindy Ward Tel: 905-436-4138 Hydro One Mr. Jim Hisson Tel: (905) 623-1071 20. TENDER OPENING MEETING The tender opening meeting is scheduled to take place at 2:15:00 P.M. after the closing time and date in Meeting Room No. I, Main Floor, 40 Temperance Street, Bowmanville, Ontario and interested bidders are invited to attend. I I I I I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARINGTON CONTRACT NO. CL2005-27 SPECIAL PROVISIONS - GENERAL P/12-29383/Specs/2Q987-SPG .doc I I I I I I I I I I I I I I I I I I I INDEX SPECIAL PROVISIONS-GENERAL CONTRACT NO. CL200S-27 CLAUSE SUBJECT PAGE I. GUARANTEED MAINTENANCE ............................................................... ..........1 2. CONTRACT TIME AND LIQUIDATED DAMAGES ..................................................1 3. CONTRACTOR'S AUTHORIZED REPRESENTATlVE...............................................2 4. OPS GENERAL CONDITIONS............................................................. .................2 5. LAyOUT..... ..... ................................ .................................. ................ .............2 6. RESTRICTIONS ON OPEN BURNING....................................................................2 7 . PAYMENTS... ......................... ............... ........................ ...... ......... ...................2 8. UTILITIES .... ........................ .................................. ... ............. ....................... ..3 9. DUST CONTROL............. ............ ............ .......... ........ ........................... ............3 10. TRAFFIC CONTROL, FLAGGING ........................................................................4 11. CONTRACTOR'S SUPPLY OF CONSTRUCTION SIGNS............................................4 12. MAINTENANCE OF TRAFFIC.............................................................................5 13. EMERGENCY AND MAINTENANCE MEASURES...................................................5 14. ENGINEERING FIELD OFFICE.......... .... ......... ..................... ........ ...... ............. .....5 15. MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL .......................................5 16. OCCUPATIONAL HEALTH AND SAFETY ACT 1991 - DESIGNATED SUBSTANCES .....6 17. WORKPLACE HAZARDOUS MATERIAL INFORMATION SYSTEM (WHMIS) ..............7 18. SPILLS REPORTING......... ............. ....... ..... ......... ..... .... .................... ..................7 19. PROTECTION OF WATER QUALlTY....................................................................7 20. TRAFFIC AND STREET SIGNS ............................................................................8 21. GARBAGE COLLECTION........... ........................................................................ 8 22. ASPHALT MIX DESiGNS.................................. ........................ ... ............. ..... .....8 23. DELIVERY OF TEST SAMPLES...........................................................................9 24. ENTRY ONTO PRIVATE PROPERTY ....................................................................9 25. STORAGE AREAS..... ..................................................... ...................................9 26. GENERAL LIABILITY INSURANCE .....................................................................9 27. CONSTRUCTION LIEN ACT ...............................................................................9 28. PROPERTY OWNER'S RELEASE OF PRIVATELY OWNED LAND USED BY THE CONTRACTOR.................................... ...................................... ..................... II SCHEDULE(C)-CONTRACTORSAFETY I I I I I I I I I I I I I I I I I I I PAGE ONE SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL2005-27 1. GUARANTEED MAINTENANCE Section GC7 .15.02 of the General Conditions is revised in that the Contractor shall guarantee and maintain the entire work called for under this Contract for a period of twenty-four (24) months. The Contractor shall make good in a permanent manner, satisfactory to the Authority, any and all defects or deficiencies in the work, both during the construction and during the period of maintenance as aforesaid. The Contractor shall commence repairs on any work identified as defective under this clause within 48 hours of receipt of notice from the Authority or the Contract Administrator. The decision of the Authority and the Contract Administrator shall be final as to the necessity for repairs or for any work to be done under this Section. 2. CONTRACT TIME AND LIQUIDATED DAMAGES (1) Time Time shall be the essence of this Contract. For purposes of this Contract, GC 1.04 of the General Conditions is revised, in that Contract Time means the time stipulated herein for Completion of the Work as defined in Clause GC1.06. (2) Progress of the Work and Contract Time The Contractor shall accomplish completion of this Contract as defined in GC 1.06 of the General Conditions on or before September 30, 2005. If the contract time above specified is not sufficient to permit completion of the work by the Contractor working a normal number of hours each day or week on a single daylight shift basis, it is expected that additional and/or augmented daylight shifts will be required throughout the life of the contract to the extent deemed necessary by the Contractor to insure that the work will be completed within the contract time specified. Any additional costs occasioned by compliance with these provisions will be considered to be included in the prices bid for the various items of work and no additional compensation will be allowed therefore. (3) Liquidated Damages It is agreed by the parties to the contract that in case all the work called for under the contract is not completed by the date specified, or as extended in accordance with Section GC3.07 of the General Conditions, a loss or damage will be sustained by the Authority. Since it is and will be impracticable and extremely difficult to ascertain and determine the actual loss or damage which the Authority will suffer in the event of and by reason of such delay, the parties hereto agree that the Contractor will pay to the Authority the sum of FIVE I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL200S-27 2. HUNDRED DOLLARS ($500.00) as liquidated damages for each and every calendar day's delay in achieving completion of the work beyond the date prescribed. It is agreed that this amount is an estimate of the actual loss or damage to the Authority which will accrue during the period in excess of the prescribed date for completion. The Authority may deduct any amount under this paragraph from any moneys that may be due or payable to the Contractor on any account whatsoever. The liquidated damages payable under this paragraph are in addition to and without prejudice to any other remedy, action or other alternative that may be available to the Authority. 3. CONTRACTOR'S AUTHORIZED REPRESENTATIVE Authorized representative as referenced in GC7. 0 1. 09 is defined as an employee of the Contractor. 4. OPS GENERAL CONDmONS Wherever in this Contract reference is made to the General Conditions, it shall be interpreted as meaning the OPS General Conditions of Contract, September 1999. 5. LAYOUT Section GC7.02, Layout, is hereby revised by the deletion of Parts 03), 04), 05), and 06), and by the addition of the following: The Contract Administrator shall identify the creek locations as shown on Map No. I and described in the breakdown sheets. 6. RESTRICTIONS ON OPEN BURNING Open fires will not be permitted within the limits of this Contract. Brush and debris may as an alternative to burning, be disposed of outside the Contract Limits and in compliance with the requirements specified elsewhere for Management and Disposal of Excess Material. 7. PAYMENTS Except as herein provided, payments under this Contract will be made in accordance with Section GC8.02.03 of the General Conditions. Notwithstanding the provisions of the General Conditions respecting certification and payment, the Authority may withhold 2-1/2 percent of the total value of work performed beyond the expiration of 46 days from the date of publication of the Certificate of Substantial Performance, to enable the Contract Administrator to produce the final detailed statement of the value of all work I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL2005-27 3. done and material furnished under the Contract. As a condition of holdback reduction from 10 % to 2-1/2%, the Contractor shall supply a Statutory Declaration as defined in GC8.02.03.07 03)(b) and advertise the Certificate of Substantial Performance per GC8.02.03.04(03). The Completion Payment Certificate to include statutory holdback release, will be issued within 120 days after the date for completion as specified under GC1.06. The date for interest due to late payment shall commence following 180 days after the date of completion of the work. As a condition of the final holdback payment, the Contractor shall provide the required Property Owner's Releases as specified elsewhere, as appropriate. The Contractor shall include in his price for the publication of the Certificate of Substantial Performance. Publication is mandatory whether Contractor requests Substantial Performance or not. The Contractor is advised that the Authority may withhold payment on Interim and Holdback Release Certificates up to 30 calendar days from the date of receipt of the executed Payment Certificates. 8. UTILITIES Sections GC2.01 and GC7 .12 02) of the General Conditions are deleted in their entirety and are replaced by the following: The Contractor shall be responsible for the protection of all utilities at the job site during the time of construction. The Authority will be responsible for the relocation of utilities where required. However, no claims will be considered which are based on delays or inconvenience resulting from the relocation not being completed before the start of this Contract. The location and depth of underground utilities shown on the Contract drawings, are based on the investigations made by the Authority. It is, however, the Contractor's responsibility to contact the appropriate agencies for further information in regard to the exact location of all utilities, to exercise the necessary care in construction operations and to take such other precautions as are necessary to safeguard the utilities from damage. 9. DUST CONTROL As a part of the work required under Section GC7.06 of the General Conditions, the Contractor shall take such steps as may be required to prevent dust nuisance resulting from his operations either within the right-of-way or elsewhere or by public traffic where it is the Contractor's responsibility to maintain a roadway through the work. Where the work requires the sawing of asphalt or the sawing or grinding of concrete, blades and grinders of the wet type shall be used together with sufficient water to prevent the incidence of I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL200S-27 4. dust, wherever dust would affect traffic or wherever dust would be a nuisance to residents of the area where the work is being carried out. I I I I I I I I I I I I I I I The cost of all such preventative measures shall be borne by the Contractor except however where water or calcium chloride is used to reduce the dust caused by traffic on a roadway which it is the Contractor's responsibility to maintain for public traffic, the cost of such quantities of water and calcium chloride as are authorized by the Contract Administrator to restrict dust to acceptable levels, shall be paid for by the Authority at the contract prices for Application of Water or Application of Calcium Chloride. 10. TRAFFIC CONTROL, FLAGGING Flagging for traffic control on this Contract shall be in conformance with the procedure outlined in OTM Book 7 (Ontario Traffic Manual). Each flagman shall, while controlling traffic, wear the following: (i) an approved fluorescent blaze orange or fluorescent red safety vest, and (ii) an approved fluorescent blaze orange or fluorescent red armband on each arm, and (iii) an approved fluorescent blaze orange or fluorescent red hat. 11. CONTRACTOR'S SUPPLY OF CONSTRUCTION SIGNS In accordance with Section GC7.06 of the General Conditions, the Contractor is responsible for the supply, erection, maintenance and subsequent removal of all temporary traffic controls, including signs, lights, barricades, delineators, cones, etc., required on the work. Traffic controls shall be provided in general accordance with the latest edition of the "OTM Book 7". As a minimum requirement and without restricting the Contract Administrator or the Authority in requiring further controls, the following signs shall be supplied: Sign Number Sign Message Number Required 4 TC-l CONSTRUCTION AHEAD Traffic controls shall be operational before work affecting traffic begins. I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL2005-27 5. 12. MAINTENANCE OF TRAFFIC The Contractor will be required to maintain traffic in both directions on the street to be crack sealed. The Contractor may wish to temporarily close one lane of traffic to facilitate construction of the improvements. 13. EMERGENCY AND MAINTENANCE MEASURES Whenever the construction site is unattended by the general superintendent, the name, address and telephone number of a responsible official of the contracting firm, shall be given to the Contract Administrator. This official shall be available at all times and have the necessary authority to mobilize workmen and machinery and to take any action as directed by the Contract Administrator in case emergency or maintenance measures are required regardless whether the emergency or reqnirement for maintenance was caused by the Contractor's negligence, act of God, or any cause whatsoever. Should the Contractor be unable to carry out immediate remedial measures required, the Authority will carry out the necessary repairs, the costs for which shall be charged to the Contractor. 14. ENGINEERING FIELD OFFICE A separate field office for the Contract Administrator will not be required on this Contract. The Contractor shall, however, permit the Contract Administrator to make use of his office accommodation and other facilities as required, and at no extra cost to the Authority. 15. MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL The requirements of OPSS 180 shall apply to this Contract, revised as follows: .1 Section 180.03, Definitions, shall be amended by the addition of the following: Work area: means the road allowance, right-of-way, and property with a boundary common to the road allowance or right-of-way within the Contract limits. .2 Subsection 180.07.02, Conditions on Management by Re-Use, shall be amended by the addition of the following: Recycled hot mix asphalt or excess bituminous pavement shall not be used as trench backfill or bedding. The Contractor shall be responsible for obtaining a copy of applicable Form Nos. OPSF 1800, OPSF 1801, OPSF 1803 and OPSF 1805 for use where appropriate with respect to disposal of excess material. I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL2005-27 6. 16. OCCUPATIONAL HEALTH AND SAFETY ACT 1991 - DESIGNATED SUBSTANCES In accordance with the requirements of Section l8a(l) of the Occupational Health and Safety Act, the Authority has determined that the designated substances as listed hereunder are present on the site and within the limits of this Contract. Designated Substance Identified on this Site Location Acrylonitrile No Arsenic No Asbestos No Benzene No Coke Oven Emissions No Ethylene Oxide No Isocynates No Lead No Mercury No Silica No Vinyl CWoride No It is the responsibility of the Contractor to ensure that all su1H:ontractors performing work under this Contract have received a copy of this specification, where Designated Substances are identified as being present at the site of the work. The Contractor shall comply with the governing Ministry of Labour Regulations respecting protection of workers, removal, handling and disposition of the Designated Substances encountered on this Contract. Prior to commencement of this work, the Contractor shall provide written notification to the Ministry of the Environment at 7 Overlea Boulevard, Toronto, Ontario, M4H lA8 of the location(s) proposed for disposal of Designated Substances. A copy of the notification shall be provided to the Contract Administrator a minimum of two weeks in advance of work starting. In the event that the Ministry of the Environment has concerns with any proposed disposal location, further notification shall be provided until the Ministry of the Environment's concerns have been addressed. All costs associated with the removal and disposition of Designated Substances herein identified, shall be deemed to be included in the appropriate tender items. I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL200S-27 7. Should a Designated Substance not herein identified be encountered in the work, then management of such substance shall be treated as Extra Work. The requirements of Section GC4.03 of the General Conditions of the Contract shall apply. 17. WORKPLACE HAZARDOUS MATERIAL INFORMATION SYSTEM (WHMIS) Reporting Section GC4. 03.06 is deleted and replaced with the following: Prior to the commencement of work the Contractor shall provide, to the Contract Administrator, a list of those products controlled under WHMIS which he expects to use on this Contract. Related Material Safety Data Sheets shall accompany the submission. All containers used in the application of products controlled under WHMIS shall be labeled. The Contractor shall notify the Contract Administrator of changes to the list in writing and provide the relevant Material Safety Data Sheets. 18. SPILLS REPORTING Spills or discharges of pollutants or contaminants under the control of the Contractor, and spills or discharges of pollutants or contaminants that are a result of the Contractor's operations that cause or are likely to cause adverse effects shall forthwith be reported to the Contract Administrator. Such spills or discharges and their adverse effects shall be as defined in the Environmental Protection Act R.S.O. 1980. All spills or discharges of liquid, other than accumulated rain water, from luminaires, internally illuminated signs, lamps, and liquid type transformers under the control of the Contractor, and all spills or discharges from this equipment that are a result of the Contractor's operations shall, unless otherwise indicated in the Contract, be assumed to contain PCB's and shall forthwith be reported to the Contract Administrator. This reporting will not relieve the Contractor of his legislated responsibilities regarding such spills or discharges. 19. PROTECTION OF WATER QUALITY At all times, the Contractor shall maintain existing stream flows and shall control all construction work so as not to allow sediment or other deleterious materials to enter streams. No waste or surplus organic material including topsoil is to be stored or disposed of within 30 metres of any watercourses. Run-off from excavation piles will not be permitted to drain directly into watercourses but shall be diffused onto vegetative areas a minimum of 30 metres I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL2005-27 8. from the watercourse. Where this measure is not sufficient or feasible to control sediment entering the watercourses, sedimentation traps or geotextile coverage will be required. If dewatering is required, the water shall be pumped into a sedimentation pond or diffused onto vegetated areas a minimum of 30 metres from the watercourses and not pumped directly into the watercourses. No machinery shall enter the creek bed of any watercourse. Movement of construction equipment in the vicinity of any creeks shall be limited to the minimum required for construction. The Contractor shall not carry out equipment maintenance or refuelling or store fuel containers within 100 metres of any watercourse. The Contractor shall not stockpile construction debris or empty fuel/pesticide containers within the Contract limits. 20. TRAFFIC AND STREET SIGNS The Contractor will be responsible for the removal and salvage of existing traffic and street signs, and their delivery to the Authority's Works Department Yard, for re-erection by the Authority following completion of the work. Scheduling for sign removal shall be as approved in advance by the Contract Administrator. Regulatory signs such as "Stop" and "Yield" must be maintained throughout. 21. GARBAGE COLLECTION The Contractor will be responsible for ensuring that garbage collection, including recyclables, is maintained and when necessary, the Contractor shall make arrangements directly with the collecting agency, to permit and coordinate pick-up. Garbage pick-up is handled by Canadian Waste Services, at 1-800-789-8886. Recyclable material is handled by Miller Waste Systems at I -800-46 I - I 582. 22. ASPHALT MIX DESIGNS The Contractor shall be responsible for the provision of current mix designs for all hot mix asphalt required for the work, or for having the necessary mix designs prepared by a certified laboratory. The mix designs proposed for use by the Contractor shall be submitted in writing to the Contract Administrator for his approval and no work shall commence until the design mixes are approved. All costs associated with the provision of approved mix designs shall be borne by the Contractor. Steel slag and blast furnace slag coarse and fine aggregates shall not be used in any hot mix required by this Contract. I. I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL2005-27 9. 23. DELIVERY OF TEST SAMPLES The Contractor shall include in his tender prices for the cost of delivery of asphalt samples to a designated testing laboratory. For this contract the designated testing laboratory is Golder Associates, Whitby. 24. ENTRY ONTO PRIVATE PROPERTY The Contractor shall not enter private property or property which is to be acquired to construct the works without the prior consent of the Contract Administrator. This requirement will be strictly enforced. 25. STORAGE AREAS Clause GC3.06.0l of the General Conditions of Contract is amended by the addition of the following: The use of the road right-of-way as a long term storage area is not allowed under this Contract. The storage of materials and movement of equipment will only be allowed for normally accepted construction practices. 26. GENERAL LIABILITY INSURANCE Parties to the Contract beyond the Contractor, the Owner and the Contract Administrator must be added as additional insureds (See Clause GC6.03.02.01). 27. CONSTRUCTION LIEN ACT The Contractor shall give the Authority notice in writing, immediately, of all lien claims or potential lien claims coming to the knowledge of the Contractor or his agents. When a claim for lien is filed by a Subcontractor, labour or material supplier or equipment renter acting under the Contractor, and proceedings are commenced by the Authority to vacate the lien, the Contractor agrees and shall forthwith pay to the Authority, in addition to their reasonable legal fees therefore, all interest costs and expenses incurred by the Authority and an additional sum equal to ten percent (10%) of the sum found to be owing as liquidated damages, and such remedy shall be in addition to any other remedy available to the Authority under the Contract Documents. Where any lien claimant asks from the Authority the production for inspection of the Contract Documents or the state of the accounts between the Authority and the Contractor, the Contractor shall be liable for an administration fee of Two Hundred Dollars ($200.00) for each request made as compensation for the preparation of such accounting or for the preparation of the Contract, or both, as the case may be, and the Contractor acknowledges that such administrative fee shall be I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL200S-27 10. properly deductible, if the Authority should so choose, from monies otherwise payable to the Contractor under the terms of the Contract Documents. Where an application is brought to a judge of a competent jurisdiction to compel production of any particular document to a lien claimant, the Contractor further agrees to indemnify the Authority from reasonable legal fees incurred in appearing on such an application and in addition agrees to pay to the Authority its reasonable costs incurred in producing such documents to the extent that the same is made necessary under the disposition of the matter by such judge, and the Contractor further agrees that such reasonable costs and fees incurred by the Authority as stated herein may be properly deductible from monies otherwise payable to the Contractor under the terms of the Contract Documents. II I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - GENERAL CONTRACT NO. CL2005-27 II. 28. PROPERTY OWNER'S RELEASE OF PRIVATELY OWNED LAND USED BY THE CONTRACTOR Upon completion of the Contract, the Contractor shall provide the Authority with two (2) copies of a form of release signed by each property owner, upon whose land he has entered for purposes associated with the Contractor's operations but not for the purpose of undertaking works stipulated in the Contract: Date ....................... To: Re: Contract No. CL2005-27 Dear I hereby certify that (Name of Contractor) have fulfilled the terms of our agreement and have left my property in a satisfactory condition. I have accepted their final payment and release (Name of Contractor) and the Municipality of Clarington from further obligations. Yours very truly, Signature Property Owner's Name........................... . Lot. . ....Concession.......... Municipality of ........................................ (Please complete above in printing) Final payment will not be released to the Contractor until all the applicable forms of release have been signed by the property owners and received by the Authority. I I I I I I I I I I I I I I I I I I I SCHEDULE (C) CONTRACTOR SAFETY POLICY AND PROCEDURE POLICY: Contractors and Sub-contractors are responsible to ensure that their personnel are updated on all safety concerns of the workplace and are aware of the safety requirements as required by the Contractor under the Occupational Health and Safety Act. Safety performance will be a consideration in the awarding of contract. Under the Occupational Health and Safety Act (Section 23 (1), (2)), it is the constructor's responsibility to ensure that: . the measures and procedures prescribed by the Occupational Health and Safety Act and the Regulations are carried out on the proiect; . every employer and every worker performing work on the proiect complies with the Occupational Health and Safety Act and the Regulations (under the Act); and . the health and safety of workers on the proiect is protected. . Where so prescribed, a constructor shall, before commencing any work on a project, give to a Director notice in writing of the project containing such information as may be prescribed. DEFINITIONS: Contractor - any individual or tinn engaged by the Municipality to do work on behalf of the Municipality. Project - means a construction project, whether public or private, including, . the construction of a building, bridge, structure, industrial establishment, mining plant, shaft tunnel, caisson, trench, excavation, highway, railway, street, runway, parking lot, cofferdam, conduit, sewer, watermain, service connection, telegraph, telephone or electrical cable, pipe line, duct or well, or any combination thereof, . the moving of a building or structure, and . any work or undertaking, or any lands or appurtenances used in connection with construction. Construction - includes erection, alteration, repair, dismantling, demolition, structural maintenance, painting, land clearing, earth moving, grading, excavating, trenching, digging, boring, drilling, blasting, or concreting, the installation of any machinery or plant, and any work or undertaking in connection with a project. I I I I I I I I I I I I I I I I I I I SCHEDULE(C CONTRACTOR SAFETY POLICY AND PROCEDURE Continued... Constructor- means a person who undertakes a project for an owner and includes an owner who undertakes all or part of a project by himself or by more than one employer. Project Manager- means the municipal management representative who has responsibility for a contract. PROCEDURE: The following items are required before any Contractors are hired by the Municipality. a) Before beginning a project, the project manager or delegate must determine whether any designated substances/hazardous materials are (or will be) present at the site and prepare a list of all these substances. b) The project manager or delegate must include, as part of the request for tender/quotations, a copy of the above-mentioned list. The list of designated substances/hazardous materials must be provided to all prospective constructors and/or contractors. c) The request for tender/quotations will require prospective contractors to include a list of the designated substances/hazardous materials that will be brought onto the work site and material safety data sheets. d) Before awarding a contract, contractor(s) will be required to complete and sign the Health and Safety Practice Form (Schedule "A"). The Purchasing Office will maintain all contractors safety performance records. e) As part of the tender/quotation conditions, before award of a contract, the contractor will be required to provide proof that all workers involved with the project have the proper WHMIS training, as required by the Occupational Health and Safety Act. f) As part of the tender/quotation conditions, before award of a contract, the contractor must provide details of their Health and Safety program. g) The project manager or delegate must provide the successful contractor with a workplace orientation, which will include, but not limited to identifying known potential hazards, hazardous material inventory and material safety data sheets for the sites. A workplace orientation/Job Safety Instruction Checklist to be completed (see Compliance page 9). h) Before the start of the assignment, the following documentation will be provided to the successful contractor, by the project manager or delegate. i) Copies of the Municipal Corporate Health and Safety Program Ii) Departmental health and safety policies iii) Workplace procedures regarding health and safety practices. I I I I I I I I I I I I I I I I I I I SCHEDULE (C) CONTRACTOR SAFETY POLICY AND PROCEDURE Continued... i) The contractor has the responsibility to provide any and all prescribed personal protective equipment for their own workers, to include as a minimum but not limited to hard hats and safety boots. If a worker(s) fails to comply with any program, policy, rule or request regarding health and safety, that person(s) is not allowed on the site until the person(s) complies. j) The Municipality will retain the right to document contractors for all health and safety warnings and/or to stop any contractors' work if any of the previously mentioned items are not in compliance. Similarly, the Municipality will have the right to issue warnings and/or to stop work if there are any violations by the contractor of the Occupational Health and Safety Act, Municipal Health and Safety programs, policies, rules, and/or if the contractor creates an unacceptable health and safety hazard. Written warnings and/or stop work orders can be given to contractors using Contractor Health and Safety Warning/Stop Work Order Form (Schedule "B"). k) Where applicable, the Municipality will retain the right to allow municipal employees to refuse to work in accordance with the established policy and the Occupational Health and Safety Act, in any unsafe conditions. I) The Purchasing Department will maintain current certificates of clearance until all monies owing have been paid to the contractor. m) Responsibility for ensuring contractor compliance to this policy falls upon the project manager or designate. This will include identification, evaluation and control practices and procedures for hazards and follow-up and issuing of Contractor Health and Safety Warning/Stop Work Orders. I I I I I I I I I I I I I I I I I I I SCHEDULE (C) CONTRACTOR SAFETY POLICY AND PROCEDURE Continued... HEALTH AND SAFETY PRACTICE FORM To Contractor(s): The Municipality of Clarington is committed to a healthy and safe working environment for all workers. To ensure the Municipal workplace is a healthy and safe working environment, contractors, constructors and subcontractors must have knowledge of and operate in compliance with the Occupational Health and Safety Act and any other legislation pertaining to employee health and safety. In order to evaluate your company's health and safety experience, please provide the accident/incident and/or Workplace Safety and Insurance Board (WSIB) information noted below, where applicable. . The New Experimental Experience Rating (NEER) - The WSIB experience rating system for non-construction rate groups ............................................................................................. . The Council Amended Draft #7 (CAD-7) Rating - The WSIB experience rating system for construction rate groups ............................................................................................. . Injury frequency performance for the last two years - This may be available from the contractor's trade association ............................................................................................. . Has the contractor received any Ministry of Labour warnings or orders in the last two years? (If the answer is yes, please include the infraction). . Confirmation of Independent Operator Status - The WSIB independent operator number assigned: (Bidders to include the letter confirming this status and number from WSIB with their bid submission.) I I I I I I I I I I I I I I I I I I I SCHEDULE (C) CONTRACTOR SAFETY POLICY AND PROCEDURE Continued... CONTRACTOR'S STATEMENT OF RESPONSIBILITY As a contractor working for the Municipality of Clarington, I/we will comply with all procedures and requirements of the Occupational Health and Safety Act, Municipal safety policies, department and site specific policies and procedures and other applicable legislation or regulations. l!we will work safely with skill and care so as to prevent an accidental injury to ourselves, fellow employees and members of the public. 1. The contractor/successful tenderer certifies that it, its employees, its subcontractors and their employees, a) are aware of their respective duties and obligations under the Occupational Health and Safety Act, as amended from time to time, and all Regulations thereunder (the "Acf); and b) have sufficient knowledge and training to perform all matters required pursuant to this contracUtender safely and in compliance with the Act. 2. In the performance of all matters required pursuant to this contracUtender, the contractor/successful tenderer shall, a) act safely and comply in all respects to the Act, and b) ensure that its employees, it subcontractors and their employees act safely and complying all respects with the Act. 3. The contractor/successful tenderer shall rectify any unsafe act or practice and any non-compliance with the Act at its expense immediately upon being notified by any person of the existence of such act, practice or non-compliance. 4. The contractor/successful tenderer shall permit representatives of the Municipality and the Health and Safety Committee on site at any time or times for the purpose of inspection to determine compliance with this contractor/tender. 5. No act or omission by any representative of the Municipality shall be deemed to be an assumption of any of the duties or obligations of the contractor/successful tenderer or any of its subcontractors under the Act. 6. The contractor/successful tenderer shall indemnify and save harmless the Municipality, a) from any loss, inconvenience, damage or cost to the Municipality which may result from the contractor/successful tenderer or any of its employees, its subcontractors or their employees failing to act safely or to comply in all respects with the Act in the performance of any matters required pursuant to this contract/tender; I I I I I I I I I I I I I I I I I I I SCHEDULE (C) CONTRACTOR SAFETY POLICY AND PROCEDURE Continued... b) against any action or claim, and costs related thereto, brought against the Municipality by any person arising out of any unsafe act or practice or any non-compliance with the Act by the contractorlsuccessfultenderer or any of its employees, its subcontractors or their employees in the performance of any matter required pursuant to this contract/tender; and c) from any and all charges, fines, penalties, and costs that may be incurred or paid by the Municipality (or any of its council members or employees) shall be made a party to any charge under the Act in relation to any violation of the Act arising out of this contract/tender. ROADMASTER ROAD CONSTRUCTION & SEALING LTD. PATRICIA RYDER ............................................................................................................................ C. ontr actor .. "'-J Name of Person Signing for Contractor /........, /. ! j / ~~t~~~r~........................................~.e~.~......~~.'...~~~:...D~i~.. I I I I I I I I I I I I I I I I I I I SCHEDULE (C) CONTRACTOR SAFETY POLICY AND PROCEDURE Continued... Schedule "B" CONTRACTOR HEALTH AND SAFETY WARNING/STOP WORK ORDER The purpose of this form is to: (Issuer to check one of the following) Provide warning to the contractor to immediately discontinue the unsafe work practice described below Direct the contractor to immediately cease all work being performed under this contract due to the unsafe work practice described below. FAILURE TO COMPLY WITH THIS WARNING/STOP WORK ORDER SHALL CONSTITUTE A BREACH OF CONTRACT. PART "A" - DETAILS OF CONTRACT CONTRACT/P.O. # DESCRIPTION: NAME OF FIRM: PART "B" - DETAILS OF INFRACTION (TO BE COMPLETED BY ISSUER) I I I I I I I I I I I I I I I I I I I SCHEDULE (C) CONTRACTOR SAFETY DATE & TIME OF INFRACTION: DESCRIPTION OF INFRACTION INCLUDING LOCATION: ORDER GIVEN BY MUNICIPALITY: DID THE CONTRACTOR COMPLY WITH THIS ORDER? DATE & TIME OF COMPLIANCE: ISSUED TO: CONTRACTOR'S EMPLOYEE TITLE ISSUED BY: MUNICIPAL EMPLOYEE, DEPARTMENT TITLE PART "C" - ADDITIONAL COMMENTS THIS SECTION IS TO BE USED INTERNALLY TO RECORD ADDITIONAL COMMENTS SUBSEQUENT TO ISSUING THE WARNING/STOP WORK ORDER, I.E. DATE AND TIME WORK RESUMED, FURTHER ACTION TAKEN, ETC. SIAdminIForms & Specs/ClaringtonlPolk:y-MOC I I I I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARINGTON CONTRACT NO. CL2005-27 SPECIAL PROVISIONS - TENDER ITEMS PI12-29383/Specs120918-SP-TI..dol.: I I I I I I I I I I I I I I I I I I I PAGE ONE SPECIAL PROVISIONS - TENDER ITEMS CONTRACT NO. CL200S-27 Note: The owner reserves the right to increase or decrease contract quantities as necessary to meet the constraints of available budget without any additional compensation or credit for the quantity charges. ROUTE AND SEAL CRACK TREATMENT - ITEM NO.1 Reference: OPSS 341 & 1212 1. General This specification covers the work of routing and cleaning cracks up to 20 mm in width in hot mix asphalt pavements and then sealing with hot-poured rubberized sealant compound. The cracks to be repaired shall be designated by the Contract Administrator as the work progresses and may be altered or varied at the discretion of the Contract Administrator. 2. Material Crack sealing material shall be hot -poured rubberized sealant conforming to 0 PSS 341 and OPSS 1212 and in compliance with ASTM designation 01190. Hot-poured rubberized sealant compound shall be obtained from a supplier listed on the Ministry of Transportation Designated Sources for Materials (Beram 195 or eqnivalent). Quality assurance test results on the rubberized sealant shall be forwarded to the Contract Administrator a minimum of one week before commencement of work. Samples of the material, for quality assurance testing, shall be taken by the Contract Administrator, as the work progresses, at the sole discretion of the Contract Administrator. Weekly samples for quality control testing shall be taken by the Contractor and results shall be forwarded to the Contract Administrator for compliance verification. Shipments of crack sealing material represented by the sample which fail in any respect to meet the requirements, as specified, may be rejected, and if rejected shall be removed from the site of the work. 3. Eauipment Heating Kettle: The heating kettle for joint sealant compound shall meet the requirements of the Ontario Fuel Safety Branch, Ministry of Consumer and Commercial Relations. I I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - TENDER ITEMS CONTRACT NO. CL200S-27 2. 4. Construction The removal and disposal of all dust and debris resulting from any operation on this contract shall take place immediately after the routing and sealing operation has been completed. Crack Routing: Cracks up to 20 mm in width shall be routed following meandering cracks, keeping the rout centreline within approximately 8 mm of the centre of the crack, and providing a rout width of 40 mm and 45 mm and a depth of 6 mm to 8 mm in a single pass. The Contractor shall demonstrate the ability to meet these tolerances. All subsequent routing shall be within these tolerances. Placing Sealant: The sealant compound shall be placed using a hose and wand fitted with proper size tip from a low pressure pump connected to the heating kettle. Cones may be used at intersections to place sealant. Sweeping: The use of a mechanical sweeper will be required on urban roads to clean the road surface in order to remove millings from the road surface that may result from the crack routing operation. Sweeping will be required to be conducted within one to two days of the crack routing and sealing operation. The use of the mechanical sweeper will not be required on two lane rural roads, but may be required on wider rural pavement widths (i.e. three lane, four lane or greater). 5. Measurement for Payment Measurement for payment shall be measured in linear metres along the routed and sealed crack, as determined by the Contract Administrator. Measurement shall be made using a metering wheel. 6. Basis of Pavrnent Under the bid unit price for this Item shall include compensation in full for the mobilization/demobilization, traveling between site locations, Traffic Control and supply of all labour, equipment and material required to conduct all aspects of work relating to the crack treatment operations including mechanical sweeping where required. No additional payment will be made for sealant which flows down into the crack below the rout. II I I I I I I I I I I I I I I I I I I SPECIAL PROVISIONS - TENDER ITEMS CONTRACT NO. CL200S-27 3. GRIND AND FILL CRACK REPAffi - ITEM NO.2 At locations identified by the Contract Administrator, where the crack width exceeds 20 nun, 40 nun of existing pavement shall be removed for a width of l50 nun to 300 nun along the plane of the cracks. See crack repair detail (Figure No. l). The surface of the asphalt within the l50 nun to 300 nun width shall be cleaned of all debris and filled with hot mix H.L.-3 surface course asphalt flush with the adjacent top asphalt. This treatment applies to transverse and longitudinal meander cracks. Crack locations requiring the grind and fill treatment will be confirmed by the Contract Administrator prior to undertaking crack repair. I I I I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARINGTON CONTRACT NO. CL200S-27 STANDARDS pavement surface ,40.to 50mm I Hot poured rubberized asphalt sealant compound FLUSH FILL OF CRACKS WITHOUT OVERLAY Existing pavement 2 to 4mm surface 40 to 50mm I I Overfill, Note 1 min Hot poured rubberized asphalt sealant compound OVERFILL OF CRACKS WITHOUT OVERLAY Overlay surface o N L4 to 6mm Existing pavement surface Hot poured rubberized asphalt sealant compound 20 CRACKS WITH ASPHALT OVERLAY NOTE: 1 Final overfill geometry after cooling of sealant material. A All dimensions are in millimetres unless otherwise shown. ONTARIO PROVINCIAL STANDARD DRAWING ROUTING AND SEAUNG CRACKS UP TO 20mm IN WIDTH IN ASPHALT PAVEMENT Nov 2004 ---------- OPSD - 508.010 I I I I I I I I I I I I I I I I I I I PROJECT: EXISTING ASPHALT SURFACE 150mm TO 300mm WIDTH MUNICIPALITY OF CLARINGTON 2005 CRACK SEALING PROGRAM No. DATE BY 40mm COLD MILLING BACKFILL WITH HOT MIX HL3 COMPACTED TO Omm TO 5mm FROM ADJACENT SURFACE ASPHALT ISSUES I REVISIONS DRAWN BY: CHECKED BY: PROJECT No. : ~ ~ 12-29483 ~ L.MAY R. ALBRIGHT T DESIGNED BY: APPROVED BY: DRAWING No. ~ 5< R. ALBRIGHT R. ALBRIGHT 1 ~ SCALE, DA TEo f 1:2.5 JUNE 2005 f ~TIH engineers architects planners TotIIn SirM Hub6dd AnocliI6eI (1887 lid. DRAWING: GRIND AND FILL CRACK REPAIR I I I , I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARINGTON CONTRACT NO. CL200S-27 QUANTITY BREAKDOWN SHEETS I I I I I I I I I I I I I I I I I I I CL2005-27 QUANTITY BREAKDOWN SHEETS ROUT AND SEAL CRACK REPAIR Bowmanville Apple Blossom Blvd Mearns A v Concession St 350 Bowmanville Bonnycastle Dr Aspen Springs Dr Vailmeadows Cr 650 Bowmanville Bradshaw St Concession St North End Cul-de-Sac 110 Bowmanville Camp ling Ct Apple Blossom Blvd East End Cul-de-Sac 20 Bowmanville Chance Ct Kershaw St East End Cul-de-Sac 30 Bowmanville Chandler Ct Bonnycastle Dr East End Cul-de-Sac 110 Bowmanville Church St Scugog St Temperance St 1,010 Bowmanville Church St Temperance St Liberty St 170 Bowmanville Clarington Blvd Prince William Dr Uptown A v 130 Bowmanville Edgerton Dr Kershaw St Apple Blossom Blvd 110 Bowmanville Elephant Hill Dr Ireland St North End Temporary Cul-de-Sac 120 Bowmanville Faircombe Cr Apple Blossom Blvd Apple Blossom Blvd 120 Bowmanville Flaxman A v Kershaw St Mearns Av 60 Bowmanville Glanville Cr Herriman St Apple Blossom Blvd 60 Bowmanville Glen Ray Ct Bonnycastle Dr East End Cul-de-Sac 70 Bowmanville Hartwell A v Martin Rd - Reg Rd 57 Bonnycastle Dr 160 Bowmanville Ireland St Elephant Hill Dr East End Turning Circle 80 Bowmanville Kershaw St Concession St Appleblossom Blvd 120 Bowmanville King St E Liberty St - Reg Rd 14 Frank St 540 Bowmanville King St W Ontario St Liberty St - Reg Rd 14 700 Bowmanville King St W Martin Rd - Reg Rd 57 Roenigk Dr 900 Bowmanville Maconnachie PI Apple Blossom Blvd West End Cul-de-Sac 40 Bowmanville Mann St Appleblossom Blvd Concession ST 120 Bowmanville McFeeters Cr 200m N of Soper Creek Dr 210m W of Soper Creek Dr 85 Bowmanville McFeeters Cr 210m W of Soper Creek Dr Soper Creek Dr 65 Bowmanville Mearns A v FlaxmanAv King Street 2,120 Bowmanville Soper Creek Dr Downham Rd Concession St 140 Bowmanville Tilley Rd Apple Blossom Blvd West End Temporary Cul-de-Sac 30 Bowmanville Tucker Rd Apple Blossom Blvd Mann St 60 Bowmanville Vail meadows Cr Bonnycastle Dr Bonnycastle Dr 260 Bowmanville Wilmot Creek Rd Bennett Rd East End Turnaround 620 Courtice Avondale Dr Trolls Rd Sandringham Dr 375 Courtice Barker Ct Tucker Rd North End Cul-de-Sac 60 Courtice Beechnut Cr Sandringham Dr Sandringham Dr 140 Courtice Birchfield Ct Hartfield Dr East End Cul-de-Sac 140 Courtice Birchfield Dr Centerfield Dr Oakfield Gate 330 Courtice Birchfield Dr Oakfield Gate Hartfield Dr 200 Courtice Brownstone Cr Avondale Dr Weaver St 200 Courtice Bruntsfield St Glen Abbey Dr Bloor St - Reg Rd 22 125 Courtice Centerfield Dr Varcoe Rd Nash Rd 400 Courtice Circlefield Ct Centerfield Dr West End Cul-de-Sac 20 Courtice Claret Rd Prestonvale Rd Sandringham Dr 40 Courtice Cloverfield St Centerfield Dr Birchfield Dr 300 Courtice Found Ct Glenabbey Dr East End Cul-de-Sac 20 Courtice Glenabbev Dr Townline Rd S - ReI!: Rd 55 Bruntsfield St 300 Page 1 of 3 pages I I I I I I I I I I I I I I I I I I I CL2005-27 QUANTITY BREAKDOWN SHEETS ROUT AND SEAL CRACKREPMR Courtice Glenabbey Dr Bruntsfield St Prestonvale Rd 425 Courtice Glenabbey Dr Sandringham Dr South End Temporary Cul-de-Sac ( 90 Courtice Granary Ln Brownstone Cr Sandringham Dr 25 Courtice Granville Dr Sandringham Dr Y orkville Dr 40 Courtice Halstead Rd Hatheway Dr Whitecliffe Dr 200 Courtice Hartfield Dr Varcoe Rd Centrefield Dr 300 Courtice Hatheway Dr Robert Adams Dr Whitecliffe Dr 125 Courtice Hearthstone Cr Weaver St Weaver St 35 Courtice Herriman St Apple Blossom Blvd Mann St 60 Courtice HilIhurst Cr Sandringham Dr Sandringham Dr 190 Courtice Homefield Sq Birchfield Dr Homefield Sq 300 Courtice Inglis A v Yorksville Dr Inglis Ct 60 Courtice Inglis Ct Inglis Av West End Cul-de-Sac 10 Courtice Lyndale Cr Sandringham Dr Sandringham Dr 255 Courtice Newport A v Auburn Ln Pebble Beach Dr 400 Courtice Oakfield Gate Varcoe Rd Birchfield Dr 100 Courtice Oke Rd Glenabbey Dr South End Temporary Cul-de-Sac 90 Courtice Parklawn Dr Stuart Rd Sandringham Dr 120 Courtice Pebble Beach Dr Pinedale Cr Auburn Ln 300 Courtice Phair Av Prestonvale Rd East End (Drwy #34) 50 Courtice Pinedale Cr Glen Abbey Dr North End 450 Courtice Poppyfield Dr Centerfield Dr East End 20 Courtice Prestunvale Rd Highway 2 Phair A v 400 Courtice Renwick Rd Whittaker Rd Robert Adams Dr 102 Courtice Robert Adams Dr Mulholland St Glen Abbey Dr 600 Courtice Robert Adams Dr Prestonvale Rd Mulholland Ct 500 Courtice Saddlebrook Ct Robert Adams Dr South End Cul-de-Sac 75 Courtice Sandringham Dr West End Courtice Rd 340 Courtice Sandringham Dr Trulls Rd Highway 2 1,150 Courtice Sandringham Dr Trulls Rd East End (30 m E of Granary Ln) 60 Courtice Stephen Av Strathallan Dr Stuart Rd 70 Courtice Stirling Av Sandringham Dr Stuart Rd 70 Courtice Strathallan Dr Trulls Rd Sandringham Dr 408 Courtice Stuart Rd Sandringham Dr Stirling Av 300 Courtice Summerlea Ct Bruntsfield St West End Cul-de-Sac 85 Courtice Trulls Rd Highway 2 Nash Rd 540 Courtice Trulls Rd Nash Rd George Reynolds Dr 900 Courtice Turnberry Cr Glen Abbey Dr Bruntsfield St 500 Courtice Varcoe Rd Centrefield Dr Nash Rd 875 Courtice Weaver St Avondale Dr Brownstone Cr 40 Courtice Whitecliffe Dr Robert Adams Dr South End Cul-de-Sac 500 Courtice Windham Cr Sandringham Dr Parklawn Dr 120 Courtice Yorkville Ct Y orksville Dr North End Cul-de-Sac 60 Courtice Y orkville Dr Sandringham Dr Trulls Rd 360 Enniskillen Potter's Ln Old Scu~og Rd Regional Rd 3 600 Page 2 of 3 pages I I I I I I I I I I I I I I I I I I I CL2005-27 QUANTITY BREAKDOWN SHEETS ROUT AND SEAL CRACK REPAIR Enniskillen Enniskillen Mite"sl CarnefS Newcastle Newcastle Newcastle Newcastle Orono Orono Orono Orono Salter Ct Werrydale Dr Trolls Ril Andrew St Edward St Lakeview Heights Sunset Blvd Andrews Rd Davids Cr Peter's Pike Robins Rd Old Scugog Rd Old Scugog Rd TalHltaH Rd MiIlStN Foster Creek Dr Sunset Blvd Rudell Rd Davids Cr Peter's Pike Taunton Rd - Reg Rd 4 Taunton Rd - Reg Rd 4 West End Turnaround Salter Ct Peeeleataae Rd Beaver St N MillSt Sunset Blvd Robert St Peter's Pike Andrews Rd South End Cul-de-Sac Davids Cr Total 250 170 +,-900 50 150 35 130 60 200 120 80 25,355 Approx. Community Road Name From To QTY (m) Bawffiaa-lills Wilmat Creele Rd Benaett Rd Bast Bad TlIHUlfBlIfld -M(f Courtice Sandringharn Dr Trolls Rd Highway 2 60 Bnniakillen Patter's La Ola 80agag Rd Regianal Rd 3 -lJi) Total 60 Grind and Fill Crack Treatment Note: Quantities indicated at the respective location are an estimate and the Contractor agrees that the actual quantities will vary from those indicated. The Municipality of Clarington reserves the right to add or delete crack treatment quantity and locations as deemed to be advantageous to the Municipality of Clarington. The Contractor agrees that he shall be paid for the quantity of crack sealing successfully performed and that he shall not be entitled to any compensation should the actual quantity be less than the tendered quantity. All tbe above locations sball be completed in 2005. Page 3 of 3 pages II I I I I I I I I I I I I I I I I I I CORPORATION OF THE MUNICIPALITY OF CLARlNGTQN CONTRACT NO. CL2005-27 OPS GENERAL CONDITIONS OF CONTRACT (September 1999) I , I- I I I I I I I I I I I I I I I I I ONTARIO PROVINCIAL STANDAAOS FOR ROADS ANDPUBUC WORkS _HAL CONDITIONS OFCQN"F'RACT SEPT'&MIIIR 1899 ~'I~ , !;C/', . \J<,' I I I I -, e-: I I I it I I I I I I I I ~:~~:;." _..