HomeMy WebLinkAboutPD-046-00
DN:P046-00
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
REPORT
Meeting:
General Purpose and Administration Committee
~~)"..-/
File # C 1/ 0
Res.# / - -00
Date:
11onday,11ayl,2000
Report #:
PD-046-00
FILE #: PLN 23.10.2
By-law #
Subject:
REMOVING ROADBLOCKS - A STRATEGIC TRANSPORTATION
PLAN FOR THE GTA AND HAMILTON-WENTWORTH
GREATER TORONTO SERVICES BOARD (GTSB)
PLN 23.10.2
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report PD-046-00 be received and endorsed as the Municipality's comments on
"Removing Roadblocks - A Strategic Transportation Plan for the GTA and Hamilton-
Wentworth";
2. THAT a copy of this report, the GO Station Location Study (1993), and the BOWillanville
West Main Central Secondary Plan and Urban Design Plan be forwarded to the GTSB for
their consideration; and
3. THAT a copy of this report be forwarded to the Commissioner of Works and
Commissioner of Planning for Durham Region.
1. BACKGROUND
At its meeting on February 4, 2000, the GTSB approved the circulation of the Strategic
Transportation Plan for the Greater Toronto Area and Hamilton-Wentworth to member
municipalities and other stakeholders for comments by April 3, 2000. Subsequently, on
March 3, 2000 the Board adopted the recommendation from the Transportation
Committee that the recommended Actions for Implementing the Draft GTSB Strategic
Transport Plan be circulated for comments and that the deadline for comments be
extended to May 15"'.
644
REPORT NO.: PD-046-00
PAGE 2
The Plan was prepared as part of the GTSB's mandate to promote co-ordinated
transportation planning throughout the GTA and Hamilton-Wentworth particularly with
respect to transit.
The purpose of the Plan is to provide the framework for developing a co-ordinated
transportation system for the GTA and Hamilton and to facilitate discussions with
potential funding partners. The Plan is also intended to serve as the starting point for
more detailed planning on specific transportation facilities and related services.
The impetus for the preparation of the Plan is the need to address a number of challenges
facing the GTA and Hamilton-Wentworth. Rapidly growing population base, the need to
maintain the competitiveness of the area to ensure jobs are available for the growing
population, and maintaining the quality oflife in the area are all important triggers.
2. DISCUSSION
2.1 HiKhliKhts of the Plan
The GTSB Strategic Transportation Strategic Plan emphasises getting the most efficient
use of the existing roads and transportation network by enhancing the existing system
within short term and expanding it in the long term. It has two main thrusts: - enhanced
movement of goods and services and an aggressive focus on transit.
A summary of the draft Strategic Transportation Plan is contained in a presentation
prepared by the GTSB (Attachment #1). Recommended Actions for Implementation are
also appended (Attachment #2).
The draft Plan has five elements:
. building a GTA - wide transit network including GO Transit, rapid transit and feeder
bus services;
. a co-ordinated approach to the planning and delivery of inter-regional transit services;
645
REPORT NO.: PD-046-00
PAGE 3
. building a GT A - wide goods movement network including expressways, arterial
roads, rail and intermodal freight facilities;
. optimizinig the use of existing assets;
. phased implementation of the elements ofthe system.
The Plan identifies seven key GT A transit corridors that can accommodate a mix of
transit services and that can be upgraded over time. It also identifies transit gateways
where motorists might be encouraged to switch to transit for the remainder of their trip.
Various strategies such as priority signals or exclusive lanes are proposed that would give
transit an advantage over automobiles. GTA east from BOWillanville through Oshawa
City Centre, Whitby, Ajax, Pickering and Scarborough City Centre to Don Mills station
on the Shepherd subway line is identified as one ofthe seven corridors.
To improve transit use, the Plan calls for improved GO Transit rail service on all existing
lines, including enhanced rush hour service and better all-day service. Specific service
improvements are listed for various lines and new service and extensions of service are
also identified. Extension of the Lakeshore East line to Bowmanville, as well as
enhanced GO Bus services to Newcastle, are identified. The Plan also calls for full
service to Oshawa.
Another element of the Plan is a proposal for a co-ordinated approach to the planning and
delivery of transit services between GO Transit and the sixteen individual transit systems
currently in operation. Co-ordination of transit fares, routes and services are proposed.
The Plan proposes specific improvements to the road network which would facilitate the
movement of goods. The extension of Highway 407 to Highway 35/115, and
construction of a connecting expressway from the proposed Highway 407 to Highway
401 east of Courtice are identified as future expressways.
646
REPORT NO.: PD-046-00
PAGE 4
2.2 Staff Comments
Staff believe that traffic congestion is the most important transportation problem facing
the GTA today. Increase population and economic growth in the future will likely
exacerbate this problem.
It is felt that the draft Plan is a first step in the right direction in dealing with the current
and future transportation problem in the GTA. Recognizing that additional analysis
needs to be undertaken to implement some of the proposed initiatives, staff is generally
supportive of the Plan as presented. Notwithstanding this, the following are specific
comments on the key thrust of the Plan:
a) Although it is agreed that transit improvements can contribute towards the
efficiency and sustainability of the entire transportation system, it should be
recognized that this solution may not be efficient or effective in the suburban/rural
areas. The report needs to examine further the appropriate level of
automobile/transit mix in suburban areas and funding should be provided for
roadways as well as transit where warranted.
b) The Plan indicates that the various proposed initiatives will be phased in over a
number of years, but gives no indication of cost, funding sources or timing for
each element of the transportation system. In order to assess how realistic the
Plan is, more information is needed on cost and funding strategies and timing for
phasing in the various strategies. This aspect of the work is proposed to be
completed by 2005.
c) The success of the proposed Plan is dependent on a radical shift from automobile
dependency to transit use. A number of strategies are proposed to enable this shift
to occur, however, the plan does not propose a strategy to educate the public about
the use and benefits of transit. Education and marketing strategies must be
planned and implemented to encourage greater use.
