REPORT 116
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
COUNCIL
Date: September 27, 2004
Report #: COD-048-04
File#_
t:..~~::; .:{t t iN /- D Lf
B I # :Y~c,c( - 'c<7
y- aw ./'1:.- .:7 -,'
Subject:
CL2004-13, BOWMANVILLE COMMUNITY PARK CONSTRUCTION
Recommendations:
It is respectfully recommended to Council the following:
1. THAT Report COD-048-04 be received;
2. THAT Rutherford Contracting Ltd., Gormley, Ontario with a total revised bid in the
amount of $2,791,345.32 (plus G.S.T.), being the lowest responsible bidder meeting all
terms, conditions and specifications of Tender CL2004-13, be awarded the contract for
the Bowmanville Community Park Construction as required by the Engineering
Department;
3. THAT the tolal funds required in the amount of $3,047,345.32 ($3,660,298.65 less
reductions plus contract administration, hydro and contingencies) be drawn from
Engineering Capital Account 110-32-325-83252-7401; and
4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to
execute the nec ry agreement be approved.
Reviewed b .
Franklin Wu,
Chief Administrative Officer
Submitted by:
A.S. Cannella, C.E.T.
Director of Engineering Services
MM\NT\ASC\LAB\ld
REPORT NO.: COO-o40-04
PAGE 2
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Bowmanville
Community Park Construction, as required by the Engineering Department.
Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were
received and tabulated as per Schedule "B" attached.
As indicated in the attached Schedule "B", the total 2004 Capital Budget for this project is
$3,592,235.00 less the funds aiready allocated in the amount of $518,000.00 for servicing the
Indoor Soccer and Lacrosse Bowl. The remaining available funds are therefore $3,074,235.00.
The total project cost, including Project Administration is $3,676,839.86 and is as detailed in the
letter from Totten Sims Hubicki Associates, marked Schedule "B". As this exceeds the total
available funds of $3,074,235.00, it is recommended that the provisional item #69, Field House
Building as well as the other miscellaneous items noted, be deleted from the contract, which
reduces the tender value to $2,791,345.32 (plus G.S.T.).
The low bidder has previously performed satisfactory work for the Municipality of Clarington.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
After further review and analysis of the bids by the Engineering Department, Totten Sims
Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Rutherford
Contracting Ltd., Gormley, Ontario, be recommended for the contract for the Bowmanville
Community Park Construction.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T(905)623-3379 F (905)623-4169
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2004-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and
Rutherford Contracting Ltd., Gormley, Ontario, to enter
into agreement for the Bowmanville Community Park
Construction.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY
ENACTS AS FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of
the Corporation of the Municipality of Clarington and seal with the
Corporation Seal, a contract between, Rutherford Contracting Ltd., Gormley,
Ontario, and said Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this 27th day of September, 2004.
By-law read a third time and finally passed this 27th day of September, 2004.
John Mutton, Mayor
Marie P. Knight-Stanley
Deputy Clerk
SEP-15-04 WED 12:16 PM TSH COBOURG
FAX NO,
p, 01/03
-
TIM
SCHEDULE "8"
engineers
architects
planners
Totten Sims Hubicki Associotes
513 Division Street,
Cobourg, Ontario. Canada K9A 5G6
(9051372-2121 Fax: {e05} 372-367.1
EMmail; cobour'9@tsh.ca www.tsh.ca
September 15, 2004
Ms. LOll Ann Birkett, CPP, AMCT
Purchasing Manager
Corporation of the Municipality of Clarington
40 Temperance Street,
BOWMANV1LLE, Ontario LtC 3A6
FAX: 905-623-3330
Dear Ms. Birkett:
Re: Contract No, CL2004-13, Bowmallvillc COIDlDlmity Park Construction
Municipality of Clarington
Tendcrs for the above project were opened at the Municipal Offices 011 Wednesday, August 18, 2004, at
2:00:00 p.m. local time. The bids rcceived, inclusive of GST, are sUllunarized as follows:
, .... ":'BIDi"""""
~, "'''', ~..c.t&\,;
," . : : '. ~
, :':
. '1, ~'
, ,~,
. ~.. . '-r'';..m''~ '. i
'I 'r' ',a,:rM.;""~\I,'" ~n-rl ~
".,,, .. i~,.....l>t1i.;..;-""'I~;
" ~: ~,',~~Jill.~,!.'~ :;>':2,'1
Rutherford Contracting Ltd.