___..r....:_.~;._..::" -<,;,,,'i''':0r ,"~'. -- .~<"'~'~",~-, ~IW:CONDt11ONSOF~. Table of Coatienca $ECnON GC 1.0.", IN11!!RPRETATtON Gc 1.01 ~......_...u.........u............_~........~.......u.....~.~..~'.......~_..a".'''.,;n.;._..~,....,.~::-io..~~~"."",.,_,"....,.1 00 1.02 ~...Jllb"'.';.'..4U".''''_.''..'';'.....'.~.....o.:.............................4..................;........;a.~....~_.~ti.............,.;o.......,,:.....1 GC 1.03 GeI-~ .-.....---_Singular,Refel"8:l'lCl$.;.........-.................~.~~~......,..........-.."*_;'................~....1 GC 1.04 O........~.u.unn._..n........_..~..._n...........__.....~..........".._.,.......~......+...':"........~.........."~...n..1 00 1.05 SlIbItIIntiaI.~._............_......_...._.._................:...:~.n.__~.;....;..._~.;;;..._~~....;_..:.. 5- 00 1.06 .~..._...__.._.n_......."__..~..........._._._..~..._.,......_...~..~...,...,.....~,.......~...: 00 1.07 FlnatAQoepl:llICe..........~._...,..,........._......,......~,......._...._........"..,,"',.............,..6 00 1.08 III Hill ltd. of C4[lrIaIn WordlI....................._............,.._........................,...........,... 6 .$EC1lQN GC 2.0 - COII"I'MCT DOCUMENTS ReliIlic:e 01'1 ColllnICt DocumenIs.............................-..-......................................_.. 7 00 2.01 00 2.02 OrdIr;of'.~JCe .............................................._......_._...............:........-.;._~............-....;.............. .7, $&CTlQN GCa.t-Alt_M11ON0F THE COHl'RACT 00 3.01 Cv...".~~._.....m_..........~_-._......~..._...........~~<i_..........._..;.~:...8 00 3.02 Wortcing .DclJlIvings _...._...._.._.._..."'"'...~.....u.._....._.......,."':"_...._......'".:"".......;..........n..'"..-..-~._...~...;...~..9 GC 3.03 Rlgbtotlhe ColllnICtAdmkf L ."10 ModIy,.___ .........l~.."............. e &Dl8rgency Sltua!ions...~......................................_.._....................."..:.............10 00 3.04 00 3.05 ~.................................._..............-....................._.........._..............._......_....:._.....~.....~<r:"'"u........... :10 00 3.06 Wortcing ,.,..................................;..-..........................................,.............................~.~..~.................._........... 1'0' 00 3.07 ~.iIhln of ColllnICt TIme...~..............,...........,.,................................................ 10 003.08 ~.............................................................._.........._.....................,.........._....~_;.~~.........;.~......;,..-;.'!...1'.1, 00 3.09 , ';,~..lj..d1llI"tfJf ~.~ .;........._............................................_...................~~.-....~...;._.,...;.;..........1-1 00 3.10 SUllCClI_IJlklt by lhe ~ .............................,.......,..........................,.....;....11 003.11 'a...al11 ..................--..................~.......:..,.................._.........,........"!..:...........;.......:"!......Ni.~.....,.,......_....12 003.11.01 c:tl'JrI.I.,I.tn,...Work_...........__.........................._...,.~..........<i..-...."........:.~...~..,....;......:... '12 00 3.11.02 ~~........_.........._................-................._....._.................................._............:..............."...........:...12 CJPe...... eo. p" '" file ~,.::-':--:.>'" .......Cll,;i&Sl... -I r~'.1 il__ 00 3.11.03 Additional Woltt .....................................................................................................12 00 3.12 Notices................................................................................................................... 12 GC 3.13 Use and Occupancy oftheWoltt Prior to Substantial Perfonnance..................... 13 00 3.14 Claims. Negotiations. MeJiodion..........................................,................................. 13 00 3.14.01 COntinuance of the WOlk....................................................................................... 13 00 3.14.02 Record Keeping.....................................................................................................13 00 3.14.03 Claims Procedure .................................................................................................. 13 GC.~.14.04 Negotiations...............................................................................:........................... 14 00.,3.14.05 Mediation ............................................................................................................... 14 00. 3.14.06 Payment.....................~........................................................................................... 14 00 3.14.07 RIghts of Both Parties............................................................................................15 00 3.15 Ellgineering AibIb......,.....................................................................................,.... 15 00 3.15.01 Conditionsfor' ~ng AotlIballon................................................................... 15 00 3.15.02 ArbiIration Procedure............................................................................................. 15 GC 3.15.03 Appolntrnentof AitlIhcduf.......................................................................................15 00 3.15.04 Cosls...................................................................................................................... 16 GC 3.15.05 The Dedsion.......................................................................................................... 16 00 3.16 Archaeological FInds............................................................................................. 16 SECTION GC 4.0 . OWNER'S RESPONSl8ILITIES AND RIGHTS 00 4.01 VVorklng AIea.............................................................................................:...........17 GC 4.02 Approvals end Permits .......................................................................................... 17 GC 4.03 Management and DIsposition of Materials ............................................................ 17 . . 1 GC 4.04 Construction AffectIng RaHwey Properly ............................................................... 8 GC 4.05 Default by the COlllr.ctor....................................................................................... 18 GC 4.06 NotificatIon of DerauIt ............................................................................................ 18 00 4.07 Cclodl4!lclol"a RIght to Correct. DerauIt................................................................. 18 GC 4.08 Owner'a RIght to CClmlct D ..1..1........................................................................... 18 GC 4.09 Temllllllllan of eu....AoI'.RlghUCI Cardinue the Work....................................... 18 TIIII..'C........ ClP8C1Mel111CtJ f1lr...,CIoIMIII.'.1 ..,1_ I I ,I I I I I I I I I I '1 I I I I I I ~<I I ifj' I I I I I I I I I I I I I ., > I I < I 004.10 004.11 004.12. 004.13 , < - ,?>:,j;~,-;~~:~#,;,,- . .:""'~. -~ .'.. _~~._-~~""..,"..~.4.'~..~.."_._..__~~~~~-i..._":p,o'":~."'~-~.h.";~-~i.:_:~'~~~....~_~_.;,__1$-' - -{ ,'" - - -', . ,,--, ", T~~~'Ut~.of-" Co~4b~.."'_."'~""''''''''....'''4.''''''-~~:....:___''_.'''''~h~~.:~::;;~-~:~.;...,...~:_'l' . ,- . Callinuation.of Co/llI...Al>ts ~........~......~.................:.........':,;".';"........1t . .~ " - -- , .", . Use tIIf Pelfom1anGe Bond ....._............._......................:........................:.........:..... 19 . . . '- 006.01 lEG TIONGC U -1IA'l'&RtAL GC 5.02 GC 5.03 GO 5.04 GC 5.0$ 00$.05.01 GC 5.0$.02 ~ tJlfllatertel~_..........u._~........._.;:....u...,....._wut.._~..._.e.....;,.....u_.....~...a~..'"'~...:..~..._..... 20." Q. U~. of ~'J II iII................_...._............................__........_...._.......~;...:_..20 AaJl.,','l'Inu1al__..._..~..~.~.."u.._.........,......~...~...-_._~~~~~~~~u_~...-lO-, .' - - . -. - . -.'; --, ~..._.._..._......_ho_.....,.........._..___-..__~____~..~~...-...:....:..,,_:. . -'. - - - , - " - - . -, . . . . ...', '. " Ownit-~ MIder'i8I.............~.......:.....u.........__...._.....__............~..~_~~~-;....~_-21 0rMl0 of ElI1t III ...' rIIIl.....:._............................................._,.....:._....._.. 21 . . ~-Mltlrill._.........__....__..._..,._..............__~...._.;......_..~.....~~:..:..::_....:._..-2:1 SECTION GCu- ~PRO.ea.IONAllDIWII\IIE PI .)t~.JUcm of,lNcxt. Persona -.:I property ..........................._.,....:................:.......2S GC 6.01 GO 8.02 GC 8.03 GO 6.03.01 006.03.02 GC 8.0a.o3 GO 6.-.04 oo6.03.fJ6 GO 8.03.05.01 GO 8.03.os.02 00 8.0'.05.03 oo8.03.05.b4 00 8.03.08 0<>6.03.01 00 EU14 "L , . " ~ ..._................;,--_......._.._...~..._......._...__~_...:~~~..:._...,.;........;.;..H.~.,.,;.;.:._~. , ~6, - ,rM..... ..................._~_._..............._.._.....__...__.~~~..~.~.~:~~........ 24 ,Ge......_..__.._................._...._,_........._....___........:.~.._.._...~."._.....~~~"':<'...~ . ~ . . . Gei:L,..LJabIty .........._....-__................__...._..~......,......._......._..........-...__..............24 .. . ~.t,~~__...____._..._.____...~..~_..~_..~". ':-' p~ Wioiler' .................................................................,..._...............25 Pr~.~ .....................__.................._.,.........n__.........~.......~.....~~~..~.....~..;"".........il6: " 1IcIiIIt'~..............n_.,.~,.......__......_.....n....._..__...",....._..........~."..._..._........~..-..,..: u..:_0cI::upency ofthe,WodtPtlor.~ 1.'f~...............,....._.~.,..........25 .'-"Mttor t.o8II-orlJeln....~.~......4.4..._..n.......4_.._.......;_u...-.;.~..~~..~_._....'21/ . " . ",.' ~'. .~lII_afli~...... .~.........._...........,!~.~ ,_..._~_,~~....~.....:4~:_..O , ',"" , . >': , ~~....~~ r)Au_..n.,u4._,..__.~~._~..-....,:-.:,,;,,,,..,.""~""."h.!426.-'. BoIi:...,.__~4..,.4..............4......~,.~~~._..'.4.............._......~.....~~.__1'....~......_......~'..~..:4.;"....... ft;~ . see iMt GC 1"-Co-ul'lAOl .IlL." .lrDI'] TIJ....',AND COt.,_OP......,JIt,l oeu .01 ON" ' lie. ml ...,c , - , . , . . . .~a.4_........._..........._4....~t.......;..~........n4.~"__....,~....~_~.....~..h:..';'~~_w...,~_, ! ;".' _,,:V '_ I -'. . , " l. ~ .:;, 'J_ ~lf~. ill.... '-.;" ~:-, ,- "'~' -' ,,<;: .., -".;', ',w' WamInty ...........................__............_............................................._................... 33 SEC110N GC 8.0. MEASUREMENT AND PAYMM'I' 00 7.02 00 7.03 GC 7.04 GC 7.05 00 7.06 00 7.07 00 7.08 007.09 00'7.10 007.11 00 7.12 GC7.13 .' GC 7.14 GC7.15 GC 8.01 00 8.01.01 GC 8.01.02 00 8.02 00 8.02.01 00 8.02.02 00 8.02.03 00 8.02.03.01 00 8.02.03.02 GC 8.02.03.03 00 8.02.03.04 GC 8.02.03.05 00 8.02.03.06 00 8.02.03.07 00 8.02.03.08 GC 8.02.03.09 0080203.10 GC 8.02.03.11 .,......;..,~...~~. ..-.~~~-~..~....' .... layout............_...................._..............................................................................29 Damage by Vehicles or Other Equipment............................................................. 30 I .1 I I I I I I I I I I I I I I I I I Ex' e!5 Loading of Motor VeI1Icles ........................................................................ 30 Condition of the Working Anle............................................................................... 30 Maintaining RoadWays and Deliounl...................................................................... 30 Access to Properties AdjolnIng the WoIk and InIlemIption of Utility Services ....... 31 Approvals and Pennlls ..........................................................................................31 SUSpension of WoIk .............................................................................................. 32 COIdl..b..o'a RIght to SIIap the Wollt or Terminate the Contract............................ 32 Notices by the Cuodl..b..o .........._...;................................_._................................ 32 Obstr1JcIioiIW.~................._........._..._..._..........~....._....u....................u,............................ 33 Umllll'liofIs of Operations......._............_..........._..............................................33 cteaning Up Before AcI.e I~ IIltce ......................_................................................... 33 MllllIlemenl.............._..._.................................................................................35 QUIItltIties...........................--............................................_................................. 35 V8/IallOnS In Tender~,..~..................................................._.................... 35 PaymenL._......................................................................................................_35 Price for 'Nortt..........._..............................................-........................................... 35 Advance PaymentS for MaIBll8I......................................................I...................... 36 Cet1IIlcalIoI. end Payment ..................................................................................... 36 ProgJ ell Payment ~......................................._................._.................... 36 CerIlficaIIon of SubovllllllC:t 00mpIeti0I. .............;.................................................. 37 SUb...",llact StaIulDly I ~kRetease Certlti..alii. and Payment...................... 37 CerIlficaIIon of SUIAUlIllilII.~hllllOll.....-........................................................ 37 SlIl4Ia1....~ ~encI SubIllarl1l8l Perfon._ SIatulory HQIdbecIc Relllll Paym4Int Qlrlllkltll........._.................................................... 38 CertiIIo8lIon of eompl! lbo. ..;................................................................................. 38 CompIellon Payment and CompIellon StatI*"Y H<Adbeck Re1e88e Payment CeriIft(: 1111 ..........................................................................._................ 39 It_Ill ......"'t'".......................-...--...-........-...........--...-..............................................39 I...... for LalIt f'IlymIInt......................................................................_.............. 39 ....... for t1IIl(,ll..~,.._CIIImI...........................................-........................ 40 Owner's 8etoOIf ..................~............._................................._............................... 40 T...., CoI._'" .If OPS___e _I .1..,0.-.1[,1 .IWt_ I I ". .. I I I I I I I I I I I I I I I I I ~ 8.Q2.03.12 '..::.:'......., :.,.... .. .... ,', ":0'" .........::.::.:.':.' ~_in:Payrnent .*..........._.......-...._................~"'....-...........';OO'~............~._~~-.~.~...;o..~~~.~~.:IJO; ~ 8.Q2.04 ~ on a Time and"'" ..Is......................,.............."............................ ~.8.Q2.04.01 .0efiiIIll0ns.................................;...............................................................;............;. . ~ 8.Q2.04.02 _WQi1c Records..............................................,......................;.........:...............<41 ~ 8.02.(l4.03 ~.forWQi1c........................................................................,........................,41 ~.8.02.04.04 Payment for I.,.abour ..............................................................................................: <42 GC 8.Q2.04.05 ~ for Material.......................................................................................,.....42.. ~ 8.02.04.06. . .~forEquipment.........................................................................................42 ~ 8.02.04.06,01. Woo'klillil Tine ........................................................................................................ <42 ~ 8.Q2.04,06.02 .~.y.Tin'll!I..............................................................................................;.........~ .~..8.Q2.04.07 .~forHaIld.TooIs..............................4........................................................43 ~.8.Q2.0U8 .~for.Wotkby~~......................................_.............................~ GC.8.02'~.08' &.fbI'.1! l,iM f:If Inwice:s_......~......._...............;o......_______.._.._...............__..~......~._,..-.,.,::43 ~ 8.02.05 ~8.Q2.08 ~ 8.Q2.07 GC 8.02.08 GC 8,m 09 Fin8r~ CerUficatlI_._.......m........_..___._~_L~..:..;._,.......:.....~',43<,. ~-ofWaiB'&.._._.._...'""'..............___.._._..........._........__._._;;;...;:,;~~.........~;," RecclIJda .....................................................................................;...........................# ~.:.8IICI,.~.--........_.......~........._......_..._............_................._~....,.......__......."""...".:~. ~.~~,.-dDarnages...._"'___.__..u._......_.....__~__-.;."'...._..._...._...~~..~~;;>>..._.,45 9"........01 - tII'''' "-,,: Ihr"" ~:.-.' . ,".\-:- ',1I:t if OJ I 'r... I I ;'1 '::: 'c I I I I 1'- I I I I I I I I I I I Ge,U1 ,,', , fi r ......:'".:,..~_.- ". ::_~:.f:.s.Z:';::\J;;-,; ,', ',..' ....,'~..-:... ;; ,~.." ,-,'-,ji, ;> , ;".j 0ntarI0~1' (Lilt ..lIdards . fOr ..... .ilct,...WorIls <"~Htl.ti1'" . ........_...., .c.:'"..>._,;....,.... "-',_,_ ",,:- "'''>c'-'' "'/'.,", .'-;::.;" '.f~'~OF~T SI!CTIOfII:GC:1.o P ....1..RE1'ATIOIit" CapCiOns .01 1he~"'IIf.~-i"1g Inlbeee GeneralColldillon$h8vebeen i".1licUlila m III of1~JJellIi!ftCe and for .... cl ..funce only end In no 'I/lIf deIlne. Ilmlt or ...... ... ....<< II'IIj, I..: at the . Gener8I CondItiorla or fIilJ'I proviIion heRIOf. Ge1.82 PMSHTO" PANSI" "AS1V' "AW$" "NN'NA. ." "CE$~ -cesS" "C~... "ON&" "GC" "MOE" "MTC" 'VfO" "MuTeD" "OPS" :~~~ "'OPSS "PEO" "tJN1:' wssp,a- "UL" "Ul.C" Ge 1.83 All, ~. ..AdIOi. ._--~--~--~-.,..~--,,_.- ..-.....~-----'- ~Ar._l.Jl In rlll&Jnn of Stale HlIIll.I8YT........IiidIuft~ f . AmIdcII. J1IJ111c.lel SIIndlRla....... - A1/l1r1c1rIcSOclelyforTeslIng........... , - AmericerllIIh Gauge ~ ArllIdoIIl w.rWorlcs lac. . .. 'I - ~~$IiIncIanI&~ _lioI1 ~.t:~ n r ,t1l1ner"Sl8ndlRlstolnl - (:1. f n 1l I ...dal,lInilildlDll - c..,l1.Il.,.... 8ure8u 9.._01: -l'"lIII - ..., or.. EnvIronment (0 r ~ .) -, .... of;T.. 'JIInIllllIon (OatIdo) UII 1I1Iy ofTl...p.;Il...... to . ~) M.... of tInlform TndIIc C<.. 1101 0. .c.... putlIiIhMJIy MTO . 0nIId0 PRlI.L ctpI Sla.ldIIId - 0nlIlI0 PMIndII81InJllld ell, t. 0nlIlI0 PlQlllndal SIa,dad 1:. (llfl 'l~ PIll"] I flllllll~"" 0nl8rI0 SuJltrof~nolt\Ie&. UII ......... P4d:AIl... CouncI Urld.',,""'~ - . U11l1ln~ I..abwo__ Canada "'pdtr _ tIInguIaf "'..reo .. .01 RefelIllCllS D .,.ma.... or _1"". 1M .... the ConInIcI..~lm J 1II"';bUQPlluill4.fp . . lncIude6e remlI1lna..the .....1IId vIcMIfta." ClllOlIIXt ftiquiret< .' . Ge1.G4 If .""Iu.. .01 Por1be IMJIG If' ofl1ll Cw.dulctlhefulllMfn8dtfiJllllai18 eppIy. ,,"llllnnn. HI !, J~"a,. .......m... _LlJMofllat.....,WIIllInIllJ ffL~M,,{ir'\I(ofje . Walk. 0fI8,.......~ .' tRt tllUL I rt'..f. ". .. ""1 ,,;.,i' j' Additional Work: means work not provided for In the Contract and not considered by the Contract AdminIStrator to be essentlaI to the &atlsfacloly OOhlPleli<ln d the Contract wIlhin lis intellded scope. Base: means a layer of material of speclfiecI type lIIldthickness placed immediately below the pavement, driving surface, finished gnlde. cuft) and gutter. or MhaL Certificate of Subcontract CompletIon: means the oe.lllU.le issued by the Contract Administrator in aooordance wIlh olause GC 8.02.03.02. CertiIioatlon dSuboontract Completion. Certificate of Substantial Performance: means the oertIficate issued by the Contract Administrator at Substantial Pelfonnance. Cbange DIrectIve: ~ any wriIten lnslruoIion IIgned by the OWner. or by the Contract Administrator wtIele:so authorized. direcling that a Change in the WOrk or Extra Work be perfol.._ ,:I'!:.' " Cbaftge In the Work: means the dlleliG.~ exteI4ian. inI::rIlse, deaease or aIleration of lines. grades, dlmellslons. quantities. methods, dr_lllgs. .*"'1',..... changes in geotechi1ica~ subsurface. surface or other c:ondiIions, d1aIages In the ctIllI8CIer of the WOrk to be done or rnaleriaIs of the Work or part thereof. .wIlhln..,1ntended IICOp8 of the eo....cl. Change Order: means a written amendment to the CoId'1ac:t signed by the C....b....b lIIld the Owner. or the Contract Admlnlstmlor whele so authofIzecI. ~.. oontingencles, a Change In the Work, Extra Work, AdditIonal WOrk lIIld changed IUb8urface 00I,d111Qi1ll," establishing the basis for payment and the time allowed for the IIdjustment of the CoIl1lact Time. Completion CerIIftcate: means the oertlficate Issued by the Contrac:tAdminlslratDr at compIelIon. Constructor: means, for the jlIll1n1les of, and within the meaning of the 00cupati0na1 HeeIth and Safety Act RS.O. 1990. c.O.1, as IIITI8Ilded and amendmentll theleto, the Co.ib....... who executes the Cu.\bcM Contract: means the undertaking by the OWner and the eo.lbioCli(),' to peIform their respective duties, nesponslbiIitie and obligations as prescribed In the 011 eJ l;t Documents. ContnIct Admllllab.tur. means the person. pIIItneI$tJip or c:orporalIon designated by the Ownar to be . the 0Wnel's represe ..". for the purpc liS of the Cl.l.lbN. Cu,jb..el~: mean the _.. Agreement bet _ the OWner and the Cu.Ib-eo.-. the Tender. the General Condllions of Contract. the SuppkNl1efll8l ~ ConditIons of co,lfl...J, Stal'Idard Specific:aItons, SpecIal ProvisloIIs, Cu.1b...t DrawInG'. adde..da Incorponded In 8 Contract Document before the execution of the .AgIe<<nenl. 8UCh other dclcurrMInIs as may be IilIted in the AgIfimenl and subsequent amendments to the Cl.l.dlacl DocumentlI m8depursuanl to the pnMsionsofthe AgI1len1elIl ConlnIcl DnlWlng$: or ContnIct Plans: mean41_lngS or plans, any GeotechniCal Report, any SUbsurface Report and other I8pClItS and Infocmeliclnprovided by the Owner fOr the Work, and withoUt limiting the generally thereof. may lnCIude 1Oil.....l8. foundation ilwe~ 18pClItS, reillforolng steel schedules. aggregate lIOU/C8S lists, Quantity SheeIs, cr08. II clioi'lS and slandanl drawings. Coi.h...t TIme: means the lime ttiplllated In the Cl.l.lb-.t DocumentlI for SUbstloI.li8I PerJormanoe of the Work, IncIudlng any exaensIon of Contract TlmemadeJlUflU8lll to the c....b...A Documents. COlltrKtor: means the person. perlnel8hlp or ~ undeftaklng the Work as Ide.diIIed In the ~ CoIdNIIlng Op.MfIon: means eny component of.. Wodc. which. If delayed, wi! delay theoomplelion of the Work, .:.~ '. ..... 2 . OP8Genn1C_ .,. !lllIre. Ull....... .. t_ I .1 ---I I I I I I I I I I I I I I I I I Co8tPU: S. ''11mluiI'Id .: t, rl -. ^"C' .. , ,.....,...: . ,,"'.- CUt-orf Dat6: _thedlllli, up to which payment__ madefor~',*klfIV*t . - ......... '. .... ...:.......'. ",- ,,', Daily Work Recon:fI: '~daiIV RecoRIs cIeliIIlng the number 8IICl htlllltllls Ghl!l~"lUnd .... worked or on standby. ~ fIIIlCI q\Mot...... of Equipment and number of hoursln,~. 0\\ ,H \dbj;_ des~rIptionandqUll'lllli..of,Ul.'rlall~, . . . " ' 4-.. .. - Day: means8Ulandlrday. . ''''.AallepIlJlll6 CIwII1 III ~1C6 of.... wGdc. ' mn 1& the CIl1IlL .1....... by the' Cllliloillt M!I11!l1J i, __ ". -.'.. ...." '.', .." ..':' :.-......,' ',-:' '. FlDllOet.aII,nr111l1,1it ....UClllllpleteemiIIVliR~bY...Cllo\1lllWt.' i~ Rr Il..