647
REPORT NO.: PD-046-00
PAGE 5
g)
d)
A GT A Transportation Centre should be identified in BOWillanville where the
,
future GO Rail line intersects with the Highway 2 transit corridor. The
Bowmanville West Main Central Area Secondary Plan provided for a GO station
and bus station on lands at the south end of Clarington Boulevard.
e)
The GTSB Strategic Transportation Plan should provide for the early acquisition
of appropriate lands for a BOWillanville GO Station. The GO station site was
identified in 1993. As development activity continues in the BOWillanville West
Main Central Area, the protection of these lands will become increasingly difficult
without a solid commitment to acquire the site.
f)
The Plan identified property taxes and development charges as the main funding
mechanisms for GO Transit. The Plan, however, is not clear on how the
development charges will be apportioned amongst the municipalities affected. It
is our view that any development charges should be weighted towards those areas
that accrue greater benefits.
Municipalities should be kept involved in the further development of this Plan to
ensure co-ordination particularly with respect to corridor protection.
The Clarington Public Works Department has reviewed this report and concurs with its
contents.
3. CONCLUSION
Staff support the efforts of the GTSB in preparing the Strategic Transportation for the
GTA and Hamilton-Wentworth. However, it should be cautioned that a balanced
approach is critical to success as a transit focussed solution can only be effective in areas
with large masses of densely population. Alternative solution may have to be found for
lower density suburban/rural area.
648
REPORT NO.: PD-046-00
PAGE 6
Respectfully submitted,
Reviewed by,
,
C.. r~~~
D' rome, M.C.I.P., R.P.P.
Direc r of Planning & Development
BN*DC*df
Franklin Wu, M.C.I.P., R.P.P.
Chief Administrative Officer.
25 April 2000
Attachment #1 - Presentation on Strategic Transportation Plan draft GTSB
Attachment #2 - GTSB - Recommended Actions for Implementation
649
.
ATTACHMENT .1
.'
-i<,J.,....:,;eit-....
Aii.;llihPd..~
.,
Y'
~
;1'./,".
--.-
. . -...-. .;:~
...,.-... ! ~~.
'... ..~ ....
Alt.. .~~~
- . . "'.----.-..'
. -.:' .;;>;:'
~_.._____i- *'
Greater Toronto Services Board
. The Greater Toronto Services Board has released a draft Strategic
Transportation Plan for the Greater Toronto Area and Hamilton- Wentworth for
discussion and comments.
. This presentation explains the foundations of the draft Plan, describes the key
elements of the Plan, and outlines how the GTSB is consulting with people and
stakeholder organizations across the GTA and Hamilton-Wentworth.
650
.GTA
Uamilton-Wentworth
Challenges
· Growth
· Economic competitiveness
· Natural environment
· Quality of life
· Infrastructure investment
The GTSB Strategic Transportation Plan was drafted in view of some
important challenges facing the Greater Toronto Area and Hamilton-
Wentworth.
. Accommodating high rates of population growth
. Maintaining the competitiveness of the area to ensure that jobs grow along
with the population
. Protecting the integrity of our natural environment
. Ensuring that our quality of life is maintained as we grow
. Investing in the infrastructure we need to achieve all of these objectives
2
651
Anticipated Growth
· 2 million more people by 2021
· 1.4 million jobs
· 1 million additional vehicles
· 5 million additional trips per day
This area is facing some of the highest growth in North America.
. Growing at a pace of 100,000 people each year, it is anticipated that another
2 million people and 1.4 million jobs will be added to the GTA/Hamilton-
Wentworth area by 2021.
. In the next 20 years, it is anticipated that another 1 million vehicles, making
an additional 5 million trips each day will be added to the GTA/Hamilton-
Wentworth Area.
Congestion is already a threat to our quality ofJife and economic
competitiveness.
This growth shows the importance of addressing our transportation issues
today.
3
652
GTAIU-W
Today
· 5.1 million residents (46% of Ontario's
population)
· 2.7 millionjobs
· 50% of gross provincial product
· 21% of gross national product
· 2.78 million vehicles
· 10 million trips per day
. The challenges facing the GTA and Hamilton-Wentworth affect all of
Ontario and all of Canada.
. This area already has over 5 million people and 2.7 million jobs, representing
nearly half of Ontario's population and a significant proportion of the
economic activity in Ontario and Canada.
. Nearly 3 million vehicles in the GTA and Hamilton-Wentworth are already
generating 10 million trips per day, moving people, goods and services.
4
653
Overcoming congestion is important to the movement of goods in the
GTNHamilton-Wentworth area:
. 70% of expressways are congested during peak periods
. With free trade, the importance of moving goods within the region and to and
from the US has grown substantially, with over 75% of our exports travelling
by trucks on our roads and expressways.
