HomeMy WebLinkAboutWD-49-00 ,~ '" ,..... ~ THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File # Res. *ff!/!-tJJ-OO Date: OCTOBER 2,2000 Report No.: WD-49-00 By-Law # Subject: SUPPLY AND INSTALLATION OF PEDESTRIAN BRIDGE FAREWELL CREEK, OLD KINGSTON ROAD, COURTICE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-49-00 be received for information. REPORT 1.0 BACKGROUND 1.1 At the Council meeting ofJuly 3, 2000, Council passed Resolution #GP A-358-00: "WHEREAS there is a desire to promote walking and cycling as an altemative to car travel; WHEREAS it is desirable to provide opportunity for residents to walk to business areas, in particular the busy areas of Highway #2; WHEREAS a number of residents in the area of Prestonvale Road and Osgoode Gate have asked for a foot bridge to go over the creek on Old Kingston Road. This area had been open for many years and is a great loss to the community; THEREFORE BE IT RESOLVED THAT Public Works investigate and report back to Council in the fall the feasibility of a pedestrian 1130 . ~.... . --- REPORT NO.: WD-49-00 PAGE 2 THEREFORE BE IT RESOLVED THAT Public Works investigate and report back to Council in the fall the feasibility of a pedestrian bridge on Old Kingston Road to connect the communities in the area and to provide a natural additional walking path for the residents of Courtice. " 2.0 REVIEW AND COMMENT 2.1 The former vehicular bridge was removed in 1999 leaving the residents with no access over the creek on Old Kingston Road. 2.2 Staff are recommending that a 25-foot long arched galvanized steel bridge, with a 3 tonne capacity, complete with white oak decking, be installed. The bridge will be engineered to meet all applicable codes and regulations and would be for pedestrian use only. 2.3 The estimated cost for the supply, installation and engineering design is $12,000.00 plus GST. 3.0 CONCLUSION 3.1 Staff feel that the purchase and installation of a pedestrian bridge over the Farewell Creek at Old Kingston Road represents a feasible project and will be including this item for Council's consideration in the 2001 Capital Budget. Respectfully submitted, Reviewed by, ~1/~ Stephen A. Vokes, P. Eng., Director of Public Works d~~ Franklin Wu, Chief Administrative Officer FH*SA V*ce 1131