Loading...
HomeMy WebLinkAboutCOD-040-04 - Cl~-i!]glon REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: June 21st, 2004 Report #: COD-040-04 File#_ ~ ~-:s~(Yf By-law # ;2e:o'-f. 1"7/ Subject: CL2004-27, Bowmanville Creek Erosion Protection, Live Crib Wall Construction Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-040-04 be received; 2. THAT Dynex Construction Ltd., Concord, Ontario with a total bid in the amount of $63,798.85 (Excluding G.S.T. = $4,465.92), being the lowest responsible bidder meeting all terms, conditions, and specifications of Tender CL2004-27, be awarded the contract for the Bowmanville Creek Erosion Protection, Live Crib Wall Construction as required by the Engineering Department; 3. THAT the total funds required in the amount of $80,000.00 ($63,798.85 tender plus contingencies, consulting and net GST) be drawn from Engineering Capital Account 110-32-330-83234-7401; and 4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to execute the nece ry agreement be approved. Submitted by: Reviewed by: '~ ~ Franklin Wu, Chief Administrative Officer Nancy Tay r, B.BA .., ~;:d AS. Cannella, C.E.T. Director of Engineering Services MM\NTlASC\LAB\km 1213 REPORT NO.: COD-040-o4 PAGE 2 BACKGROUND AND COMMENT Tender specifications were provided by Totten Sims Hubicki Associates for the Bowmanville Creek Erosion Protection, Live Crib Wall Construction, as required by the Engineering Department. Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were received and tabulated as per Schedule "B" attached. The total project cost, including Project Administration, and costing allocation is as detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "C" and will be provided from the Engineering Capital Account #110-32-330-83234-7401, from which there are adequate funds available as outlined from a combination of 2002 funds carried over for this purpose and the 2004 Capitai Budget allotment. Although the low bidder has not previously performed work for the Municipality of Clarington, they have provided satisfactory service for Hydro One Networks, City of Brampton and Toronto Region Conservation Authority. The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Engineering. After further review and analysis of the bids by the Engineering Department, Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Dynex Construction Ltd, Concord, Ontario, be recommended for the contract for the Bowmanville Creek Erosion Protection, Live Crib Wall Construction. 1214 CORPORATION OF THE MUNICIPALITY Of CLARINGTON Schedule "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2004- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Dynex Construction Ltd, Concord, Ontario, to enter into agreement for the Bowmanville Creek Erosion Protection, Live Crib Wall Construction. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between, Dynex Construction Ltd., Concord, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of ,2004. By-law read a third time and finally passed this day of ,2004. John Mutton, Mayor Patti L. Barrie, Municipal Clerk 1215 ~ Cl!J!:._n Municipality of Clarington SCHEDULE "8" BID SUMMARY Tender CL2004-27, Bowmanville Creek Erosion Protection, Live Crib Wall Construction Dynex Construction Ltd. Concord, ON R & M Construction Acton, ON Ron Robinson Limited Bowmanville, ON Hard-Co Construction Ltd. Whitb ,ON Brinkman & Associates Reforestation Ltd. New West, B.C. $68,264.77 $80,176.72 $99,548.58 $124,072.92 $127,518.32 1216 JUN-15-04 TUE 04:35 PM TSH COBOURG FAX NO, SCHEDULE "C" II 11M Totten Sims Hubicki AssocillteSc 513 Division Street, Cobollrg, Ontnrio, Canada K9A 5G6 19051372.2121 Fax; 19051372-3621 E:-mojl~ cobourg@tsh,ca www.tsh.cLI engineers architects planners June 14, 2004 Ms. Lou Ann Birkett, CPP, AMCT Purchasing Manager Corporation of tho Municipality of Clarington 40 Temperance Street BOWMANVILLB,Omario. LlC 3A6 Dear Ms. Ilirkett: Re: Contract CL2004-27, Live Crib Wall Construction Bowmanville Creek Our officc has rcviewed the bids snbmitted for the above contract and fmd them to be in order. A list of the bids rcceived and the Engineers Estimate are provided in tho table below, All numbers are inclusive of OST. BIDDER Dynex Construction Ltd. Concord, ON R & M Construction Acton, ON Ron Robinson Ltd. Bowmanville, ON Hard-Co Construction Ltd. Whitbv, ON Brinkman & Associates Reforestation Ltd. North Bav, ON Enl!:ineer's Estimate TOTAL BID AMOUNT $68,264.77 $80,176.72 $99,548.58 $]24,024.92 $127,5]8.32 $105,000.00 The work covered under this tender was previously identified as Phase 2 work in Report EGD-25-02 pl'epa red ill May, 2003, ]n Report EOD-25-02 it stated that thc estimated erosion protection costs were $48,000.00 and that funds for this work be allocated from the surplus in accoullt #7205-02009-0261. At the timo Report EGD-2S-02 was prepared a conceptual plan of the erosion protection work was all that was available to prepare the estimated cost for the work, Upon completion of the detailed design the estimated costs increased to $95,000.00 in 2003 (increase in 2004 to account for additional construction COSlS). This work was previously tendered under Contract CL2003-17 and was not awarded due to the shortfall in funding. As tbis work was necessary to stop the ongoing erosion at this location the Enginccring Services Departmelll added additional funding of $50,000 in the 2004 Budget (Account #5800-8310-04105) increasing the total amount available for this project to $98,000. 1217 JUN-15-04 TUE 04:36 PM TSH COBOURG FAX NO, SCHEDULE "e" Ms. l..ou Ann Birkett JUDe 14, 2004 2 Dyncx Construction Ltd. has completed a number of projccts similar in nature to the works required under this contract for Hydro One Networks (Markham), Orfus Industrial Development (Mallon), City of Brampton. Toronto Region Conservation Authority (Whilevalc Dam) and other~ and have completed the work as ~pecified to thc satisfaction of the inspectors, oWners and approving agencies. Based on the references contacted by our office Dynex Construction Ltd. would be able to complete thc work required under contract CL2004-27 with a high Icvel of quality and in a timcly manner. The following is a summary of the total estimated project costs based On the low bid, detailed design, agency approvals. contract administration and contingencies. Item D nex Construction Ltd. bid exclusive of GSn Detailed Desi n and A rovals Estimated Contract Administration Contin encies Total Pro'ect Costs Bud et Amount Account #7205-02009-0261 (exclusive of GST Account #5800-8310-04105 exclusive of GST) Total Bud et Amount Bud et Sur lus\Delicit (exclusive of GS'!') Cost $63,798.85 $7,700.00 $5,200.00 $3,301.15 $80,000.00 $45,174.05 $48,543.69 $93,717.74 $13,717.74 Based on their past work experience, the infol1l1ation provided by the references contacted by TSH and available budget it is recommended that Dynex Construction Limited be awarded the contract. Should you have any questions regarding this matter, plcase contact the undersigned. Best regards, ~~ ' -"7 ..J2.0/! on Albright, P.Eng. Project Enginccr RA/sn Jl.;\] 2-2.9171 \corrc$p\2032?rev2,doc pc: A.S. Cannella, Director, Engineering Serviccs Nancy Taylor, Director of Finance Peter Windolf, Manager of Park Developmcnt 1218 11M