Loading...
HomeMy WebLinkAboutWD-5-95 THE CO 4 ,{7,UN,XI IPALITY OFCLARXXGTON XXX REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# �7 I Z. ► g-? o zZ Date: FEBRUARY 6, 1995 Res. # Report#:. WD-5-95File #: --D-02-31-008 By-Law# Subject: SPRINGFIELD SUBDIVISION, PHASE 2, PLAN 40M-1709, CERTIFICATE OF ACCEPTANCE, STORM SEWER SYSTEM Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-5-95 be received; and 2 . THAT the Director of Public Works be authorized to issue a 'Certificate of Acceptance' for the storm sewer system constructed within Plan 40M-1709. REPORT 1.0 ATTACHMENTS No. 1: Key Map 2.0 BACKGROUND 2 . 1 On August 15, 1991, the former Town of Newcastle entered into a subdivision agreement with 708545 Ontario Limited to develop lands by plan of subdivision, located in Courtice, and i described as Plan 40M-1709 (Attachment No. 1) . The agreement required the developer to construct all roadworks, including hot-mix paving, curb and gutter, sidewalks, boulevard sodding and street trees, a storm drainage system and street lights, hereinafter referred to as the 'Works' . 2.2 The subdivision agreement provides for the separation of the Works into four (4 ) stages: i PAPERcvc« RJ61S PRitrtEO OtJ REGYGLED PAPER REPORT NO. : WD-5-95 PAGE 2 a) Storm Sewer System; b) Roads and Above Ground Services; c) Tributary Stormwater Management Works; and d) Stormwater Detention Work and Water Quality Work. 2 .3 The Storm Sewer System was completed and a 'Certificate of Completion' was issued dated December 4, 1992 . The system was placed on a two (2) year maintenance period which expired on December 4, 1994 . The works were subsequently re-inspected and all deficiencies have now been corrected to the satisfaction of the Director. 2.4 It is appropriate to issue a 'Certificate of Acceptance' for the Storm Sewer System. The subdivision agreement provides for this certificate to be issued by the Director of Public Works, subject to the approval of Council. Respectfully submitted, Reviewed by, .ILL— Walter Evans, P.Eng. W. H. Stockwell Director of Public Works Chief Administrative Officer WAE/NAC/ph January 19, 1995 Attachment X002 SA a 0 ------------- U) J � N YORKVIILE c U DRIVE JOHN WALTER coca I i � I I CRESCENT kypj?11VGFIFLIDS SUBTIVISAIJ 40ff- 170 9 H AD �J COUR oa a�0 0 CT Fl 6 D o C:\ATTACHS\SUED\40M1709.DWG 1 DRAWN BY; JM DATE; JAN, 1995 PE� � U ATTACHMENT N0, 1 J�EYMAPIE: WD-5-95