Loading...
HomeMy WebLinkAboutPSD-053-16 „1 ATTACHNILE ;T# TO ciza-,mogion Planning e i e Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Council Date of Meeting: July 4, 2016 Report Number: PSD-053-16 Resolution: C_- D Or-A- »� File Number: PLN 26.14.1 By-law Number: Report Subject: Update on Rotosonic Borehole at Clarington Transformer Station — Request to Alter Location Recommendations: 1. That Report PSD-053-16 be received; and 2. That all interested parties listed in Report PSD-053-16 and any delegations be advised of Council's decision. Municipality of Clarington Report PSD-053-16 Page 2 Report Overview Council approved $25,000 funding towards a rotosonic proposal by G360 Group to complement and add to the scientific knowledge gained from the existing deep geologic hole drilled in late 2014. The deep geologic hole was drilled by Hydro One as required by the road use agreement with Clarington. A major objective of the rotosonic proposal was to continue the well monitoring by Hydro One (once they are done) and establish a long-term monitoring site for the Oak Ridges Moraine Groundwater Program. On June 22, 2016 a request to relocate the rotosonic borehole to alternate locations was received. Planning and Development Committee referred the communication to staff for a report. 1 . Background 1.1 Clarington Council and staff have been very involved with the proposed Clarington Hydro Transformer since March of 2012. Involvement has included public information meetings, the Environmental Study Report review, attendance at the Community Liaison Committee meetings and numerous discussions. 1.2 To address ongoing concerns from community members and residents, Hydro One proposed and Clarington accepted funding for peer review of the Surface and Groundwater monitoring program. The peer review consultant, Mr. Steven Usher of SLR Consulting (Canada) Ltd. was retained in accordance with the Purchasing By-law and has been working with the residents, staff and Hydro One consultants since October 2014. 1.3 Another major development was the deep monitoring well required by the road use agreement which was drilled to bedrock (below the Thorncliffe Aquifer) in December 2014. The hydrogeologists (CLOCA, G360 Group, Stantec, SLR)jointly agreed that the MW5-14 site on Hydro One property was the most relevant location for this deep geologic hole and monitoring well. The MW5-14 site already has monitors at 4 metres, 7 metres and 40 metres; the deep borehole monitor at 112 metres and another monitor at 52 metres were a result of drilling the deep borehole. This provides multi-level monitoring (that is, a nested cluster of boreholes and monitors). 1.4 In the April 2, 2015 proposal (Attachment 1) from G360 Group requested that a rotosonic borehole be located at the MW5-14 site, instrumented with a Multi Level System (MLS). Since that time all parties have been working towards finalizing the legal agreements and making the detail arrangements to meet the requirements for the rotosonic drilling and MLS installation. The CLOCA Board has approved the necessary legal agreements and Hydro One is in the final stages of executing these agreements. The agreements provide for the rotosonic drilling and the long- term monitoring of the deep geologic hole and MLS by CLOCA for the Municipality of Clarington Report PSD-053-16 Page 3 advancement of scientific knowledge of the Oak Ridge Moraine and its hydrogeology. 1.5 On June 22, 2016, Drs. Cherry and Parker (Attachment 2) requested that alternate locations on private property be considered for the rotosonic hole. This request appears to have resulted from the amount of time that has passed, concern that the Masters students involved will have to pay for an additional semester and lack of a firm date for drilling. 1.6 Members of the Enniskillen Environmental Association (EEA) appeared at Committee on June 27th requesting that Townline Road also be considered as a potential location. Committee referred the communication to staff for a report at the July 4, 2016 Council meeting. 2. Rotosonic Proposal 2.1 G360 Group from the University of Guelph and other participating hydrogeologists proposed a multilevel monitoring well (the MLS) installed in a borehole drilled by rotosonic methods at MW5-14. It would have state of art multi-level monitoring equipment. It would be drilled using a different methodology than the deep borehole providing additional scientific data. Dr. Rick Gerber of the Oak Ridges Moraine Groundwater Program was the designated liaison between G360 and Hydro One; as an employee of Central Lake Ontario Conservation Authority he has also had carriage of the legal agreement which received Board approval in May, 2016. 2.2 Hydro One has accepted the proposal for the rotosonic borehole and multilevel installation and is working diligently to ensure that all the necessary arrangements are in place to realize this goal. The legal agreement with Hydro One for the long term care, maintenance, and monitoring is in the final stages. Hydro One has retained the responsibility to decommission of the multilevel deep well when required. The proposal is to maintain these piezometers for the long term so that as much scientific data as possible is obtained. As noted in the proposal "Also given that groundwater trends can take long periods of time to develop (e.g. decades) a longer monitoring data set is preferable". 2.3 The Rotosonic hole provides an opportunity to use the rotosonic drilling methodology to obtain undisturbed soil samples that are unaffected by drilling fluids. Of equal importance, it allows the installation of the multi-level monitoring device that can be used to test water pressures and water quality at many more intervals per borehole than the conventional technology used by Hydro One and G360 at the existing deep geologic hole. 2.4 Clarington's objectives in supporting the rotosonic where: • Provide a detailed assessment of the aquitard in proximity to the Hydro One site (that is, in the direction of groundwater flow) to ensure it performs as Municipality of Clarington Report PSD-053-16 page 4 predicted by the existing studies. This includes water levels and water quality. • Provide an opportunity for longer term monitoring, exceeding the 5 year mandate of Hydro One. • Provide an opportunity for long term research of the Newmarket Till aquitard, which protects deeper wells in the area, through the Oak Ridges Moraine Coalition study group. • Provide insight to the continued safety of the private wells in the area to unanticipated effects from the Transformer Station. 2.5 CLOCA objectives in supporting the rotosonic in addition to those outlined above is: • understanding the hydraulic and geochemical performance of the geologic deposits associated with the Oak Ridges Moraine. 3. Borehole Locations 3.1 MW5-14 Location (Beside Existing Deep Hole) The drilling of the deep hole was completed in December 2014 down into bedrock. The work was supervised by Stantec on Hydro One property with Group 360 (Dr. Emmanuelle Arnaud and 4 students), Dr. Rick Gerber from the Oak Ridges Moraine Groundwater Coalition (composed of the Regions and Conservation Authorities) and the Municipality's peer review consultant, Steve Usher of SLR participating. The rotosonic hole would be drilled on the Hydro One property as set out in the proposal. The legal agreement necessary is in the final stages and has been approved by the CLOCA Board. Because of the Hydro One construction activities on site, the specific location adjacent to MW5-14 will not be available until September. The preferred location by G360, Dr. Gerber and our Peer Review consultant (Steve Usher of SLR) is the existing MW5-14 monitoring location for various reasons including scientific, long term access and the established working relationship. 