__ .... qu8l1flllft, Uftil pdces 8I1Id fIn8I doIIlIr .mounts of tlI./IBms of.. GllII'IPl....UrllUr.c.... IIlcIucIlng _iallo.,,1n tender iems_ ExIIa WOIk, aI... out In the iIme __ bm ."1I'ftIl_ .....J4!lu " , " trorceAccouIlt: See"1'lmeaft!Lt't.u liar. . ," " :.- ',' .... :.. . QeoIeIlImlcal R'IIOIt; mllo. 8 ftlPClIt or olt1er IafoImaIlon Ide~ lOll. ."lIt'!TN "MI., , . 00I1dlllone'1n ... ... Gf.any "'" DIlIlit 61 ~~. aIiol\ or" " , .. II: m..n"!!u..qul" ...on ofthel pert oI..WOI'Ic. .....'~C!OIs: 1I'lUI'l$__ lie ",".....dy ClIIIacI_ or~"OC4Ile ,"_'~fi""'."'.,.,.. .. '. jICllIiIer 1ooIs. . ... . . . .. , "<"., HIghny: _ 8GCllIlll'tOol,.puIlIlc blghway any pert of WhIc:h .''''-'11 ,for,or .'c1Gy_lIIIIIlI8I pubIlc for.... PI mg. of...,~U8nd.indudee........ betWeln.... ......JlIQlleIIt.......,. l.umpSUm.1t8n: ~~~ltIem ~19 8 portion of.... WQlkfor~_~,....~ It 8a1ng1e ~~ ~ WllOt b8Sec:l on 8mmtnd quanIIty;..,.,.^.~.iiIlIlj"tI\!8tl 1n"',.QX.0liQl~ .. . '...r.""'-'Ywltr lIem.theI_ . vaIu8, ~. lilt on ."h.ltt;flaf~"'~,"~.JJ'~ __.~. ~.Ile1lqer, muIljpIle<I by latender t.lIlIt priOe,~,,""".iiI/lIl..,'tt'l*fIl'..'. ..........01.. . . . II} $100_.., .... .... b) n. 01.............. ~on.... buIs of ....oI....<l.l.. rt.1ItIIilter ~'._"''''''WlIl'''''' ......1'..... mlllil.~I_I""jL.'I'! 1nil'J..~Tmant"'''''fllImIn8_..~i ...... . .......CA. r1. ,uUl. ""Il <:f' L. '1"" ....u 1..!:" ~. OWner: means the party to the Contract for whol'II the Work is being. perbmed. as identified In the Agreement, and IncludeS. wllh the same meaning and iIIlpOrt, "AulhOrIly". Pavement: means 8 wearing course or COl.II'5eS placed on the Roadway and consisting of asphaltie concrete, hydraulk:cementCOllClete - POl1Iand cementCOIIClete, or plant or road mixed muk:h. Perfonnance Bond: means the type of securlly fumIshed to the Owner to guar:antee completion of the Work in accordance wllh the Contract and to the extent provlded In the bone!. Plan QuantIty: means that quantity as computed trom wllhIn the boundary Hnes of the Work as shown In the c....Jb.....t Documents. Project: means the construetIon of the Work 81 oOlltenlll,,nd by lhls Contract Quantity Sheet: means a 1st of the quanlilIes of Work to be done. Rate'!1t Interest: means the rate cIe$IlI'n1Ined by IheMinllter of FInanoe of Ontario 'and issued by, and 8Y8IlabIe from. the Owner. ",_ ~c"o~.. ." RecOnis: mean any books, p8yIOIIs, accounts or other IlIfol'lllallon whIc:h relate to the Work or any Change In the Work or claims arislngtt....""om. " Roadway: means that pert of the HIghway duigntd or Intended for use by vehicular lnIffic and includes the ShouICIets. Shoulder: mans that porllon of the Roadway betnun the edge of the wearing surface and the top inside edge of the dIll:I1 or fII slope. Special Provisions: mean special dIleclloIlS conlainIftg requirements peouIIar to the Work. Standanf Specification: means a standard ~ AIqIlired and 8lipuIated by the Owner" for '* ro..fl6OC8 of the Work. SUbb...: means a layerofmaterlal of &pedfied~lIIncUhlcla lISt! betwMn theSUbgrade and the Base. Su~~, means a person, paI1nec1It1ip or COIJlOIlIlion undertaklng the ~ of a part of the Work by virtue of an BgI8MIent wllh the c....dl~. .,,~, SUbgrade: means the earth or rock surface, whether in out or fiI, as prepered to support the Base. ~and Pavement. .~ . . SUbsuifac:e Report: means a report or other illfoll'l\6llA. idenllfylng the IooiIlion of ullIilles. cono8aled and adjacent structures and physical obslructions whlcll faU wIlhInthe influenoe of the Work. SUperlrMndent: means the ec..dlaotor's autt.o.lzed "'PIne .t.4We in respon$ibIe chaIge of the Work. SUnety: means the penon. paI1nerShip or COlJlOllllion. other than the c....41..... ioenIad In Ontario to IrMACt business under the IMunIno8 Act, R.S.O. 1980, c.L8. lI$ amended, exeoullng a bond provIdad by the CO/Ib~. Tender:' means an oller In wrlling trom the C.."b...:to., submitted in the fonnat pnIIOl1bed by the Owner, to COI'I1Illete the Work. TIme.... MIIHrtaI: lMena co.ts e8IouIlted __1lltD-c:lauIe GC 8.02.04. Payment on. Time and Material BaaII. WIlII'8"Co1t Plus" and"FOlllll Ma<<.ritt' IN UIlld Ihey....... the _ mnnlllg. -:''''. .-r J,- ...~. ,.. , ..... " OPBo...Ic... -. .,c.....L.1 .tll8 I I ""J I I I I I I I I I I I I I I I I I , ,I. ,':.:.;'- ' I I I I I I I I I I I I I I I I I ~:;-';';.- UIlIty: means IIIl alloYegtOIli!dorUl\dlo.~ound faclIiIr maIoltalned by. munlclJwflr. r~ ~:.~ ~......, Of'"'lJl r-1I d ~ IIIllHI__ 8IJIrices SUCI1aallln1lary ...... .......... .11 I '.H, ,r. llw.,..OlI. steIlm. dlIIalnlnWrllinn.lrlfpltane$ld cable te\lWlicln. . ,', ., ' ~ Period: means the perioCl of 12 fl'I()dl/)Il ftom the date of ~tlWdillI ~~or IUCI\ longer l*iod as may be sjileclfiecl for cer1ain M M r'lIla or some or all of the WorIt. . WI. a 48te' Ol ' Sut:.staallal Pelfonn8nce is not eal8llIished. the W8n'anty Period 8b8l1 COhlltlllll'lt <<I the date of Oomfllello... Wclrt: meensthe._co~ ~~.end~__~bytheC\.tdl.,...t~' WOd'-litiAr!lll: ..........IIIlll.I.:lllmentsClllilll8dorllOCl~....~..:.~ of t.lMJWodt." . .' '. .......o.r. . ....JAY..,. .) ~~~end~lsl3IIll':~ ...... ........ '1:1). ."~~~...Ii.IIl(~'I:lflh8'e....t._hr.n ill4.A.,_~_qJ"l~~~Ji,l....IJ"., - 'Nl~."'ftor IlIltwlll..'......lllllrJ n. .111lW!l4,",,1l'~I(.l'.~~"~(JJ'~""..'.i "Of.4.i.::'''M'.M~IIIlI:of_~ ......be~~~hli~.~.li.).~lI'Ot,'.. ~wItb.....6O'I6. of the IIOI'IllIII .....lIIlllequlpment'...'Jlft' cf_.o.....d_.. c........18oJlJr_ fOr.", 5l1oUl$;" ... . . c)tIlCIC8PtaOeyCll't.~1:SI ~..CtllI I$pnwe_cU_ p100eecliJIf WilIl.Q:lo.IUjlt4C>11ll81iofl," ......by..O"'..AdmiI.blL Iil"bym cnof. l. ~.'~ .,.-.the ~.,...t' by the ownerOf' ff.ll\lClh "~llllioo........__..,<lII.>fl( "'00i~.,**, by_owner.. or-1IIl dl,,-yee of any oneof1hetn,Of'by;..".......O\1 beMlfOltheOwnert " B. ~of~..~n.M.llf$. >.. '.. . Hi.~C8UIl8__!he fI UDnable ~ of the Curd!" .Wh/clh -.l:IeM'\ull. 1I1~_the Ova........ .....llilI ',.' of the Q....~Adl...lllb..dllc'. , ,WortdnlJ~;orWuldl4~ - meensanyo-......1gS or PtInS/lf1lf IIliIICl...~itI.......~. .-1IOn oftheWGdtencl...,.wiIhout lellllll",... fI8lW8IIY ~~fr1U : cite.... @~ . ~ pIIIIlS.eboPdI..I.iIJp, eboP pIanI or fjj Ulloodlagrams. GO 1.85 SlIbW 11.1 h$llRlllC4l .01 TMWoItI$.. 'I 1 r lL p1l1tDfl\lecl, a} when the WoIk1iC>,..'pIIl1omled l.lnder theOlli4-.;t or e: 1UI:Il ~J 6II,*,,'IhilrlIlofla;..., for... or..""" UIlId _... PW/lIlI8ll'11l1nded:1IIld b) whenl!e Work......W~llld ___~ ihlllj - ofCllt1\.IUIl~.1lf.~"'''. knOINndefeCt, .....d~ i&notltlCftlhlln L 3% of I!efRt SIiO(tClOO of the ConlnIcltplicll, B. a of" nIIld.".CIOO d1he eo..,.I,;lplicll. end Hi. 1"ofl!eh'. ll'ltoftheContr8Ct~ .02 For theP!ll'P<lIn of _COnInIDt. wt18I1I the WOrk or e .l.....pert ",l8r..drfllr\lllltqrl$ beInt. .U8ed for"Il'IIPOIII IIIt1nded _",AIIMi11der d'''WOIt__,fiIle~.J. .t elqledIIio*for ,ulln,beyan4 .. conIIOl ~ ... Oll,"'~or. ......~ _the ConlnICtDl...... not'" comPI"lthe WOrk ~a 1JIr. the pIicIlofl:Sl ~<..,., r "IJln. .'. AllIllIIn!n" 1O.be ~ end~ 10 OOI1lplete the WOrk....be~_ ...Qil,.~ price In d.1I nnIniIlf SOt 11,.dIIII~_ .. .........00Il <qr. I.O~ [,.. I ... ,... I I --I I I I GC 1.08 Interpretation of CertIdn WOnIa .Ql..,']J1e words "accepfabIe", "apfIRlvar. "8t.IlhorIz8d", "coIlSidt.red necesslIy", "diected", "nlQUftd", I ~,;:~~, or words of Ik8 Import, llhaII munapproval of, dilecled, requlrec:t, consldered~~____ ~7necnsallYor ~Dy.niFlliCClplalil8or . ~f~ to the Coi~b-A AdmlnIslralior unless the I COIIl1ext c:IeaI1y IncIIo8les oIherwIIe. I I I I I I I I I I I GC 1M CompIIllDn .01 The Work shall be ~ to be completed &n!1 seMces or Materials &hall be deemed to be last supplied to the Work when the price of COIIIplelior~ correction of a known defect or last supply is not more th1In the lesser of. a) 1'" of the Contract price; or b) $1,000. GC 1.07 F1nal~ .01 Final At;oeplanee shall be deemed to occur when the eu.,b-A Administrator is satisfied that, to the best of the Contract AdrrllnisIrators knowtedge at lI1at time. the Col.b-.hn has rectified all imperfect work and has discharged all of theec..,.......... ~ under the Contract. -"... .~.~.-:,., ~ .,~_..... ..... . OP8...... eo.. 'r .. fI~. T ,11M'" il ~'.~:.::<: " r.::':: . ~; .1 ',,::'::. I I I I I I I I I I I I I I I I I ...CT1ONGC.U~~~ GC2.01 R "Il nee on ~.et. Dotunul~" ,.01 The 0wI*\\1.l!" ~1he"Mnldioo fumiShed In the CotlllllClt I)OCumenIS;ClID"~lnJ dll(lql..ah thefollo!Nlng.illll'ju..a;.ptiO;1S: . ..... .' a) The 1oo1l1iOll.oI' _1lIIinIine und6.II.00nd utlIiIies which WIll a<<ect theWod< ...~toa ~~ . L 1m.~.8Ild U. . 0.3 m \I8I1Io8l Q) Theo.ner_ nol....._4 1I...."''lll.lkMlS d .d8la. oroplrl/ol..~m~'''''_,~' ~.11i~~for....peNI8Idlhe c.....M.<8lId udud_.fIolnthecu,-.poeJ ~..- cl oa.r lllform 11:>11 .~ udIPf fronlllll$ .....1II1ly. . .GCU2 OIIF" "'.udulOe .01 Inthaevent oJ._ilIllDn1i4-..1CY or ....t,.clllttbeWl_.dlhe,~i~iUt....1IlGb docUrnIntl$ ......~Ioaand.govern lntie follOwIng ordet:. . . . .).;< .) AQlWmIftt .. . .)Addenda 0) SpeQIaIPro\IlIlm\\l . Cl)eo..04~1 .) ~Spe. ,.~ f)TeIIdIr . 0) SuppIen""lC;a\ GIlI.l1'<' CondItions h).GenenII~ l} ..WoII<Itftl OIM\IJ$ ~ ...8haIl.,....lIIIithln88Ch of the 1IbcM' IIcrtel ot~ .02 In the.... d _ (! -~t iInlOllO or .oQOIll " ney In the ~"-~GnD.~" ficlIIawIa&...... atII\lIr... · · . ~Pitl~ 1IIOWlI~"'" on..J:.lnIWInSI....pem ..... ..., dll"J"~lll fltll!lllllld . t'rOrnth.nlllme.J,J....fN; .)01.... oflll'get.... IhlIIIgovern overttlOled aI. III( SCIIIIlt; 'c)I)I..I,1I ~",pem overgeneral~lgI; and ;.d) DiJ:o..Il.ot..... IhlIIIpem over'" of en ........lnthel8ll8...... .03 Inthaevant.oJ" (lIQIlIIiGt Il\ the ~ of SCIlodIIIRISpIlI::..~;..~ ORIatot '01:>'<1.111""".. . .) Ont8rlOPI~... "lIl1~Spec:Ill<:.liQnI;tIlen .. . ... ...... .. b) 0Itler Stalld*",S'pUIf~'1UdI lIS'" produced by ~cass.~ _t~and lef8felIC8ClIn"~ Plu4..cl8I Stand8rd SpecIflcatIorIS .04 Theeo.lIiiltilA~ are oompIemenlary. n what 18 ~byllllYone"'''lllt.~'' If rwqulnIdby ... . .' . .......1<::1 llIll -.r;- . lih--.. Jilr_ ,..., GC 3.01 SECTION GC 3.0 . ADMINISTRATION OF THE CONTRACT Contract AdmInistratDr'a A1IthorIty .01 The Contract Administrator will be the Owner's represenlative during constlUclion and until the issUance of the Completion Certificate or the __nee of the F"1I1lII Acceplance Cel1ificate whichever Is later. All instnJcIions to the CO..balAur including inslructions fIom the Owner will be Issued by the Contract Adminlslralor. The Contract Admlnlslmor will have the authority to act on behalf of the Owner only to the extent provIdeclln the Contract Oocumenls. .02 All c:Ialms, disputes and other maIIao'S in question "*Illig to the peIformance and the quality of the WoIk or the i1le.lltelatio.l of the Coutt...J Docurnenta shall be lervned to the Contract Administrator. ", - .03 The Contract Admlnistnltor will Inspect the WoIk for lis COI1bmIty with the p/ans and spec:ifications, a.gd to reconl the neoesslII}' dalB to eslabIIsh payment quantities under the schedule of tender ':quantities and unit prlces or to make an Blnssment of the value of the wortc compleled In the case of ,~sum price COldltd. ' _~_,_______~~~"',__..__,__~_.~ .-.-.- _.- .- __-'-----__.~' '.-'- __"___U_~'_"'_____'_ ~_" .04 :Jfie COhba...l Adrr1/nWlI.... dllllsl..i.." the emounls owing to the Co.lb~ under the Contract and wUI Issue cerlIlic mil for payment in aud1 amounts as provided for In Section GC 8.0, MflsuleI.18llt and Payment. The Contract AdmInIstrator will with reBlo.l8bIe ~_!BS review and lake applopriate action upon the COllb..........s lIUbmissions sud1 as shop nwIng$. product data. and samp/es In acconlance with the c........J Documenls. The Contract AdminlstnItor wBIlm.estigafe all alTgaliOllS of a dlatlge In the c:haracter of the WOIk made by the Co.lba.r and Issue 8ppropriate inIlructions. The ContractAdrnirM.... wBl pI8pare CI1snge Dilecti_ and Change 0Idens. Upon written applioatioo by the Co.lb~, the eo.lb...J Admi...... 8nd the Cu..b~ wlDjoInUy conduct an inspection of the WoIk to eSlablilllthe date of SUbstantial Perionnalloe of the WOIk , and/or the date of Completion of the Work. The Contract AdrnInIlIt..... wi! be, In the fInIt i"'""", the /nleqlreIer of the Conlr8ct Documenls and the judge of the perb'i_lCe thereunder by .bcllh 'JlIItieS to the Cu..lid. tnta.",~ and dej::lslons of the Conlr8ct Adll'...... shall be consistent WIth the intent of the Contract Oocumenls and In maIcing '- dacIsIollS the eo.ll...J AdmIl...... will nOt show partIaIltt to either 1*lY. .~ .-,~ .10 The Conlrac:t AdmlI....... will have the IIIIlhortty to rejec:t part of the WoIk or Material which does no! confonn to the Contract Documents. .11 Oefeclive work, whelher the __ of poor WOItInanship, use of defacliw material, or damage thlough cat ele SlI.ess or other act or omission of the c... di~ and'whelher incorpoIated In the WOIk or not, which has been rejec;led by the Co..b.... Administrator as falling to conkllhl to theConlr8ct Documents &hIIlI be I8I11OYlld PfOl!IPtIy 110m the WoIk by the Conf....to. and rep/acecl or re-executed prompUy In 8CCOldanoe with the Conlr8ct Documents lit no actdltiorl8l oost to the OWner. .12 Any part of the Wolt destroyed or damlIgedby IUcl1 removats. repllloemehb. or re-executions shall be made good. PRlhlplly, lit no acIdItio... oost to the Owner. .13 If, In the opInlQn of the Conlr8ct AdmInIIfnItor, III not 8lqI8dlent to conect defl ClIv8 work or work not perfoaned In IIcoantal106 will the Co.iL...t DocumInII. the Owner may deduct fIllm monies othetWlle due to the c...,,~ the d1h_1IOa In VIIlua batw.n the work III performed and 1hat called for by the ConnctAdmlul....... ..... . OPSo-..Ca."'. ~.,~.'LJI ~..... I I I I I I I I I I I I I I I I I I I 01 G~'_ ~. l..- ~:_:~ "I l'f(. 0 ~ - I I I I I I I I I I I I I I I I I '- ~~;. .14 'Ic':~ 1IIIYH....~ Ill8lIe by'" Ccll.u..t ;""11f~1 r. Of>..~n!lf;._ C811lfiunror.lelll....."of..JlIrR'Ient by'" QilIm<.......ot..WI~ }o.rl ,liB,! lllJ. tI Alject_tle(.ct-..orMalllrilll.....-_IIIt~ 1G_~......ruaIlt4J~.jlJtc...j fat 0 .15 The C<..~iIICt Mdi..4Mdftwe IIle ~ eo *'~ .~ .ll1l'1Cl.,,\t.l~ilr felt lIUQh h;8SClC1IIllIe Iinla,. fNIIJ be r.eo I II')' to ..lll4lll. the ~Clh"y porIiGlIl:Of'''~*''''. ClIlIStR1eIion layout or the iIlIf-lK~' of any ~ of ... WQri(;0 TIlele ",.be lIRl';elIll'a . COtfFU ISran_'" tIIl~ nlMn ofWOl'k. GC a.o% W~ Dtftlinp o .01 TheCOlA4lllIior.... ..... for the p.....lIliCIn of cl88rIy ldenIIIIlld8Mlllltelt WD1 ~r~ ab..uqe... catlldfortly"CortlI_~ . - ".'. .02 The .c...AlacliOI' ....8ubmlt VfilIIdng D1/A1;.ui.~_:'~~~Ju LO .'.: ~m ,'II prompln'" _In ecdeIty MqII8l1CI SO ..liO:ntt.....ckIIay'W..WI.*;'!'lf':At iT .~ or the c.....d Mq~ flU.. _~l'V-theY"":joInIly JIi.llf.li11'ff:.......!tn'.............,(or subllll T~'1l'I ... t'ldumof WwIdIIlI DlJ..Anp .Vtcwlclng 0161111(11'..""" ..IlJlI fn" ~ 1 n... /II. ...ame of ..\ (,,.un the Co.iL...,. ....1WIIfy .. 0Ir.*_,* ,~Jllti Jf I T lll..-o of .. . _lllll......~_I8qlliNIIlIl..._Allldltlnt\lll\M.o_~ i lit . ' ;Cl3 The CclJlhlltAdmlliltUll, wilIl8ViIW 8M NIUm WaIIdnO DnRi9 .In . ~Q "m. - an ~. IT upCllual1'cI1"'OI'~ wIlh run......~nptI,I8.IO.......__.... . . - ". ' ,Jl4. The c:omr.ct AI:IMtotW..'S 18Vi1W. be liO d*k for '-4~,lIlJ tI>" ..dlnjJ! ~J.l__ 1J8I*. 1Q118If1lIII'l.-v _tIUCh review ........reIilMt.. co....... tlf~ ~j~ U 11111"...__ . 01' <;ll'iJu1:"if bUle VjillllJilllo._LlJI or Of Ill' .~ for m.........1H1 ~l .01- Q;I...l1_ OoeutflII!lta~..IdrIll_tle~IJ.~ '1lJS .....U:I'Il,NllU.c...,_:IlI_OdItllMl MIlkJWALlr. " . .05 Theeu.A~ ............,dl8lll.SInWCj..40r8._....~ 1tJ1l!lt~ 1". lriaierr,' .....W~l" .. t\III ec:..Al~ D~~l "..* 8M AIIIlbmI.UllJT1 ...... .JJ! I 1__ QcAthcltAitlltl i 1 . ~ f, WbIft fU_~ tie QMlb~ ~_.Qt. I "tMlltl1I r.. ,In; , . __w_.~.rr ......1IlIIntlOle..~~ L' 1I:."th&.~MuH:l1~. ' . ,08 WcIk Itl.llll to.t\III Wo4fng 01'-''''''''' proceed _....~ GlUJ.Ui ...... ,................tIy..CoflhatAllrIlio I' :w _ml' 1(........11[11.. '*-i' . 1"",( to CClJ1ItnIClt .......... " " . -."", - ,07 The CclI4It:hf......, one HtoftlefllA&-.t W<lddllt.Dt. 1J If' ~ .tdllll....r.'.......:tIt d~ . GC3m",CIf"'CvAtI_~ r . . L.diortollJ 1IlI.....'jf.._"':TI.f~III-17 .01 The COnti......... .....,....,...In v,,11[ ..'" JIl. .a.IUII;In.. m.r~i9~ '1~1f~. ~ l'oIoe tit any time ..ConInICt: AdmiI.b4l]l! . COIlIlderS !he o....t......klR ~n. .. ..1 *., Dr bf "1 lulltl."WOrkor II' lIue III 17fT.-- _~llOr.iIlIInt. . . ,- - '''. . .02 TheCOl......... When...1f 11>.11 In........... SIlqUIIIOltClf II QpuiulI ",CiIio lJlClt 10_ .........bi:Olll....WllItI belIIlI'lI(81'IIltd by oth8lL . . .,- ,03 1+*It. ~ .....rll _.. Co.. ul(lr'" .....1lIIt.. neDil. y tlIlItIf~ IrD Oil.. ...~Io/l~r II ................~ ,-..-,';" .--.<'-,,,.i'; '.,.. ClNGl r1tq: ~. 1 ..nr. j r.''4l1l l t. GC 3.04 Emergency 8ItuatIons w-o--- .01 The ContJact AdI..0h0b...... ha" right t<ld~.....Je the exlstience of lIIl emetgeIlCy 1liluetion, and when $uctlllll el11eIgel1c:y sllIl8tiOn is deemed 1tl exist, the Cordraet Administrator may instruct the ec...bcdur t<llBke action t<l1elll8dy the sllIllltion. If the COllllaclxll does not lake ijmeIy action, or if the Contraclior is not available. the ConlnICtAdo.......... may dinlc:tolhels to remedy the situation. .02 If the emergency situation was the fault of the COlltl....tur, the remecIiaI work shIIll be \lone at the C....b....tut's expense. If the emergency situation was not the fault of the Conlraclor, the Owner will pay for the nlmedlaI work. GC 3.G5 Layout .. .". .01" The ContJact AdrnlnistralDr wi! provide baaeIne and bencI1m8rl< information t'ol'!he generallocalion, ,. .~..lleI1t and elevation of the Work. The Owner wi! be IeSpOn8ible only for f!le 00l.....b1e88 of the . :~ pnMded by the Cl.lib.,.tAdmllMOilCllM., ~'oii;-~ GCui WorIdnCL~_. ._. __..____..... -< '. ",. -.~I-- .01 The o:...Il-.h.t'.lheds,sIle offIces.tolIets, __~81Y strucllnsand 8lDrlIge __ for material lIIlCI equipment 8haII be gRlUped In . COIl'Ip8Ct mIII~lIIlCI n.aLlIlIL.ed in. neat lIIld ordelty condition at... times. fo, .02.. The Conlr8clDr.... co.A... his canstrucIIon I:IpIQtiansto the WllIlcIng Alea. Should the C..ub-.h.t . require mole space lhlIIl1hatthown on .. Co."..... Drawings, the COllb~ 8haII oblaIn 8uctl space at no adcIItlonaI COlt to .. Owner. .03 The Conlrac:lDr 8haII not enter upon or .OCCUW8RY prlvate property.for any purpose, unless the Conlraclor has reoeNed prior wrilflIIl pem , ')II from the property owner. GC 3.ll7 ~18Ion of Cu.tb-t TIlne .01 An elpP/i<"<<lon for lIIl ""01 ConlnIct nn.shIIII be made In wrlIIng by .. Co........... to the . ConlnICt AdrninislraIDr 88 IOClIl 88" need for" -..1Ilon bec:oIMs ewkIent and et Ieest 15 Days prior to .. ~liItIunol" Contr8ct lime. ,. ~.lIon for lIIl extension 01 Co.,tr..... Tine 8halI enun_..... rill an6, and .......1engltI 01"., AIqUinld. .02 .~ IlI11ab1e for COlIlidendiot. oIlIIl II "I IlIion of Cu./b"'" Time.incIude the following: a) Delays; See 8l~ GC 3.08. . . b) ChlIIlgas in the Wol1c; See *'- GC 3.11.01. C). Extra WoI1c; See cI8uIe GC 3.11.02. d) Addllional WoI1c; See cI8uIe GC 3.11.03. .03 The C..ub....t Adlllflllllb..... wi!; In coneiderlnt an ap~llllon for an extension to the ConlnIct Tme, take inlD account Whether .. delays,. Changes in the Work. Extra Wolle or AddItional WoItt JnvoIve a Coi."lll Operaliol.. .04 The COlllrBCt nn. .... be aeoded for 8lICh 8IdionaI time 88 may be reconwnencled by .. Conna AdmIr........... and deemed fair and ru I oilable by" Owner. .05 The terms and 00l1dllio.. of.. Contr8ct shaH oonllnue for auch ext8nIIon of Contract TIme. ..... to ONo...tCo. '1', IT "':1 L.........l lIr1_ I" I I I I I I I. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 00 3.08 DeI9s .01 It the Contractor is ~ in the pelfoollance of the Wolt by, a) war, blockades, and ciYiI commolionS. errors in the Contract Documents; an act or omissiOn of the OWner or Contract Administrator, or anyone employed or engaged by them direclIy or indirectly, contrary to the provisions of the Contract Documents; b) a stop work order issued by a court or public authority. provided that such order was not issued as the result of an act or omission of the C<ndi..cliOi or anyone employed or engaged by the Conbactor direclIy or indirecIIy; , -, -,' c) the' Conlract'Adinlnl$b41or givlngnotice under snbsec:ti'V1GC'7.09; SuspensionofWolt; d) abnormal inc:Iement weather; or 'e)'an:haeoIogIcal finds in accordanc:ewith Sllbsedion GC 3.16;ArdlaeoIogic:al FII1ds, then the Co.lb........ shall be reimbursed by the Owner for-reasonableoosls Incurred by.the Contractor as the result of suc:h delay, provided that in the case of an epJIi:~6on fer8ll,exIenIion of.Contract Time ,due toilbnormal'Inc:IiIment'weather;'1hir,eu.dl..ceor sIIalt.,wIth'1he-<Co.ltlilCb'$-appIication, submit lNidenc:efrom EnvIronment CanadaIn:supportof'1lUdt~~1Sion of.Contract Time will be granted in aoc:ordance with subsectlonGC3;07;Extensionof,Conlract.Tme. .. ._.,._..__._----------_.~--_.~-.~--~--_.._-_.-._~---_..----- --. -_. "~~.__._,.._.._._._-_....._... -', .021t the Work-is delayed by labour disputeS, --ltIlkeSorloc:koouls.-incIucfmg-Ioc:k-out& declreed or rec:ommanded tolsrnilmbers by arec:ognlzed ...o.lliac:a's Bnociation, ofwhlc:h'the Co.1tI4Ctof isa , 'member orto Whk:hthe Co.,bac:lDr lsolherwise bound-Which ani beyond the'Colltr8Ctor'S oontrol. 'then the Collbact 1'lrnel shall 'be' extehded' ilnacoontanoe'with' SlIb$ectIorl G<> 3.07.. Extension of ' o...dlad. Tme. tn no case shall the exIenIion of ConlractTime be less'than the time loSt'as the result of the event c:auslngthe delay, unless a shortIIlr extllllsiorrlsagAJedto by the Co.dllllCtol. - The ' ContraclorshaD not'be .utitled to peyment fer costs Incurred as the-result of.such deleysunlesssuch , delays ani the result of actions by the Owner. ' 003.09 As8Ig~ of Contract .01 The ec..,b~ shall not assign the Contrac::t, either in whole or In part. without the written consent of the Owner. GC 3.10 Sab.-lb.a.::tlng by the Contractor . .01 TheColdlacllol maY~ltract8llY pert of the Work; subjec:tto these General-ConclitIonsand any Iirllibitiv.1S specified in the Contract Doc:umentS. .02 The ConbadDr shall notify the Contract Adniinlstratot. in'Wliting':otthe illteldiOn-to SIAl.-di..u Such notifICation shall Identify the part of the Work; and the Sutxx..di.....h..o with Whom Ills inlended, .03 The Contract Admluilltlatorwill:wtthIn 10 Days-ofl8Cllipt ofsuchnotilicatiOr....aocepl or reject the Intended SubcxI./b.aor. The rejection-will beinwrltlng.and wIlIlnc1udethe reasollsferthe rejection. '.04 The Contractor shall not, wIlhout the writlen consent of the Owner..d1ange a ~ltIactor-Who has been engaged in ac:cordancewith subsec:lion GC 3.10 Sutxx..lbloOtil'lg by the Cu.di.otllf. ;05' The Contrector shall "'11 me arid protect the- rights of the partles under the ConIrIIct with respect to Ihal part.of theWork ,to bei*fonnedunder ~lbacl and shall, a) enter into agreements with the ii/tended SI/IM)"b....us to require them to perform lheir wort in 8OCOI danoe with the Conlract Ooc:uments; and b) be as fully responelbIe tD the Owner for acts and omlir'o lIS of the c....lb~.. Subc:onII6ctoI1 8nd of persons directly or IndlrectIy employed by them as for acts and omlllloi1l of persons dlreclly ~~ho...~~. ' - OPao...lc... -'rr..,on.at.l. .... ,.. ..... 11 .06 The OwneI's consent to sub.....,b ....ting by the Contractor shall not be construed to relieve the Contractor from any obIgalion under the Contract and shall not impose any liability upon the Owner. Nothing contained in the Contract Documents shaD create a conlnIc:Iual relationship between a Subcontractor and the Owner. GC 3.11 GC 3.11.01 Changes Changes In the Work ~. '-~'f .01 The Owner, or the Contract Administrator where so authorized, may, by order in writing, make a Change in the WOlk wilhout invalidating the Contract. The Contractor shall not be required to proceed with a Change in the WOlk unbl in receipt of a Change Directive. Upon the receipt of such Change DireclIve the Cu.,b........ shaa proceed with the Change In the WOrk. .02 .~~ Contractor may apply for 811 exIenslon of Contract Tme acoording \0 the tenns of subsection GC 3.07, Extension of Contract Trne. ..03 .Jf.-the Changes In the WOIk Rllate solely \0 quanlilIes, payment for that part of the WOlk will cbe made . ~dil19 to the oondilions specified In clause GC 8.01.02, Variations In Tender Quantllies. If the .. Changes In the WOIt do not solely relate to quantllies, payment may be negoliatied pursuant to .. subseclion GC 3.1~, Claims, NegolialIons, Mecfl8llon or payment may be made according \0 the condItIonsc:ontained In clause GC 8.02.04, Payment on a Tune.and MaterIal Basis. < GC.~.11.l12 . Extra.WoItc .01 The Owner, or Contract Administrator where so 1IUlhorized, may Inslruct the Contractor \0 perform Extra WOlk without Invalidating the Contract. The eo.