5
654
More people and more jobs mean more travel- especially east to west across
the GTA as employment centres grow in every city and town.
6
655
The official plans of GTSB member municipalities, which guide the location
and pattern of development over the next 10-20 years, provide the basis for the
draft GTSB Strategic Transportation Plan.
The pink shading on this map shows the existing and designated urban areas as
identified in the official plans.
The map also illustrates the importance of the rural and agricultural areas (in
brown), valleylands and other green spaces (in green) and the Niagara
Escarpment and the Oak Ridges Moraine (in white).
7
656
Removing Roadblocks
To Continued Economic Prosperity
For the Greater Toronto Area, Ontario and Canada
A Strategic Tnnsportation Plan
For the GTA and Hamilton-Wentworth
January2{}{)O
. The Province and municipalities have been working on transportation issues
in the GT A and Hamilton-Wentworth for several years - this Plan builds on all
of that work, but is the first time a proposed plan has been prepared for public
discussion.
. The Plan is the result of considerable work by GTSB staff in collaboration
with a team of professionals drawn from across the GTA and Hamilton-
Wentworth.
. The Plan provides the basis for co-ordinated planning of all parts of the inter-
regional transportation system - expressways, aiierial roads, GO rail and bus,
rapid transit and feeder buses - all are important and service levels on one
influence conditions on the others.
. A strategic and practical approach has been taken, making the most of
existing transportation infrastructure.
. The Plan is a starting point intended to engage members, stakeholders and
public in a focused dialogue.
. It has two major thrusts:
1. Enhanced movement of goods & services
2. Aggressive focus on transit
8
657
Transportation Investment
Partnership
. required for implementation
. federal, provincial and municipal governments
· fundamental to economic competitiveness
. vital to Canada's greenhouse gas commitments
. long term, stable investment
. GTSB transportation accord
. Implementation of a GTSB transportation plan will require a transportation investment partnership of
the federal, provincial and municipal governments and involvement of the private sector in the search for
solutions.
. Municipal governments in the GTA and Hamilton-Wentworth do not have the capacity to address our
transportation crisis alone, having only two funding sources available - property taxes and development
charges. Just to meet the estimated funding shortfall of $800 million per year would require a property
tax increase of$1 0.6% or a "transportation development charge" of approximately $7,500 per new
housing unit constructed.
. Ensuring the economic health of the GTA and Hamilton-Wentworth is vital to the economic future of
theprovince and the nation. The area already represents half of Ontario's economic activity and nearly
60% of the growth. The area accounts for one-fifth of Canada's economic output and nearly 40% of the
nation's population grov.1h.
, . Overcoming congestion in this and other urban regions is also key to improving the quality of our air
and to meeting Canada's international commitments to reduce greenhouse gas emissions.
. Implementation of the plan to address congestion and maintain our competitive edge over competing
urban regions in the U.S. will require a long term commitment to stable levels of investment in the
transportation network in the GTA and Hamilton- Wentworth.
. The Greater Toronto Services Board and its member municipalities are working in collaboration with
private sector and community stakeholders to focus the provincial and federal governments on this issue.
At the February 4 meeting of the Greater Toronto Services Board, public and private sector stakeholders
representing well over 30,000 groups, businesses or individuals signed an accord calling for adequate,
long-term and stable investment in the transportation network serving the Greater Toronto Area and
Hamilton-Wentworth. Signatories to the Accord include, among others: Air Canada, the Bank of Nova
Scotia, Sun Media Corporation, York University, Humber College, the Urban Development Institute, the
Toronto Real Estate Board, the Ontario Traffic Conference, the Ontario Road Builders Association, the
Carpenters and Allied Workers Union, the Learning Enrichment Foundation, the Canadian Urban Transit
Association, the Ontario Chambers of Commerce and boards of trade and chambers from Toronto,
Hamilton, Burlington, Milton, Halton Hills, Mississauga, Brampton, Richmond Hill, Ajax~Pickering and
Greater Oshawa.
. The Plan provides the basis for these discussions with the federal and provincial governments.
9
658
Strategic
Transportation Plan
· GTA transit network
· Co-ordinated transit
· GTA goods movement network
· Optimizing existing assets
· Phased implementation
The Plan has five elements:
. A GT A-wide transit network including GO Transit, rapid transit and
feeder bus services running on the arterial road system
. A co-ordinated approach to the planning and delivery of inter-
regional transit services in the GTA and Hamilton-Wentworth
. A GTA-wide goods movement network incorporating expressways
and arterial roads, rail and inter-modal freight facilities
. Provisions for optimizing the use of existing assets
. An emphasis on the phased implementation of elements of the system
10
659
GTSB__....._____
LO:'IiG-TER."
~,
,,>--~,.-'
- -----..
- -"~----"--
...... ------
_ ~__'_
_....._-............~............,
fl ....._c-
.......---
iIioOi5 GO__
+ ---
The long-term GTA transit network is shown on this map.
. The network ofGTA transit corridors, shown by the blue lines include some
form of transit in separate rights-of-ways, be they priority bus routes, streetcars
or subway extensions
. Services and facilities in each corridor are proposed to evolve as ridership
grows. The Plan proposes the development of implementation strategies for
each corridor, setting out a phasing program and criteria to guide the timing of
each phase
11
660
Enhanced GO Transit rail services on all existing lines, especially during peak
hours are a key element in the Plan, with the first priority being....