3.2 Townline Location(s) The second choice would be the Townline Road right of way. Depending on the specific location selected (it should be downgradient of the site, on the east side of the creek), the costs should be similar to the MW5-14 site for the rotosonic drilling. Having two holes in separate locations, MW5-14 (deep hole) and Townline (rotosonic) would actually be of great benefit doubling the information, scientifically. However, it should be pointed out that the three locations shown by Municipality of Clarington Report PSD-053-16 Page 5 Figure 1: Alternate Locations NP�ROPo,3�f O y_. r \ , OQ Private Property va M 14 Townline Rd coNG�S Municipality of Clarington Report PSD-053-16 Page 6 G360 are not downgradient of the site, contrary to the original objective (first bullet in section 2.4 above). Providing access to the site is a challenge. From the north along the road right-of- way would require clearing. The Operations Department commented on June 24th that to clear the road right-of-way a contractor would have to be used and they would not guarantee it would be completed by July 4th. Townline Road is a boundary road and partially owned by the City of Oshawa. Any agreement with G360 to establish the borehole on the road right-of-way would require Oshawa's agreement. Portions of the unopened right-of-way are under the Conservation Authority regulation and an alteration permit would be necessary. Two potential locations of the borehole have now been submitted by G360 with the third southerly location shown on Figure 1 as the previously considered location. Documentation required of G360 would be proof of WSIB clearance (for the driller and researchers), liability insurance and safety protocols required by the Ministry of Labour. The drilling contractor and researchers would be working on municipal land it would be prudent have a road use agreement in place with G360 or at a minimum the typical requirements for any contractor on municipal land. G360 and members of the EEA were attempting to secure access via an adjacent property owner to avoid clearing the ROW. 3.3 Private Property Location There are pros and cons to the private property location off of Langmaid Road. It is not downgradient of the site and lies in a different subwatershed. Additional drilling cost may be added because of the higher location on the hill. There could be benefits if this second data-point were further north. To the north there is more of a chance to actually intersect Halton Till and the Mackinaw aquifer and prove the groundwater divide more definitively. It is our understanding from G360 that they have used private drilling sites in the past and have a prototype agreement (5 year) they would enter into with the property owner. We are assuming the logistics surrounding the drill rig access route to the site will be addressed. Hydro One have indicated permission to cross their property has not been sought or granted. Given that municipal funds are being allocated to this work it would be prudent of the Municipality to ensure that long-term access is addressed through an easement or other legal mechanism and that the participants (e.g. drilling contractor and G360) have WSIB clearance, proof of insurance, a specific work plan and deliverables for Clarington Council. Municipality of Clarington Report PSD-053-16 Page 7 For the Oak Ridges Moraine Groundwater Program to have long-term access to the site there would have to be an agreement reached with the private property owner. At this point in time CLOCA staff have indicated that they could not comment or commit to any involvement until they have more details regarding the proposal. Any legal agreement with CLOCA would require approval of the Board and would not happen until the fall at the earliest. 3.4 For Council to alter the site location and where the funding is being allocated, a resolution rescinding Resolution #C-136-15 (Attachment 3) would be required. 4. Comments 4.1 The request to relocate the rotosonic borehole came from the University researchers and EEA based on the Master's students being forced to extend their theses timeline by at least a semester. While unfortunate, it is not unusual for Master's students to take longer than the minimum timeframe to accomplish their work. Also there was no commitment or guarantee of timing, rather it was understood that the rotosonic drilling had to work within the schedule of the other construction activities on site. 4.2 Shifting the location of the rotosonic borehole away from the MW5-14 site could have scientific benefit for some of the outstanding questions about the mackinaw aquifer and sand lenses that may occur in the area; however, it depends on the site selected whether these objectives will be met. To date, no details of the exact location on Townline Road or the access arrangements for the private property have been provided. 4.3 Hydro One has proven through the collaborative work on the deep geologic hole to be a very good partner with a very capable project manager. Moving the rotosonic drilling off-site undermines this partnership and jeopardizes the long-term monitoring agreement for the deep geologic hole and remainder of the monitoring wells on the site. 4.4 The primary objective of establishing a long-term monitoring site (beyond 2019) as outlined in the proposal by G360 may not be realized by the shifting to an alternate site, it creates uncertainty with regard to long-term land ownership and monitoring activities. 4.5 It has been indicated in writing by Hydro One to G360 and partner agencies that: "Hydro One is committed to the agreements with CLOCA and at this point in time our best possible timeframe for the execution of the rotosonic well drilling is September 2016. This timing is due to our construction constraints in the MW5 area on the site. Over the next couple weeks Hydro One will confirm the drilling start date and if there can be an improvement in the timing this information will be communicated immediately". Municipality of Clarington Report PSD-053-16 Page 8 5. Concurrence Not applicable. 6. Strategic Plan Application Not applicable. Submitted by: ®�i� � Reviewed David J. Crome, MCIP, RPP Franklin Wu, Director of Planning Services Chief Administrative Officer Staff Contact: Faye Langmaid, Manager of Special Projects, 905-623-3379 ext. 2407 or flangmaid(a)clarington.net Attachments: Attachment 1 — Proposal dated April 2, 2015 from Group 360 Attachment 2 — Letter dated June 22, 2016 from Group 360 Attachment 3 — Resolution #C-136-15 The following is a list of the interested parties to be notified of Council's decision: Brad Bowness, Hydro One Clint Cole, Enniskillen Environmental Association Drs. John Cherry and Beth Parker, Group 360, University of Guelph Dr. Rick Gerber, YPDT-CAMC Steven Usher, SLR Consulting (Canada) Ltd DJC/FL/df Attachment 1 to Municipality of Clarington Report PSD-053-16 Hydrogeological Assessment of the South Slope of the Oak Ridges Moraine, Clarington, Ontario (Hydro One Clarington Transformer Station - MW5-14) Proposal April 02, 2015 StUdV Team University of Guelph, G360 Beth Parker, PhD -Director, G360 Centre for Applied Groundwater Research John Cherry, PhD, P.Eng -Associate Director, G360 Centre for Applied Groundwater Research; -Director, University Consortium for Field-Focused Groundwater Contamination Research Emmanuelle Amaud, PhD Jana Levison, PhD, EIT Tara Harvey, Graduate Student McMaster University James Smith, PhD Sidney Duggan, Graduate Student Kelly Whelan, Graduate Student Central Lake Ontario Coiiservation Atithority Richard Gerber, Phl), P.Geo. (Oak Ridges Moraine Groundwater Program YPDT-CAMC) Proposal: betoiled Hydrogeologicial Assessment, Oak Ridge-, Moraine,Clarington,Ontario TABLE OF CONTENTS 1. INTRODUCTION ............................................................................ 32 '1.1 Background.................................. ....... ........ ...... ....... 3 1.2 Current Status_......... ..............***""''­'­'­..........*...... '11.3 Proposed Long-Term, Monitoring .......................................................................... 8 '11.4 Next Steps................................ ....... ........... ...... .................. ...... ...................I...........8 2. TASKS, METHODOLOGY & REPORTING................................. 10 - 2.1 Infrastructure: Rotosonic and modular multi-level system....... ........................ 10 2.2 Site Access.........__......... ...................... ......__................. 