It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report ADMIN-19-00 be received;
2. THAT Council approve the preliminary designs for the construction of a new Bowmanville
Main Branch Library and expansion of the Municipal Administrative Centre;
3. THAT staff be authorized to call for tenders for this project as set out in the Critical Path;
4. THAT staff be authorized to undertake a pre-qualification procedure for all bidders; and
5. THAT an additional $1,040,000 ($650,000 escalation, $261,067 penthouse and $127,900
construction contingency) be approved for the main Branch Library and expansion to the
Municipal Administrative Centre and that the additional cost of construction be added to
the proposed debenture requirements for the facility.
1. BACKGROUND:
1.1 At the January 17,2000 Council Meeting, Council awarded the contract for architectural
services for the construction of the Bowmanville Main Branch Library and expansion to the
Municipal Administrative Centre to Shoalts and Zaback Architects. Since that time, the
consultants in conjunction with the Project Team have developed various drawings to
accommodate the requirements of the Library and the expansion requirement of the
Municipal Administrative Centre. Following Council's approval of the concept design, the
Project Team will continue to work with all parties to finalize design features in the
preparation of the working tender documents.
lLU6
1
~ "
"
REPORT NO.: ADMIN-19-00
PAGE 2
2.0 CRITICAL PATH:
2.1 In Report ADMIN-07-00, the Project Team prepared a critical path which outlines each
step in the process from selection of Architect to Building Occupancy. The Project Team is
on schedule and will be issuing a tender call in March 2001. It should be noted that the
Ceremonial Groundbreaking has been rescheduled to Wednesday, July 12 at 2:00 p.m.
instead of Thursday, July 6th.
3.0 PRE-QUALIFICATION:
3.1 In accordance with previous practise, staff is recommending a pre-qualification process for
potential bidders of this project. This process offers advantages to the Municipality in that
it eliminates the possibility of a low bidder being awarded the contract when they may not
be qualified to do the job. Further, pre-qualification ensures the respective contractor's
financial stability and credibility.
3.2 Also, in order to provide maximum opportunity for local trades to participate in this
project, the Durham Construction Association will be kept informed of the tendering
process and further, the plans will be on display at their offices.
4.0 CONCEPT PLAN:
4.1 The Architect will be making a presentation to Council in conjunction with this report.
Some of the areas that have been addressed in the expansion of the Municipal
Administrative Centre include additional washrooms, more meeting space, a connection
from the existing main floor to the main floor of the library and the potential for expansion
whenever the need arises.
4.2 The conceptual plan has been costed out by Helyar and Associates and indicates that based
on the conceptual floor design, we are within our previous budget forecast (Attachment #1).
12U7
'.
~
REPORT NO.: ADMIN-19-o0
PAGE 3
4.3 However, there were some building considerations that need to be approved that would
have an impact to the project budget.
4.4 The fourth floor plan illustrates the mechanical room, the main computer room and related
staff and the Library administration. In consideration of potential expansion needs and the
issue of acoustics between the working area and the mechanical room, the Committee is
recommending that the mechanical room be relocated to a penthouse location similar to the
existing building and that the budget reflect an additional $261,067.00.
4.5 The concept plan indicates a partial basement which will connect to the existing lower level
by way of a mechanical lifter. If we would like to increase the lower level from
approximately 3,600 square feet to 11,000 square feet an additional cost of $523,279.00
will have to be added to the project budget.
4.6 The tender call for this project is early spring of the Year 2001. The critical path was
established in consideration of financial requirements, working drawing completions etc.
The cost consultant has to indicate concerns with regard to escalation contingency as a
result the consultant is recommending that we include an escalation contingency of
$650,000.00 which will be used only if requested. If it is not required once the tender
results are reviewed, this amount will be directed to offset debenture costs in consultation
with the Treasurer. Another recommendation from the Cost Consultant and the Architect is
to increase the construction contingency from 3% to 5% which increases this $327,900.
4.7 Due to the recent change in responsibilities involving the Manager of Operations, it is
recommended that the Chief Administrative Officer investigate alternatives in effectively
dealing with the Municipality's role in construction administration. On various projects in
the past, the Municipality has engaged the services of a Project Consultant who would
undertake regular site investigations, contemplated change orders and site instructions.
12U8
'"
'"
REPORT NO.: ADMIN-19-o0
PAGE 4
4.8 As a result of the Project Team, Architect and Cost Consultant review of the concept plan
and budget, it is recommended that an additional $1,040,000 ($650,000 escalation,
$261,067 penthouse and $127,900 construction contingency) be approved for the main
Branch Library and expansion to the Municipal Administrative Centre.
4.9 The original budget, approved through Report ADMIN 33-99, identified the project cost at
$7,282,000. The additional recommendations brings the proposed budget to $8.3 million.
It is recommended that the additional cost be added to the debenture requirements. When
the project is tendered, a final budget will be presented to Council for approval.
4.1 0 The Architect presented to the Clarington Library Board, the concept floor design for the
Library. The Board is in support of the conceptual design.
4.11 As the project progresses, staff will be reporting back to Council to update and seek the
necessary approvals.
Respectfully submitted,
Reviewed by,
d~-:- Ok
Fre erick J. Horvath, Property Manager
and Health & Safety Officer
Franklin Wu,
Chief Administrative Officer
{/7~?
Cynthia Mearns, Library Director
~
FH:sa
12U9
~~, 27 C9..L.lo: 50 FAX
SHOALTS & ZABACK
1llI002/002
ATTACHMENT III
TO REPORT ADMIN-19-00
..
.
Shoalts and Zaback Architects Ltd.
June 20, 2000
Clarington Library and Municipal Administration Building Expansion
Bowmanville, Ontario
Project No. 0006
Comparison Budget versus June 20, 2000 Estimate by Quantity Surveyor
Budget Estimate
Base Building (40,000 ff@$15O.00) $6,000,000 $5,879,000
Site work $~oo 000 $187.000
Subtotal $6,300,000 $6,066,000
Renovation Work to MAC $150000 $492.000
Subtotal $6,450,000 $6.558,000
Construction Contlngenoy $200,000 $200,000
Fees $420.000 $299 000
Subtotal $7,070,000 $7,057,000
G.S.T @ 3% $212.000 $211110
Subtotal $7,282,000 $7,268.710
Additional Recommended COnstruction 0 $131,737
Contingency + G.S.T.
Escalation To Spring 2001 Tender Q $666.040
including G.S.T.
Total $7,282,000 $8,066,487
Notes:
1) To add Full Basement
431,000 x 1.09% = 469,790 x 1.05% = 493,279 + 30,000 = $523,279
(escalation) (contingency) (additional fees)
2) To add Penthouse
215.000 x 1.09% = 234,350 x 1.05% = 246,067 + 15,000 = $261,067
(escalation) (<:antingency) (additional fees)
3) Addition To Construction Contingency Increases It To 5% As Recommended By Quantity Surveyor
4 Cataraqul Slreel Suite 206 Klng.ton. Ontario K7K 1Z7 E-Mail: szar<:h@ko..nel Tel: (613) 5410776 F.., (6'31541 0604
1210