12
661
. . . the expansion and improvement of Union Station. This is necessary to
enhance its role as the most important inter-modal transit centre in the region.
In fact, the expansion of Union Station is required for any significant
improvements to the GO rail network.
13
662
. The Plan identifies a series of GT A transportation centres, where different
modes intersect and co-ordinated transit and customer services are offered.
14
663
The Plan also proposes:
. Improved feeder bus services into GO Transit rail and rapid transit services,
including GO Transit bus services to smaller urban centres,
. A network of transit priority routes with measures to speed the flow of buses
in mixed traffic, and
. Enhanced connections to Pearson Airport, including connections to the
Georgeto"TI GO line and links to transit corridors to the north and south of the
airport
These elements of the transit network in particular depend on ensuring a high
quality network of arterial roads throughout the GTA and Hamilton-
Wentworth
15
664
Co-Ordinated
GTA-Wide Transit
· Service co-ordination
· Transit fares
· Customer information
· Planning
The second element of the Plan relates to the co-ordination of transit services
across the GTA and Hamilton-Wentworth. This includes building on existing
service co-ordination across municipal boundaries, moving toward more
convenient and co-ordinated arrangements for transit fares across jurisdictions,
providing more accessible information,on transit schedules, routes and fares
across the GT A and Hamilton- Wentworth, and taking a more integrated
approach to planning for interregional transit services.
16
665
GTSB.....______.__
l.tJ:'\(;.TF.R:'ot(!llZl")I;()l;lIr.;.\l<lVE.\lf.'T:l:F-1'l1HlRlO:
--
~---~_.,
-~"'"~
--. ......~--
-<<r_......-
---
.. ....,.....'"-,-"',
() """-----,-"
+ -
~ -.....-.......
.f. ........_"""
'0 --
"'"'>.~fA""""'......"""".'"
. The Plan identifies a GTA goods movement network comprising
expressways, arterial roads, rail routes, connections to airports, ports and
intermodal freight facilities. A number of key connections are identified,
including extensions of highways 404,407,410,427, and the Lincoln
Alexander Expressway (Red Hill Creek Expressway).
. A number of expressway widenings at key bottlenecks are also anticipated.
. The Plan recognizes the need to improve connections to key border crossings
along our vital trade corridors.
. The Plan emphasizes the need to complete and maintain the highway and
arterial road networks as the basis for moving not only goods, but also people,
transit and professional services such as courier and delivery.
17
666
A number of measures are proposed to optimize use of existing infrastructure:
. The preparation of full life-cycle cost estimates for all infrastructure, as the
most cost efficient way to expand the capacity of transportation system
. Improved co-ordination of traffic management systems, and approaches to
managing traffic incidents like accidents
. Measures to reduce growth in transportation demand, including
comprehensive system of commuter lots, measures to support ride-sharing, and
parking and pricing strategies to support transit and higher occupancy vehicles,
and
. Protection of corridors and sites for long-term transportation needs, including
future interchanges on expressways, future rapid transit aligrnnents and
stations, and commuter parking and bus access facilities
18
667
"-
Implementing Actions
Approved for 2000
- Transit corridor analysis
- Goods movement analysis
- Transportation investment strategy
- Integrated transit information systems
- Co-ordinated GO development charges
- Critical expressway congestion points
- Harmonize EA processes
The Greater Toronto Services Board has approved some key work needed to
move forward with implementation.
. A transit corridor analysis to sort out phasing and priorities in the GT A
transit network will be designed to meet first phase EA requirements
. A goods movement analysis to provide essential information on the origins,
destinations and movements of goods and services, needed to move forward on
strategic improvements to the network
. A transportation investment strategy to engage the federal and provincial
governments in a partnership needed to implement the plan
. The development of an integrated transit information system, using digital
mapping, to afford transit riders with easy access to information on the routes,
fares and schedules for cross-boundary trips
. Co-ordinated actions and development charges for GO Transit expansion,
identification of short-term improvements need to address existing congestion
points in our expressways, and harmonization ofthe federal and provincial
environmental assessment process to avoid costly duplication of time and
effort
19
668
2000 Pending Adoption.
Of Strategy
· GO Bus service options for 10 years
· Union Station design and phasing
· O.P. Protection ofGTA Transit
Corridors
· Transit co-ordination protocol
· Municipal endorsement of vision and
objectives
Once the GTSB has adopted the Strategic Transportation Plan, a number of
further actions are recommended:
. Identification of options for improving GO Bus service over the next 10
years
. Development of detailed design and phasing plans for the expansion and
improvements to Union Station
. Protection of the GTA transit corridors set out in the Plan through municipal
official plans, as they come up for review
. Adoption by the Board, GTSB municipalities and transit operators of a
protocol on matters relating to interregional co-ordination of transit services
. Endorsement by GTSB municipalities of the vision and objectives set out in
the Plan
20
669
2001
. GO improvements & long-term strategy
. gateways & commuter lots
. bus feeder services & priority transit
. corridor protection
. transit co-ordination priorities
. specialized transit/transportation
· goods movement
. incident management
. freeway traffic management system
Recommended actions in 2001 build on the work completed in 2000:
. Commencing implementation of the GO Transit 10-year capital program
. Preparation of action strategies for GO enhancements beyond 10 years, and a
range of specific elements of the Plan
. Extension and improvement of the freeway traffic management system by
prOVInce
21
670
Beyond 2001
· long term land use/infrastructure
co-ordination
· transportation centres
· transit operators sharing/collaboration
· co-ordination/extension of traffic
management systems
· demand management program
· rail corridor rationalization
· co-ordinated capital program
. Based on work completed in 2000 and 2001, actions over the next few years
include the preparation of implementation strategies for remaining elements
of the Plan and development of a long-term co-ordinated capital program
based on agreed upon priorities.