11 2.3 Reporting Structure.....__....................... ........_....................... .................................12 3. DELIVERABLES.......................................................................... 12 3.1 Short-Term—Years 1-5 ......................... ........._.................................. .................._12 3.2 Long-Term Monitoring (after 5 years; >2019) .........................__.......................... ..... 13 4. FINANCIAL, LEGAL & SCHEDULE....:....................................... 13 5. SUMMARY................................................................................... 14 6. REFERENCES............................................................................. 16 APPENDIX A: Rotosonic Borehole Quote.................................... 17 APPENDIX B: Reference Letters................................................... 18 LIST OF FIGURES Figure 1: Hydro One Clariington Transformer station location with approximate project area shown as black line (Image- Google Earth)...... ............_................ ............._... .......3 Figure 2: Project site plan(Figure from Stantec, 2014)_ .........................................................6 Figure 3: Piezometers installed at Hydro One Clarington transformer station,Site W5-14. .7 Figure 4: PrGposed interaction and informationidata sharing structure. ...... ........................ 12 Proposal- Detailed Itydrogeologieal Assessment. Oak Ridges Moraine,Clarington,Ontario 1 , INTRODUCTION 1.1 Background Hydro One Networks Inc. is constructing a transformer station located in the Municipality of Clarington (Figure 1). This project was approved by the Ontario Ministry of the Environment and Climate Change(MOECC)following a Class Environmental Assessment(EA)on January 2",2014 subject to six conditions- Two conditions relative to this proposal include the preparation and implementation of a Surface Water and Groundwater Monitoring Plan and the establishment of a Community Liaison Committee(CLC)to disseminate and exchange information between Hydra One and members of the public. The CLC first met on June 5,2014 and is expected to meet through the detailed design and construction phases of the project- In 2014, Clarington,using funds provided by Hydro One, hired a hydrogeological consultant,(Steven Usher, SLR Consulting Inc-)to assist with its' review, planning and administrative duties and to provide interpretive support to Council,their constituents and staff in the understanding of technical matters associated with pre and post development conditions at the site. Hydro One's monitoring requirements and CLC duties must extend through 2015 to 2019 as a condition of the EA approval. An opportunity exists for all parties to make use of the detailed information at this site in the Oak Ridges Moraine (ORM)planning area to better understand the flow systems associated with the Moraine. • 1 1 t s1 Figure 1:Hydro One Clarington Transformer station location with approximate,pnq,�ect area shown as black line(!mage:Google Earth)- April 02,2015 Hydro One monitoring site MW5-14 Page 3 of 18 Proposal: betailed i ydrogeological Assessment, Oak Ridges Moraine,Clarington,Ontario The proposed construction of the Hydro One Clarington Transformer Station has and continues to experience controversy. A group of local home owners known as the Enniskillen Environmental Association(EEA)have historically expressed and still have concerns relating to the project and the safety of the local water resources. Researchers from the University of Guelph(UofG;Beth Parker,Jana Levison and John Cherry)have provided comments(Cherry et al.,2613)on behalf of the EEA during and subsequent to the Environmental Assessment process. The Regional Municipality of Durham and the Central Lake Ontario Conservation Authority have also provided review and comment throughout the Environmental Assessment process. The YPDT-CAMC groundwater initiative commenced in 2001 to provide assistance to four Municipalities and their nine Conservation Authority partners with tools and products to better understand and manage their groundwater resources.Among other things,the tear of hydrogeological experts developed a shared populated hydrological database,a geological model,and several numerical models_This work has served the agencies in their business needs and supported major aquifer monitoring decisions.Dr. Rick Gerber is a member of the YPDT-CAMC team_ Many gaps exist in the technical coverage of the ORM area and it is important to progressively close these gaps to strengthen the overall understanding. Over the last decade,UofG researchers and the YPDT-CAMC team have had informal discussions regarding groundwater monitoring infrastructure and possible future collaboration to begin filling these gaps, largely facilitated through their shared interest in aquitard hydrogeokagy. Aquitards are lower permeability deposits such as clay or dense till (deposited by glaciers) soil units but also extending to rock units(e.g.shale, limestone). While monitoring exists for the majority of major aquifers in the Province, there is limited monitoring of these lower permeability aquitards which are considered contaminant barriers to many of the municipally Alized confined aquifer systems. Understanding the efficacy of these barriers is key to adequately assessing vulnerability of deeper municipal drinking water supplies. Collaborative efforts discussed included upgrading the quality of groundwater monitoring infrastructure for regional investigations associated with the Oak Ridges Moraine_ Over the last year,Dr.John Cherry has had discussions with the EEA and Municipality of Clarington regarding the need for enhanced site characterization and groundwater monitoring relative to the transformer station and also related to the protection and understanding of the Oak Ridges Moraine in general_ Following the EA approval of the Hydro One project by the MOECC(January 2614), UofG approached the YDPT-CAMC team (Rick Gerber)to possibly collaborate on establishing a high-quaiity monitoring site in the Clarington area_ Given the high oast of installing such infrastructure as well as the local concerns, it was decided that if the opportunity to collect high-quality hydrogeological information(long-term)proved to be feasible then this possibility should be explored. Such information is deemed to be useful to both local undertakings and also to the regional analysis of the Oak Ridges Moraine being conducted by the Oak Ridges Moraine Groundwater Program. On October 2, 2014 the Municipality of Clarington provided road allowance access to Hydro One to construct a road into their Clarington Transformer site. Part of the road easement agreement included a condition that Hydro One amend the site g-roundwater monitoring program to include deep drilling to collect geologic information along with the installation of a deep monitoring well,and that Drs_Rick Gerber and John Cherry be invited to participate. The information generated is also to be shared with the(Municipality of Clarington,CLOCA, the EEA and the CLC_ This deep drilling program was conducted in December 2014 with further details included in the next section(1.2 Current Status)_ April 02,2015 Hydro -fine monitoring site MW5-14 Page 4 of 18 Proposal. Detailed Hydrogeological Assessment. Oak Ridges Moraine,Clarington,Ontario This proposal relates to leveraging the effort and cost that has already been expended by Hydro One for water resource investigations at the site. The aim of the proposed work is to enhance and maintain long-term(following Hydro One monitorinq EA obligations)the existing groundwater monitoring infrastructure that has been installed at site MW"J5-14_ The proposal outlines the components deemed necessary to turn this location into a high-quality, rm long-tegroundwater monitoring location_ The two main components relate to: • Drilling a cored borehole by the Rotosonic method for the purposes of the installation of a mutli-level groundwater monitoring device;and • Obtaining legal access to this location (MVW5-14)in perpetuity_ 1.2 Current Status Construction of the Clarington Transformer Station