~b....tur shaa not be required \0 proceed with the Extra WOlk until In receipt of a Change DireclIve. Upon receipt of such Change DireclIve the Contractor shall proceed with the Extra Wort. .02 The Contractor may apply for an exIenslon of Contract Time according to the tenns of subsection GC 3.07, Extension of Contract Tme. .03 Payment for the Extra WOIk may be negoliated pursuant \0 subsecIion GC 3.14, Clams, NegotiaIk..1S, Me"'""'lnn, or payment may be made accorcfll1!l \0 the conditionsoontalned In clause GC 8.02.04, Payment on a Time and Material Basis. GC 3.;1:1.ll3 AddItIonal Work .01 The. Owner, or Contract AdminlslralDr where so aulhorized, may request the Contractor to peIform Addillonal WOlk wIIhout im.alidalillll the Contract. If the Cu..b........ agrees to peIform Adc:fdional Work, the Contractor shall proceed with such AddilionaI WOlk upon receipt of a Change Order. .02 The COhb ....tu,. may apply for 811 exIenslon of Contract Tme according to the tenns of subsection GC 3.07, Extension of Contract Tine. .03 Payment for the AddilionaI WOIk may be nagoIIated pursuant \0 subsection GC 3.14, Claims, Negotiatlot IS, MecIlalion, or payment may be made acoording \0 the conditions oontalned In clause GC 8.02.04, Payment on a TIme and Material BasIs. GC3.12 NotIces .01 Any notice permitted or required to be given to the Contract Admlr........ or the Superintendent In respect of the WOlk shaR be dumed to have been glv8n to and received by the 8ddreslSs on the dldI of delivery If deIIverecl by hand or by facIIIlllIe b.llmlulon end on the fllIh Day after the dldI of meIIIng If lent by Ill8II. .....12 OPaGeMNlCo. 'q' ,ufConlNc:t.I.pl .....1.. I .. I I I I I I I .J ; I I I I I I I I I I I. I I I I I I I I I I I I I I I I I .02 The Co/dlactorand \he.Owner sl1alI provide each other with the ~1Il add....n. telephone numbers and facsImIe IieI ,,1inaI rIUI1lb8rs for \he ContnICt Administralllr and \he'Superinleftdent at the commencement of \he Work. .03 In \he event of an ~ncy sIluaIion or other wgent maUer \he ContnICt AcImlniSIIlldDr or the SUperintendent may gNe 8 verbal notice, provided that such notice is c:onlirmed In writing within 2 Days. '.04 ,Any notice 'PemIiIled or'required to be gMln to the Owner or \he ConIr8dor sh8llbe gillen in 'lICOOldallce with the notice provision of the COntr8Cl GC 3.13 . Usa and Occupancy of the Work Prior toSUbstaRtial PerfOrmance '.01 . Where It is notcontemplllleehlsew1lere in'theConlnd DocumenIs,>theQwnermayuse'or occupy \he Work or any pert theIeof prior to SulAtaidllllcPfltfornlancei providedjb8UIt,te&st 30 Days' written notice has been gillen to \he eo,lbactor. .02 The lEe or occuperx:y of1he Work or any pBlttheleofby1heOwnerptiorto13ubitanlllll P..f~ll"/lIIl1Ce sh8II net <lOrISlilubt' an 'lICoepGnce 'Of the work, or parts so' occupied.' "lri''addIllon,the use or , ~lp'irx:y of the WOrkah8llilot 18Iieve theCu.lliaclor or the Cu..bacliol's Sumy from q IIabIity , 'that has arisen, or may arise; from the pelfl.o"l8IlCe 'of the' work 'In - accexdallce-wIth 'the' Cu.lli..ct ',Documents. The Ownerwlll be niSpOI1SibIe for any damage that 0CCUI8 bec8ule'of the ~ use or ocCupancy.SUchUli8or occnpancy of any pIct.of the Work by the Owner does not waive the " 'Owner's',right1D-dlarge.the.Cutltlac:lor-1iqu1datecl damages In 8CCClIdancewllh1he,'\elmSof the co.,bact. GC3.14 GC 3.14.01 CIaItml, Negotlallons, IIedIItIoa ContInuance of the Work .01 Unless the 'COntnICt hat been Jenninated or c:ompIeIed,the Cu.lli-.lol ah8II in fN8t'J case. efIer secvlng or I8C8iving qnolification of a claim or dispute; -verbal or wriIIen. conlInue to ptoceecl with '_ the work wiltfdlie dIIgence anclexpeclition;'If'is ur.delstocd by'theparties that such.actlon wUl net jeopaIdize any claim It may have. ' GC 3.14.82 ReconI KeepIng .01 Immec:llately upon commencing work wh1ch may result In 8 claIm,1heCu.lli..ctDr shaD Ic8ep Dally Work Records cIurIng the CCIIn8 of \he Work. .ulIide'IUosubllla'lllall6 the c.......Allts cIaIm~ and the Co.lli....t AdmIr........... wDIkeep Dally W61k',fteccrdS:to'be useclln In! I I'll-lie C.."b4ldOf'a cl8lm, all in acccrdanca with cIauIIe GC 8.02.07, Records. " .02 The Contractor and the ContnICt Administrator shall reconcile their respective 0aIIy Week Records on a daHybasis, to slmpIify nwlew of \he cIalm,.when submilIed. .03 The keeping of Dally Work Records by \he Ccntr8ct Administrator or \he reconclling of such Dally , work Records with thclII&of\he'Cdilliactor shall not be constnIed to be ~A..lClt of the claim. . ,,' GC 3.14.03 CIaIm8 p,,"*,,,ft1 .01 The ConlnIctor ah8II give verblII notice of any ...~ which may IelId to a claim for addlllonal payment lmmeclIatli'j upon becoming IIWlIftI of... tIIb~. .02 The Co. d,acIicIf ah8II pIOVIde wrIII8n nolIce In the lII8ndarcI fonn "NalIoe of InlIIlt to CfIIm" within 7 0IIya or the CClI/lhl8llCllll*lt of..., ptIrt of the Work which may be dIctId by the 1Ib~. '0P8o-.1"l '1' arQ..JJ.....1 t 1_ .....13 .03 The ContracloI' shall submit delaiIed claims as soon as reasonably possible and in any event no later than 30 Days after completion of lhe work alfecled by lhe situation. The detailed claim shan: a) Identify the item or items in respect of which the claim arises; b) state ,lhe grounds, con1ractual or othelwise, upon which the claim Is made; and c) include the Records maintained by the c.:..lb6Ck.o supporting such claim. In exceptional cases the 30 Days may be increased to a maximum of 90 Days with approval In writing from lhe Contract Administrator. .04 Within 30 Days of the receipt of lhe Conbac;b:)('s detaUed claim, lhe Contract Administrator may request the Contractor to submit any further and other particulars as the Contract Administrator considers necessary to assess the claim. The Contractor shall submit the requested information within 30 Days of RlCelpt of such request f"- .05 Wdhin 90 Days of receipt of lhe detailed claim, the Contract AdminIstrator shall advise the Contractor, In writing, of lhe Contract AdmInIstrato(s opinion with regard to the validity of lhe claim. ....n. ., GC.3JI4.C14 Negotiations '~'::n_ _ _.._._ .____,_ __.........___..... ..A. ,..... .01 . nie parties shaD make all AI8SOn8bIe efforts to resolve their dispute by amicable negotiations and agree to provide, without prejudice, open and timely dIsc:Iosure of relevant facls, i,fom1ation, and ,documents to ~Ib these negoliations. .02 Should the C..llb....u disagree with the opinion given in paragraph GC 3.14.03.05, with respect to "any part of the cIalm, ,the ,ConlIact Admini&Irator sh8II enter Into negotialivns with the c.:...ll....u to resolve the mauers in dispute. Where a negolialied selIIement cannot be reached and it Is agreed that payment cannot be made on a Time and Malerial basis in accordance with clause GC 8.02.04, payment on a Time and Material BasIs, lhe parties shall proceed In accordance with clause GC 3.14.05, Mediation, or subsection GC 3.15, Engineering Arbitration. GC 3.14.05 Mediation .01 If a claim Is nOt resolved satisfacliorlly through lhe negoCiation slage noted in clause GC 3.14.04, , Negotiatio.lS, within a peIiod of 30 Days foIowing the opinion given in paragraph GC 3.14.03.05, and , lhe Co.lh....uwishes to pursue the Issue further, the parties may, upon mutual agreement, utilize the services of an independent third party mediator. .02 The medlaloo shall be mutually agreed upon by lhe OWner and C..llb....u. .03 The mediator shall be knowledgeable regarding the .. of lhe disputed Issue. The mediator shan ,~ with the parties together and separately, .. neenm)', to review an ~ of the issue. In a . Mil allblllpt to assist the parties in resolving the issue themselves prior to pllx:eeding to lkbibaliun the mediator shall provide, without prejudice, a non-blndlng recommendation for settlement. .04 The review by the mediator shall be completed within 90 Days following the opinion given in paragraph GC 3.14.03.05. .05 Each party Is responsible for its own costs related to the use of lhe third party mediator prooess. The cost of,the third party mediab.. shaH be equaly shared by the OWner and ContracloI'. GC 3.14.Cl6 Payment .01 Payment of the claim win be made no IaI8r than 30 Days after the dale of reeoIution of lhe cIalm or dispute. SUch payment wIl be made llcoordlllg to the lienns of Section GC 8.0, MeIsurement lInd P8yme!1t. .....1. OPSo.n...ICc. "Ill ~GfConlNat..I~11 tlller11ll8 ,. I. h I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I "~""<-X';".- . . -0''''-'-'' GC 3.14.07 RIgIds of Both Parties .01 It is agreed that no action taken under this subsection GC 3.14. CIalms. Negotiations. Mediation, by either party shaD be -construed as a renunciation or waiver of any of the rights or recourse available to the parties, provided that the requirements set out in this subsection are fulfiUed. GC3.15 GC 3.15.01 Engineering ArbItration CondIt/OnS for Engineering ArbItratIon .01' If a claim is not resolvedsalisfactorily through the negotiation stage noted in cIawe GC 3.14.04, Negotiations. or the mediation stage noIed incla1m8 GC 3.14.05, Mediation, either party may invoke . the provisions 'of$\~ GC 3;15, Engineering ArbIbdtiuol, by giving written notice ~ the other party. .02 NoIIfication that arbitra/icln shaD be implelnented to reeoIvethelssunhallOe~1n writing as soon as"posslbleand 'nolalel..thaIi''15O''Days~foIIowlnsr'the OpiniOI'l"glVen In pal8OIl!lh GC 3.14.03;05. When! the use ofa third partymedlalDr was implementedNlolillc;alionahall.lIltVlilbin120 Days of the opinion given in paragraph GC 3.14.03.05. . .03 Th&parties shall be bound by thedeclslon ofthearblbalor. .04 Th& ndes and prooec/ules.ofthe A1b/t1atiOn At::t, 1991, 5;0.1991. c.17, 85 emended,.shaIl apply to .anyarbllnllion ODl1ciIICied.hereuncler except tothe.ex/ent.that they are modified by :tbe expIUS provisions of this subsection GC 3.15,EngIneering Mllba/iOl1. GC 3.15.02 ArI*latlon PlOClIdure .01 The following pR:I\isions are to be included In the agreement to MlIlrate and aresubjec:t only to such 'right of 'appeaI'" existwherethelJlblb..ro. has exceeded'hlsor'her jur/Idl(;/iol:I or have othelwise dlsquallllecl him or henlIIf: . a) AI existilogllCliolll InJeSpeCtofthe ITIdllIais under lIo'blb.d....rwll'be.stayed petldlng adl/blllio.1; II) ,AI outstanding claims and mat/8rS to be I8IlIed are to be set out. in . schedule to the agreement Only such clalmsandmatle.'S as are In the schedule will be adl/bAd, and c) Before proceeding wilh the arbitration, the CUllb...L ShaD Cuhrlhl that aU n..lters in dispute are set out in the 1Chedu/e. GC 3.15.03 AppoIntment of Ai'bIb...... .01 The artlib.... shall be mutuaIy agreedupcllfby1heOWnerand-co.lb~"edjudlclde the dispute. '.02 Whale the Owner and CUllb..clor cannot egree on a sole arblb..lbo wIlh/n 30 Days of the noIification of al1lIil ation noted in paragraph GC 3.15.01.02, the Owner and the ConlI BdDr shaD each choose an appointee wilhin 37 Days of the notice of 81b1bation. .03 The appointees shall mutually agree upon an lIlbItIalor to ac/jI.~ the dispute wilhin 15 Days after the .. appoil_ was choIan or they shall8fer the ma/Ier to the Alblbdlll.n and MedIaIlon InsIItUte of Ontariolnc..whlch.w8l select an adl/b..tw to ,adjudicaIe the dispute within 7 Days of being requested to do 10. .04 The ..bib..... shaI not be illiel\llled IinanciaIy in the Contract nor In either party's busIneu and IhaH not be e~ by either party. .05 The 811l111...... may eppoint /ndepandlInt 6.ql8f1a and any other penIOlII to lIIIist him or her. OPao.n..lc... ~r lIafCal......'IU... t_ .....1. .06 The a.tlib ..tu. is not bound by the rules of evidence which govern the trial of cases in court but may hear and consider any evidence which the alblb.luf considers relevant. .07 The hearing will commence within 90 Days of the appoinbnent of the arbitrator. GC 3.15.G4 Costs .01 The arbitratofs fee shall be equally shared by the Owner and the Contractor. .02 The fees of any independent experts and any other persons appointed to assist the arbitrator shall be shared equally by the Owner and the Contractor. .03 The arbitration hearing shall be held in a place mutuaUy agreed upon by both parties or in the event the parties do not agree, a site shall be chosen by the arbitrator. The cost of obtaining appropriate facilities shall be shared equaUy by the OWner and the eo..bGdu.. l.Y:.~c"..,~ .. .::.. .04 'llie arbilIato. may, in his or her discretion, award AlnOi'lllbIe costs, related to the arbIbaliun. GC a:.u The Dec:isIon -.-' .01. The reasoned dec:ision will be mailelnwritingwithin 90 Days of the conclusion of the hearing. An extension of tine lD make a deeIsIotI may be gl'llllted with consent of both parties. Payment shall be made In accordance' with clause GC 3.14.06, Payment. GC 3.16 Arcttaeologfcal FIncIs .01 If the Contraclor's operations expose any items which may indicate an archaeological find, such as building remains, hardware, accumulations of bones, pottery, or alTOWheads, the Contractor shall immediately notify the Contract AdminislralDr and suspend operations within the area Identified by the eo.ob....l Adminis!lalDr. NoIification may be verbal provided that such notice is cc...rh,.ft!ld in writing Within 2 Days. WorK shall remain suspended within that area until otherwise directed by the Contract Administrator in writing, in accordance wiIh subsection GC 7.09, Suspension of Work. .02 Any delay In the completion of the Contract flat is callsed by such a suspension of WorK win be considered lD be beyond the ContraclDr's conln:lIln accanlanoe with paragraph GC 3.08.01. . .03 Any wort directed or aull10rized in connection wlth an archaeoIogicalllnd wiD be consIdenld as Extra , . Work in accolllallce wiIh clause GC 3.11.02, Extra Work. ',iZ . ".>1@1""; --I",."';r '.~. ..... 18 OP8o.nn1Can~lIu.GfConlNlll.'J.1I ,1ber1'" ,. I. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 00 4.01 SECTION GC..... - OWNER'S RESPONSIBlUTlES AND RIGHTS Wor1dttg Anla .01 The Owner wiD acquire aD property rlghls which are deemed necessary by the Owner for the conslnJclion of the Work, including temporary working easements, and will indicate the full extent of the Wortdng Area on the Contract Drawings. :02 The Geotechnical Report enc:Ulubsurface Report which will be pIOIIidedby the Owner 88 part of the tender documenls shall fonn part of the Contract Drawings. OO4.G2 Approvals end Pennlls .01 The Owner wiD pay for aU plumbing and building penniIs. .02 The Owner wiDobIain and pay for a11,permiIs,ioensescend~""~..::l'I:C\uimd..fOr PRlject approval. . ' 00 4.03 , l18nagementand Disposition ofllat8rlals .01 ' 'The Owner wiD identify in Ihe Contract Documents Ihe materials ID be moved within or AIII\O\Ied from, IheWortdng AIea. and anyGhanlc:terislk;. of those fllllllia1s.whIch will neceSlIl.. speclaI materials management and dispoeltion. '," ".02tnacl:lOrtlal\ce'Wlltrte(juI8llonnnder the 0Ccupe1ioiltJl HH/ttI,IJnd'SafetyAct; R.'8.0.'1990;'c.O.1, 88 amended, the Owner advises th8t e) the designated substances &iIica, lead and arsenic are genenlly ~ lhIoughout the Working Ar8a occurring neturaIIy or 88 e RlSUIt of vehicle emissions; b) the designated substance IISb SllIls is present in IISbesIDs conduIIs for utilities; . C) 'the . fOllowing : hazardous -materials. are -,ordinarIlY, PI e s ent In construclIon' ectMties:' limestone, gypsum,merbIe. mica and Portland cemell!; and d) exposure-ID 1hese8Ubstanees. rnay"oeetIr88"a RlSUItofaclivlties by. the Coolllaelol.1lICh 88 sweeping, grincfng. crushing,dn1ing; blasting; eutling and abIas1....bIasling. . .03 The Owner wiD Identify in Ihe Contract. Oocuments any dulgtnd subllanCes or hazardous materials other 1han thole idenllfled above Md their Ioeatlon in the WorkilQ Area. .04 If the Owner or c:........ cIiIeovers oi'.lSadvised.of.the'prmnee;.ot,dnigmRed.aubstanees or Il8ZIRfous' maIIllriaIs .whil:Ih-. in addilion IDthose 1lsted.1n flII8GIIIIl/I' 00, 4.03.02, or not dearly . :Idanlllled In l1e-Contl.eI"DoeurnenIs~lIo'lJ:1D:p..II..tph,OO*-G3:03~"'flOIlce wII be provided ID the OCher party Irnrnedi;ReIy wilhwrlll8n ......Iil........,.wlthln2Days..The Cl.or~llaeliof will slop work In 1he eree1lI...edilllelyMd wII determine Ihe nee: merysteps required toeonlJllele lie work In aeeordanc:e wlth eppIicebIe legislation and regulation. .05 The OWner will be responsible for any ,easonable.acIclillonaI C08Is of removing, managlngMd disposing of any maleriaI 'not IdenIItled in the ContractOoeumenlB, or whene condlllon,uxlst that could not have been n~n,llIbIy'forenen at the. time of tendering. AI work under I1IS paragr8Ph shalbedeemed lD,be Extnl Work. .06 Prior to comrnenoement 01 the Work. the OWner will pnMde ID the Cl.or......., a lilt oItho1!e products contJoIled under the WOrkpIece Hazaldcus MalI8rilIIs Infomlllllon SyIIem or WHMIS. which Ihe Owner wII euppIy or UM.CIIl the Conlrac:t, IDgether wllh copies 01 the Mal8IIaII Safely QIIIII8heeIs for 1hese producla. M..... 1 ....rs UMd in the ~'l oIIcation 01 producla ........A.d under WHUlS IheII be Iabelad. The Owner wII notIy Ihe Cu........ in 1IIIIIIng 01 ellalllis.to .. lilt and pRMda NIevllnt ,..,fa1 SlIfeIy DIItiI SII..... -oP8........c. .'RIGle l..,j.t.pl .111f'. .....'7 GC 4.04 Construction AffectIng RaIlway Property .01 The OWner will pay the costs of all flagging and other traffic control measures required and provided by the railway company unless such costs are solely a function of the ContraclDr's chosen method of completing the Work. GC 4.05 Default by the Contractor .01 The Contractor shall be in default of \he Contract if, a) the Cu,.b....tu. falls to commence \he WoIk or execute the Work properly or otherwise fails to comply with the requirements of \he Contract to a substantial degree; or b) if the Contractor is adjudged bankrupt or makes 8 general assignment for the benefit of creditors because of insolvency or if a receiver is appointed because of insolvency. . GC 4.06 Notification of Default ~~s;j~< .01~'J,he OWner win give written notice of 8 default to \he Contractor as soon as \he Owner becomes '"aWare of the aReged default but failure to give such notice in a limeIy way -5IaII--not c:onstilute condonation of the default. The notioe w111nc1uc1e InsIruclions to conect \he default within 5 Working Days. GC 4.07 ColltlacC.or's RIght to ComIct. Default .01 The Contractor shall have \he right within the 5 fuR WorkIng Days following \he receipt of a notice of default to correct the default and provide the Owner wIlh satl5facto1y proof that appropriate corredive measures have been taken. .02 If the correction of the default cannot be completed within the 5 tun WorkIng Days following receipt of \he notice, the Collb....b..r shaU not be In default if the Contractor, a) commences the correction of the default wIlhIn \he 5 fuR WOlldng Days following receipt of the notice. b)' ~ \he OWner with an acceptable schedule for the progress of such COllection; and c) con lpIete.. the COIl'8Ction In a<:cxlIdance with such schedule. GC 4.08 Owner's RIght to Correct Default .01 If the Contractor fails to conect \he default within the time specified In subsection GC 4.07, . ,;~.b ....-tu... Right to Correct a Default, or subsequenlly agreed upon, the Owner, without prejudice to . c~ other right or remedy \he Owner may have, may conect such default and deduct the cost lhenlof, as certified by the ConlractAdminlstrator, from any payment \hen orlhe\....robi due to the Cu,lbaClul. GC 4.09 Termination of Contractor's RIght to Continue the Work .01 1IIIhere the Contractor fails to conect a default within the time specified in subsection GC 4.07, Contractor's Right to Correct a Default, or subsequently agreed upon, the Owner, without prejudice to any other right or remedy \he Owner may have, may terminate \he Contractor's right to continue \he Work In whole or In part by giving writIen notice to the Contractor. .02 If \he Owner terminates \he ContnIctol's right to continua with the WOI1t in whole or In part, the OWner wIl be enlllled to, a) take poss e 111011 of \he WOlldng Area or that portion of the WOlldng Area devoted to that part of the WoIk tarmln8l8d; b) ulIIize the EqulpnMlnl of the Cu,.b....... end My M.er181 within the WorkIng Area which Is intended to be lnoorpoleJ Into the Work, the whole IUbject to the right of lNrd pertIes; c) wIlhhold fult1er peymentII to the CMdl4lc:b wIlh I1IIp8Q to the Work or the portion of the WOI1t wIlhdl...n fnlm the Co..tI4lCfO( untIthe WoIk or portion lhenIof wllIIdIonl4'Ils completad; ..... t. OP8Gene1111ea~.I.lIIConlNc1.II~11 ,..tI.. I .' I. I I. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I d) ch~the Cut41.wAoothe addIIionaI cost MttheConlraet price ofcompl.lingthe~or Jl()rIion thereof WllhdnIwn fIOm the ContnIcIor. as certified by the COllllactAdn*.llelC'end any addiIiClnal oompensation paid lD the Contract AdmiMahA for..... additioneI tfJMce al\Sing fIOm the c;:orrec:tion t9f thedefaull; e) charge the C<ll41aOlOr a reasonable aUowanoe. as delermlnecI bylhe ConlI'ac:tAlflnildwllodo.. to c:over c:QI1ediOnto the Work IIElIfolhled by the.contraclor that I'AllYbe requlnIdUl.1Cl4lrl$Ubsection GC 7.15. Warranty; f) .chalve the C(Altladolfor any damages the Owner may have l$UIlained . a .l8SIiItof the default; and g) charge the ConlIactor the amount by which the cost of QClI'l'8Clions to the Work.lIIKtertubsection 'GC 7.15jWatlanty.~s the aI/owanQe pnMded for such comldIons. 004.10 FIn8I P~to Contractor .01 If the OWner'scost lDcorrect and compIelBtlhe'Workil'l:wholeortn:part~is';le$llll1anthe MIOUllt WIlh.'1eId ftom the eu....cIOr.undenubsec::tlon' 'GC;4.09.'Tem..latiOfi..ot:~Ill~$ RIOht lD Continuelhe Work,'the OwnerWll pay the'bal8IICt'lD1he':QojItld:if'.'aocil\..btfinalllCCOUl'lling for the CoI'dract is complet. , 004.11 T......atiwt of the eo... .01 Where the COlllr...istn clef8UII oftheConllactthe OwnerI'AllY. wItt!OUtprejudiclllD8!lYotherriflht . or IeQlecIy the Owner..., have.1elminat8 theContntct by gMngwrlUennollceofteRl\!ll8llonlD the .eu........the$nly.W 1111)' 1nIStee'orl8Cllveracling on behIIf of.theCUl~estateor aedilols. .02 If lhe Owner eIec:ls lD tenQin8le the Contract the OWner will pIOVide the Qoj4l.ctorand.the ~ or _eiJet with a COII'lpIeteIlCCClUllling lD the dalie of termination. 004.12 COhtinuatlon of Co..b-w'a OblIgations .01 The eu.41~s:~ under the COolIect 8$ toquallly;, COI'l'8dJon anct~1ty of the Work perfonned prior to the .ana of termination of the ConIIactor temlill8llofl of the Ciltlll..oll).'s right to continue with the Work '" whole or in part shall continue to be In ~ .... suchtelallnalicin. OC4.13 Use of Performance Bond .01 If the ContraclDr is In derauIt of the Contract and the'COllllllGkll'has:PfO\/iI:Ie4.,aPelfolfflllllle Bond. the pR)Visions of thiS SecIIon llhaIIbe exercised'ln aclCXlIdalloewlththe 1lORdIIIonsofthe Pelfonnanoe BcIrKt. --. . OP80-.101 ..11..'0.1 Ilott.' tlIr.. .....1. i;',;"'" . . '., __ ;;" . . .02"- r!\\'id tuppiedby tile c...~d:l.1h8II ~","".1IijurimE!llts of thE! ConlnIci ~-.'. '.' .' ',"." ',' . ...;...;'.' .' -.:.",j';,.,,;.<'--:\:) .... . ..' . :. .~ ,~~ or"'~.lIYtbeCM~_l"lfSto"",the CMIIl-..b.........IIl'JrrlAe for .~ or...Il.......Of... ........~IIe..Plllf by the Col......., ,.~, .' m ___ '__ .._ __,___ -.;--..----:----~c~.-:--------~-----~-. ';_ '" . ._C'. ______.__~---n..--_-_~______,~----.- -..--_----- .-~~ .04n.Contl~ .............Ccli.......,.,'.t II " the light >>inlElfupon the premim of the Ma......llIIIrll.If8ctIor supplier>> CfJII'I QlIt...l1.I~,*'-' end telling 8Itpei;lliedor. .requ!!lJl1bytheOck*e.4M.lcl.... I ~. GCut 8ECTIOH ClGct.O ..1IAJ15RIAL Sbtljl~aUI t IIid .01 AlIVeteriaI'M( 1 Hlly.... ....~ OO"~.Ul!JloltheWork,elCl!lllpt..IiIted..lleIngaupplied by fleQwl1e(, .....be..~IIY..COIl.~"'_~... prioE! for'" ~-lIlnderil!erns shelf be deemllld >>IrlcludeUOOftlIlE!llSllllontJtlM'IlJllPIy otsuch ~ . GC..6.02 QlIaIi\y tJf ~~t9ItlJI '>;Z";: .of All......., suppIled .bYthe ~.. .,...,e,;.,.w. unIeIs 0IherwIIe sped!ieditl.. Contract 00clIlments. ". .. . . ., " '.~, '-r' . . .05 The ec,-..........t;IlllifY ..~A4,Jilih.IR.,tIIe.... ofllqlly ~.lnadVance ..offle M'IlItalIh/fllllOO,,**.."'e the~."..c:t~tiUlD perform the """IlIIPI~.. . '-I8I~lj;l endltlllng. .. .06' n.Owtler1Ml1l!)t be ~ _~ ......0..... ......aIIoo"..the~-..b fellsao liIIve lIUfIIclent IICIWiICt. l1QlIce'..ao,.;O-.a:t A4h........ .>> . etIIIbI8 tile CclrIQct Admlnl....... aoceny out the fIIqI/InId 1n1fAK~.u .1111." _1eslIng~ the tCtiedulecl",ing dale. .07 The (;OIl........"*__tb..O...OI of......-.y nil! rlII"itllt" _lIUlIMt...oliu.'l Of fleCc!llll6tOt "........ '. .' ,OS' MlUJ1IiIwIIlcbll riot~" tie of . quJlIl)i~lUlted>> the purpoee requlrec.fendtlle _of such MWlutalflhd be$.lbject Ill! the -..roWll....QIl.....U........ .';q "", ..;;. ~. 0; t. _. GC~.R,.I.nld........ .01 .~ MaMlilll..- be ~ .fnlm tIIe~...... expedltiouety ......~ IMlIlllc8llon 10 Ihllt ~ fnlm the ea"...:t Admlll....... ~.the co.4l-..b falls 10 .compIy wilhllUCfl nolice thE! O(ltib.:l Adn.M..... mByC8UllethE! qJr c,.,rBrllfllllD be Iel11CMldrromthE! '.VoI'kln9 MIa and dillPCJlJed Of in~ lheO"ib.....~~ Ildel'l 10 be the maat ~mannerand the CoM*lUlIheIpeythe COIIIol dl~ .It. ......... OYeItInd etlarge$. GC .&,04 SubIIIIutIont ~. .Of 'Where tbupecllk bola...... C91~1D...,. rl.arlel d!*lg\ ~"'d by. trade or other ....... T"-1haI be .....0I'Ily upan........Met8Ii8lIO ~1I..IlIIl8d, 1lf\l!ltl....IMI. AIfIIIIded _the Uti*", of...,..... by.~.. Mllrthe ~t'106 Of the Tender. theCc!llll<llClh mey. epply IDIle co.~ 'Aifl.. Jr.) t~>> .....enoIller .,..r181 'ldeIllll\Id.by . diLlo. lIIrde. or other MmlI.tDrtheMII!Itil.[ r~ . rl't _... rl1 __plIcetIoIf... be in wrlIlngend.... _the.'" -"pRlllll! jtJtI1ltIJernll....