22
671
Consultation
· Broad circulation and web site access:
www.gtsb.on.ca
· Collaboration with municipalities
· GTSB hearings in April
· Comments by May 15
· GTSB consideration in June
. This Plan is proposed as a starting point for public dialogue on the future
transportation system in the GT A and Hamilton- Wentworth.
. Consultation is vital to building consensus around the Plan and the need for a
transportation investment partnership to enable implementation.
. At its February 4 and March 3 meetings the Greater Toronto Services Board
agreed to circulate the Plan and recommended actions for implementing the
Plan widely for comments from municipalities and stakeholders, and directed
staff to report back to the GTSB Transportation Committee at the end of May
on the comments received.
. The Plan being widely circulated and has been posted to the GTSB web site
at www.gtsb.on.ca.
. Public consultation on the Plan is being undertaken in collaboration with
GTSB member municipalities, who are consulting with local stakeholders as
appropriate.
. The GTSB Transportation Committee will be scheduling dates in mid-April
to hear from individuals and organizations who wish to make a deputation on
the Plan. Information on those hearings will be posted to the GTSB web site.
Those who wish to register for a deputation should contact the GTSB directly
at 416-338-2989 or toll free at 1-877-335-3319.
. Written comments to the GTSB are due no laler than May 15, following
which the GTSB, through its Transportation Committee, will consider the
results of the public consultation and recommendations for revisions to the
Plan.
23
672
~,~I~":lJ. l'l!ii:;:::'o~~>,:tt:,i~Ci,~~
. ., - . t
W':~
~ ~
J .. ..' ...Ii!iIa..
~
~.=;:...
-'I.--.~
= -;r
~ .
::o-!-c-' . :~~>'<
g.~-... "......-..
,~ ".~....~.'
Greater Toronto Services Board
. A key step will be Board adoption of a revised strategic transportation plan
as its first infrastructure strategy under the GTSB legislation, based on this
document and the input gained from member municipalities and through the
consultation process. The first opportunity for the Board to consider adoption
of the strategy will be in June.
24
673
C\I
...
I-
Z
UJ
~
J:
~
0<-
-..j
+:>-
A-l
Appendix A
GTSB Strategic Transportation Plan - Recommended Actions for Implementation
The following table sets out forty recommended actions, organized according to the sections of "Removing Roadblocks," the draft
GTSB Strategic Transportation Plan for the Greater Toronto Area and Hamilton-Wentworth. For each action, the table indicates the
partners who would be involved in implementation, the recommended time frame for completion, an explanation of the purpose of the
action and, for those actions recommended in the year 2000, funds required and part of the staff recommended budget request for
Transportation Committee initiatives. Actions already approved by the GTSB or the subject of a separate GTSB decision-making
process already underway (e.g., consideration of the GO Transit lO-year capital plan) are noted.
Plan Recommended Actions Implementin Timing Explanation Fnnding
reference g Partners (Year)
Foreward 1. Engage the provincial and federal governments in a GTSB and 2000 will link implementation of the Included in
Transportation Investment Partnership through tnember plan to the need for $50,000 budgct
continuation of a collaborative effort with member rnunicipalities transportation investment request for
municipalities, key private sector and cOlnmunity with key partnerships to ensure long transportation
stakeholders, the Federation of Canadian stakeholders, term, sustainable investment in funding
Municipalities and other large urban regions in FCM, othcr thc transportation network in strategy
Canada. Canadian city- the GTA and H-W.
regions,
provincial and
federal
governments
2. Prepare a program of transportation projects of GTSB and 2000 provides a co-ordinated GT A- Included in
intcr-regional benefit in the Greater Toronto Area membcr wide perspective to incorporate $50,000 budget
and Hamilton-Wentworth to be communicated to all municipalities into municipal priorities for request for
GTSB member municipalities for consideration in federal and provincial transportation
prcparing their submissions for the anticipated infrastructure funds funding
federal-provincial-municipal infrastructure program. strategy
0"-
--..J
Ul
A-2
Appendix A
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
3. Prepare a submission for the anticipated federal- GTSB, GO 2000 ensures that GO Transit Included in
provincial-municipal infrastructurc program, T ransi t system improvements are $50,000 budget
comprising GO Transit system improvements, based considered for provincial and request for
on the GO Transit 10-year capital plan and including federal funding under tbe transportation
Union Station as the first priority. infrastructure program and funding
provides a vehicle for strategy
highlighting thc provincial and
fcderal interests in tbe
expansion and improvement of
Union Station and the GO
system
Introduction 4. Prepare a GT A-wide strategy to co-ordinate long GTSB in 2002- will support implementation of
term planning and phasing ofland use, transportation cooperation 2004 municipal plans and provide a
and infrastructure. with member . GTA-wide platform for future
lTIunicipalities plans, helping to minimize
growth in transportation needs
and support the transit
network with higher density
development in key locations
Transit Is Fundamental
Enhancing 5. Adopt the GO Transit to-year plan as the basis for GTSB 2000 to provide for improvements
GO Rail capital investments (to be considered by Finance & in GO services and to allow for
Services Administration Committee on March 31 and April the preparation of development
28, 2000). charges by-laws forGO
Transit services
.r
~
-.....J
~
A-3
Appendix A
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
6. Identify priorities, allocate funding, begin property GO Transit 2001 + to implement the plan's
acquisition and cOIn me nee construction of elements priority of enhancing service on
in the GO Transit 10-year plan on an incremental existing GO Rail lines
basis as warranted by ridership and GT A
transportation network objectives.
