Loading...
HomeMy WebLinkAboutWD-12-00 ..~ ~ THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON Meeting: REPORT GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File # ~ FEBRUARY 14, 2000 Res. #C//f-t/I-oo Date: Report No.: WD-12-00 Our File: C.01.27.001 By-Law # Subject: CLARNEW SUBDMSION, PHASE I, PLAN IST-88061 (NOW 40M.1976) EDWARD STREET URBANIZATION - BEAVER STREET TO APPROXIMATELY 90 METRES EAST COST RECOVERY BY DEVELOPER Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-12-00 be received; 2. THAT the Purchasing By-law 94-129, Section 5.06, be waived and that the Developer (Clamew Developments Inc.), be reimbursed in the amount of$71,516.81 for the cost of the Edward Street wbanization; and 3. THAT the funds be obtained from Account No. 7205-99004-0261. REPORT 1.0 ATTACHMENTS No. I: Key Map , No.2: Budget Sheet No.3: Cost Recovery Invoice 2.0 BACKGROUND 2.1 The Municipality of Clarington entered into a Development Agreement dated June 15, 1999, with Clamew Developments Inc., for the development of Plan 18T -88061. 1126 , REPORT NO.: WD-12-00 PAGE 2 2.2 The Development Agreement required the developer to improve a section of Edward Street, to an urban profile. D.G. Biddle and Associates Limited, the engineering consultant for the developer, has prepared a cost summary. They determined that the costs of the Edward Street urbanization attributable to the Municipality are $71,516.81 (see Attachment No.3). StafIhas reviewed the cost summary from D.G. Biddle and Associates Limited and concur with this amount. 2.3 The funding for this work was provided for in the 1999 Capital Budget (see Attachment No. 2). 2.4 In order to reimburse the developer for the cost of the works, a Purchase Order in the amount of $71,516.81 must be issued by the Municipality's Treasury Department, which requires that Purchasing By-law 94-129, Section 5.06, be waived. 2.5 The Treasurer has reviewed the funding requirements and concurs with the recommendation. Respectfully submitted, Reviewed by, ~~ Stephen A. Vokes, P. Eng., Director of Public Works C5v~Q3.~ Franklin Wu, Chief Administrative Officer AHC*SA V*ce 04/02/00 1127 I I' I II r- ---EDWARD ATREET 1--- -VRBAN1 TION . ~ / I 1---___1 r--- /-J f--------~____L ------~ I " I tu ~------1 ~ " -------L--------'-----___________i~ ~t----- . i,L_____________~ : ~-----~ _ _J ~I ----J .1Il ~------l I ___ I__---L--~ ~--"----I-I . I ' _I I : ~~~~~~~uJ,L~{;i9F _~}\ ll- < I'--ll JLNEWCJrSTL5---Ji ,h. _ ~L~L ____L ----- ~~ J;-Tl[l~JO'I---------~"~n --=-.(' , Illj(~[ii! \\' r-~\ ,lh~l-li \\ --II----JIL---'..-~n Edwarn Stre E \\ __--T-,r~,--=:J--<1l 1-1 1"". / \,\ _,ll~~--c'L.J[jLI i =JtSUB-~ECT__ .."" ... _"~ ;-).~__ 1'niiIlJ.. -<srI'E, DRAWN BY:J.R.M l DATEJAN.~ b-- J~urr>"'Zi ~- MAPj:;~~~::::~;;~o - l 1128 r-~,-: -, L ----l . \ I -----t-- I J I I l__L_J EDWARD STREET E. .. 1 L r 1~'- 1- I i I CLARNEW SUBDIVISION 40M-1976 ll{ w~}: s - THE COR P 0 RAT ION 0 F THE M U N I C I PAL I T Y 0 F 1999 CAPITAL BUDGET AND FOUR YEAR FORECAST C L A R I N G T: & ~ o ....'9 .... ..,..; g~ ... Z .: ~~ ui:li <0 ...