is awaiting approval of a Permit To Take Water(PTTIA?)application submitted to the MOECC.The existing monitoring network, including other site investigation locations, is shown on Figure 2. All cin-site investigation boreholes terminated at depths less than 16 m beneath the ground surface(mbgs)with the exception of site MW115-14 (Figure 3)where a borehole was drilled to 40 mbgs. This location already had 2 piezometers installed by Hydro One as part of their site Monitoring Plan. This is the site that was chosen for the deep groundwater exploration program(conducted during December 2014)as directed in the road easement agreement. The December 2014 drilling program involved drilling and coring a borehole to and into the shale bedrock. A continuous core of the sediment column ,was obtained from ground surface to approximately 2 m into the bedrock for a total depth of 129.5 m. Borehole gamma logging was conducted at this location to characterize the soils to a depth of approximately 52 m_ The field investigative team included individuals from Stantec Consulting (Brant Gill, Natalie Spina), 'SLR Consulting Inc. (Steve Usher),University of Guelph (Emmanuelle Arnaud,Tara Harvey)McMaster University(Sydney Duggan, Kelly Whelan),and the Oak Ridges Moraine Groundwater Program (Rick Gertner). Natalie Spina,Emmanuelle Arnaud, Tara Harvey,Sydney Duggan and Kelly Whelan were on site daily during drilling to log and sample the core and provide drill crews oversight_ Hydro One on-site staff,under the direction of Jeff Cridland, provided assistance and logistical support_ A summary of the current groundwater monitors installed at MW5-14 is included in Figure 3. Five 2-inch diameter piezometers have been installed labelled here from shallowest to deepest as A to E. Hydro One has incorporated four of the five piezometers(A to D)into their site monitoring program(2015-2019)that will include measuring grater levels and groundwater quality analyses. The deep piezometer(E)is not part of the currently proposed Hydro One monitoring program. It is our recommendation that these five piezometers be monitored in conjunction with each rather to ensure a consistent and useful dataset. This situation needs to be rectified as the monitor should not be left idle for the next five Mears_ Ideally the deep piezometer(E)should be incorporated into the Hydro One monitoring program or another party identified to monitor this piezometer_ Given the positive interactive situation bebnreen all parties that was established for the December 2014 field investigations, we are hopeful that a suitable arrangement can be established whereby all five piezometers at MW5-'14 can be cooperatively monitored. April 02,2015 Hydro One monitoring site iMW5-14 Rage 5 of 18 Stantec o'r �},I` ~ •I;f . P:\�•,i Vin,,well f;lOn12C,2131 I f I I'-I ler.25131 ;s'fml_.2111 J) f r gIVJ�1= 1 �..�• �-i Yie:lanJ Nc.�1,� , 41 tC Rf.:Jl2; lI 1a ; .Wvh't'i� l•.�:�r-rn�ls Ic%P.zV,21 s � /// N,o=tip -. � •� i 1n•n,i.15L1 I 1' :y re-say 6MT+a ,rd i - ur 4., [ems-,z i —'°•" ,, r.... „�o...,�r., .1 RHA RHil y {�I t + { Or � � l it•. � _ I>� Project Site Plan Figure 2 Project site plan(Figure from Stantee,2014)_ Proposal- Detailed Hydrogeological Assessment, Oak Ridges Moraine,Clarington,Ontario HydrGOne Claringto'1; MW5-14 Geology 2"PVC piezometers Formation Estimated Actual A B(s) C (i) D E (ID RAFT) Weathered Mahon Tlii 22 T1 Dm (H -15 -42 -62 -25 -87 -102 .35 -12'2 Lower 142 -45 �M1l�ewrrte►nkc, .. Trii gm) -162 ... 'S dt! Fi65 .................................— ....... ................. -55 177'•DIMict(Drn)•w beds of fsa&cl -182 -202 a r-65 1 1 r •222 - -242 0 ------ -- ----- -- ------- -------- - ------------------ ---------------- 250'•'Sand(�;m,c)$�si-cl layers � 7horywl{,tfe (4-2'to2.5'thick) -262 rte,,tT€1 •85 280'-San<]I],m,c)-layered •282 -302 •95 •322 330'-5a n-d If gr)with Si It -105 " -342 15P..Yri'-------------- --------------------------...................... -411,-------------------------------------------- ------------ ------------- - -362 -i15 Sunnyhraak 367.4'- -382 Drift(SU) Scarborough -Q2 .125 Fm-(5c) t 419.2'to 425'-Shale •422 .135 .442 Figure 3.Paezomet+ers instWlled at Hydro One iClanngton transformerstatran Site ArtW5-14- April 02,2015 Hydra One monitoring site MW5-14 Page 7 of 18 Proposal: Detailed Hydrogeo logical Assessment,Oak Ridges Moraine,Clarington.Ontario 1.3 Proposed Long-Terni Monitoring The Oak Ridges Moraine Groundwater Program has been opportunistic in establishing higher-quality groundwater monitoring locations in various hydrogeologic settings within their study area,which encompasses much of south-central Ontario. Most of these locations are situated within the western half of the Oak Ridges Moraine(ORM). The Program's monitoring locations are seen as complimentary to groundwater monitoring being conducted by municipalities(associated with municipal Supply Well fields)and ambient groundwater conditions monitored by the Provincial Groundwater Monitoring Network (PGMN;conducted by the MOECC.and Conservation Authorities)- As mentioned previously.,this proposal is all attempt to leverage the effort and cost that has already been expended through Hydro One investigations at the site,and establish a high-quality, long-term groundwater monitoring location at MW5-14. A high quality, long-term groundwater monitoring site in the proposed geologic setting generally includes the following, some of which has already been accomplished: a) Continuous core of the sediments above bedrock and confirmation of the bedrock rock type-This is usually cored using mud rotary techniques because PO-sized core generally provides the best quality soil and rock samples and the highest likelihood of drilling to a greater depth; b) Installations of monitoring wells and multi-level sampling ports at various depths within the geologic profile to establish vertical groundwater flow interaction between the various soil and rock units encountered. This interaction is analysed utilizing water levels, chemistry and physical testing(e.g. pumping tests). Ideally, at least one of the monitoring wells should be 2.5"diameter or greater,and installed at or near the bottom of the deepest borehole, to allow for the largest number of geophysical tools to be sent down the borehole for geophysical togging;and c) Access(physical and legal)to the monitoring site in perpetuity to collect hydrogeological information. At monitoring site MW5-14, Hydro One has already facilitated and completed the most costly item outlined in a)and part of b)above. For a relatively small further outlay of effort(and funds)it is anticipated that a high-quality monitoring facility can be established at MW5-14 that will assist the understanding of the regional groundwater flow system. Information generated from such a facility is also expected to benefit more site specific investigations conducted in similar hydrogeologic settings. The proposed further outlay to transform site MW5-14 (situated on Hydro One property)is described below with any new funding coming from agencies other than Hydro One. 1.4 Next Steps The above work has provided a basic framework for understanding the geologic profile at this site. Five ground) hater monitors provide spot measurements of conditions at those intervals. The drilling however identified both thick continuous units of similar properties, and also considerable lengths of variable conditions. For example the Newmarket Till below MW5-,14-D (Figure 3)is a mixture of diamict, and fine-grained sand lenses, and silt lenses which are characterized by contrasting geologic and hydraulic properties. April 02,2015 1 iydro one monitoring site M W 5-14 Page 8 of 18 Proposal- Detailed Ifydrogeological Assessment, took Ridges Moraine,Clarington,Ontario The next step, proposed here, is to complete the existing infrastructure with detailed instrumentation capable of long-term groundwater monitoring and designed to examine these hydrogeological nuances. This is detailed in Section 2, below. Specifically,the objectives of the proposed long-term groundwater monitoring program are to: • Fill existing knowledge and data gaps; • Comparison of different field methods including groundwater monitoring construction and exploration methods(e.g. conventional mud rotary coring versus Rotosonic coring); • Understand the continuity and integrity of the till deposits(aquitards)to be applied both locally and regionally; + These aquitards are the protective layers for aquifers utilized by both private and municipal well supplies; • Understand the regional continuity of aquifers for potential future water supply; and • Validation of the current geological and hydrogeological understanding being applied to municipal groundwater infrastructure on a regional basis. April 02,2015 Hydro one monitoring:site MW5-14 Page 9 of 18 Proposal- betoiled Hydrogeological Assessment, Oo.k Ridges Moraine,Clarington, Ontario 2. TASKS, METHODOLOGY & REPORTING The proposed tasks for future work at site MW15-14 to transform and complete the existing infrastructure to a high-quality, long-term groundwater monitoring facility includes: • Drilling a Rotosonic borehole with associated installation of multiple groundwater sampling ports within that borehole(Infrastructure); and • Provision of access by Hydro One to U of GuelphNPDT-CAMC staff in perpetuity(Site Access). 