7. Co-ordinate the preparation of development Regional 2000 to minimize duplication of
charges by-laws for GO Transit se.rvices. 11lunicipalities, costs and ensure a strong and
City of consistent basis for all
Toronto and development charges by-laws
GO Transit for GO Transit services
8. IdcntifY options for new GO bus services in key GO Transit 2000 to grow transit ridership in key
corridors over the next 10 years. corridors where higher order
transit is planned
9. Prepare a long term GO rail and bus service GO Transit 2001 will provide the basis for
phasing strategy (i.e., beyond 10 years), including corridor and site protection and
priorities and phasing for: long term context for shorter
- enhancement of peak services, two-way and all-day term infrastructure and service
services, including interim use of buses; decisions
- new stations, station relocations and ilnprovements
to existing stations, including inter-modal
connections, bus access and commuter parking;
- bus setvices connecting smaller urban centres to
GO rail stations and other parts of the GT A transit
network
- additional trains and buses;
- expanded or new maintenance facilities; and
- corridors and lands to be protccted, including for
potential stations on potential lines.
A - 4
Appendix A
CJ"-
-----l
-----l
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
Union Station 10. Approve the purchase of Union Station involving GTSB, GO 2000 required to implement
GO Transit (approved by GTSB Feb. 4,2000). Transit and enhanced GO services and
City of Union Station's role as the
Toronto GTA's multi-modal
transportation hub
11. Direct GO Transit to prepare a detailed plan, GO Transit in 2000 to provide the most cost-
dcsign and phasing strategy for Union Station collaboration effective Ineans of
irnproVClnents to 111aximize opportunities for GO with the City accommodating GO service
service, including: of Toronto and and the basis for approaching
- expanded tracks and platforms; TTC provincial and federal
- enhanced pedestrian connections; and governments for funding
- development of the bus terminal.
GTA Transit 12. Request GTSB member municipalities to protect GTSB and 2000 + to ensure coordinated planning
Corridors GT A transit corridors through official plans as they member for GT A-wide transit services
are reviewed. municipalities and protection of GT A-wide
transit needs
A- 5
Appendix A
0-
-..J
=
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
13. Design and undertake a transit corridor priorities GTSB with 2000 and to move forward from the $75,000
and phasing strategy, including: l11ernber 2001 strategic transportation plan to budget
- compilation/review of existing corridor analyses; municipalities a capital works program and to request for
- staged implemcntation of a specific set of transit and GO maximize the benefits relative study design
itnproven1cnts over a specific time period; Transit to costs of new investments in and $200,000
- a transportation demand/supply analysis for each GT A transit services and to prepare
radial corridor served by existing or potential GO infrastructure strategy
Transit services, plus GT A Transit Corridors, (subject to
including connections to Pearson airport; approval of
- for each priority corridor, identification of phasing study
for service evolution, transit and infrastructure design)
reg uired to support corridor service and staging, key
station elements, and connectivity and feeder service
requirements.
-establishment of GT A-wide priorities for
implementation, property protection and costing
-meeting first phase environmental assessment
rcquiretnents.
GTA 14. Prepare a strategy for GT A transpottation centres GTSB, 2002- to support incremental
Transportatio where different transit services inter-connect, member 2004 development of the GTA
n Centres including: identification of prioriry centres; services municipalities, transit network as a fast,
to be provided to transit riders; actions to ensure GO Transit convenient, integrated system
prioriry access for feeder buses; and actions to and transit and to take maximum
integrate those transportation centres located in operators advantage of phased
designated urban development centres with improvements to the GTA
surrounding land uses and to support pedestrian transit network
access and planned development.
a--.
--..J
'-D
A- 6
Appendix A
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
15. Prepare a GTA gateways plan, including property GTSB, 2001 to identifY priorities for
protection and a phased implementation strategy member minimizing traffic volumes on
coordinated with improvements to GO Transit municipalities, key expressway corridors by
services and other transit services and mceting the GO Transit providing opportunities for
requirements of the Environmental Assessment Act and Province transit use for parts oflonger
(MTO) distance trips
GOBus See #6 and #7 above.
Services
Transit 16. Prepare a comprehensive strategy to enhance bus GTSB, 2001 to address the critical link
Priority feeder services into the network of GO rail, rapid member between local transit systems
Routes transit and GTA transit corridor services, addressing municipalities, and the GT A-wide transit
targets for scrvice levels, options for priority GO transit and network, including GO Transit
signalization, reserved lanes and other transit priority transit servICes
measures; the investment required for additional operators
equipment and operational improvements, station
improvements and other measures necessary to
improve the connection between various transit
services.
17. Prepare a strategy for phased establishment of a GTSB, 2001 to coordinate efforts to
network of priority transit routes and HOV lanes on member improve the speed and
key expressways and arterial roads, focussed on olunicipalitics, convenience of transit
enhanced connections with important origins and GO Transit, movements across boundaries
destinations, supporting the GT A transit network transit
and official plans and based on analyses of congestion operators and
points, costs and benefits. Province
(MTO)
Connections See #13 above.
to Pearson
Ai rport I
~
=
<=:J
A-7
Appendix A
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
Integrated See # 13 above.