~8I_lIlr.1. end 1IUCfl-, _l'~..." It:;... "'~.' ,..w.tlIl r.;"Ill....... .....10 ON'1!1 JIIO~ /if ..._lllll~'".+L ....rUlle 'I" .' ......1;,.. , .";,' I I I I I I I I I I I I I I I I I II .1 I I I I I I I I I I I I I I I I I . . .02 RuIlngs on a.pIQp08ed.;~ wlII not be I1l!Ide prior to the ~. oflhe Tender. SubstiluIIons 8haII not Ili8 macfe without the prior approval of tile. Conti'aCt Admil...... The approval or rejection of a.. proposed 8UbstiIulion will be macfe ettlle discrelion of the Conti'aCt Adminis1rator. .03 'If the pI'OpOSed SUbsti/utlOn is approved by tile Contract Admirtil:4lodul.tIle ConlracllI:lf 8hallbe entiUed to tile first$100Q of1heaggregatll saYing in cost by reason of such aubslltution . to 50% of eny addlIional saYing In cost In el<<: au of such $1000. Each such 8pp1OV111 8haII be conveyed to the . . Celldlac;tor inwrllingorby issuance of 8 Cel1lIic;aIe of Equerdy on the Owner'utandard form. of . "Cert/ficallon of Equallty",..,jf eny adjustment to the Contract price'/sI\18de.by reesonof such substitution aChange.On:/er shall be issued as well. GC 5.05 GC 5.G5m 0WMr Supplied Material Ordering of Exc III Material .01 Where MaWnal/s ...~ by theOWner.'8IId/where;1hls.:MatillriilM$~OIdered~1lytlleeu.~ In ....>?ll'n of tie amount 'Ipedfied to comp/elIe.theWork;:,;aucll':e'{IIJ'I"UrtI<! ~ :bec;ome the property of the COhb....... 011 colllplelionoftlle WoI1c end shalbe chaIged to tile Cl,,414nat cost plus 8pp/01le overheBclll. GC 5.05.02 c.ntof MaIlIrlaI .:,01.The.CO..b........8haII; In advance of receipt of 8hiprnen/sof MsIeriaI.luppl/edby the,Owne!'. ~e. . adequate end properstpmge faclIlties 8OClIltI/:IlbIe to the ConlIacl Adn1InIstr8tor,ancfonthe receIpt'Of ..' such Material BhaII prompl/y plac:e it In storage except where it Is to be incorpol ated fol1bwllh Into the Work. .02 The ConlracllI:lf IhlIII be responsible for ~lCIl of MaterlaI suppIieId by the Owne!', .at the specified .deIlveIy point. for lis safe hancIliIlg . 1lOl.. If such MatilIriaI is .damaged WhHe . under..fhe.CCIfllRlI of the Coo.bat.lll. IlIha11 be repJeced or IepBired by the ~lIk~et no ""sa to tile Owne!" endtD the ...r.....tiuIl of tile co..b...{ Admiltil:4l.....~ Ifsucht'atlliali$ ntjalllit1lby the. Contract Adllitil:4lMulfor re8sons WhIch are not the fault of the.Cot&~ it 8haIINm8In Inthec:ere end at the.risk of the Cu,dl...... until lis disposltioll has been de/iemllnBd by the Contract Adminis1rator. .03 Where MaferiaI tIUpp/lBd by the Owner erriws at the deIivelypoint In a.daIll8Q8d OCII~ or where there are d"nscrepancies between the qualllllie& ntcei1led~end:1be:qu.flj"II':lIhoWn on the bills of lading. the Coillk.u IhlIII immedialely,report.suchdamage.or discrepenclestothe Contract Admiltil:4lalut" who' shall .8fl8j1g8 for an::h,~j""l b.'.II~,,~ IIIIdprollide the eo,.b.....lW with a wrilIen ~fa r I e from.responsIblIIty for such damage or.wfiClencie$. ~damage or deficiencies are not so reported it will be assumed that the. shipment IIrrived In good order end eny damage or deficlencles reported thereafter shall be made good by the Co.ltl..... at no exlra cost to the Owner. .04 The full amount of MaferiaI supplied by the Owner In each shipment shall be ~ for by the ContracIot end such MaliedIII shall be at the risk of the CelldJacID( alIer llIIdng deiIvwy. SUcI\ MaterlaI IhlIII not, except with theWriltenpermlssion of the Cl"lb...J. AdmInisIralDr. be UI8Cl by the Co"tl-u- for purpcSIS otherthen the perfonnance of the WOI1c under the Celllbact. .05 Empty reels, crates. ~. m:l other type of peckaglng from ti '''liaJ lIuppIied by the OWner shall become the praperty of the Collbaclol when they are no longer IeqUintd for .. 0Iiglna/ purpose and shall be distlOted of by the Cell dJ8Cklr unless othetwIse specI/Ied In theContr8cl Documents. " OP8__CoI "1" IUfColllMlll....W .IIlef,. .....21 t". ' .oe The eo........ .... fl!VVIdIlthe ConlrIIct~'J~,,!.lMIH'" ~ Iwceiptllf ., thiplnenl, copies of bIls oftadlng, orlAM:h ~ ckIOl",.i!l.1Il:IU ~ the ConlI8et .AdminIStnlIllr may require to 1I....1lillta enctreoollclle thell!-"'oft~Jrl\lll!1lllri1l8d. .07 Where Material IlUpplilld by the Owner is ontenIdenct stoo~ prior. to the 8Wan:I of the Corwact, the eo.dl~'" at no ~ CllStIO ~ ~.~il;IelY UflOft CCfl~OfoptQliorls. ehec::kthe f.1ateda1, tepOItlll1Y damage 01' .(!~I[f"lO the ConlnliI:t AdI.41lillt." enct ake charge of the MaleriaI at the 81Dd<plIe.... ~:__ or delIc:lencies.. not SO nlCCIIded by the Co.llIIlOtclr IlbIIIbe II$SUl'lllIiSlhllt the ~.._In good orderwhen the Col.~ took charge of It enct 8IIY ~ or clefic:fIIIfilliell ~Ihet.. IIlaII be n\IId!I good by the Contr8ctor at no eldra COlit 10 theOwner'. "";'i".:-' ,:" _ .'ll/i::o ~~ . .... "'... .."..: ~.,.. ....II! OP8Gen1111ClW 11" 111'0, L '-.'UI ...- I .' l,i 'I I I I I I I I I I I I I I I I I I ,I I I I I I I I I I I I I I I I I I I . '~-._..~.,>...------~,- GC 6.01 SEC1'IOtf,GC 6.0 -INSURANCe. PROTECTION ANQDAMAGE Protection of Work, Pensons and Properly .01 The Contractor. the CQ!lbaGtOr's agents and all worl<ers employed by or under the QOIllrolof the Conlractor. including ~lliaGloos. shall protect the Work, pel'8OI1S and ~fRIm..cfIImage or injury, and shall be fellPO/ISlbIe for all Josses and damage whie:h ll\8)' arise 8$ the resuIl of. the <M,b ~s operations under the Contract IR'lIess Indlcated to the conlr8ry below. :02' The Contraclor Is responsible for the full cost of any necnury ~1X'01/fI;ioIl$ a(Id the restoration of all damage whera the Contractor damages the Work at property in thepetformance of the Contract If tie Cotllladol Is not rasponslble for the damage that occurs to tie Work or property the Cohbador shall restore such damage. and such work shall be adminlstered ..........ow to these General Conditions. .03 The Contractor shaIlimmediallelyinforrrHhll"COlit.<iUAdmInIsl.ralorOfa/t'damage end IniUrles wtlich occur durlng 1he term of the ContIact. .04 TheContraclorshall nothe rasponslbleforlo$S enddamageihatoccurs 8$ a""" or. a) war, b) bIockIIdes end civil commoIlons; e) enorsln tie <M.tl"""00cumenIs; or . . .. d) lICt$oromisllClnS ofJleOwner. tie ConlnllctAdt'nirdllh..... theI'!IjJeIds and ~""orothers not under tie eonInlI of the <M41c...t...r. but within the Working AnlB wIIh the Ownef8pemisslon. .05 The ConfJaetor and his SuIety or Sureties shall not be rillrned from any term or pnwision of any responsibility. ~ation or liability under tie Contract or waive or impair any of tie rights of the Owner except by a re-' r I e duly executed by the Owner. GCUZ indemnification .01 The Co"b....h.t shailindelnilify and hold harmless the Owner andthe.<Mlt..:l Admll....... their aganIs. ofIioefIand empI~ us from and against all daims,den8Ids.Iosses,expll!...... costs. damages. . actions, suits. or proceedings. by third parties. hereInafle. ~ ~.. direc:lIy or indlr8clly arislng or aleoed to arise out of the performance of or the failure to .ped'orm the Work; provided such claims ..... a) a\IrlbUIabIelobodly~.1ickJ HI. !lis HU. or dealh or to damage to or dUlllCtlOrloflallglble JXQIIeIty; b) caused by neglgent lICt$ or orninionSd.the'CoIIfJac.1r:lr oranyone:for.1M1asa lICt$..the Co..t....A.... may be liable; and e) made In writing wilIIln a period of 6 years from the date of SubsWdlal f>erfoImance of the Work 8$ set out in the Certificate of Substantial Performance of the Work or. whera sospeeified in the Contr8et from the date of ce(.ifi(:allon of FmaI Aoceptance. .02 The Contraelor shaD indemnify and hold hannless the Owner from .. and tMItry. claIrrt for damages. royaIlies or fees for the lnIi1ngement of any patented invention or copyright OCCIlliollad by the CO..b-tl... in eol1ll8Ction willi the Work petfonned or MaleIiaI fumI8hed by the C<MlIlaotol under the Co..t....A. . .03 The Owner expnIIIIy wet.res the ~ to Indemnity for elaims Qtherlhan those..... ~ in panIg!8Phs GC 6.02.01 and GC 6.02.02. .04 The Owner ... Indlmnlf1 end haIcI harmIeIIthe c....~. hit........ Dlfice..4lI.1PIoY1II from and aga/nlIt at ....demIIlds. IasIes, ...n.... cioslI. ~...a!1J.1UIts. or pI'OCIHdInglI8IiIInO ClUt of the eo.~s perform.llce of the CcnInICtwhlcll.. ~""'lo a lack of or defect In tllIeor.en "Iged lack of or cWect In tIlIe to the \"Io.~ A/eJII. -<lP8 o.n..I CIIt "InU' CIolInIcIl.'I, I ... tlIII PIlI 23 '-'~':(/'<~ .05 n. ContnIctllr e..p.1 Irl>' ~ .""hl "'),~ilIlilll-.y forolaims Olher tIlen tIIose Itated Jbove in paillfJrllPll GC6.02.04. GC6.ll3 ColfblntJi.......rUce 'GC 6.ll3.O1 GaMe" .01 V\IiIhout restrlding thegeMiallly oflllllo*llOft $06.02. 1ndenlo1lflcallor'.. tile (M,b-..,' 8haII provide, mainbIin and pay for tile Insur8nce ~fjslIIcfundel' Clauses GC 6.03.02 and GC 6.03.03. ~. (..OWll<a$J6 In clann GC 6.03.04,~6.03.05 end GC 6.03.06 will only amIIY when 10 ~~ InIt1e ~ DocllrftentS. .' ,'.. ," ' GC603 02 Gen."'I~In*.Jf..I.I' ..... :i.~ ~. .01 General ~.iI'IsunIra.... be In tile natIit.clf ll1!lCo..llad<<, wllh lhe 0Wr\et" It1e Co.illa..t ,1!fI1iI.- ........ ~!\I!lI1rlIUnId8. ......of not leis ll1!IO 5111i1Cln:doIIlIts InClullVe per ,~ for bodlIy JrVury.'deliIh. and "i~Lto. .~'1ncludIng Ioaot.~ 1t<llNOJ. wllh 8 ,:-w..tv 'cl8mcli;ededuclible of not men .. $llOOO. n. b'mof ilia ~~be tile ~Bul1I8lId~,.l8C'21OC(1]'llfi.l1.. .. ~ . .... ..... . .02 "';'AnoItI<< fOrm of.1nI!nnce equaf to Clr' beIIIr,"" AICIlJhd In IBC Fonn 2100 mav lie UI8CI. prcMded .. tile requlnlMonls IIlItlId In tile ~_... ~AIlPllWal of thIS ___ wi be cIlllJl~'" upon'" ea..Il...... .AltIII*" tIle....lIICIls'et8ft ...,lICetl8ldtG _WIlle InIIlmnce In.... Pl.....ka'Of 0AtaII0 8Ild ob"uln9thlf'i1'~nr'aoertilkrtli of equI\J1IIIFICf tG tile ~ Il~.oe.' "to. " ;0";''''' """ .03 The _...ullallbe ....1IaIMd 0llI1tinUQ!.III._ commeucement oftlleWOrtc urlIII 12 monltl$ following tile" of $ tIletlIIltiIII PwI~h18l1Cll Clftlle:~....aut In1heCedlll let $Ub8lantial Pelb......a of tile Walt, Clr' unlIl tile Flnelt~~.r &....c.lIllc4. .. tseuad, ..miche:_1s liter. and willi AI!Il*ttGcornpl.ted op,JIIIIons DO.,IUIO."" 8pl1riocl of not"'''' ~ nlOlbfmm tile.. of FinII A~N(ltIIlCl8 of tile: WGIk.... aut In" fInII....,~lplilnCe ~, and 1IIer~ to be ......Nd for 8"" peltQdClf4~ .04. n. COIA....ctor.... MmIt""" to tIle~, '..- of CIllflIInUIlIlx of tile ..o;.~I It) oparatla". , ~and If tile: eo.ill~ _ tGdo 1O,....illllltion peItQd tor cllllnIll9 IncI8nlnIty deeCIibecIln I*~GC6.02.01 C), wllnotMbIndIrlgCllf"'OWner, .05 sI:.4JIct...Cul'ih....... dec:tdenotto ...j...,,8\ll.(l~.""'" for ope .Illionll ~1t1e use of tIlglfcltvestorblO!'ns. Clr'pIIe dItvIIlOClr' ITlnmrWQr\<;or.wl'lO';l8l Clr' ualrenlng ~. .rllitofplO~ertY .06 r;:;:::::=:=:::I'=:::*-"~ In ~ of QIIIt.'lIn u...n,~ Clr' 1IIl\llndm.lltfOIltlil 'lg co\.eqge. .07 "CIains Mede" inluAua pc1lln wII!lOtbe JIllilriJllJd. cae 6.ll3.ll3 A..IlIlulll..f "It_1I1Ll A)J .01 ~,"""1iIIbIIIV ineUnIncIt./n flIIpllGt of lie J. ... ~ ~ IhaIIIIlJW IImIIs of not.... tIIIl'I5 miIIOn .-1nl*"t18perClCCUlNlllle for bOdIly ~~~llInddlllllllg6 to ~. In tile: foIIoMng b'me ~to' .....*.. Qwnet" not.....$tDlya' wrIlIIIn notice irJact.** of..., eer..: *.r.... c:Il8ftIleClr' .........1Il fU1rillli\w -:,.,.: 8). Jt.l..-!'C..IJWIIIICI fl~llIltlll poIcly IlCJlto'~J.ln .:l..o..l~"'IiINly~ end 1t}..lI.nJU d~1cIm . -~UlIll ~~~~1.#." pIIIty~_I!l(folIllt b81~ lu....-_..IIdI..~ U:I!,'d1J'4tllll'~.CP 1I .11 ~ ",..c...lll'6*lo. ..... ...~ - Q)'II"fO l~ l. Ji .1 LJ. ,. I I:ii! I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ',,:':':;:;.'=::,' .. _.',,~.'_r."__.. '.:. . .....;.-;.,.."...,~--,.-.," GC 6.03..G4 AIrcraft 8IId w.,(4Ml L...bIlItJ 1....,._ .01 AilCnlft8l1d Watelc."'lIeblIiIylnsularloe wl\h repot to owned or~ "lIfllt.YIIlIfeIl:lllillUf ~ dinlcllY or irldlI'eCIIyln\he penOlhl8llCeof\he Work. ~liI$8 Of -of.lllklnlll.~Ses,shall be subject to Ilniits ofnptless 1\lall5 mWion doIIars.lncluslve per~forbcldlly'injlIly, dtath, and&lnlagetoP!D\il8itJ Ine\uCling.IossOf.1.IlIe thln<If. and Iimill;Of.not less "5~~for "Cleft Pl!lSengerhaz:8rd. . Such Insurance &hall be In 8 formaocep\able IQtI1e Owraer. The policies &hall be endorsed to.pnMde \he Owner wl\h not less than 30 Days' Wlfltennoticeln 8dVanceof canoetJa\ion, chaoge or amendment restricting ~age. GC 6.tIU5 cae a.oa.os.01 PI'QP8rty and Boller Insurance ......,..rty\nllu~ . .. .01"All risks P!D\il8itJ.1nsUt8nce lIti8II be In thel1llll\e(lf the.ccxllllilctoc.-~..nU"C()"b~ '. '.' . AdmlllilltIalurflllft1ed.as,lIlddlIional. insunlds,instI'Irlg:not;Iess:.\ban;.fI1e-~".\Ile.AIIi!Ol!IIt of \he Contract price end the,ftIII vatue. as may..be.lIJ1WlQ,..~~...;.~.~1I,of .111telf81 ;\hat..~ ~. to. be' prov\I:fId ;bV"\Ile"OWrier,:b~'Ilfton~_;:Ihe"Work.'wl\h. a . dedUCllblenot ~1%Of\lleemount ~ attl1e IiIe oftheWOlt. ThiI ~allalbe in ,';<<form acoeptable 1& the Owneralld ....be n~llI~i1ed continuotIIIy .WIIlI. .10~"'." date of FInal ~.,_<<the Work. aslat out In the Final AOOIJ: '1IlC6 CeItlI111,1 . . OCI;QJIU2 BoIIer___ ,. . '.01"~in$uranc!tinlillfnO:tI1e IIlklIe$\S of the eu..-.h.., the Owner:andthe ~"''''''Admlll''. for ~-.,.., ........rnenl value of boiIeI8and ~ ',mllls. bmIng flIIll-:\IleYltldc, ..be In 8 form ao:ept'" ~ the Owner. ThII inItnnce'lI1aII be ma\I~~ from ~ of use or operation of the property InIunld unlII10Dap..........of FInal Acceptance of theWorlc, as... out In the FmaI Ac:ceplance Cetlificalil. .. GC &.03.os.03 . ..... atIcI 0cclup8ncy of tile Wottcf'riorto CompIIlCl>>n .01 $louId the Owraer.'IWiIIt .USllorOCC\lPY part en. of theWQlf< prior.toSvl,.,*_~.,*I08, \Ile OWnerWill'give.30Oays'WI1IWi noIiCeto the.eu.~ Of\lle '.Illed JlUqlQlIealld... of such use or occupancy.Prlorcto such use or occllp&nCy the ConIrlIctor shall notify theOwraer litwrilingof \Ile eddillonal rnm/Um CCl8t. if lilly, to maIntaIn.property and bolIer ~ .WhIllhahal be at the 'Ownen; ....... If """"V of such use or ~~theCl.l.."",,<1lI '1l.lJfeto provide coverago. the Owner upcnwrillen noIicefrom.the~c("otlaCb ,and~pdor....;.......~ IhlIII provIde..,.......1llin and pay for property and-lloller,1osuIance IoIurlng.llliUvaluetof" WOIlI. IncIudlng ~ for such ... or OOClIp8llCy..and Sh8II.pRMde...-eo.......... pIDLlIfof8uc:h insurance~ . The eo..... IhalI refund to .. Owner the unlamed ,pnlllliums~llIlIBto \Ile Contractor's poIIdes upon tElmlInaIIonof covenlge. .02 The policies...... ~fllIt, In the event of a 10&1 or damage, p&yrIl!lIlt "lIeftllBde to_ Owner and the Conlnlctor as thei' IJIItldve ihlel8lls may appear. The eo.......... stlIIII.act on.llehaIfof bolh the.~ and the eu.otl........' for\lle 1lUlPOI8 Of adjJsting the.""". oflClClll_....damlfge payment WIth \Ile~ When 1he8ldent afthetolsor dlInlaae III d IhJ..Ii~d....~~ ..... proceed to ftlStln the Work. I.oeI or.damage IhalJnot at'rect \Ile ,. andobllQ"af aIIhet party uncfer Ihe eo.~... thllt \Ile c...otl............ be entIIledto*UCb.Tf Q._~of ConInIctTime reJdve.IQ ."extent of \Ile loss or damage as the COlIII*lt AddlIIlll . ~ mardeclde In consuJl8tlon with the COIIlI acb. OPS.....c. "'11.,0", '>II'JiI.l .b....... ...... _':~-k'''''' GC' ..0&04 PaJmi........... or.. ~~.... .01 TlleCultfl~.... be...~1brec II 111 _'...~. in ad_Ill to the llQIOUIlt due~the COIl1niIGt...IlmOUIIf'lll ~.. ~ ..WUt.,..4fWlIlIIoo of" Wcxkha$'t/iIliln ..-sed, auc;l!' ..amG\Iflt to be _ as .. nrl-'tliI.ltIi.......WOrk ll<<lCMd$and in ~"Wllh 1M · ~. of SectlotI OO8.p. U...ur......~ .~ IllIll$lJ!llonIle Ccll'1lI~ .8halI be et,_~to retJaMl _Ile peymenl$ .....tlJ........... an'ICllII1t6fthe CdIib~a__t in IlelestDfationoUhe WOrk. .02 The Col......... .... be ~fOr..!l"..~ Ullcferlhe pcAlGIestlltOel'lt ~ .SUCh amodlll$ /IlII)' be~fIot1\ lhe eo..~/lI'~l:Illblilyby the terms. ofthls~, '<'~.., ...c..-.,- -. .-- - ...... .03 In \he event of. lolls or d8mage tD.ihe Woltt,__1Plm the aclion or omIssloa of lhe Owner or oIhem, \he Owner IhalI P8)' tile (AA6~ ..Coat of "uti ~ the WOdc as.. ..lllll<l6l.1 of the Walt pnlceedll and In .......__ willi tile InJl!lmelIls of sectioft 00 8.0, U urement and ~ "." . GCfmJII ConItIIll!Y,.1TJ II.J"IJL~D...t .. --.;; -';;~-~~~-~_:bu.O ~.U..t Iii,," mIlClIlIIieo' and ecfItlflllnant used by .. CUld. I" for lie flIlb..... of.. .....IPdU.1I tIaIIIt InIlnnae Oft IetnpcllWY llIIiIIIers end p....1II'8 n......... be In 8 fI/IIm ~....."'.1It_OMlwancl.... t1llt IIIOw ~t d8Im8 by..1n8Inr epkllltthe Owner. 1lMtjlCllt''''' ........doll.d to jlRlMde"Owner'\1lltft not.... thIIn 30 Days' wrIUlln nolice In lIdv8nce of Illl HII... chIIlg. or 8IlIIRdAWnt fI lkiL.. 116illl. Sll.bjrect to . I . 'bY .... of IIA8nclIlI .4( i II~by tile o...ltiI""*,, fOr lI8NIIurance of the OilIoIa..AI:Io'SIquJpmlNlt,the'Owner .... .....the equipment...... ....... and fOr the pIlrpaIe of.. c...dl._~"" iMl" ...dumlld ID be inIlunld. "* pi:l1Ii;r IhalI be ameilIIeIf to /IRlIIIde flWnllnlmforlle aU;) rt~ 1)...._ *811'" '\1lItft ruPI:ftDd8mIge ID theeo.l.~ I!!cIuiPmenl . '. GCI.t3.87 111.0,.." Rllqu1rUILJUIlt _lhllAiJft - .. . .01 l.InI8II$ .,.ciA.J1tl11l11rwtl1e "dIMoftot,...\~ ...... pelley.... be. _the_ of CQll1IllIIK.I1MlRICI..WoIk....10.Days ..... ofAnaf ~ llIloaottheWofk;." out InttMtFinal'Aoc..Jf ..ce. ce.~ . ..02 TJllIjQ),j~... .....ltIieOwlWt. Oft 8'-'\1 i!f.: ~ID lhe Owner,PftIOf" ~ prior bClll'lllllel......<<theWCtk,-.-:I'..... ..'... of ...Ccl.lff...AQ. and ....theill:iJ ..w.:l* or1hellluket'. ,. . ,03 The Colllll~"" Oft1"'qli...-t. jlo~..' .r~'JI~" Owner. willi 8 ~... '~of eech InsuaIlc:8 poIQy..... of-.,.lIIUfII ,ll4lIlIlIi~'lI!"""" or pltlLMltb818S ~. by1hf! irlIUIer ID det8rrnlnetheCOitof".1neUnince. The 4(lU.)lf_CIlpf IhaIIIndude ..........., en ofIIoer Ofthe~'tIM IR IIffeIllIl. 8 ......""'811.... Clthe.1nelnt ClC'the lIIIdll<Nlillilrorlhe ..... . b. . -' ..~ .. .. .04 Whete 8 .. Ie NII.wed .. 00lllI\d:l{'" ,po," the OWner. Oft a rotm ~ to the 0wMr. ...... PftlClI oft. . L n..IfI...r' 11M, II.", 00l1'IIlI8lI1lII off8l18:J8I. ..... ON'lInl.tI. An lllf~1I1, 1....1.1. _.... I ,1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I .07 If the ec..ltl ~ fail$ to PlY the cost of the insuranCe placed by the Owner within. aoo.yt of the d!Ite on whictl the OWner made . formaJdemand for relmbursementof 8UCh costs the OWner !tl8Y deduct the costs thereof fIomll1Ql'lies whictl are due or may become due to the Cuo.baotu.. GC 6.04 Boncllng .01 The Contractor shaU provide the OWner with the surety bonds in the amount required by the tender documents. :02' SUch 'bonds shall be issued by'. duly licensedaurety company ault....bd to1ransllc:t abu8ir1elS of suretyship in the Proviooe of Ontario and shan be maintained in good slI8nding until the fulfilment of the ConlnIct. . '-01'8 GenIrlII ell 811 '" ConInIlll. II. 1 ... 1118 .....27 .....~.:.,c..'_.-!.;.:..~.;;.......~.. sect10N GC UJ.CONTRACTOR'S RIB r.'.("l1-... AND CONlttoL OF THE WORK GC 7At1 Olneral> ., .01 The Contrac:klr ..-rams that lhe site of the \Notk has been visited during lhe pntparlIIiqIl of the T__ end the dl8I__ of ttle WOIk and "'lOCal CllIldiIions which may affectlhe pelforrhanc:e of lhe WOIk _1cnoWn. .02 The ContnlctoI shall not ..oI1lftl8flCe lhe WOl1t- dlIliver anything liO the Work!ngAnllllunlil the 'Q"/hU;.,, has reCl1llveda wrillen 00ier1D .......~~jJl\CJ6 the WOrk, signed by the Q"..,..AAdmlnistl....... .03 n.. Cw\lI...... .shlIlI have c::omplete oontrol Ofj'" W4Ildc and shall effec:tiwIy dlteCt8lld supervise the WOIk SO as liO en_UOljkl..\~Wllhthe Ot...l~ Documents. The Cl:l......ro. shallbel1lSpQllSlble for COI1SlI'UQtion means. rnelhodl. 1iIChn.....'........ and prooeduras (md for coon:tlnallng the ~ parts of ttleWolk. .04 .i'lit c....Ii.:liO( shall have lite... cetPOI,,-tlr.,.4eelgn. ereclior~ OjleIlItiOn,.rnaInten8nce and .; .:.~ of ....y struc:'tUnIlJ and oIw 1to1o. ~Ilol.,. ~... and 1he deSIgn and..~of " ;i~II"'''MqUilMtn1hllr... .05"~.aalll ,...... GC 7~01.04, ...... the Contr8ct Documents Inc:lude deIIgns klr tempOI.Y stnIc:lIUNIs. and oIw IllmpOIWV f$' ~"0I!lpeCify a meIhod of COII111l1UC1tionln wIloIe or part, 8UClh fadlltias and rnelhodI shall be lXll'I.....to be part of the deSIgn of the WOrk, and the ~tilWI ....not.be hekI fnr .J1IIbIeror_ part of lie dealgnorthe spedfled meIhod of '.CorlItruclIon. ". c...oIlG:lt.... .~6e .lInlllbla for the execution of sucttdellgn 01 IPfICifIlld rnethodof COI1SlI\IClIill In the ..... OJ:!. II..,. that the Cll..a..Illo Is respolIslble for the execuIlon of the Work. .<16 The c....... ... exea"'1Ile tIm\S oftheCOllnct In slrict ccmpIIIrnce Wllh the requiI..lleIds of theOoaIpation<< HHIth and $Il8ty Ad, R.$.O. 1tllO, c.O.1 (lie "Ad") and 0I\CItl0 Regulation 2131'91 .(WhIeb. reg'~ CchSIil ~lilIn F'lIfr ~. _ any Oltler regutlIIions under the Ad. (the ~ wtddI may IIlIeCt .....to...~Of.. WOrk, as the "can8lruc::li00I ...,.... as def'..18d by the _ . theClllelMY' be. TIle ~...... li1III_lhIII: a) WOI,,* safely Is 0Mn IrStjlriarly In ......"dI.. ptlc:iIna 8Ild _fuomlng Ihe Work; b) 1Is~ _ aupervlIary emplc~111 hlMa'wOtklllfl knowledge ofttle dulIas ofa -constn.lcb'" and "empIoyeI"'. defined by the Ad. 8Ild".p;oJ1alnnl of the ReguIllIllonIePl*"'* liOthe Work, .. and .'JI8I$OII8ICOhlllllmenttoCOll1lllY_'- c)-a copy of lie RlOIIt CIIIIWlt II"lIIIlon of.. AIlt1lld- Regulations _ ....n,. at1he ~ '. ..-ceWllhlntheWorkln&Area.<<.lnthe IIliJ.llDUflll101fice,ln'' Fmmion of.......mor . .~fortheperflllj.lIIlC8oflleWork; . ..4t~ ~ to CMyout lie WOIk Ill] ml the lcnowIedge, IIdIis and PfOleolived8Yloel . -nrquinIdbylaw or l.....llol-.nded for ......,a NICOglIlZed Industry BlIIllcl8lion 10 allow them liO work In ~ e) lis .........yernplll).m...-ry out thelr",ln e ~ and f8IPOIlSlbIe manner wllh dUe COIl1iden11liOnforl!te huIlh. and l!lIfIty,of ..~ and f) at Subol;.......... and 1hefr~..I..P'~pllly ...~ frQIIt Injury whlI8 they... allhe work pIlIos. .01 The Coilli<lidl. wtIen AlqII8IAId'" pllW....Owner wllh a copy of Is he8Ilh8lld lIIIfety poItcy and pq.411l\ at lie ...... m I 1\. and .... ]J/l4'lfid prompIIy to reqt.... fnlm the Owner for ""'*.. Ilia.. 1llIt1ls methods_ pmDtdU~.. GIlOyiIll out the Work ~ Wllh the Ad. and RSauJltkW. ""'COI*._"" <<lOlIIlJllJilI..,sprlllnlilllMll of lie OWner 8Ild ~~ appolllWd to...."'" lleld 8Ild lie Rallrr: ..."tlIJJ 1r..U"1Q1IloM d WlIIMr"'" 8Ild1lll8lY In theperfOmllll-.dtheWortt TIleCwM 111.1.....li!II.ltnlft and _the OWnerlwwlllJlt fnlm any ."ItI..3\l8I_:......wtIIch..9MW "",,,1111D ___lie Wolfe """1M.. .... of lie Col......" ......to~.... ..lttllrlJ4ll.I'._ "'.'IIe Ad.tInd thafW'.oldOi". c~.. ,.....t "... ". *.--...,... .'.~", ..... .. ...........0'1 l1li . II, 1Il,'IUll ill..... I. , I.~ I I I I I I I I \ I I I I I I I I I I I .1 I I I I I I I I I I I I I I I I I .08 ~rior to cQmmenCel1'MlntoUhe WorXthe Col,IIa<;klrQU provicIe to,~ CoIl......~.. .alist of those products ~ib..Ah:ldunder the WOflcpIace HazaJdousMali!ll'iall~flIfmation Sllll ..orWHMIS. which the eo.lt>acli)( ~ 10 use on the CClntrlIcl Related .....Sal'etyDe18 '$heels.shall accompanvthe submiII8ion. AD containens used In the appllcaIioftof pnxIucIs conbotled under lfJttMlS shall be labelled. . The Conlla<;klr.&hall riolify the Contractor ~ of. c::hange$ In WJilingand pmvide l'8I8\_ Material Safety Data Sheets. .09 The COub...a.rnU haVI' an authorized repl'lli! ItaIM! on the site while lIlY work is being perfonned. 10 acUoror oil' theCoc*ador's behalf. Prior IDc:ommenc:ement d QClflSlnJClion. the ColltllllCkll.'$lIIlll . nolIfythe Contnlct AdminIalralDr. d the names/lICIdlesses,. posltionsand, IeleptloneIlUl1lbeJ$ ofJhe pontraclor's ~ who can be COIItacl8dat any time 10 deal with matlierIrellliuy 10 the Contrac:t. . ;10 "1'heeo.lll..aAoio 'shaII,'-at'IlO' 8dc:Iltional (:OSt'lD the Owner, fUrnish all1l88ONIbIe", 't!lIHiesand BSSistancel1lqUlrecJ by the Contract Adn..lIIIio(~fot.'Jlloper,-ioIpeetit'~AlIIdllll1lmlllalioh of the . Workorthe'taklngofmeasuremenlsforthe~DflJlll)'menl-::;;..:'" ~'; ._~~ .11 The Con!raclDrshall pmpar:e.lIlldupclate .'l'lIqIIfed;aCOJlllq Iclioluelledullii1ncliClllllrlll1'l&~ of themejor and crilicalllCllvilies of1tle WCll1(;"l'tIelCllledule.shaUbe.dealgnedlD.....-~ wllh Ute $pllCifIecI eo.dI~ TIme. The ac:hedule Ihall be aubmllled'lD.the COntral;t ~ wilh/ll14Oays flum the dale of the ConIr8ct awBRI. ' .12 ~ theeo..tI.cliO( finds any enor, incxlnl'IIJIlf-Y or ominiou l1lIatIlllllDt!le' --. the ": ColdllilClDl'shaIIlJRllIlPIly-reportit 10 the.Contnlct.Adminlalralor and.shall notpoceed wllh'the aclivily 'aftiIcIed' UlllllreceMng cIIreclion from theConlr8ct Adl..lilib.... .13 The Colltl<K;llo. ahaU arrange with the appropriate utill\y 8\1thOl1lieS for Ute stake . out . of aI undergRlUl141 utIllIIea and service c:onnecliona which may be ,~ by the WCll1(; The Cv.41-to. shall be ~ to!' any dI!mage done 10 the underground.utIlilIes.by 1tIeCol.......folces during construcIIonlf the '... out ~ ate within .the"lCe6givenln 'JllII'lllJl'lIP GC 2.01.018). GC 7.G2 Leyout .01" Prior 10 eommencementof ~ the ContnlctAdmlnistratDr and theColl4l...... wIlllacllaon slIIIthose plOpINty bin. ~u.lne5and \Jenctlm8ltaI which ace necmel)" 10 ~,U11" Working MIa andtD Jay out the WOlt. aa.lIhown on the eo....A Drawlngs. '.02 The Conllactor shall be.esponsible fOrthe'pcelIlllVation ofaDproperly-barS:whIle the Work 1lI1n flRlll~ns. excl$pt thole properly ll8l:s.which'...'bIHlll'llCMld,tD;fIl'o~' ~"'ifheWork. .