Gormlev, ON
Ron Robinson Limited
Bowffianville, ON
Dig-Con International Ltd.
Bolton, ON
Dol Turf Restoration Ltd,
Bond Head, ON
* Bid amended - extension error
$3,660,298.65
$3,8873524.75
$4,394,436.39*
$4,449,195.22*
The low bidder's submitted tender has been revicwed and is in order. Rutherford Contracting Ltd,
complctcd the construction of Clarington Comcrs Park for the Municipality of Clarington in 2000 and
sLaff rcport that the work was completed to an acceptable level. Rutherford Contracting has more
recently completed projccts similar to CL2004-13, in scope and valne, for the York Region District
School Board, Matlamy Development Corporation, Southwest Newmarket Landowners Group and
rcferences reported that they completed the work to an acceplable standard and felt they should have no
problem with the Bowmanville Community Park.
Tho following is a summary of the costs and budgct associated with the project based on the low bid
rcccived:
SEP-15-04 WED 12:16 PM TSH COBOURG
FAX NO,
Corporation of the Municipality of Claringfon
Seplemher 15,2004
Total Construction Costs (excl. GST)
Contract Administration (commencing Aug. 20, 2004)
Utility Servicing (Hydro One)
Contingencies
Total Project Costs
2004 BUDGET AMOUNT (Account No. 110-32-325-83252-7401)
Money allocated for servicing Indoor Soccer and J,acrosse Bowl
(Community Services)
Total Remaining Budget
P. 02/03
2
$3,420,839.86
$ 120,000.00
$ 30,000.00
$ 106,000.00
$3,676,83!>.86
$3,592,235.00
($ 518,000.00)
$3,074,235,00
Based on the remaining available Budget and total project costs, there is a funding shortfall of
$602,604,86. As was stated ill the tender, Item No. 69 - Ficld House Buildings was provisional and
would be removed from the Contract should the available budget be exceeded. As there is a deficit
based on the low bid the following changcs are recommended:
Removed Item No. 69 - Field House Building
Add Item No. 69B - Reduced Servicc Building
Removal of provisional works identified on drawings as well as
reduced scope of work.
Removal of Asphalt Walkways (990 m2)
Reduce Item No. 52 - Granular 'A' (475 t)
Reduce Item No. 54 - H.L.-3 Walkway (150 t)
Reduce Item No. 57 - Coloured Concrete quantity by 580 m2
Add Quantity from Item No. 62 - Naturalized Surface
Treatment (25,900 m') to Item No. 61 - Seed and delete Item No. 62
Remove Plant Material, Items No. 63(k) and 63(P)
Remove Item No. 65 - Drinking Fountain
Remove Item No. 71 - Storage Building
(Re-budget in 2005)
Remove Item No. 72 - Sanitary Forccmain
Net Tcnder Cost Rednction
($ 437,208.00)
47,000.00
($ 13,238.25)
($ 13,321.50)
($ 39,068.62)
($ 55,685.00)
($ 5,841.00)
($ 9,3%.91)
($ 71,046.30)
($ 31,688.96)
$ 629,494,54
The above modifications to the tender reduces the total temler amount to $2,791,345.32 (excl. GST) and
the total projcct costs to $3,047,345.32, resulting in a project surplus of $26,889.68. The total reduction
in tender value is less than 15 % when considering the Items removed with the exclusion of the
Provisional Field House Item.
With the rccommended changes to the scope of work for the lender, funding availability and based on
the past experience of the low bidder, it is recommended that Contract CL2004.13 bc awarded to
Rutherford Contracting Ltd. in the total amount of $2,986,739,49 (inc!. GST).
Tender deposits may be returned to all contractors except the low and second low bidders.
11M
SEP-15-04 WED 12:17 PM TSH COBOURG
FAX NO.
P. 03/03
Corporation of the MunicipaUty of Clarington
Scptcmb,'t 15, ZOO4
3
Should you require any additional information, please contact the undersigned.
Yours truly,
f<-
Ron Albright, P.Eng.
Project Engineer
RA/ym
Pf42-80205/0t1rre:t-pf205l1.dQe;
cc: Mr. A. S. Cannella, Director, Engineering Services
Mr. Peter Windo1f, Manager of Park Development
Ms. J. O'Donnell, Clerk n
TIH