~ ~aj rv --.0 DEPARTMENT: PUBLIC WORKS ROADS AND STRUCTURES SECTION PAGE REFERENCE: 1 1999 PROJECT PROJECT COST/FINANCING ACCOUNT #: 7205-99004-0261 COSTS PROJECT NAME: ROAD RECONSTRUCTION EDWARD ST. EXTENSION ROAD RECONSTRUCTION 88,000 PROJECT ADMINISTRATION 12,000 LOCATION: NEWCASTLE VILLAGE DESCRIPTION/DETAILS: FULL RECONSTRUCTION TO AN URBAN ROAD STANDARD INCLUDING GRADING, GRANULAR BASE AND SUB-BASE, CURB AND GUTTER, HOT MIX ASPHALT, SIDEWALK, AND STORM SEWERS. TOTAL COSTS: $ 100,000 FINANCING - t RESERVE FUNDS Coroline Street P/W PARKS CAPITAL 22,600 .... DEVEL CHRG P/W 77,400 ~ -0 tr '0 - lV C lV 0 ~ - a (f) lV tr Edword Street I-T. ......<: . I ___ 100m - lV lV ~ ~ lV - > (f) 0 ::> 1\1 ~ I.J~ 1\ ~ ILL James Street I I TOTAL FINANCING: $ 100,000 CLARNEW DEVELOPMENTS INC. ItlIVOICE FOR MUNICIPAL WORKS EDWARD STREET RECONSTRUCTION(STAGE I SERVICES) DRAFT PLAN OF SUBDIVISION 18T~8061 -PHASE 1- REG. PLAN 40M 1976 VILLAGE OF NEWCASTLE MUNICIPALITY OF CLARINGTON OUR FILE: 66267 CONTRACT UNIT ITEM DESCRIPTION UNIT QUANTITY PRICE 1.0 STORM SEWERS (EXISTING EDWARD ST.) 1.1 300mm concrete pipe I.m. 39.50 $75.00 1.2 1200mm precast manhole v.m. 3.10 $699.00 1.3 Single precast catch basin(road) ea. 2.00 $1,377.00 1.4 Boulevard catch basin ea. 1.00 $1,429.00 1.5 250mm catch basin connections I.m. 12.00 $74.00 1.6 T. V. Inspection I.m. 39.50 $2.00 1.7 150mm service connections ea. 3.00 $562.00 Total Storm Sewers 2.0 ROADS (Existing Edward St.) STAGE I CONSTRUCTION 2.1 Tree removal(item 11.5 - additionai work) I.s. 1.00 $1,575.00 2.2 Remove existing curb & gutter I.m. 30.00 $10.00 2.3 Excavation & Fine Grading m3 1473.50 $4.00 2.4 100mm underdrains I.m. 174.00 $9.00 2.5 Granular 'B' material (375mm) m3 320.00 $16.48 2.6 Granular 'A' materiai (150mm) m3 108.00 $23.46 2.7 Binder asphalt (80mm) m2 722.00 $705 2.8 Concrete curb & gutter (complete) I.m. 174.00 $32.00 2.9 1.5m concrete sidewalk I.m. 160.00 $52.00 2.10 Topsoil & sod boulevards m2 500.00 $3.50 2.11 Adjust existing San. M.H. to Grade ea. 1.00 $350.00 212 Additional granular 'B' (item 11.4 additional work) m3 273.50 $16.48 2.13 Restore existing driveway (item 11.2 addillonal work) I.s. 1.00 $477.88 2.14 Decommission well in existing Edward SI. I.s. 1.00 $2,280.50 (11.6 additional work) Total Road Works Existing Edward Street 1.0 2.0 SUMMARY STORM SEWERS (EXISTING EDWARD STREET) ROADS (EXiSTING EDWARD ST.)STAGE I CONSTRUCTION VALUE OF MUNICIPAL WORKS U General Items Sub Total 15% Engineering Sub Total 7% G.S.T. TOTAL INVOICE FOR MUNICIPAL WORKS 30 1/2 TOTAL COST $2,962.50 $2,166.90 $2,754.00 $1,429.00 $888.00 $79.00 $1,686.00 $11,965.40 $1,575.00 $300.00 $5,894.00 $1,566.00 $5,273.60 $2,533.68 $5,090.10 $5,568.00 $8,320.00 $1,750.00 $350.00 $4,507.28 $477.88 $2,280.50 $45.486.04 $11,965.40 $45,486.04 $57,451.44 $668.68 $58,120.12 $8,718.02 $66,838.14 $4,678.67 $71,516.81 ATTACHMENT NO.: 3 REPORT NO.: WD-12-00