Loading...
HomeMy WebLinkAboutCOD-013-04 . CI!1!mglOn REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Fig March 8th, 2004 it Gf'p. -llolo-o<t Date: Report #: COD-013-04 File#_ By-law #~ootl-- 07,2. Subject: Tender CL2003-36, Roenigk Drive & King Street West Intersection Improvements. Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-013-04 be received; 2. THAT Miwel Construction Limited, Stouffville, Ontario with a total bid in the amount of $182,000.00 (Including G.S.T.), being the lowest responsible bidder meeting all terms, conditions, and specifications of Tender CL2003-36, be awarded the contract for the Roenigk Drive and King Street West Inspection Improvements as required by the Engineering Department; 3. THAT the total funds required in the amount of $300,000.00 ($182,000.00 tender plus work by the Region of Durham, contingencies, consulting and net GST) be drawn from Engineering Capital Account 8310-03201-1401; 4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to execute the necessary agreement be approved. Submitted by: ~~ ~"3 Reviewed bY:O~--~""1..v ~arano, H.B.Sc., C.M.O. Franklin Wu, Dir tor of Corp' rat Services Chief Administrative Officer ., C.A., MMILABlkm 1Lv REPORT NO,: COO-013-o4 PAGE 2 BACKGROUND AND COMMENT Tender specifications were provided by Totten Sims Hubicki Associates for the Roenigk Drive and King Street Intersection Improvements, as required by the Engineering Department. Tenders were advertised in local papers, as well as Electronically. Subsequently, tenders were received and tabulated as per Schedule "B" attached. The total project cost, including works by the Region of Durham, Project Administration, and costing allocation is as detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "C" and will be provided from the Engineering Capital Account #8310-03201-1401, from which there are adequate funds available. The low bidder has previously preformed satisfactory work for the Municipality of Clarington. The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Engineering. After further review and analysis of the bids by the Engineering Department, Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Miwel Construction Limited, Stouffville, Ontario, be recommended for the contract for the Roenigk Drive and King Street West Intersection Improvements. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOW MANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169 1 L : , Schedule "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2004- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Miwel Construction Ltd., Stouffville, Ontario, to enter into agreement for the Roenigk Drive and King Street West Intersection Improvements. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between, Miwel Construction Ltd., Stouffville, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of ,2004. By-law read a third time and finally passed this day of ,2004. John Mutton, Mayor Patti L. Barrie, Municipal Clerk 1 / ,- Cl!Ki[Jglon Municipality of Clarington SCHEDULE "B" BID SUMMARY TENDER CL2003-36 ROENIGK DRIVE & KING STREET WEST INTERSECTION IMPROVEMENTS \, BIDDER Miwel Construction Limited Stouffville, ON Harnden & King Construction Inc. Ajax, ON Ron Robinson Limited Bowmanville, ON Elirpa Construction & Materials Limited Pickerin , ON TOTAL BID AMO. $182,000.00 $205,993.76 $208,316.53 $221,412.81 H:\BI DSUMM\2003\BSCL03-36, DOC 1<- J SCHEDULE "C" II Tnt Totten Sims Hubicki Associates 513 Division Street, Cobourg, Ontario, Canada K9A 5G6 19051372-2121 Fax: 19051 372-3621 E-mail: cobourg@tsh.ca www.tsh.ca engineers architects planners February 12, 2004 Ms. Lou Ann Birkett, CPP, AMCT Purchasing Manager Corporation of the Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario. LlC 3A6 Dear Ms. Birkett: Re: Contract CL2003-36, Roenigk Drive and King Street West Intersection hnprovements, Bowmanville Municipality of Clarington Our office has reviewed the bids submitted for the above contract and find them to be in order. A list of the bids received and the Engineers Estimate are provided in the table below. All numbers are inclusive of GST. BIDDER Miwel Construction Ltd. Harnden & Kin Construction Inc. Ron Robinson Ltd. Eli a Construction & Materials Ltd. En . eer's Estimate TOTAL BID AMOUNT $182,000.00 $205,993.77 $208,316.52 $221,412.81 $224,373.65 Miwel Construction has completed a number of contracts for the Municipality of Clarington under our inspection. In addition, contracts have been completed in recent years in Cobourg and Fenelon Falls with construction values ranging from $350,000.00 - $2,000,000.00. In all cases TSH provided contract administration and Miwel preformed to acceptable standards and work was completed on schedule. These contracts contained all aspects of the work to be completed in the Roenigk Drive and King Street Intersection project. Based on our experience in working with Miwel, we recommend acceptance of the low bid. We refer you to the attached cost apportiorunent summarizing all project related costs which indicates that the total project cost comes in under budget. Funding for this project is to be drawn from account #5800-8310-03201-1401. L Ms. Lou Ann Birkett January 12, 2004 Should you require further information please contact the undersigned. Best regards, ~.'" "! .7 ------; ;"~; , ,/--- ///~;... /: ~ /' l~e /tv / ,,/ Ron Albright Project Engineer RA/sn P:\12-29171\Corresp\20115.doc Enc!. pc: Mr. A.S. Cannella, CET, Director of Engineering Services Mr. R. D. Baker, Traffic Coordinator (+ encl.) Ms. W. Chandler, Clerk II (+ encl.) , L SCHEDULE "C" 2 VII Municipality of Clarington ROENIGK DRIVE AND KING STREET WEST INTERSECTION IMPROVEMENTS AND SIGNALIZATION, BOWMANVILLE Schedule "C" Cost Apportionment For Low Bid submitted By Miwel Construction Contract CL2003-36 Revised March 1, 2003 T.S.H. Project: 12-29171 Description Total Comments Account Number 8310-03201-1401 Construction Costs Contract CL2003-36 $170,093.46 Low bid submitted by Miwel (excl. GST) TSH Project Number 12-29171 Detailed Design, Approvals and Tender Documents $27.755.28 Excludes Crib Wall Design and Tendering Costs ( to Jan. 29, 2004) Estimated Construction Administration (TSH # 12-29171) $16,000.00 Other Costs Signalization Work Completed By Region of $59,000.00 As per R.OD. Estimate Durham ine!. Material, labour and Administration Relocation of Bus Shelter $4,000.00 To be completed by Miwel Sub-Total Other Costs $63,000.00 Sub-Total Estimated Project Costs (excl. contingencies) $276,848.74 Net G.S.T. (3%) (excl. contingencies) $8,305,46 Contingencies (including G.S.T.) $14,845.80 Total Estimated Project Costs $300.000.00 Budget Amount $330.000.00 Estimated Budget Surplus/Deficit $30,000.00 H ;\2C04 TEN DE:RS\[C i2003~:),~. ccstaPi>::rlicnrncd >(, 5 )COSI Af'i);)' lion men! I . IL {, ~ Printed on 31112004 tsh