}.lrf other property Il8l:s dilIlUlbed, d8magedorAllllOV8d by1tle eo..b......... opera\iol_lihllUtleftlplacad by.an Ontario Land Sunteyor, at the Cv.dl-ta..l'a expense. .03 At. no extra cost 10 the Owner, 'the eo. dlactol shall provlde the Contract Adl....olllK wllhaud1 materials and device$ 81 may be nee.sslll)' 10 lay OUIthe besellneand benchmalf(s.and81 maybe neenslll)' fOr '" InspeOlion of \he WCll1(; .04 The Cv.41...Jur shall pftMde qualified peI'8CItInel tD lay out 8IId UI8llIl8h .....anct gI8dee necessary fOr conatrucIIon. The eo.l\laclol shall noIIfy the Contract AdmiIlilib.to.oI any..1lIyotIt work C8lried out. 80 that \he __ may be eheek8d by fie Contract Adl..l<lilib....... .06 The ContracltDr shaII-.n and malnIaIn 8U~lllll._aIignment lnIfUnI andll;Qli"YtlellObmarka 88 may be llIquQdfar \he PRlPlll'exeeuliOn dtheWoltc. The c-.......... shaII.MlPIIiY-.eapy daD alignment andi)rade"""lD the Contract Ado......... . " OfI8___C~ Mil I..OannlII~.I'..~'e I ,... ,.... .(l6 T1t4l Cl<lolll....._.....fulI ~.!",,~ ....and ~ of.tIICh and .. flIlI1ls oftheWol1t; ~ ~ 1.. of wtlelher tI:llf$l:ll.llilJlIor'slayout-.x _b4!IeIi:~ by the COnInICtAdmll". . .07 All sta\c8S.. mMcs andrefeAll!ll8 ~ ~~"'the Conlrac:t .Adminlslrati:Ir shalllle.c:arefulIy ~.by 1he Coo.......". In 1he.. of1helt~ or'ftM1lOV8llS a'f1IlIUIt Clf1tle~ ~lS, StJCh SIIIkes. mlWlcS and .....ceflllll'lS... be AlPl8ced by 1he connctAdlI...... at theC"..tI~...... .;,. GC'i.03 Danl.. ",Velllcll. ~'I..r'quIpment 't.,....,.,.: ,~. . .01 lfat8RY time. In the opinion of.Contraet~~;bt~.. damage is being done (l(iS. 110 be. dOne 110 8RY Roadway 01' 8RY lmpIOIIament ~. Oilliside the WoI'kInt Alee, by thee_ill...." .' ..... 01' other~......" Inll""'UIlllClIoIed equipfnIat; Ihe eo..ll~'sllall.on Ihe .clgrdioI '.' n.oftheCdiIll.ct Mm. Ii."*'*"._.............. .;~... eost. 110.-' ~..,1!IlIke ~,,_. .' 01' ~for $UC:b vehlc:IeSClI'........j.~iihIII... ....... 01' In tICIIIIll.oII1llr......... :~theellU8&ofeuchcl.h.lIOthe . T f\'l.~\OftheConlrac:tA4/Ilk....Itn. ..-:~~. . - - ......'.--,.... . .7 -- GerME. 1I1.......IIf_*1'.j!lL14iill .01 '..,.....a.nlcle iSlIaulIl1g t~~rIiIl for Uae Cll,t'... WlltIc. InWlloleOl' In pelt1lPClnalliQl_J.ancl WIt8Ie rnoIIOrWhialll t.......iI~b' 1Ii,.~1" the c........... .... not... at permit euch.~cIe 1IO.,..1DadttcI ~ lie ..... .ltln 1he ltitlhwwy TIltIIfc~fl~O. 1990. ..Co..... at MI8IlCIed;\PJhelhettllllh~ ......r 'lid In fie name Of the CvlIllJ..{ClI'tlfIeMfSe. tItrcept wh8fe ...... dU.. . n .(/.... ..!!IIJll''';~1dl1Q .... WIt8Ie ~!l1 ~ ItJpenniltecI. . TheColib~_ beer.. 0ilUS OfWI1OhInI'!I'1l1l"lcNIds. ~.... . . Ge7M CctNIIkMI"'" we-dill;'" '. . .01 TheCol.tl~ ....._ the .~AiIIlt.ift...eoncIIIIan and fnIe froin..~Qfallonof .... .CJllIettl18n that eaclIed by the Owner...... GO 7.06 Malnl11 . gRO.lh,.,.....e..eu.. .01 Whin.. ~ R~iI~bY~ ." sballbeMpt.apenllO 1nIIfIc. and the c....4lClklt ....el8lePt ."~'illtll:..fifl!l"F".luIIuc&>n.be ...pDI....forpl~l9and If.-Jld.... forthedunllionefIWWOIk.. j~.II/iJlJ'" WOltdng..... wIIe1IlIt 811)ng..~1w .....1. lnclullnolle raecllIllitlIJrC!lllll1ntG1lCl... an.... WllI1lnaraclj-m.1Ie ~. In ~ 0 rlleuae WIth IheJilt,lTa). . .02-~Coidl."'" not be "ecIl1O 11""'''+. rt.., IIIOugh 1he Wl:llkklg'" -'llllICh lime as . 1h8 Cl.il..~... ..<lolll.i8flC8lfopu8llonUI'~'I.11Jo18l1hut doWn<< an any P*1ef.. CantnIet lhat has ...., aooep6Idinaccon"~_"" General CandllichlS. The COflb~ &halt not be ~ 110" ltelcInO c1lemlcals0l" "11.__- <<carry ClUtanowpklwlng. .03 Y4!ere'loCI8Ilzecland..' aepe.. JLIt IICIiOllSeflle. '. .........~~ only ...~ bYtfle. OOlill.ctol...I's. ~ ..eo.ltIdN wllnot be requlnId~~ ..~ .aectialIS .of" IIlu1.... UiI1lI euch ........~.1Q1 11 . .........'... Oflle....... ~by..~ IJIftIlII OP IIlIioMUlIdIt...Q.l,.tIlU ... . .04 Y4!ere the Ci.n.. ~'.fllUiIldl for ......~l1d AllmllM.... ~.. dIIIOura lttspeclflc Lx_"... _~fcll'......... ef". h~"'f ~ for the lIUIlMqI_ren.tClII8Iof ...........,.~I..IIeQ.4lt.W p II u,.~~~rt tL lOlllICh.. ...... ......Ill!U Ill" 4''''-, In....I'II....... I .1.. I I I I I I I .,1 I I '1 I I I I I I II I I I I I I I I I I I I I I I I I I .05 The Contractor shan maintain. ina satisfactory condition for traffic, a road through the Wor1<ing Area. at the Owner's expense. The road through the Wor1<ing Area wlIIlnclude any detour c:onstructed in accordance with the Contract Documents or required by the Contract Admlni$b,aklr. Compensation for all labour, equipment and materials to do this work shan be at the Contract prices appropriate to the work and; where there are no such prices. at negotiated prices. Notwithstanding the foregoing. the cost of blading required to maintain the sulface of such roads and detours shall be deemed to be included in the prices bid for the various tender items and no additional payment wlll be made. ". ',06 'Where\Wl1(underthe.Contract is discontinued for any extended period Including seasonal shutdown. , , .the COllb actor shall. when' directed by the Contract Administrator. open and place the'Roadway and detours in a pasllSble. safe and satisfactory condition for public travel. .07 Where the Contractor conslrucls a detour which is not speclfica/Iy provided for, in the Contract Documents; or required bythe'Contract'Administrator,the construclion of the detour and. ifrequired, . the subsequent'removalshall beperfol'irKid-'.at'the.:.ec..dl....k..~s "8XpeI]S8,";"::The detour shan be construcledandmaintaiiled to .struCtuia1~.8tRf~'.~;,~ by ,the Cutlbed . Adminislrator.' Removal and siterestoratiorl'::shllII ,tbe.,:perfonned;,:8$~,~ . by the Contract Admlnislrator. ;08 ,Where, with the priorwrillen approVal of the Contract Adminislrator.the Hlghway Is closed and the . 'traffic cftverted entirelyolfthe H"l9hwayto anyolher HighWay. the Cutdl....b.. shall, at no extra cost to . the Owrier;'supply,.enldt and maintain-nffic control devices In 8CCClRtanoa with the MUTCO. .09 . Compliance willI' the foregoing proVisions shaH in no way relieYethe.Co,.b.....ll.r of obIigationsuncler .. ',- subsedion'GC-e;01;' Pnlteclion 'ofWork,Persons' and"Property, dealing' with:the,.CulIb........,.s responsibility for damage claims. except for claims arising on sections of Highway within the Wor1<ing Area that are being maintained by others, ' GC7m MUll to Properties Adjoining the Work and IntenupClcm of UtIlity hm- . .01 The Contractor shaH provide at aU times, and at no extra cost to the Owner, a) adequate pedesbian and vehicular access; and b) conlinuity of utility services - to properties adjoining the Working Area. .02 The Contractor shaD provide at all times and. at no extra cost to the Owner aoc BSI to fire hydrants. and water and gas valves located in the WoI1cing AtrIa. .03 Where any intenuplions In the supply of.UtIIity'S8Nices'ana'Rlq\ired:.'and,\8re aulhoriad by the CoI.bact Adrnlnlstrator.the.Cu.lb....b.. 'shaIl give the affected property owners notice In eccordance with subseclionGC 7.11. Nolices by the Contractor, and shall anangesuch interruptions &0 as to create a minimum of InteIference to those affected. GC 7.08 Approvals and Permits .01 Except as specified In subseclion GC 4.02. Approval and Permits, the Contractor shaa obtain and pay for any permits, UoenIBS. ,and certificates which at the date of \endet'clo&ing, ana required for the performanoaoftheWork. .02 The Contractor shall arrange for all necessary inspeclions required by the approvals and permits speclfied in paragnIph GC 7.08.01. ..' OPScaec..lCcll ~.T1lIorConnlGl.'ISt ....1. '"-lIe 11 GC 7.os Suspension of Work .01 The Contractor shaH. upon written notice from the COntract Adminilib.lI>r. discontinue or delay any or aU of the WOI1t and work shaD not be resumed until the COntract Administrator so direcls in writing. Delays. in.~ circumsllInoes. will be administeled according to subseclion GC 3.08. Delays. GC 7.10 Contrac:tol's RIght to Stop the Work or Tenninate the Contract ~. .01, ,If the OWner is adjudged banknIpt or makes a general assignment for the benefit of creditors because . "of Insolvency or if a receiver is appolnted becaUH of insolvency. the Contractor may. wilhout prejudice to any other rlgt1t or remedy the eo........tu. may have, by giving the OWner or receiver or trustee In bankruptcy written notice. tenninate the Contract. . .02 'If.the WOIk is stopped or otherwise delayed for a period of 30 Days or ~. ~ an order of a court . or other public authority and flR)VkIed that such order was not issued as the result of an act or fault of , ,,~Cu..b....tu.. or of anyone dlrecIIy employed or engaged by the Cu,ibod.....the eo.lb~' may. ;~ prejucflCe \0 any other rlgt1t or remedy the Coolbadur may have, by giving the OWner written .1lO!iCe. tennlnate the Contract. . .",___ .... ,...._~. ,~. ....-... " .~ p' .03 The ContnlclDr may notify \he OWner In writing. wiIh a copy to \he Contract Administrator. that the . Owner is In derauIt of (MlbotCt\.l8l obIlgetJtlns if. . a) the Contract AdmInlslrator falls \0 Issue certificetes In llOCORIanoe wIh \he provisions of Section GC 8.0. Measurement and Payment; b) the Owner faIs to pay the Cu,lb......... wIIhIn 30 Days of \he due dates identified In clause GC -. 8.02.03, CertllIeallon and Payment, the amounts certified by \he Contract AdmInlstillb... or within 30 Days of an awan:I by an .bIll.' or COII1; or c) the Owner violates \he requirements of \he Contracl .04 The ContractoI's wril\en notice \0 the Owner Ihall advise that If \he default is not conedied In \he 7 Days lmmedial8ly following \he receipt of the wrIIten notice \he Contractor may, without prejudice to any other right or remedy \he eo..bactor may have. stop the WOI1t or \em. a Ie the Contract. .05 If the Contractor tenninates \he Conlract under the condllions set out in this subsection, the , Cu,lb........ shall be entilIed \0 be paid for aU work performed accon:Iing to the Contract Documents and for any losses or damage as the ConbllCllol .may sustain as a result of the tennlnation of the Contract. GC7~~ Notices by the ~jb"'" ... .01 'a$ro.e work is canled out which may affect the property or Operations of any MlnislJy or agency of g5verriment or any pel1lOll, company. partnenhlp or corpoudion, including a munlclpal QOI ......llon or anY boaId or commission lhenaof. and In acIdItIOn to such notices of the commencement of specified operations as are presaibed eisewhere in the Contract Documents. the Contractor shaH give at least 48 hours advance written nolice of \he date of commencement of such work to \he person. company. ~Ip. corporation, board. or commission 10 elfected. .02 In the case of damage to, or interfeIenoe wlIh any uIiIities. pole lines. pipe lines. conduits. farm tiles. or other pubic or prlvateIy owned works or property. the Cuhllec:h" shaft immediately notify \he Owner and \he eo. .bact Adminlstnltor of the IocalIoIl and details of such damage or lntelfetence. ..... J2 OPS......eo. "T ..CIf~.' .UAIl.r1. I .1 HI I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I, I I I I GC7.12 Obstructions .01 Except as 01herwise noted in these General Conditions. the ContraclDr assumes all the risks and responsibilities arising out of any obstruction encountered in the perfonnance of the Work and any traflicconditions. including traffic conditions on any Highway or road 'giving access to the Working Area caused by such obs1ructions. and the Contractor shall not make any claim against the Owner for any loss, damage or expense occasioned thereby. ;02 Where theobslruclionis 'a: Utility or other man-made object, the Contractot: shall not be, required to. assume the risks 'and responsibilities arising out of such obslruclion, unless the location of the , obslruclion is' shown on the plans or described. in the specifications and the iocalion. so shown is within the tolerance specified in paragraph GC 2.01.01 a), or unless the ~ andiocalion of the . obslruclion has othelwise been'made known to the Contractor or could have been determined by the visual site investigation made by the.Contractor in accordaIlCe with these GeneraICondltions. .03 During the course of the Contract, It is.the\Co"b....b...'s>responslblIityr~ UtilIty companies . "or other appropriate-authoritlesforfurlher.1nfonnalionin iregarxt:tolthe~iiliunof these Utilities. :. to exercise the nec:e s sarycareln constrUction"opetaliohs;"8lld'to1ake-aucholtiilr.JlI1lClIIIlions as are neoestary to safeguard the UlIIily from damage. . GC 7.13 LImItatIons of Operations .01. Except for such work as maybe required by the Contract Administrator,tomainlain the Work ina safe and satisfactory ooncIilion, the ContraclDr shaD not carry on operations undar the Contract.on. SUndays without permission in writing from the Conlracl Adminislralor. .02 The Contractor shall cooperalawlth other ContraclDrs. Utility companlas and the Owner and thay shall be allowed access to theirwor1< or plant at all reasonable times. GC 7.14 . Cleaning Up Before Acceptance . .01 Upon attaining Substantial Performance of the Work, the ContraclDr shall remove surplus,matelials, . tools. construdionmachlneryand equipment not required for the parfonnanoe oftherema!nlng Work.. The Contractor shaH also remove all temporary wor1<s and debris other than thai caused by the Owner, or others and leave the Work and Working Area clean and suitable for occupancy by the Owner unless othelwise speclIied. .02 The Work shall not be deemed to have reached Completion"Ul1til1he-GonlraclDr has nsmoved surplus malarials. locis. construclion machlnery.and~'equlpmenl The Contractor shall also have "'moved debris, other than thai caused by the OWner, or others. . :: . GC7.15 Warranty .01 The Contractor shall be responsible for the proper performance of the Work only to the extent thai the design and specIficalions permit such performance. .02 Subject to the previoUs paragraph the Contractor shall conect prompUy, at nc additional cost to the Owner, defects or deficIancles In the Work which appear, a) prior to and during the period of 12 months from the date of Substantial Performance of the Work. as sat out in the. Certificate of Substantial Performance of the Work, b) whe", the work is cornplated attar the data of Subslanllal Performance. 12 months attar Completion of the Work, c) where there is no Certificate of SUbltanlial Performance, 12 months from the data of Comp/elion of the Work as set out In the Completion CeI1Illcale, or ,ops cae..- Coo...a.. fII ConInlcll., .1 .-,_ ..... 33 d) such longer periods as may be specified for cer1aln Materials or some of the Work. The Contract AdminislratDr will promptly give the contractor written notice of observed defects or deficiencies. .03 The Contractor shall correct or pay for damage resulting from conections made under the requirements of paragraph GC 7.15.02. ..F' , . . of>' :,'. ; ,.~. ~~'!:'" /f;' >: , ........-:....~, .. ....... .......' ,;"'" '.te;'.., ~:.-.-. .... 34 OPSCIeneoI!ICoo .. ....eao..t. '1111 tlar181ll I .1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I "~~;;::::- GC 8.01 GC 8.01.01 SEemaN GC 8.0 - MEASUREMENT AND PAYMENT , Measurement QUMtItIes .01 The Contract Adminhotldtoo will make an estimate once a month. In writing, of the quantity of Work petfonn8d. The first estimate will be the quantity of Work perfocmed since the Contractor , commenced the1:omradiand 8Wly,subsequentestimate; except1he final one,wIlbe of the 'quantity , of Work performed since the preceding estimate was made. The ContractAclmlnistrator will provide the c:opyofeach estimate to the Contraclorwllhln 10 Days of the CUt-Off'Dale. , ".02' Such quantities for pfOgl'l ( (payments. shall be construed and held to llppIOlCimate. ' ,The final .. quantitles for'the issuance of ' the CompIetionCeltlblnhallbeba8ed on the ~ of Work completed. .03" MeasUrement of the quantities 'of theWoOC performed,wiIlbe':ellbel:;t)y~,~rement or by " . Plan 'Quantity ,,,,a~ .'lnc:Iicaletl1n1t/efc:..........."'htjusbilellls\~mn lurements 'WiIf nomiaIIy beri1ade 'ulIlngPlan 'Quantity 'pt iricIpIes' but may; 'where. appiopriate,bemade U8Ing AcluaI Measurements. Those' items' idelltIfiedon1he'Tenderby1he'notdo" (P)In.theunit column ....."shaI be paldaccording.t) the1"lanQuantity.1tems where thenol3t/on (p)doesnot oocurshall be ' , " paid according to AcluaI ~ ' ' GC'.o1.oz V8rildIons In Tender Quantities .01 Where It'appears that the quantity of Work to be done'andlor MateIiaI to. be supplied by the Co,,~.....h,,' under a unit price lIender Item will exceed or be Ielis than the tendeI' quantity. the Co,,~a..hn' shan p10ceed to do the Work aneIIor $UppIy the Material requiAld to ClOIl';plIete the tender Item and payment Will be made for the 'actual amount of Work done and/or," 1 ial euppIIed,at the unit prices stated In theTender except as provided below: , a) III 1heesse of a Major Item where the quantity of Work perforined and/or MallIriaI SUllPfled by the Co"b~ exoeedsthetender quantity by IIICIAl than 15%. eIther.party to theCuilbw may make a WIilten request to 1Ileother ~to'~ a revised unit price for lhatpoctlon of the Work perfoolled andlor'MateriaI suppfllldwhichexceeds 115% of the lender quanIily; The negotialion shall be c:anied out as I0OI\ as reasonably possible. Any revi&Ion of the III1It price'shalI be baled on the IeBSoII8ble CXISt of doing the Work and/or auppIying the MIbI ial under thetencler Item plus a "'I'"a.lIIbIe allln.l8l_ forpRlClt and ~ overhead. b) In the esse of a Major Item where the"quantity.of'Wotk.....""...ed~ supplied by the ContracIor Is less than 85% of the tenderquantity; the C""b.....t..rmay:make a written request to negotiate for the poItion of the actuaI,ovemn~I'and,filaedlCOl\S;..l'lolicallle to the IIIl10UIIt of the undenun III ~ of 15% of the tender quantity; Forpurposis'of.....negotlalIon.theoverheads and fixed CXIStS applicable to the Item are deemed to'have been prorated unlfonnly over 100% of the tender quantity for1he Item. OVerhead costs shall be COlh-.mMld by a .....11811t oertilied by the Co,,~...A.. 's senior financial officer or audiklr and may be audIled by the OWner. AlIematlveIy, where both parties agree, an allowanoe eql.8lto 10% of the'unIt price on the amount of the undenun in exoess of 15% of the tender quantity will be paid, WriIlen requests for compell&lltion must be reoetled no later than 60 Days after the is8Uanoe of the Completion Certilicate. GC 8.G2 GC 8.oz.o1 Payment PrIce for Work .01 PrIoes for the Work IhalIbe full oompensIIIion for aIllllbour, Ecjulpment and Materl8t IlIC(I.IDd In" perfonnanoe. The term ... labour, equipment and Materiar shall Include HMd Tools. .... and Other Incldentals. OP8~Con.a .af(:anll_.'I~lIn"'. Plgelll .02 Payment for work not specifically detailed as part of any one item and without specified details of payment wiD be deemed to be included in the Items with which it is associated. GC 8.02.02 Advance Payments for MaterIal >" .01 The OWner will make advance payments for Material Intended for incorporation in the Work upon the written request of the Contractor and according to the following terms and conditions: a} The Col,b actu. shall, in advance of receipt of the shipment of the Materiat arrange for adequate and proper storage facilities and notify the Contract Administrator of their Ioc;ations. ,b) The value of aggregates, processed and stookpiled, shall be assesse<:l by the following procedure: i Sources other Than Commercial (1)~ranular'A', '8' and 'M' shall be assessed at the rate of 60% of the Contract price. (2) Coarse and fine aggregates for hot mix asphaltlc concrete. surface treatment and Portland cement concrete shall be asssssed at the rate of 25% of the Contract price for each "" aggregate stockpiled. ..:..;.o,U."'Commen:iaI Sources " ~.Payment for separated coarse and fine aggregates wiD be considered atipe above rate when . '~ such materials are stockplIed at a: con/l'Allcial source where further proc e s sing Is to be carried ' -. out before IIlCOI"",cdh'll such malerIaIs InlD a final product. AdvanCe payments for other materials located at a c:omrnercIaI soun::e wRI not be made. . c) Payment for all other n I8Ie1 ials, unless otherwise specified elsswhere in the COllh.....t, shaD be based on the imIcice price, and the CUllb~ shaD submit pn:Iof of cost to the Contract Administrator before payment can be made by the OWner. . d} The payment for aD Mate! iaIs shaD be prooated against the appropriate tender item by paying for , sufficient units of the item to cover the value of the material. Such payment shaD not exceed 80% of the Contract price for the Item. ' e) All Materials for which the Con\IaClOr wishes to receive advance payment shall be placed in the designated storage location Immediately upon recelpt of the material and shaD thenceforth be held by the Co.lh<ldur in, trust for the Owner as oolIateral security for any monies advanced by the . OWner and for the due completion of the Work. The Contractor shall not exercise any act of ownership inconsistent with such security.orrernove any Material from the storage locations, except for inclusion in the Work, without the COlISllnt, In writing, of the Contract AdmInistrator. f) Such materials shaD remain at the risk of lhe Co.lh..dor who shall be responsible for any loss. , damage. theft, Improper use or cI8slruclion of lhe m slsrtal however caused. ' ,,- .02 'Where the OWner makes advance payments subject to the conditions Ilsted in paragraph GC 8.02.02.01. such payment shaD not constIlute IICceplslIce of the Material by the OWner. Acceptance , . only be detennined when the materiII-wlhe I8qUirements of the app\"",1ld& specllication. GC 8.02.lI3 Celtlfication and Payment ,~ GC 8.~03.01 P'''lIrBn Payment Ce.Uflcate .01 The value of the Work perfonned and Material supplied will be calculated once a month by the Contract Administrator In accordance with the Contract Documents and . clause GC 8.01.01. Quantities. .02 The progress Payment CertifiCollle wiD show. a) the quahlltiefl of Wort perfonned; b) the value of Wort perfonned; C)1II1Yadvanced payment for MateIiaIs; d) the amount of Itatutory hoIdblIck, liens. 0wner'8 set-off; e) the amount of GST as applcable; and f) the amount due lhe Cu........ ... 311 opso...eo. IlIII..af~.8Im .ar11ll8 .1. , I- I I I 1 I I I: I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I .03 One copy of the progress Payment Certificate will be sent to the Co.............. .04 Payment will be made wilhln 30 Days of the Cut-Off Date. GC 8.02.03.02 CertIfication of Subcontract Completion .01 Before the Work has reached the stage of Substantial Performance. the COntracllOr may notify the Contract Administrator, In writing that a subcontract is completed satlsfaclIOrily and ask that the . Contract Adrninlstratcll' c:eI1Ify.the. completion of such subcontract. .02 The Contract Adminislrator will.lssue.a CerlificateofSub...u..b...::l Completion if the suL......dl....t has . been completed lidtisf.....bi:y. and all required .inspectlon and testing of the works COWAICl by the subcontract have been canied out and the results are salisfactory. . . . .03 The Contract Admlnlwb...... will set out Inthe~~ot~the"on which . the subcOntract 'was COIl!P1etedandwilhln~'7'Daylr' of;ti1edate,the:subc:ontIacl'i1s certIfied:complete, the ContractAdminlstralorwill give a copfllfthe:cenilicale.to.1he,Cullb...uaod.lD.1he SUbcontraclDr COIIOllf1'18d. . . GC 8.02.03.03 Subcontract Statutory Holdback Re'- Cw.lllkateatid Paymtt!It .01FCll1owing rece/pt of the Certificale of SUbcOntract Completion. theOWnerwlllelea8e ,andP/lY. the . ContraclDr the statutoIy holdback retaineclln respect of thellllbCOl d1act...SUch Alll r . esha8.be made _ , '.46 Days after the'date the subcontract,was certlfiedcomplele,and.pnMdlng;the,.COllllacb,.submIls the following to the Contr8Cl: AdmInislralDr: a) a document.salisfacto.y to the'Contract AdmlnistralDr that will relaasethe Ownerfnlm .. further claims relating lD the SUbOOhb8Ct, qualified by staled exceptions such as holdback monies; b) evidence sali&r.do. y to the Contract AdmInistralDr that the SUb...,.uba..a.. has disctlarged all liabilities InciurNcIIn carrying out the sub...Odbaol,.. . e)a satisfactoIy clellance 0IlI1iIi0ate or letter from the WofkpIao6 Safely and Insurance BcaRI relating to the SI;Jloo......l, and '. . . d) a oopyof'the,"".....tbetweerl'the Col.bac;lor and the Sl.lboo.jli~ and.Il.RtIl4ro..:by ~ shewing the tolaI amount due the sw......b..cb from the ColdlacllOr. .02 Paragraph GC 8.02.03.03.01 d), will only apply to Lump SUm Items and then only when the Contract Adminislrator spec;lIically requests it. . .03 Upon receipt of the statulDry holdback, the eu..b~'ShaII'iorU1wiIh'give~ ~ the payment due under the lIIlb-ill....L .04 Release of statutory hoIlfback by the OWner In respect. of a- subCOIlbac:l shall notrelleve the Contraotor, or the Co.,b -M"s Surety, of any of their rasponsibIitIes. ...... GC 8.02.03.04 ee.1lficatIon of Substantial Performance .01 Upon application by the ContraclIOr and wheIe the Contract has been substantially performed the Contract AdminislnllDr wID Issue a CerIificate of SUIl6talItial Performallce. .02 The Contract Adrnlnbitl...... wID set out In the Certificate of SUbstantial PerrOlll'llllC8 the date on which the Contract was ....ltiIIIy perfOrmed and wIlhln 7 Days after IIgnIng the said certIfk:aIe the Contract AdrnlnistnIlDr will pnMde a copy to the Contraclor. .03 Upon raceIpt of a copy of the CertIIlco1Ili& of SUbIItlInliel Petform8nce. the ColllracfDf ... rorvlWIlh. as raquIred by SectIon 32(1) Paregraptl 5 of the eorr.tnIoIIon I.IerI Act, R.S.O. 11190, C.C.30, .. amended, publish . copy of the cer1ifIcele In a oonstJuclIon trlIde 1Ie")'Ip&per. Sudl put.IIQaIkln Ih8ll Include placementlnthe DIlly CommercIal N_. 