2.1 Infrastructure: Rotosonic and modular multi-level system Complex hydrogedlogic settings often exhibit large changes in hydraulic properties and three-dimensional groundwater flow patterns over short distances. The problem can be further exacerbated within aquitards (e.g. glacial till)by the presence of fractures andfor sand seams and the fact that conventional piezometers can,take months to years to provide useful inforniation, Conventional piezometers also contain casing joints which can leak, further complicating results. The Lower Newmarket till is situated beneath site MWJ5-14 and is found throughout much of the ORM study area. T'his unit controls the flow of groundwater between the shallow groundwater flow system and the deep groundwater flow system, thereby acting as the protective layer for the deep aquifers used for private and municipal water supply. The Lower Newmarket till and other geologic units encountered on site are characterized as exhibiting subtle yet important changes in hydraulic properties over short distances. This type of setting requires more detailed monitoring to fully understand the details of groundwater flow paths. Theproposal is for a Rotosonic borehole to be drilled at MW5-14. This drilling method vibrates a drill casing to depth while collecting a continuous core sample. The key characteristic of this drilling method is that a drill fluid is not needed for borehole control or as a drill bit coolant. This minimizes the possibility of drill fluid subsurface contamination which can take months to years to remove or naturally dissipate. A modular multi-level system adapted for high resolution monitoring of, hydraulic head and ground water quality will be installed within the borehole. The system accommodates up to '15 monitoring intervals within one hole and can be used to monitor overburden andlof bedrock to depths of interest at MW5-14. Detailed vertical monitoring provides important information on hydraulic head and groundwater quality distributions that are missed with fewer monitoring intervals- The monitoring system offers unique advantages where detailed monitoring in heterogeneous settings is needed to assess and understand groundwater flow and possible contaminant migration. Even with the availability of core logs prior to installation of multi-level systems, most of the specific depths at which the highest head differentials occur often cannot be anticipated from detailed visual inspection of the core, indicating the essential and unique role of the high-resolution head monitoring (Parker et aL,2006). Advantages of the proposed Rotosonic drilling method and installation of multi-lbvel monitoring system include: • Unified, holistic Understanding of the hydrologic system including both aquitards (e.g. till, silt)and aquifers(e.g.sand). The existing conventional monitors are screened in aquifers with the exception of monitor MW5-1 4C-1 April 02,2015 Hydra One monitoring site MW5-14 Page 10 of 18 Proposal: Detailed I-fydrogeo logical Assessment, Oak Midges Moraine,Clarington, Ontario • Comprehensive understanding of groundwater hydraulic gradients resulting in an improved appreciation of vertical flow though the stratigraphic profile and of the integrity of the fill as a protective barrier for deeper aquifer systems; • Improved understanding of the hydraulic properties of the encountered fill units.which will be useful to the ORM Groundwater Program.These data are not achievable from conventional borehole monitoring; • Multi-level sample ports are smaller volume than conventional piezometer installations thereby allowing for quicker response times within aquitards; and • The Rotosonic drilling method is reported to be fast with uncontaminated samples(no drill mud)and no downhole sample contamination with the result being that the integrity of soil and groundwater samples is greatly increased. One of the research objectives of selecting this location (MW5-,14)is that different drilling methods (PQ mud rotary versus Rotosonic)can be compared including costs,timing of completion,quality of samples obtained and quality of groundwater monitoring installations achieved. Another ancillary benefit is,the training of students in advanced hydrogeologic techniques. A drilling contractor will drill the Rotosonic borehole. The Multi-level monitoring system will be installed in the borehole by the drilling contractor and UoG technicians supervised by Beth Parker and John Cherry, in collaboration with Rick Gerber. It is understood that the drilling contract would have to be administered by HydroOne because of Ministry of Labour and 3rd party liability issues.The logging of the Rotosonic core would be done by UoG and McMaster University personnel who logged the core from the borehole to bedrock that was drilled in December 2014. All on—site work will follow the safety and logistical procedures that were established during the December 20*14 drilling program, led by Hydro One's Jeff Cridland- All potential site visitors from the University of Guelph, McMaster University and CLOCA(Rick Gerber) are covered under Workers Compensation. 2.2 Site Access The groundwater monitoring infrastructure at 1;AV%15-14 consists of 5 conventional 2 inch diameter PVC piezometers. Hydro One plans on monitoring only 4 of these fA-D) as part of their EA required monitoring program for the period 2015-20,19. It is assumed that Hydro One plans on decommissioning all!5 piezometers when their monitoring obligations have been satisfied. Given that MW5-'14 consists of 5 groundwater monitors, all 5 should be actively monitored iinClUding MVV5-,14E. We(YPDT-CAMC, UofG)require forma[permission to access this site through 2019 to ensure that all 5 monitors are actively monitored if Hydro One is unwilling to do so. We request site access permission to install the groundwater monitoring infrastructure detailed in Section:2.1. The installation of this further groundwater monitoring infrastructure will upgrade this site to a high-quality groundwater monitoring facility to be utilized for both regional and local hydrogeologic investigations in the long term. Given the outlay of funds to install the Current monitoring infrastructure and the proposed outlay of funds to upgrade the facility, it would be a lost opportunity to decommission this site after Hydro One is finished their monitoring requirements in 2019. We request permission to April 02,2015 Hydro one monitoring site MW5-14 Page 11 of 18 Proposal= Detailed 1tydrogeological Assessment, Oak Ridges Moraine,Clarington,Ontario access site MW5-'14 in perpetuity to continue collecting valuable groundwater information as outlined in Section 1.4 above. A legal entity is needed should any of this groundwater monitoring infrastructure cease to be used at some point in the future and to provide for maintenance of the piezometers in the long-term. The legal entity is responsible for decommissioning should this prove to be necessary. Central Lake Ontario Conservation Authority has agreed to be the legal entityy for this proposed long-terra, high-quality groundwater monitoring facility at 1ti4 ^B-14. Further details are provided below. 