Loading...
HomeMy WebLinkAboutWD-05-00 , THE CORPORATION OF THE MUNICIPALITY OF CLARlNGTON Date: REPORT /... / j, GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# J?}.:> Ufl , FEBRUARY 14,2000 Res. t(2I?fJ.-.tf.I-oo Meeting: Report No.: WD-OS-OO OurFile: B.01.l7.001 By-Law # Subject: PIPE CROSSING AGREEMENT WITH CANADIAN PACIFIC RAILWAY FOR THE CONSTRUCTION AND MAINTENANCE OF A STORM SEWER AT MILEAGE 165.60, BELLEVILLE SUBDIVISION PLAN 18T-88047 Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: I. THAT Report WD-OS-OO be received; 2. THAT the proposed By-law attached to Report WD-OS-OO (Attachment No.2), authorizing the execution of a Pipe Crossing Agreement between Canadian Pacific Railway and The Corporation of the Municipality ofClarington, be passed; and 3. THAT the Mayor and Clerk be authorized to execute this agreement at such time as it has been prepared to the satisfaction of the Director of Public WOIKs. REPORT 1.0 ATTACHMENTS No. I: Key Map No.2: Proposed By-law authorizing the execution of a Pipe Crossing Agreement between Canadian Pacific Railway and the Municipality of Clarington 2.0 BACKGROUND 2.1 The development of Phase 2 of the lands south of Highway No.2 west of Green Road (see Attachment No.1) requires the construction of a storm sewer beneath Canadian Pacific Railway, to facilitate the post-development drainage of these lands. 1101 .. REPORT NO.: WD-OS-OO PAGE 2 2.2 In a Subdivision Agreement executed with the Municipality, the Developer of Plan l8T- 88047 (Green-Martin Holdings Limited), as shown on Attachment No.1, will be required to construct the storm sewer beneath Canadian Pacific Railway. 2.3 Canadian Pacific Railway has approved the storm sewer work, subject to the Municipality entering into a Pipe Crossing Agreement with the Railway for the construction and future maintenance of the proposed storm sewer. 2.4 The Subdivision Agreement sets forth that the Developer is responsible for any and all costs related to the design and installation of the storm sewer works, including the Pipe Crossing Agreement and all associated approvals and permits. 2.5 The engineering design for the storm sewer work has been completed, approved by Canadian Pacific Railway and the Municipality of Clarington, and now the Developer is prepared to proceed with this construction. Respectfully submitted, Reviewed by, s~e~ Director of Public Works Cr~-.:::,~ Franklin Wu, Chief Administrative Officer AHC*SA V*ce 27/01/00 1102 PROPO SEWER PI D STORM CROSSING II I u, I ~"', I{ . , ...~. . Ii : iG'''''[<j_+ ,/1 lQOT[ .-.' _1\, II ~t) ! ~--~;~, r:" ~ ~ WM~N~J SUBJECT r :' ~: Yl\J~~JU' ~\ c1nl,DRAWNBY:J.R.M I DATE JAN 12'2000...1 SITE (" .---'. I I REPORT WD-05-00 (II LEl ~\ (c---l \1 11/1 ~ ~\\ ~ NO 1 UJ I ATTACHMENT. KEY MAP /Ii ~--+-l;) s 1103 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2000- Being a By-law to authorize the execution of a Pipe Crossing Agreement between Canadian Pacific Railway and The Corporation of the Municipality of Clarington for the construction and future maintenance of a proposed storm sewer at Mileage 165.60, Plan 18T-88047 NOW THEREFORE the Council of the Corporation of the Municipality of Clarington hereby enacts as follows: 1. TIIA T the Mayor and Clerk are hereby authorized to execute on behalf of The Corporation of the Municipality of Clarington, and seal with the Corporation's seal, a Pipe Crossing Agreement between Canadian Pacific Railway and the said Corporation for the construction and future maintenance of a proposed storm sewer. BY-LAW read a first and second time this 21" day of February 2000. BY-LAW read a third time and finally passed this 21" day ofF ebruary 2000. MAYOR MUNICIPAL CLERK 1104 ATTACHMENT NO.: 2 REPORT NO.: WD-05-00