THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
REPORT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File #
Res. *ff!/!-tJJ-OO
Date:
OCTOBER 2,2000
Report No.: WD-49-00
By-Law #
Subject:
SUPPLY AND INSTALLATION OF PEDESTRIAN BRIDGE
FAREWELL CREEK, OLD KINGSTON ROAD, COURTICE
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report WD-49-00 be received for information.
REPORT
1.0 BACKGROUND
1.1 At the Council meeting ofJuly 3, 2000, Council passed Resolution #GP A-358-00:
"WHEREAS there is a desire to promote walking and cycling as an
altemative to car travel;
WHEREAS it is desirable to provide opportunity for residents to
walk to business areas, in particular the busy areas of Highway #2;
WHEREAS a number of residents in the area of Prestonvale Road
and Osgoode Gate have asked for a foot bridge to go over the creek
on Old Kingston Road. This area had been open for many years and
is a great loss to the community;
THEREFORE BE IT RESOLVED THAT Public Works investigate
and report back to Council in the fall the feasibility of a pedestrian
1130
. ~....
.
---
REPORT NO.: WD-49-00
PAGE 2
THEREFORE BE IT RESOLVED THAT Public Works investigate
and report back to Council in the fall the feasibility of a pedestrian
bridge on Old Kingston Road to connect the communities in the area
and to provide a natural additional walking path for the residents of
Courtice. "
2.0 REVIEW AND COMMENT
2.1 The former vehicular bridge was removed in 1999 leaving the residents with no access over
the creek on Old Kingston Road.
2.2 Staff are recommending that a 25-foot long arched galvanized steel bridge, with a 3 tonne
capacity, complete with white oak decking, be installed. The bridge will be engineered to
meet all applicable codes and regulations and would be for pedestrian use only.
2.3 The estimated cost for the supply, installation and engineering design is $12,000.00 plus
GST.
3.0 CONCLUSION
3.1 Staff feel that the purchase and installation of a pedestrian bridge over the Farewell Creek at
Old Kingston Road represents a feasible project and will be including this item for Council's
consideration in the 2001 Capital Budget.
Respectfully submitted,
Reviewed by,
~1/~
Stephen A. Vokes, P. Eng.,
Director of Public Works
d~~
Franklin Wu,
Chief Administrative Officer