2.3 Reporting Structure The proposed reporting structure is summarized in Figure 4_ It is anticipated that a streamlined interaction and reporting protocol will be optirnal given the different entities that are involved including the proposal team, local government and Hydro One. Proposed Interaction Structure Lang-term groundwater monitoring site MW5-14 Hydro One(Owner) .lariragtcnTrarr$fcrm?rStat cn - Site MW5-14 Designared Li&i Rick Gerber e Central LakeOntaric Ccnsei-vaticn Authority(CLOD;Legal Entity) Munir'pafit;ofClaringtm > UniverstyGfGueipihG360 Enn sk: leriEnvironrnerita Assn • B.Parker,-J-Cherry,E.Arnaud M100aster Unpre"L J a m es Srm ith Rick Gertner Faye Langmaid Figure 4--PYoposed ir(teractran and r:farmat onldata shanng structure. 3. DELIVERABLES 3.1 Short-Term—years 1-5 1-hyrdro One is conducting an on-site monitoring program for the approximate period 20:15- 20,19 to satisfy MOECC requirements. It is preferred that the Hydro C1ne monitoring program April 02,2015 Hydra One monitoring site A W5-14 Rage 12 of 18 Proposal: betailed Hydrogeological Assessment, Oak Ridges Moraine,Clarington, ontorio includes all 5 piezometers at MW5-14. Until this issue is resolved it is unclear what, if anything, other parties will be asking to complete. It would be prudent for all 5 piezometers to be monitored for the period 2015-2019. We look forward to further discussion towards resolving this issue. 3.2 Long-Terra Monitoring (after 5 years; >2019) The long-term monitoring goals at MW6-14 will be to continue the monitoring program conducted by Hydro One for the period 2015-2019. It is assumed that the ultimate groundwater monitoring infrastructure at MW5-14 will include the current 5 groundwater monitors plus multi-level monitoring probes installed within a Rotosonic borehole. It is anticipated that transducers with dataloggers will be installed in select piezometers collecting data at regular intervals (hourly),and that manual measurements(—monthly)will also be conducted. Groundwater sampling and analysis will be conducted(—annually)along with physical aquifer/aquitard testing. These data will be shared with the various interested stakeholders regarding water resources associated with the Oak Ridges Moraine. Information will be disseminated through publication in University theses,scientific journals, public lectures and talks at conferences,as well as through the YPDT-CAMC web site (www.oak6daesvwvater_ca - 4. FINANCIAL, LEGAL & SCHEDULE The following lays the groundwork for the suggested logistics and details. Letters of Reference outlining pertinent details are included in Appendix B. Subsequent discussions with all parties, particularly Hydro One, will refine these details. 1) Legal Entity- CLOCA has agreed to be legally responsible for the groundwater monitoring infrastructure at site MW5-1 4 subsequent to 20,19 for the boreholes that Hydro One must monitor as a condition of the EA. They will do this as well for the proposed detailed multi-level monitoring installation in the Rotosonic borehole immediately upon completion. This also means the arrangement and completion of the decommissioning of all boreholes at some point in the future(>2019)should this become necessary; a. It is requested that Hydro One transfer decommissioning funds to CLOCA for the existing borehole cluster(5 piezometers A through E)at site MW5-14. The anticipated cost is expected to be on the order of$10,000 assuming $2000.00 per piezometer; b. CLOCA will also be responsible for the decommissioning of the additional Rotosonic borehole at some time in the future(this borehole is not under the EA approval conditions and the construction costs are not being funded by Hydro One); c. A Memorandum of Understanding (MOU)will be prepared between CLOCA and Hydro One. 2) RotoSonic Drilling—Rotosonic drilling,,and multi-level piezometer installation will be supervised by the University of Guelph. Funding sources and logistics for this includes: a. Municipality of Clarington$25,000-To be transferred to Hydro One ter pay for the preferred Rotosonic driller. A quote from Choice Sonic Drilling is included as Appendix A; April 02,2015 Hydro one monitoring site MW5-14 Page 13 of 18 Proposal: betailed Hydrogeological Assessment, Oak kidges Moraine,Clorington, Ontario b. EEA$5,000 to John Cherry-This will be used by UofG to purchase a Waterloo System multi-level installation to be installed within the Rotosonic borehole; c. John Cherry NSERC-Should Rotosonic drilling (2a) cost more than$25,000 then an invoice will be sent by Hydro One to John Cherry to cover the remainder; d. John Cherry NSERC-Should the purchase of multi-level piezometers cost more than$5,000 then John Cherry will pay for the ren-cinder; e. This task can be completed at any time subject to driller availability. Time is not expected to lower drilling costs so ideally the sooner the better. Also given that groundwater trends can take long periods of time to develop (e.g. decades), a longer monitoring data set is preferable,- and f. University of Guelph and McMaster University researchers will make regular Visits to site to measure water levels, or take groundwater samples,or conduct hydrogeological testing!(under the Supervision of YPDT-CAMC staff)- 3) Long-term Monitoring (>2019)-The key components of this task will be site access from Hydro One which will be outlined in the MOU with the legal entity (CLOCA)and the existence of a decommissioning fund as outlined in 1 above. Other items include: a. YPDT-CAMC staff(employees of CLOCA)will make regular(-Monthly)visits to the site to measure water levels, or take groundwater samples, or conduct hydrogeological testing subject to Hydro One schedules and health and safety requirements; b. University of Guelph and McMaster University researchers will make regular Visits to site to measure water levels, or take groundwater samples,or conduct hydrogeological testing(under the supervision of YPDT-CAMC staff); c. Annual maintenance costs are estimated at$1000/year. CLOCA will prepare a capital budget submission for FY 2016 and ongoing to cover these costs. Alternatively,the Oak Ridges Moraine Groundwater Program(YPDT-CAMC) program could cover these costs should the partners agree;and d. Laboratory analysis (e.g. chemistry, isotopes)will,be conducted opportunistically as funding is available. 5. SUMMARY The following provides a summary of the relative events and requests contained within this proposal for Hydro One's consideration: 1) Hydro One has established a monitoring network for the Clarington Transformer station location in response to MOECC project approval requirements. It is anticipated that this monitoring program will extend through the period 2015 to 20*19; 2) Hydro One conducted deep groundwater exploration tasks at site tAW5-14 during December 2014 in response to conditions attached to their road easement agreement with the Municipality of Clarington. This exploration was conducted in concert with CLOCA, YPDT-CAMIC, University of Guelph, McMaster University, Municipality of Clarington, and CLC(SLR Consulting)representatives; 3) Monitoring site MW5-14 now contains 5 groundwater monitors (piezometers) installed at various depths. It is unclear if Hydro One will monitor all 5 of these monitors for their monitoring period 2015 to 2019; April 02,2015 Hydro One monitoring site MW5-14 Page 14 of 18 Proposal: betailed Hydrogeological Assessment, Oak Pidge!; Moraine,Clarington,Ontario 4) Given Hydro One's current groundwater related site expenditures at MWS-14 if would seem prudent to monitor all 5 piezometers at MW5-14 for the 2015-2019 monitoring period; 5) Permission is requested to augment monitoring capabilities at site M4W5-,14 by drilling a Rotosonic borehole and installing the associated multi-level groundwater monitoring system; 6) We hope to work out a mutually agreeable solution to enable monitoring to occur at all 5 monitors at MW5-1 4 plus the installed multi-level monitoring system through