Planning and
Staging
Co-ordinated Transit
A Fast and 18. Adopt a GT A-wide transit service co-ordination GTSB, 2000 to provide a consistent Included in
Convenient protocol, based on the strategic plan, as a shared 111ember framework for translation of $50,000
Choice of framework for co-ordination of services. municipalities, GT A-wide transit objectives to budget
Travel GO Transit each municipality and operator request for
and transit transi t co-
operators ordination
Co-ordinated 19. Set priorities for enhanced GT A transit service GTSB, 2001 to guide efforts over the next 2
Transit in the co-ordination across municipal boundaries, including member to 5 years to improve
GT A and proposed phasing, costing and revenue sharing municipalities,
H-W arrangements to maintain revenue neutrality for GO Transit
operators on implementation. and transit
operators
20. Identify and implement opportunities for transit GO Transit 2002- to maximize efficiencies in the
operators to share operational information in real and transit 2004 provision of GT A cross-
time, share equipment and collaborate on purchasing, operators boundary services
maintenance and training needs.
21. Prepare a strategy to improve coordination of GTSB, 2001 to enhance the mobility of
specialized transit and other transportation services, member senior citizens and people with
based on analysis of the demand, opportunities and municipalities disabilities across the GT A and
barriers to serving GTA cross-boundary trips. and specialized Hamilton-Wentworth
transit
operators
0"-
ca
A- 8
Appendix A
Plan Recommended Actions Implementin Timing . Explanation Funding
reference g Partners (Year)
Integrated 22. Prepare a strategy to incrementally improve the GTSB, 2001 to improve the convenience of
Transit Fares integration of transit fares and fare media member using the GTA transit network
municipalities,
GO Transit
and transit
operators
Integrated 23. Update and build on the conclusions of the GTSB, 2000 to maximize opportunities for Included in
Custooler Transit Integration Steering Committee on the member transit riders to make best use $50,000
Information regional Ride Guide, coordinated telephonc municipalities, of existing co-ordinated budget
information and interregional signage, including: GO Transit services and enhancements to request for
- recommendations on key issues like ongoing and transit service co-ordination as they transit co-
project funding, technology, private sector operators are implemented ordination
participation and formal arrangements for the
ownership and sharing of assets and the opcration
and ongoing maintenance of the data base;
- development of a geographic data base for providing
coordinated transit customer information and trip
planning; and
- alternative means of accessing this infonnation,
including the internet and kiosks in public venues.
lntermodaj 24. Prepare a strategy for the location and sizing of GTSB, . 2001 to ensure that commuter lots
Integration commuter parking lots to support the phased member are used to build transit
implementation of the GT A transit network and municipalities, ridership, especially in priority
including expansion of commuter lots along existing GO Transit, GT A transit corridors, to
and new expressways, including Highway 407. transit ensure that they support
operators and efforts to improve feeder bus
the Province services, and to implement
(MTO) ridesharing and carpooling
programs
.'
0'.
co
f'...)
A- 9
Appendix A
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
Planning and 25. Investigatc, as part of the review of thc GTSB GTSB in 2000 to provide the tools needed to
Delivery of requircd under the Grcater Toronto Services Board consultation effectively co-ordinate inter-
Higher Order Act, revisions in thc GTSB's mandate to providc with member regional transit across the GT A
Transit clcar responsibility for planning and co-ordination of municipalities and H-W
intcr-regional transit services, including the and transit
distribution of funding, costs and revenues to opcrators
operators related to inter-regional cross-boundary
services. (for consideration by Strategic Planning &
Review Committee as part of the review of the
GTS13)
A-tO
Appendix A
0--.
=
v-.J
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
The Movement of Goods and Services
A Strategic 26. Prepare a multi-modal analysis of goods and GTSB and 2000 and to provide information needed $100,000
Goods services movements and trade corridors in the GT A member 2001 + to establish strategic priorities included in
Movement and Hamilton-Wentworth, including: municipalities for planning, policy budget
Network - a comprehensive review of how the provincial in collaboration development and investment in reg uest
expressway and municipal arterial road networks with the transportation infrastructure to
function together and with other modes to serve the Province facilitate the efficient and
movement of goods and services; (MTO), timely movement of goods and
- detailed freight data and analyses of patterns and federal servtces
trends in facility location, origin and destination truck government,
rnovements, trip generation rates, travel times, the Data
sizes of trucks and c'"go types; Management
- the emerging role of intermodal facilities; Group and
- characteristics and implications of aggregate haulage; industry
- issues and barriers to goods and services
1110venlcnts;
- impacts of trade routes and border crossings;
- development of a commodity flows model to allow
for ongoing goods movement analysis;
- consolidation and mapping of traffic cordon counts
across the GTA and H-W; and
- analysis of that sector of the service industry which
is dependant on road travel, ego courier, inter-city
buses, local delivery and maintenance services,
including an industry survey to establish the scale and
issues affecting this sector.
"
0'-
CD
.p.