0P8 ca..III CcIl1ll111 . .,~. flJll oN'. .....17 .04 Where the Contractor fails 10 publish a copy of the Certificate of Substantial Performance as required above within 7 Days after receiving a copy of the certificate signed by the Contract Administrator. the Owner may publish a copy of the certificate at the Cootraclol's expense. .05 Except as otherwise provided for in Section 31 of the ConstnJction Lien Act, the 45-day lien period prior 10 the release of holdback as referred 10 in clause GC 8.02.03.05, Substantial Performance Payment and Statutory Holdback Release Payment Certificates, shall commence from the date of publication of the Certificate of Substantial Performance as provided for above. .~ . Substantial Perfonnance Payment and Substantial Performance statutory Holdback Refease Payment Certlf"lC8tes .01 When the Contract Administrator issues the Certificate of Substantial Performance the Contract .. Administrator will also issue the Substantial Perfonnanoe Payment Certificate and the Substantial J~~rformance Statutory Holdback Release Payment Certificate or where appropriate, a combined ~ntcertificate.' .~ j~- -~..,- ;: .00.~~Substanlial Performance Payment Certificate will show." ''1iPthe\lalue of Work Performed 10 the date of Substantial Performance; --- . . b) the value of outstanding or incomplete Work; 'c) . the amount of the statutory holdback, slowing for ariy previous releasas of statutory holdback 10 the Contractor in respect of oompIeted sutM...b....llo and deliveries of pnl selected equipment; d) the amount of maintenance securitY required; and o,e) the amount due the Cohb:actor. GC'8.o2.o3.05 , . ~ ~". .03 . Payment of the amount certified wIl be made within 30 Days of the date of issuance of the payment . certificate. .04 The Substantial Performance Statutory Holdback Release Payment Certllicate will be a payment certifk.alt: releasing 10 the ContraclDr the statutory holdback due in respect of Wolk performed up to the date of Substantial Performance. Payment of such statutory holdback shaD be due 46 Days after the date of pubicalk>n of the Certlfk.61& of SUbstantial Performance but subject to the provisions of the Construction Lien Act and the submission by the ContI8ctor of the following dOcuments: a) a release by the Cu,lb~ In a form ~y to the Contract Administrator releasing the Owner from aU further claims relating 10 the Cu,lb....l, quallfiecl by stated exceptioolS such as ; outstanding WOIt or matl&rs arising out of SlIbseclion GC 3.14, ClaIms, N~, Medlalion; b) a statutory declaration in a form satisf8Gtoly to the Contract Administrator that aU liabIIllIes Incurred ;~by the Co"b~ and the ec..lb-.h.o"s SUb...."b~"S In carrying out the Contract have been . .(fis(:harged except for statutory hoIdbacka pn:lpel1y retained; . c~:lit.r.!lGtoiy Certificate of Clearance from the Workplace Safety and Insurance Board; and '<1. f of pubrlCatlon of the CertlfiC8te of Substanllal Peffonnance. . GC 8.D2.03.06 CerlIfIcatIon of Completion .01 Upon application by the Conbaclor, and when the Contract reaches Completion, the Contract Administrator will issue a Completion Certificate, .02 The Contract Administrator will set out In the Completion Certificate the date on which the Work was completed and within 7 Days of signing the said certificate the Contract Admlnlstrator will provide a copy to the Contractor. ';:'1:\: '0.. . ...,~ c .... CPa GenMI COI dIIih.., Connd. 8 ..Ii nIIer ,.. .1. . .1, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I - GC 8.02.03.07 CompletIon Pllyment and CompletIon 8tatutory Holdback ReIUH Payment Ce,lIlcates .01 When the Contract Admillistlator issues the Complelion CertlficaIe, the Contract AdmiIdstIator will also Issue the Complelion payment CertiIicate and the Completion Slatutoly Holdback Release Payment CerIificate or where appropriate, a combined payment cerIIIicate. .02 The Completion Payment CertifICate will show, al measurementand value of Work at Completion; . . . ;blthe ainount of the furthercstatutoly holdback based on the value of further work .compIeted over and above the value of work completed shown in the SUbslanllal Performance Payment Certificate. . referred to above; and cl the amount due the Contractor. .03 The . Completion Slatutoly: HoklbackReIaa8e~t'.-:Q.,""J.wlIl~,"-",~,~ .,' ., releasinSrto'the 'Col.lo-tor'the' furlher:iiliIUItorY'hciIdbIIckJ; .Paynlent"ote\l!lh'~*'Y. hoIdbackshaU . .,' be due 46 Daysafl8r the date of CompletioWiOfthl!'WOlIc.as~_~...Gompletion,Cer"J:icate , but subject to the provisions of the Construcfiotl UenActWld.1he'-8llbmIssIont!Y;the Co.lto~ of the , following documen1s: al a release by. the CO'...<1ICllloinaform....I..~ to the ConlraI:tAdmlnilllnltorle'Vrl'ng the OWner from ell further claims relating to theConlract, que\llied by stated exoeptloolS where apP!OPriate; . . . . . bl allatlJtory de<:la.dlk.I1ln afonn satisfactory to theContraCt~.... thatal IiablliIie6 incurred 'by theColIlnlctol ancftheCotdlacto.'s SIl~ibaClQ/'S In c:arryIng out thec:...dl....l tIave been . . diIcharged, qua&fied by slat8cl exceplion$ where eppropt iale; and cl' a salisl'actory CertiIicate of Clearance from the Workplace Safely and Insurance 8oaRl.. GC 8.02.03.G8 tnterest .01' Intarest due the CO"bacM Is based on simple Interest and is ealClrllltechlSing the applicallle Rate of Interest. GC 8.o2J13.C19 Interest for Late Payment .01 Provided the Contraclor has c:omplied with the requlrementll of the Contract including all documentation requirerllents, when payment by the OWner to the c:...dl...Al.t for Work perfanned, or for reluse ofstalutory I1okIlleck,Is delayed by theOWner..then the.c:.......AI.t ....be.er.Ill*llll receive inteleSt on the outstanding payment aUheRate'of'lnlelest;'lf pa)hial'lt;:1s not NCBNed on the dal8l set out below: . al PJOgress Payment Certif.cates: 30 DaYS1ldllllrthe Cut-OIfD8llB; . . :.~ bl Certificate of SUbco..bid Completion:. 30 Days.after thedate.oertilklChl$:the date onwhlch the sub.....,b....t was compIated; c) Subcontract Slatutoly Holdback Release Payment Cer1iIica\e: 76 Days lIIter the date on which the subcotdiacl was compIated; d)' Substan\lal Pelform8nce Payment CertifIC8\e: 30 Days lifter the date of issuance of.. oertIfioate. el Substantial Performance SlaIulDry HoldIleck Release Payment Cer\lficate: 76 D8ys after publication of Ihe Payment CerlII'IC8bB of Substantial Performance; 1) . Completion Payment..Cer\lflcate: 30 Days after Ihe date 08ItiIIed as the date on which the Contract reached CclmpIelIor~ glCompletion SIa\Utory IioIdIled RekI.. Payment CerllIIc;ate; 76 Days after Ihe data. 0II'liIIed as Ihe date which the Work was compleled. .02 If the Col,baclor has not complied wIIh Ihe requINImenla of the Co.lIl.cl. including .. ~ ~, prlor to elCPhIon of the lime pedods described In 118I""'" GC 8.02.03.09.01, ..... will only begin to IICCIUe when the Cc"lliaclol has c:omplRld thole teqUirwnints. OPSo.eo.lCol-'r11ll"Col_"I~Il.iNf'_ ..... . GC 8.02.03.10 Interest for Negotiations and Claims :.\ .01 Except as hereinafter provided, where a notice of negotiation, notice of Intent to claim and the subsequent claims are submitted in accordance with \he time 6mits and/or procedure described by subsection GC 3.14, Claims, Negotiations, Mediation, \he OWner will pay \he Contractor the Rate of Interest on \he amount of \he negotiated prioe for that part of \he Work or on \he amount of \he seWed claim. Such interest will not commence until 30 Days after \he satisfacIory completion of that part of \he Work. .02 :'Where the Contractor does not attempt to resolve \he negotiation or \he claim in an eXpeditious , manner, Interest shall be negotiable. .03 Where \he Co..bactor falls to give notice of a claim within \he timelirnitpresc;ribed by subsection GC "3.14, Claims, Negotiations, Mediation, interest shall not be paid. ' ~~A.':-.. , -..... . .04c~,a Contractor fails to comply wilhthe 3O-day time limit and \he procedures prescribed in ~:~~ GC 3.14.03.03 for submission of cIalms, interest shall not be paid for Die delay period. _ 'l;'";,,, ", . "-~" '~~"-." GC8;02:03;11 0Wner'a Set.otf .i,.'., .01 ,Pursuant to Section 12 of \he Const1uclion Lien Act, \he Owner may relaIn fn:lm monies owing to \he Contractor under this Contract an amount l!uIficlent to cover any oulslandlng or disputed liabilities Including \he oost to remedy deficiencies, \he reduction in YlIlue of subslandard portions of \he Work, claims for damages by third plirties which have not been detennined in WIiling by \he Contractor's 'InSurer. undetennined claims by the Owner under pmagraph GC 8.01.02.01 a), any assessment due .\he Workplace Safety and Insurance Board and any monies to be paid to the workers in accordance with clause GC 8.02.06, payment of Workers. .02 Under these circumstances the OWner will give \he Contractor applO\lIiate notice of such action. GC 8.02.03.12 Delay In Payment .01 The OWner shall not be deemed to be in default of the Contract provided any delay in payment does not exceed 30 Days fn:lm \he due dates as defined in panlgraph GC 8.02.03.09.01. GC 8.02.04 payment on . TIme and MaterIal Basis Definitions GC8:D2;o.U1 ~::-:;:-:-: , .01 FCir!the purpose of this clause \he following definlllons apply: ,.oOjo. ' Cost of Labour: means \he amount of wages, salary, travel, travel time, food, lodging or similar items and Payroll Burden paid or incUITed directly by \he Contractor to or In respect of labour and supervision actively and necessarily engaged on \he Work based on \he recorded time and hourly rates of pay for such labour and supervision, but shall not Include any payment or oosts Ineumld for general supervision, administration of management time spent on \he enlke Work or any wages. salary or Payroll Burden for which \he Contractor Is compensated by any payment made by the Owner for Equipment Cost of MaterIal: means the oost of MaterlaI purchased. or supplied fn:lm stoc:k, and YlIlued at current market prices, for \he purpose of canyIng out ExIra Work, by the C"..b6..klr, or by others when such arrangements have been made by the Contractor for oomplellng the Work, as shown by Itemlzed Invoices. Operated Rented EquIpment: lM&nS Rented EquIpment for which an opetator is provided by the supplier of the equipment and for which the nlIIt or Ieeae InctudeI the cost of the opel8tor. ... 40 OP8o....CIll - fl6afCllnllllct-'l,U.lIleI t.. .1 . .1 I I I- I I I I ,1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I PayroH Burden: means the payments in respect of workplace insur8nce. vacaIIon pay, employment Insurance, public liability and property damage insurance, sickness and accident insurance, pension fund and such other welfare and benefit payments rom ling pert of the Cu.lb...At.ta normall8bour costs. Rented Equipment: means equipment that is rented or leased for the speciaJ purpose of Work on a Time and Material Basis from a peIlIOIl, firm or corporation that is not an associate of the __ as defined by the Securities Act, RS.O. 1990, c.S.5, as amended, and is approved by the Contract Adntilli$b..tor. Road Work: means the preparation,construclion, finishing andconslnJction maintenance of roads. '. ' "'streets; highWays and'parking 1olS' and includes all work incidental thereto other than work on. 8tn.K:lures." , Sewer 'and 'Watennaln Work: means the preparation. construction. finishing, and construction 'maintenance'of sewer'systems and watennain systems; and lncIudes aI work Incidental thereto other than work on struc:tures. " StlIndby'Tlme:'means any'period of1ime WI1lCIi'ls.not~WO.1dllg:1["~>dwhicl1toOetherwith '. the Working Time does, notexceed''10hoUtS:in';..yiCll1elWorklng;Day~anchliliilig'-whic:htime, a unit. of ,equipment cannotpraclically Ileused on.otber.lNOrk1lUt:.lT.",d ..4l.....;uu~....norder1o.COIItinucl,with , 'IInssigned1ask'lilnd during which time the unltis In fuIIy'operabIe CClrIdilion. , Structure Work: ' means'the construction, reconstrucIion,' repair.' aIlenIllol~ remodelling, renovation or , demoIilIon of any 'bridge, bullcllng, tunnel or retaining wall and inclucIes the preparation forancl the laying of the foundation of' any "bridge. building, tuimel or 'retaining wall and the installation of' eqUiPhlllllt and appurtenances Incidental th.....o. The 127 Rate: means the rate for a unit of equipment as listed In'oPss 127; ScheduIe.ofRental Rates for Construclion equipment Including Model and Speclfication ReferelIC8, which is cumIIIt at the time the work is carried out or for equipment which is not so listed, the rate which has been calculated by the , 'Owner, using the same principles as used In determining The 127 Rates. Workona:rme-and 1laterllllBasls: means Changes in theWOl'k,ExlnIWorkand Addlllonal Work " approved by the'Co.lflad AdminlstraIor'forpaynient'on a Time 1IIld Nrlnial tIa$I&. The WQrkon aTane <and:MateriaI Basis &hall be'&Ubject to all the terms, condilions,apedlicalionsand pnMslons of the Contrecl Working TIme: means each period of lime during which a unit of equipment Is, acliveIy ancI of necessity " . engaged on a specIIlc; operation and the first 2 hours of.eech.ImmediaIieIy.roIIowlJ1g.period ,dt.Iing WhIch 'the unit is not so engaged butduring whic:htheoperetiono.luIlhenM&ll:prooeedIagand during.whlch lime the unit cannot praclically be nnmerred toothePMxtc butmustremai.'on1h8'sile,'.Inorderto continue with Its assigned task& and during which lime the,unIUaln.aJully operable condition. ~ .', GC 8.02.04.02 08" Work Records .01 Dally Work Records prepared as the case maybe by either the Co..b~s repnuntdle or the . Contract AdmInlstrator and repoltlng the labour and equipment eri1ployed and the Matelkll used on each Time and ...1IW1a1 project, shall be reconciled and signed each day by both the COntrec:tor's representaliVe and the Contract Admll'lilib..... GC 8.02.04.03 PaylMntforWOft( .01 Payment as herein provided shatI be full compensation for alll8bour, equipment and MaterlaI to do the Work on a TIme and MaterlaI Basis except where there Is agreement to the .....111... f prior to. the COI..mencement of the WoIt< on a TIme and MaterlaI Balls. The pIyI.18l1t ......._.. on a nne and MaferiaI basls IhIIl apply to each individual Change Older autholtred by the Contr8ctAdrllin.......... OP8o.n..lCol.ln..f~.'r.l ....1. ..... 41 c. GC 8.02.04.04 Payment for Labour .01 The Owner will pay the Contractor for labour emptoyed on each Time and Material project at 135% of the Cost of Labour up to $3000, then at 120% of any portion of the Cost of Labour in excess of $3000. .02 The Owner will make payment in respect of Payroll Burden for Work on a Tlllle and Material Basis at the Contractor's actual cost of Payroll Burden. .03-'At. the OWner's discretion, an audit may be conducted in which case the actual Payroll Burden so delennined shall be applied to all Tme and Material work on the Contract. GC8.o2.04.05 Payment for Material 6~~<'. .01 The Owner will pay the Cohbactor for Materi81 used on each Tme and Material project a1.120% of the '~llf the Material up to $3000, then 81115% of any portion of the Cost of L1ateria1 in excess of '. ":;19000.:, Gd~L.06 > ,. ,"," Payment for Equipment GC 8.D2.04.06.o1 Worfdng Time ~ - .. .01 The Owner will pay the Contractor for the Working TIme of al equipment other than Rented Equipment and Operated Rented Equipment used on the Work on a Tme and Material basis at The '127 Rates with a cost adjustment as folows: a) Cost$10,oooorless-noadjuslment; b) Cost greater than $10,000 but not exceeding $20,000 - payment $10,000 plus 90% of the portion in excess of $10,000; and c) Cost greater than $ 20,000 -$19,000 plus 80% of the portion in excess of $20,000. .02 The Owner wiD pay the CUllb....u for the Working Tme of Rented Equipment used on the Work on a Tme and Material Basis at 110% of the invoice price approved by the Contracl Administrator up to a maximum of 110% of The 127 Rate. This constraint will be waived when the COntracl Adminll..b dlot' approves the invoice price prior to the use of the Rented Equipment .03 The Owner will pay the Contractor for the Working Time of Opel8led Rented Equipment used on the Work on a Time and Material Basis at 110% of the Operated Rented Equipment invoice price apJllOV8d by the ContnIcl Administralor prior to the use of the equipment on the Work on a.Time and Miteriat Basis. . ~. GC 8:G2lD4;06.02 .. Standby Time .01 The Owner win pay the Contractor for Standby Time of Equipment at 35% of The 127 Rate or 35% of the invoice price whichever Is appropriate. The Owner will pay reasonable costs for Rented equipment where this is necessarily retained In the Working Area for extended periods agreed to by . the ConIracl Administrator. This will Include Rented Equipment intended for use on other work, but has been idled due to the circumstances glvlng rise to the Work on a Time and Material Basis. .02 In addition, the Owner will include the Cost of Labour of ope.alofs or assoclated labourers who cannot be otherwise employed during the standby period or during the period of idleness caused by the circumstanoes giving rise to the Work on 8 Time and Material Basis. .03 The Cohllac::t AdminI8trator may requlnl Rentad ~ Idled by the drcum8lllnoas giving rise to the Work on TIme and MalieltaI 8aIIi8 to be Allurnad to the lessor until the work requlIlng the equipment can be resumed. The Owner will pay such costs as result from such retum. ... 42 0P8 GenelIII CcIl1.a.. fI Connell. Slpll ,... 1_ I . .1 I I I I I I I. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I .04 When Equipment is transported, solely for the purpose of the Work on a Time and Material Basis, to or from the Working Area on a Tune and Material basis. payment ....- made by the Owner only in respect of the transpolting unlls. When Equipment is moved under .. own pGWeI' it shall be deemed to be working. The method of moving Equipment and the rates shal be subject to the app{OV8l of the Contract Administrator. GC 8.02.04.07 payment for Hand Tools .01 Notwilhstandlng.any.othetprovision of this Section..no.payment shan be .made to.the.Contractor for . or in respect of Hand Tools or equipment that are tools of the trade. GC 8.02.04.08 Payment for Work By SUbC:OllUKtors . .01 Where the Contractor arranges'for Work on a.Tine and MateriaJ,Basis,or.a part of it, to be. perfonned ; " by;Subc:ontractor",on..a,,"Time'an(LMaterIaI.,basis.,.and~~. ~rpl:ior to the .. .c:ommencement .d:such.:wark:*in acx:ordance witI:ui.lber.nlClUimlJlllnls~'GC 3.10 ... . . SUbCOntracting by'the CoIlllac;tOl: the Owner wlI pay the'COllt!of_Woi1coiOll4~ ~ . 'by'the SubcOntraclorc:alclllated'8Sifthe.co.ntractorl1ad'done . .' Basis, . pIus-a markup Cl'....- on the following basis: a) 20% of the finlt$3.000; plus . b) 15'110 of the amount from $3.000 to $10.000; plus c:) 5% of the amount in lIlIICeSS of $1 0.000. .- .00.,No fuJther markup:wiI be.appIied.regardIess.oUhe eldenl towhlch.the work Is assjgned or. sublet to . ';: othecs; - If work'ls;illi9;l1d .or'$Ublet-.1o an. UTOciate, .asdefinedby;th& ~.Ac:t no markup whalsoeverwiU be applied. . '. GC 8.02.04.09 SUIImIssIon of Involc:es .01 . At the start of -the Work'on a Tme and Material BasIs. the COId1ac:tor..shall.prov\deJt\e. epplk:abIe. . . labour and Equipment raIes notalreadysubmltled to.the Contrac:t AdmInistrator during the eot.n8 of such work. .02 .Separate<sun.rnaries shall be compIeled by the eo....ctor a<XXlIliIlg to the,~ ~."Summary, . . for Payment.of Accounts ona Tine .and Material BasIs". . Each ._...18fY .stlaII.lnc:Iude, the order numberandeoverlng dates of the work and stlaII itemize.separateIy 1abour,11rl.naJs,and Equipment. . .lnvoIces.for Materials. Rented EquIpment and other charges incuned-by.theeo.dl.....l(l( on the Work . on a Time and MaterlaI BasIs ~ be induded with.eech-SUll'lR1lI!Y...,o,"",,-,,", . .,-=--".... -"'. :03 Each month.the.eo.dlcdAdmln' lar-wtll incIude-wIlbthe.IIIClIIlI!IY,pI!(!Qll'....~C!!(tIfIl.iale, the costs of the Work on a Tine and Material BasIs Jnc:urred' during' the. JlI8lleding month aRin . accordanc:e with the ......bact admInistrativeproc:edures and the c...lll....AUl's invoic:eof the Work on a Tune and Material BasIs. . .04 The finaI"slIITlITI8Ii for Payment of Acoounts on a TIme and Materlat BasIs" shall be su\ImIIted by the eo.,b actor within 60 Days after the completion of the Work on a TIme and Material BasIs. GC 8.82.05 F\naI Acceptance certlflc* .01 After the.acceptance 01 the .Work .the eo....c:l Adrninistralor will Issue the. FIIlllI ACcaplsnCe CertIficate, or, when! ~~. after the Wan8nty PerIod '- expRd. The FInal ..........1C8 Certiflcale wi. not be is8Ued until.. known delllc:ier'.clllS have been 9dJl1fW! orcorruv II, _the case may be. and the c....b odlll has discharged all obIIgalIons under the Contrael OPe 0enenII Col1Jllla.. of~. 811I11"'* tlll8 ,.... 43 .' GC 8.02.06 Payment of Workers .01 The Contractor shan, in addition to any fringe benefits. pay the workers employed on the Work in accordance with lhe labour conditions set out in the Contract and at intervals of not less than twice a monlh. .02 The Contractor shall require each Subcontractor doing any part of lhe Work to pay the workers employed by lhe Subcontractor on lhe Work in accordance with paragraph GC 8.02.06.01. .03 Where any person employed by the Contractor or any SUbcontractor or olher person on the Work is paid less than lhe amount required to be paid under the Contract. the Owner may set off monies in accordance with clause GC 8.02.03.11. Owner's Set-Off. GC 8.02.07 Records .01 The Contractor shan mainlain and keep accurate Records !elating to the Work, Changes In the Work, Extra Work and claims arising therefrom. Such Records shaD be of sufficient detail to support the total cost of the Work, Changes in the Work, and Extra Work. The Cot III acto.- shaD preserve all such .' original Records until 12 months alter the final Acceptance Certificate is isstJ!ld or until an claims have been setIIed. whichever Is longer. The Contractor shaD require that SUbC:Ollb....hn employed by the Contractor preserve aU original Records pertaining to the Work, Changes in the Work, Extra Work and claims arising therefrom for a sImIar period of time. .02 If, in the opinion of the Conlrac:t Adm/rdlitldh"" Daly Work Records 8Je required, such records shan Jeport the labour and equipment employed and the MaterIal used on any specific portion of the Work. The Daily Work Records shaD be rec:oncIIed with and signed by the Contractor's Jepnlse..laliw each day. .03 The Owner may Inspect and audit the Contractor's Records relating to the Work, Extra Work and Changes in the Work at any time during the period of the Contract. The Contractor shaD supply . c:ertIfled copies of any part of lis Records required whenever requeSted by the Owner. GC 8.02.08 Taxes and DutIes .01 Where a change in Canadian Federal or Provinclai taxes ooc:urs alter the date of tender closing for this Contract, and this change could not have been 811tk:ipated at the time of bidding, the Owner will incA ail! or dec:lease Conlrac:t payments to aoc:ount for the exact amount of tax change iM:llved. .02 Claims for compensation for addllIonaI tax cost shaD be submitted by the Contractor to the Contract Administrator on forms provided by the Cu.lbact AdnlinMldtor to the Contractor. Such claims for additional tax costs shaI be submitled not less than 30 Days alter the date of RnaI Acceptance. .03 Where the Contractor benefits from a change in Canadian Federal or Provincial taxes, lhe Contractor shaD submit to the Contract Administrator, on forms provided by the Contract Administrator, 8 statement of such benefits. This statement shall be submitled not iater than 30 Days after Final Ac:ceplance. .04 Changes in Canadian Federal or Provinclal taxes which Impact upon commodities, which when left in . place form part of the finished Work, or the provision of services. where such services form part of the Work and where the manufaclure or supply of such c:ommodlties or lhe provision of such servloes is c:anied out by the Cu.......... or a SUbooullac:tor, 81'8 subject to a cIalm or benefit as detaUed above. Services in the IatIer COlllext __ the auppIy and operellon of equipment, the provision of labour and the supply of OClIlA' .odltIes, which do not form part of the Work. ... <14 OP8.~Con., ..of~.S.pl. ,_,_ I ~I , .1 I I I I I I I I I I I I I I I I I .1 J J I J I I I I I I I I I I I I I I GC 8.02.09 Liquidated Damages .01 When ~quidated damages are specified in the Contract and the Contractor fails to complete the Work in accordance wiIh the Contract, the Contractor shan pay such amounts as are specified in the Contract Documents. OPSGeMrMCOI dhla_t:AConnct.V ).1 .'* 1_ .....411 ..