the period 2015 to 2019; 7) From a technical perspective (and to better capitalize on the Hydro One expenditure to date)it would be preferred that Hydro One permit the continuation of groundwater monitoring at site MW5-14 post-2019. The altemative would be to decommission this location in 20,19 when Hydro One has fulfilled their MOECC monitoring requirements. No additional costs would incur to Hydro One as a result of longer term monitoring; 8) Post-2019 we request permission to access the groundwater monitoring facilities at site MW5-14 in perpetuity with CLOCA acting as the legal entity; and finally 9) No direct cost or funding is requested from Hydro One except for transfer of funds that would have been spent decommissioning the five MW5-14 piezometers A-E to CLOCA. These funds will be held by CLOCA for decommissioning at a [Liter date should this be deemed necessary at some point in the future(>2019). We thank you for your consideration of this proposal and we look forward to a successful collaborafion in establishing a high-quality, long-term groundwater monitoring facility at site MW5-14. The water resource information generated at this site is anticipated to benefit both regional and local investigAons across south-central Ontario. Sincerely, Dr. Beth Parker Dr. John Cherry University of Guelph, G360 Group University of Guelph, G360 Group Dr. James Smith McMaster University Dr. Richard Gerber Oak Ridges Moraine Groundwater Program(YPDT-CAMC) 416-737-1550 April 02,20915 Hydro one monitoring site MW 5-14 Page 15 of 18 Proposal: Detailed Hydrogeological Assessment,Oak Ridges Moraine,Clarington, Ontorio 6. REFERENCES Cherry,J.A., B. Parker and J. Levison.2013. Independent Review, Hydrogeological Concerns for the Clarington Transformer Station Class Environmental Assessment Draft Environmental Study Report. Prepared for the Enniskillen Environmental Association. July 31- Hydro,One.2012. Clarington transformer station class environmental assessment draft environmental study report. Report N U rnber:590-CLEA-12-11- Environmental Services and Approvals, Hydro One Networks Inc. Toronto, Ontario. Parker, B.L., J.A. Cherry and B.J.Swanson. A multi-level system for high-resolution monitoring in rotasonic boreholes. Ground Water Monitoring and Remediation, 26(4), 57- 73- Stantec Consulting Ltd. 2013. Hydrogeologic&hydrologic assessment report Clarington transforrner station, 1609-60745. Prepared for Hydro One Networks Inc., Stantec Consulting Ltd., Kitchener, Ontario, 102 pp. Stantec Consulting Ltd. 2014. Pre-Station Construction Groundwater and Surface Water Baseline Conditions Report, Hydro One—Clarington Transformer Station. November 18, 82pp. April 02,2015 Hydra One monitoring site MW5-14 Page 16 of 18 Appendix A: Potosonic Borehole Quote 010E THE ONLY CHOICL- IN SONIC DRILLING Project Proposal Choice Sonic Drilling Ltd. Quote No: 171 72 Main st,Mount Albert Customer Name: John Cheery Ont,LOG 1MO Client Contact: Tel:647-527-3745 Project No Concession 7&8 choicesonicdrilling.coni Contract Name: Sao pe of work Wiling one BH's to apprommately 200 teet,it All be turn ad into a multi level piezometer upon BH's tinal depth. All BH's will bei led using Sonic technology and will produce a continuous core sample of 4.5"to depth of hole.All wells will be to MOE specifications,Materials would be supplied by client. Start date from: 101-Sep-14 Finish date to: 01-Oct-14 DESCRIPTION UOM QMNY" RATE EXTENDED RATE Mobf0emob to site Lump Sum 1.00 2,500.00 2,500.00 Perdiem for crew Each 4.00 285.00 1,140.00 Hourly rate for Sonic Rig,Box truck Hours 40.00 295.00 11,8rJO.00 Toolino Charcie 4"x 6"Drilling Metre 60.001 45.00 2,700.00 8"override tooling charge (if needed) Metre 0.00 55.00 0.00 Water delivery to site with rental of water cubes Days 0.00 295.00 0.00 Decommission of 61-1"s(grouted to surface) Each 0.00 20-00 UO ,Flush well protector or stick up well protectors Each 0.00, 125-001 0.00 Total 1 18,140.00 dourly drill rate includes loading,moving,drilling,installing,testing,development and clean tip. All uffliffes will be cleared by client prior to drill's arrival Discreet sampling materials,testing equipment and all water samples will be the responsibility of the client. Water used for drilling can either be supplied on site or can delivered for an extra cost Drill cuttings and waste water caused by drill will be handled by client_ Page1 of 1 April 02,2015 Hydro One monitoring site MW5-14 Page 17 of 18 Appendix B: Reference letters W-1 TORO MO Oak Moraine Groundwater Program(YPDT-CAMC) March 30,2015 Faye Langmaid Manager of Special Projects, Municipality of Ciarington Planning Services Department 40 Temperance Street Bowmanville, ON LI C 3AG 905-623-3379,ext.2407 Re: Hydrogeological Assessment of the South Slope of the Oak Ridges Moraine, Clarington, Ontario–proposal to Hydro One, Dear Ms. Langmaid; The Oak Ridges Moraine Groundwater Program was established in 2001 by four municipalities(Peel,York and Durham Regions, City of Toronto)and nine conservation authority partners situated within south-central Ontario across the extent of the Oak Ridges Moraine. Program staff also work closely with the Ontario Geological Survey,the Ontario Ministry of the Environment,the Ontario Ministry of Natural Resources, and the Geological Survey of Canada. Projects with researchers at Canadian Universities are also on-going (e.g. University of Waterloo, Trent University). The goal of this collaborative effort is to establish science-based, responsible water resource management. The premise of the Program is that sound technical understanding leads to more effective water resource planning and policy. This is seen as vital in regards to the Oak Ridges Moraine given its importance in influencing water supply and ecosystem health within much of south-central Ontario. One of the key components of any hydrogeologic analysis is the availability of long-term, high quality monitoring information. While much water related information exists across the Oak Ridges Moraine,the quality is quite variable. The presence of state-of-the-art, groundwater monitoring infrastructure is largely non-existent. The Hydro One Clarington transformer station site contains a large thickness of glacial fill deposits that protect both shallow and deep aquifer systems. The proposed monitoring will provide valuable information regarding groundwater flow through these fill deposits that can be applied across much of south-central Ontario. The locations,of higher quality monitoring locations are shown on the attached Figure 1. Higher quality sites include the presence of a carefully logged soil core extending from ground surface to bedrock and the installation of 3 or more monitoring wells at various, depths. To date,the higher quality monitoring stations shown have been largely installed over narrow geologic structures(e.g.tunnel channels)where the till deposits have been partially or completely eroded. The proposal to Hydro One referenced above seeks to install high quality groundwater monitoring infrastructure at a location on the Moraine(Clarington), Monitoring at the site would generate research-level hydrogeological information and knowledge ultimately leading to a better understanding of aquifer(water supply)vulnerability. This site will fill a large gap 101 Excharmp Avenue, V"han, ON, Cowdo, L4K 5R6 lei ter.. Hydrogeologital Assessment of the South Slope of the Oak Ridges Moraine, Clorington, Ontario (Hydro One Transformer Station MWS-14) - proposal relating to the paucity of information relating to how groundwater flows through till deposits associated with the Moraine. We fully Support the proposed project as its intent is viewed as significantly enhancing Our Program objectives. We have developed significant hydrogeologic expertise related to the flow systems associated vMh the Oak Ridges Moraine. We expect that we will work closely with the study team to convey our knowledge, particularly in placing the local findings into the regional context that we have developed. Other in-kind contributions are possible, for example one opportunity may include collecting samples from the monitoring infrastructure and having them analysed as part of our on-going,isotope study being conducted with researchers from the University of Waterloo. We look forward to developing a successful collaboration with Hydro One as outlined in the proposal. We also look forward to working with world-class researchers in enhancing our understanding of the hydrogeology of the Oak Ridges Moraine. Finally,we fully welcome the long-needed establishment of state-of-the-art-monitoring facilities along the Oak Ridges Moraine. Sincerely, A Steve Holysh, P.Geo. Hydrogeologist and Co-Manager Oak Ridges Moraine Hydrogeology Program (YPDT-CAMC) s,holysh@trc:a.ori.ca: 416-66*1-6600 x5588 Richard Gerber, Ph.D., P.Geo. Hydrogeologist and Co-Manager Oak Ridges Moraine Hydrogeology Program (YPDT-CAMC) rgerber@trca.on.ca;416-661-6600 x5589 March 30, 2015 ORM Groundwater Program (YPUT-CAMC) Page 2 of 3 Hydrogeological � f the South Slope of the Oak Ridges Moraine, Clarington, Ontario (Hydrorr Stab - sal �sa B f s UrcOne C+:e_A]p G;lmk]p SL:e.