HomeMy WebLinkAboutWD-05-00
,
THE CORPORATION OF THE MUNICIPALITY OF CLARlNGTON
Date:
REPORT /... / j,
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# J?}.:> Ufl
,
FEBRUARY 14,2000 Res. t(2I?fJ.-.tf.I-oo
Meeting:
Report No.: WD-OS-OO
OurFile: B.01.l7.001
By-Law #
Subject:
PIPE CROSSING AGREEMENT WITH CANADIAN PACIFIC RAILWAY
FOR THE CONSTRUCTION AND MAINTENANCE OF A STORM SEWER
AT MILEAGE 165.60, BELLEVILLE SUBDIVISION
PLAN 18T-88047
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
I. THAT Report WD-OS-OO be received;
2. THAT the proposed By-law attached to Report WD-OS-OO (Attachment No.2), authorizing
the execution of a Pipe Crossing Agreement between Canadian Pacific Railway and The
Corporation of the Municipality ofClarington, be passed; and
3. THAT the Mayor and Clerk be authorized to execute this agreement at such time as it has
been prepared to the satisfaction of the Director of Public WOIKs.
REPORT
1.0 ATTACHMENTS
No. I: Key Map
No.2: Proposed By-law authorizing the execution of a Pipe Crossing Agreement between
Canadian Pacific Railway and the Municipality of Clarington
2.0 BACKGROUND
2.1 The development of Phase 2 of the lands south of Highway No.2 west of Green Road (see
Attachment No.1) requires the construction of a storm sewer beneath Canadian Pacific
Railway, to facilitate the post-development drainage of these lands.
1101
..
REPORT NO.: WD-OS-OO
PAGE 2
2.2 In a Subdivision Agreement executed with the Municipality, the Developer of Plan l8T-
88047 (Green-Martin Holdings Limited), as shown on Attachment No.1, will be required to
construct the storm sewer beneath Canadian Pacific Railway.
2.3 Canadian Pacific Railway has approved the storm sewer work, subject to the Municipality
entering into a Pipe Crossing Agreement with the Railway for the construction and future
maintenance of the proposed storm sewer.
2.4 The Subdivision Agreement sets forth that the Developer is responsible for any and all costs
related to the design and installation of the storm sewer works, including the Pipe Crossing
Agreement and all associated approvals and permits.
2.5 The engineering design for the storm sewer work has been completed, approved by
Canadian Pacific Railway and the Municipality of Clarington, and now the Developer is
prepared to proceed with this construction.
Respectfully submitted,
Reviewed by,
s~e~
Director of Public Works
Cr~-.:::,~
Franklin Wu,
Chief Administrative Officer
AHC*SA V*ce
27/01/00
1102
PROPO
SEWER PI
D STORM
CROSSING
II
I
u, I
~"', I{ . , ...~. . Ii :
iG'''''[<j_+ ,/1
lQOT[ .-.' _1\, II ~t) !
~--~;~, r:" ~ ~ WM~N~J
SUBJECT r :' ~: Yl\J~~JU' ~\ c1nl,DRAWNBY:J.R.M I DATE JAN 12'2000...1
SITE (" .---'. I I REPORT WD-05-00
(II LEl ~\ (c---l
\1 11/1 ~ ~\\ ~ NO 1
UJ I ATTACHMENT.
KEY MAP
/Ii
~--+-l;)
s
1103
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2000-
Being a By-law to authorize the execution of a Pipe Crossing
Agreement between Canadian Pacific Railway and The Corporation
of the Municipality of Clarington for the construction and future
maintenance of a proposed storm sewer at Mileage 165.60, Plan
18T-88047
NOW THEREFORE the Council of the Corporation of the Municipality of Clarington hereby
enacts as follows:
1. TIIA T the Mayor and Clerk are hereby authorized to execute on behalf of The
Corporation of the Municipality of Clarington, and seal with the Corporation's seal, a
Pipe Crossing Agreement between Canadian Pacific Railway and the said Corporation
for the construction and future maintenance of a proposed storm sewer.
BY-LAW read a first and second time this 21" day of February 2000.
BY-LAW read a third time and finally passed this 21" day ofF ebruary 2000.
MAYOR
MUNICIPAL CLERK
1104
ATTACHMENT NO.: 2
REPORT NO.: WD-05-00