A-ll
Appendix A
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
27. Develop a plan to enhance specific elements of Province 2001 to address existing and
the goods movement network, including expansion (MTO), anticipated future barriers to
or extension of highways and arterial roads and federal the efficient movement of
improved connections to freight and inter-modal government in goods and services
terminals, based on the comprehensive review of the collaboration
movcment of goods and services. with the
GTSB,
member
lnunicipalities
and the
industry
28. Develop a short term plan to identifY and address Province 2000 to address existing major
the most critical expressway congestion points (MTO)in congestion points affecting
affecting GTA and H-W movements of goods and consultation goods movement GT A-wide
services. with GTSB and trade corridor connections
and member to border crossings
municipalities
Optimizing Existing Assets
Asset 29. Develop an assessment framework for GTSB, 2001 to facilitate the preparation of
Managemcnt transportation infrastructure proposals which mClnbcr asset management plans to
includes life-cycle cost estimates, including municipalities minimize costs and disruptions
operational, maintenance and rehabilitation costs. and Province due to repair and maintenance
(MTO)
Traffic 30. Extend and improve the freeway traffic Province 2001+ to quickly help to address
Management management system to all GTA and Hamilton- (MTO) and existing congestion points on
Wenlworth expressways, including Highway 407 and Highway 407 the expressway system
at key points on all trade corridors to U.S. border ETR Corp.
crossings, with first priority to the QEWand
Highway 401 west corridors.
0-.
CD
Vl
A-12
Appendix A
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
31. Co-ordinate the frceway traffic management City of 2002- to maximize the GT A-wide
systems operated by the City of Toronto (Gardiner Toronto and 2004 traffic management benefits of
Expressway and Don Valley Parkway) and the Province both systems while minimizing
Ministry of Transportation (400 series highways and (MTO) costs
QEW).
32. Investigate the possibility of extending the GTSB, 2002- to maximize the GT A-wide
freeway traffic management system to key parts of melnber 2004 traffic management benefits of
the arterial road system whieh connect and provide municipalities the system
alternate routes to frecways in highly congested and Province
corridors. (MTO)
33. Prepare a GTA-wide incident management GTSB, 2001 to minimize the impact of
strategy co-ordinating the actions of the various member incidents on the efficient flow
jurisdictions and agencies who respond to provide municipalities, of people and goods
procedures and equipment to quickly clear accidents emergency
and spills, provide real time information to the media services,
and the public, and directing travellers to appropriate Province
altcrnative routes. (MTO)
Transportatio 34. Develop a comprehensive GTA-wide GTSB, 2002- to make maximum use of
n Demand transportation demand management program to member 2004 investments in the existing
Management include telecommuting, flexible work hours, municipalities, transportation network by
employer-funded transit passes and subsidies, transportation reducing the growth in
riclesharing programs, parking policies and pricing agencies, automobile traffic, particularly
strategies. Province during peak periods
(MTO),
community
and private
sector
organizations
35. Scc #24 above.
r
<
A-13
Appendix A
0"-
co
0'.
Plan Recommended Actions Implementin Timing . Explanation Funding
reference g Partners (Year)
Phased Implementation
Protection of 35. Prcpare a GT A-wide transportation corridor and GTSB, 2001 to protect the opportunitics to
Future site protection strategy to identify and recolTIlnend Inelnber implement the GTA
Corridors and means of protecting: corridors required for municipalities, transportation plan
Sites enhancement, expansion or extension of the GT A transportation
transportation network; sites for transit stations, agencies and
including parking and bus access facilities; and access Province
to and from airports, ports, truck tcrminals, rail (MTO)
yards and inter-modal facilities, and providing the
basis for technical feasibility studies meeting the
requirements for Environmental Assessment
approvals.
Freight Rail 36. Investigate opportunities to rationalize the use of GTSB, GO 2002- to ensure that the public sector
Rationalizatio existing rail corridors. Transit and 2004 is prepared to seize
n member opportunities to enhance
municipalities transit that may emerge from
changing market conditions
affecting the railways
Service 37. Prepare on overall phased implementation GTSB, GO 2005 + to consolidate the results of all
Implcmclltatio strategy for the GT A transportation network based Transit, detailed work into a clear
n on the analyses completed for each element of the member program of infrastructure
system, including a co-ordinated GT A-wide long municipalities investments
term capital program for elements of the GTA and Province
network identifying costs, funding sources and (MTO)
approvals needed.
A-14
Appendix A
0-..
CD
-...,J
Plan Recommended Actions Implementin Timing Explanation Funding
reference g Partners (Year)
Consultatio 38. Receive the draft GT A Strategic Transportation GTSB in 2000 to gain public input on the Plan
n Plan and circulate it to all member municipalities and collaboration and possible revisions prior to
other stakeholders for comments by May 15th, 2000 with member adoption as a GTSB strategy
and report back to Transportation Committee at municipalities under the Greater Toronto
their May 26'" 2000 meeting (approved by the GTSB Services Board Act
on February 4'''. 2000, with comments requestcd by
April 3, 2000). .
Guiding 39. Endorse and adopt the GT A transp0l1ation vision GTSB and 2000 to provide a consistent basis for
Principles, and objectives. member planning and transportation
Vision and municipalities decisions affecting the GT A-
Objectives wide network
40. Request the provincial and federal governments Province 2000 to ensure all environmental
to harmonize the provincial and federal processes for (MOE) and considerations are evaluated
cnvironmental assessment approval for infrastructure Federal together and to avoid
and conduct them simultaneously. Government unnecessary delays in approval
(Environment processes
Canada)
" -,