=.p PrG]:r5 cast r.3 Lxtaxr i {.kuur+il Ldll ixiu 1''i?`.a,7i:Uxx•e 1}lu"-IrSxaJ 0"M rlanrwg Maar:r*Je in metes,11:1?I "x[1u1 Cdix-of Wdnrp Eempr:rn-cM T1r5-'o"'I C'na lnx1l zQnY kv3,1.11=17 g MuI+lipa;S 051 belunUOfY G 20000 .4174)+} Gb-UJ Int41'x+ted wrnel chornei 1'rr�n-lx-m= IJi4'I hdF lP=.7 r' n Ii 15xiw tr.,�5y:g 111:::�57n1r} 4FDT-GA VAC-_u5+a `s�r S+Summa Fixs.:.mrlx Figure 1: Higher quality monitoring locations in the Oak Ridges Moraine study area. Higher quality locations include the presence of a carefully logged core to bedrock along with the installation of 3 or more tpr nitoti ng wells at variable depths. March 30, 2015 ORM Groundwater Program POT- f Attachment 2 to Municipality of Clarington Report PSD-053-16 June 22, 2016 Attention: Mr. Mayor and Council Members Municipality of Clarington Council Services 40 Temperance Street Bowmanville, ON L1 C 3A6 Attention: Faye Langmaid RE: Proposed modifications to approved Rotosonic hole location and $25,000 funding The University of Guelph (UofG) and McMaster University are appreciative of Clarington Council's $25,000 commitment and the work that has occurred by all parties involved towards the advancement of a Rotosonic hole and installation of a Multi-level System (MLS). The drilling has not been able to proceed on a schedule that will allow the graduate students who are depending on data from the hole and from the multilevel system to complete their Masters theses in the time allotted to them by the University. The July 5 start date drilling schedule meets these needs. Although there are still ongoing attempts to get drilling approved for the Hydro One land at the deep core hole site, the prospects for full approval by July 5 are very poor. However, G360 is proposing an alternate drill site on private property appropriately located for the purposes of the scientific study and consistent with the Clarington-approved funding in order to expedite the completion of the MLS. This alternative site arrangement will enable the schedules arranged with the drilling contractor to be met and it will ensure that the team of scientific collaborations can proceed with no deficiencies so that the financial investment by Clarington can give the best possible value. An agreement is being established between G360 and a landowner for access to the MLS for a period of five years with G360 owning the costs of well decommissioning when this is needed. We hope that CLOCA will see this monitoring as valuable to them and that CLOCA will want to take the MLS on as part of their long term monitoring network. This plan will allow G360 to convey data to interested parties in an accelerated manner and create a reasonable and effective timeline for the graduate students working on this project. It will also allow Clarington to have full access to the hole/MLS in their pursuit to inform and protect their citizens. We will welcome Dr. Rick Gerber to be a collaborator on the drilling of the hole and the multilevel system installation,just as would be the case if the hole were to be drilled on Hydro One property as originally planned. We will also welcome the participation of Mr. Steve Usher during the drilling and MLS installation. With this slight shift in collaborative efforts because of the new location of the hole, and with a focus on this new location from G360, McMaster University, the Municipality of Clarington, and the EEA, it is expected that the advancement of the Rotosonic hole and installation of the MLS will occur in July of 2016. Drilling of the Rotosonic hole and installation the MLS on private land, with ownership by G360 for the near future will best facilitate the scientific goals of this project. The drilling at the rotosonic site will be done to install a multilevel monitoring system with many monitor intervals (16 ports). Each monitoring internal is like an individual monitoring well. So in essence, this location will have sixteen wells, each at a different depth. The particular MLS, to be installed in a rotosonic hole to a maximum depth of 300 feet, is the new G360 MLS that we believe will in the future have great value at this site and at many other sites on the Moraine and far beyond. This MLS project has substantial cost associated with it, including the student research stipends, travel to and from the site, purchase of the MLS and the sand and bentonite for installation, the drilling contractor cost, purchase of pressure transducers and recoding units for monitoring in the MLS, water analysis cost for samples from the 16 ports on the MLS (inorganics, isotopes, dissolved organic carbon and more). The total cost of this project through to completion of the two Masters theses exceeds 150K. To enable this project to proceed we have rounded up funds from a few different sources including: - G360 - McMaster - Geological Survey of Canada -the EEA The Geological Survey of Canada (GSC) is a collaborator on the project because the MLS is an innovative endeavour and because the site location is of particular interest to the GSC geologists. GSC geologists have much experience and expertise concerning the Moraine. The 25K that has been planned to come from Clarington is a key component of the overall budget: we will send to you soon the details of the MLS design so that Rick Gerber and Steve Usher can have input before the drilling begins. All of the components of the MLS have been ordered but there is flexibility in what is to be put in the ground by the fact of the modular design of the MLS and that we have some extra component pieces. Yours sincerely, Dr. John Cherry, FRSC, PEng. Distinguished Emeritus Professor, University of Waterloo and G360 Centre for Applied Groundwater Research, University of Guelph Dr. Beth Parker, Professor and NSERC Industrial Research Chair, and Director, G360, Centre for Applied Groundwater Research, University of Guelph j i i i I Municipality of Clarington Attachment 3 to Report PSD-053-16 Council Meeting Minutes April 27, 2015 Item 4 Resolution #C-136-15 Moved by Councillor Neal, seconded by Councillor Cooke That Report PSD-024-15 be received; That Council Resolution # C-172-14 (Attachment 3) granting G360 Group access to Townline Road for the purpose of a deep borehole and providing a grant of $25,000 to the University of Guelph be rescinded; That the Municipality of Clarington provide.up to $25,000 to fund the Joint proposal of Central Lake Ontario Conservation Authority, University of Guelph and McMaster University (G360 Group) for their proposal "Hydrogeological Assessment of the South Slope of the Oak Ridges Moraine" dated April 2, 2015 (Attachment 1); That the project be funded with a transfer from the 2013 Donations Account to the Consulting Reserve; That Hydro One be requested to provide site access for the additional rotosonic borehole and long term monitoring activities as outlined in the proposal in Attachment 1 to Report PSD-024-15; That Steve Usher be requested to prepare a written report to the Enniskillen Environmental Association based on his presentation of April 27, 2015; and That all Interested parties listed in Report PSD-024-15 and any delegations be advised of Council's decision, I