Loading...
HomeMy WebLinkAboutPD-013-00 .~' ~~ ~ .;;.-- , .. ~~ DN:J'D.Ol3-00 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: General Purpose and Administration Committee File # 703 /}1tJ;;(.~ . Res.#h!19-1-7-0o Date: Monday, January 31, 2000 Report #: PD-013-00 FILE #: PLN 12.5 By-law # Subject: COURTICE IDGHWAY NO.2 CORRIDOR/COURTICE MAIN CENTRAL AREA STUDY FILE: PLN 12.5 Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PD-013-00 be received; 2. THAT staff be authorized to proceed with preparing the Terms of Reference in consultation with Regional staff and the tendering of a study for the Courtice Highway No.2 Corridor/Courtice Main Central Area Study; and 3. THAT all interested parties listed in this report and any delegations be advised of Council's decision. 1. BACKGROUND --- The purpose of this report is to seek Council's authorization for staff to proceed with the preparation of the Terms of Reference and tendering of a study for the Courtice Highway No.2 Corridor Study and the Courtice Main Central Area Study which is to be cost shared with the Region of Durham. The geographic area to be studied extends from Townline Road to Hancock Road and includes Special Policy Area F - King Street Corridor and Special Study Area No. I - Courtice Main Central Area as identified in the Municipality of Clarington Official Plan and shown on Attachment 1. 633 . " ~I REPORT NO.: PD-oI3-00 PAGE 2 2. DISCUSSION 2.1 Courtice Hiabway 2 Corridor The Corridor Study extends beyond Special Policy Area F to allow for a review of the successes and failures of the previous efforts in the Courtice West Central Area. Special Policy Area F of the Clarington Official Plan is designated residential and consists of a number of large residential lots. This area is recognized in the Official Plan as having redevelopment potential with an opportunity to promote intensive developments of the type and scale that would be transit supportive. While the plan identifies the type of uses that are permitted (medium and high rise residential, recreational community facilities, institutional and limited office), it does not, for example, articulate how and where intensification will take place; what constitutes limited office; what will be the impact of development on transportation or what would be the visual character of the area. More detailed study is required to address these questions and also to determine how this highway strip can be transformed from a highway on the east to a "main street" character within Courtice. A preliminary Terms of Reference outlining the phases and general elements of the corridor portion of the study is attached to this report as Attachment 2. 2.2 Special Study Area No.1 - Courtice Main Central Area Special Policy Area No.1 is predominantly greenfield. The Official Plan states that "prior to any development the municipality shall prepare a secondary plan which provides detailed land uses and articulates urban design principles for development of the Main Central Area". The Official Plan envisions the area to be developed as the centre of commercial, cultural and community activity with a fully integrated array of land uses. A secondary plan is now needed to ensure that the vision for this area is realized. 2.3 Emeraina Issues Because of recent pressure for development in the above areas a number of issues are corning to the forefront. Issues such as traffic circulation and access, servicing, urban design and detailed land use patterns must be addressed before development can proceed 634 . , .... REPORT NO.: PD-013-00 PAGE 3 v effectively. The evolving character of Highway 2 and the need for a planning framework for the Main Central Area must be addressed. 3. CONCLUSION Based on the level of interest for development in the proposed study area it is imperative that the study proceed as early as possible to ensure that opportunities for creative and comprehensive solutions are not lost. Also, in order to facilitate comprehensive planning in a cost effective manner in this area the study would be co-ordinated with Public Work's Roads, Transportation Plan for Courtice. It is proposed that the study be phased over two years. This report has been reviewed by the Director of Public WOIXs who concurs with its contents. Reviewed by, e, M.C.I.P., R:P.P. Planning & Development d~~-~ Franklin Wu, M.C.I.P., R.P.P. Chief Administrative Officer. BN*DC*df 25 January 2000 Attachment #1 - Key Map Attachment #2 - Preliminary Terms of Reference Interested parties to be notified of Council and Committee's decision: Mr. Gene Chartier Manager of Transportation Regional Public Works Department 105 Consumers Drive WHITBY, Ontario LlN 6A3 635 ATTACHMENT NO.1 ~ '" 9 "' 0: '" ~ "' " ~ ~ o ~ GEORGE iB .,; "' !::: '" " 0 ii:: 1i ~ 0 "' z " ::> " f2 GLENVlEW CECIL "~ ~ g 0 ~ "' ~ uj ~ ~ i( !I WESTMORE ST. N H ROAD w " ~ ::> o " ~F1ELD LANE ~ lPOPPYFlELD DRIVE '" o ~ '" ROAD f3 '" " " ~ "' " ~ => " " RD. S' 0 ~ '" '" "' "' " 0 " ~ => 1'::::::::::::1 COURTICE MAIN CENTRAL AREA _ COURTICE SPECIAL POLICY AREA" F. 636 January 21,2000 Preliminary Terms of Reference Courtice Highway 2 Corridor Study PHASE ONE - IDENTIFY UNIQUE ROADW A YINEIGHBOURHOOD SEGMENTS Purpose: To identify and describe (in general) the different "corridor segments" along Highway 2. . Base Data Collection & Review: development proposals, mapping, transit, traffic, planning, photos . Document Existing Conditions , traffic speed, volume, access spacing, intersection spacing, building setbacks . Define Context for Change - identifying sections that are currently transforming due to development and traffic pressures. PHASE TWO Purpose: To establish detailed "design concepts" for each of the corridor segments identified along Highway 2. . Define Emerging Functional Requirements of Corridor including access management concepts . . Delineate Vision for Corridor . Define Corridor Segments and Formulate Design Criteria . Define Vision for each Corridor Segment . Interim Focus Session . Council Presentation PHASE THREE - PRELIMINARY DESIGN Purpose: To provide preliminary and functional design detail for any changes contemplated in the corridor. . Prepare and Refine Conceptual Designs . Prepare Cost Estimates . Present Final Concepts for Approval 637 PHASE FOUR- PREPARE 5 YEAR IMPLEMENTATION STRATEGY Purpose: To develop an implementation strategy that coincides with development activity and Regional Capital funding/budgeting . Establish 5 Year Vision . Prioritize Design Components into 5 Y ear Work Program . Generate Images of Corridor over 5 Year Term . Council Workshop . Prepare Final Report 638 ~