Loading...
HomeMy WebLinkAboutWD-25-95 4 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON XXX 2MMiffiRkXTykI XX REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File Date: JUNE 5, 1995 Res. # 6� -_ = Ry-Law# Report#:_Wp.�.25-,--9- ._ File#: _.0 0.8-.- 0 01 Subject: YELLOW CENTRELINE, ENFIELD ROAD BETWEEN CONCESSION ROADS 8 AND 9, ENFIELD Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-25-95 be received; 2 . THAT the request to paint a yellow centreline on Enfield Road between Concession Roads 8 and 9 be DENIED; and 3. THAT a copy of Report WD-25-95 be forwarded to Patricia McLellan and that she be advised of Council's decision. REPORT 1.0 ATTACHMENTS No. 1: Key Map No. 2 : Correspondence dated March 1, 1995, from Patricia McLellan No. 3: Copy of Report WD-63-91 dated July 8, 1991 2.0 BACKGROUND 2 . 1 At a regular meeting held on March 13, 1995, Council passed Resolution #C-182-95 as follows: "THAT the correspondence dated March 1, 1995 1001 `CYC"P4PER 'RECYICLE 14145 6 PNtlIED Ott RECYCLED PAPER REPORT NO. : WD-25-95 PAGE 2 from Patricia McLellan regarding a yellow centreline on Enfield Road, be received; THAT the correspondence be referred to the Director of Public Works for review and preparation of a report to be submitted to the General Purpose and Administration Committee; and THAT Patricia McLellan be advised of Council's decision. " 3.0 REVIEW AND COMMENT 3. 1 The letter dated March 1, 1995 (Attachment No. 2 ) requests the yellow centreline to prevent accidents in bad weather with the offer to pay for the paint if the Municipality pays for the machinery and labour. 3.2 Extensive Review Done in 1991 An extensive review was done in 1991 regarding the feasibility of painting centrelines on Concession Roads (Report WD-63-91, Attachment No. 3) . Council approved the recommendations in the report: i 112 . THAT only concession roads which meet the warrants listed in the Manual of Uniform Traffic Control Devices be considered for centreline painting; and i 3. THAT provision be made in the 1992 Budget, for Council's consideration, for centreline and edge line painting all roads which meet the warrants. " I 1002 REPORT NO. : WD-25-95 PAGE 3 3. 3 Some Facts 3.3. 1 The estimated cost to centreline paint a kilometre of road in the first year is $535 and in the second year is $377 . The cost in the first year is higher than in the second year because the road has to be "pre-marked" in the first year, but not in the following years. 3.3.2 The estimated annual cost to centreline paint Enfield Road, from Concession Road 8 to Concession Road 9, in the first year is $1, 120 and in the second year is $800 . 3 .3.3 The estimated annual cost to centreline paint all of the Concession Roads in Clarington is $309, 000. 3.3.4 The estimated annual cost to centreline paint all of the roads in Clarington (75 km) which meet the warrants from the Manual of Uniform Traffic Control Devices is $28,262. 3.3.5 The 1995 budget for centreline painting is $20,000. This i provides sufficient funds to centreline paint 53 kms of the 75 kms of roads which meet the warrants from the Manual of Uniform Traffic Control Devices. 3 .4 Enfield Road Characteristics Enfield Road north of Taunton Road is Regional Road 34 . This Regional section is straight, 7 metres wide with a two (2) metre shoulder on each side. It is smooth asphalt with a painted centreline. When a motorist travels north of Concession Road 8 (Regional Road 3) the Clarington section has no centreline, is straight, rough primed surface, narrower pavement width of 6.5 metres and narrow shoulders of 0.5 metres. I 1003 i REPORT NO. : WD-25-95 PAGE 4 There have been no reported accidents on Clarington's road section over the past three (3) years. The fact that the painted line stops at Concession Road 8 should indicate to motorists that the road has changed and they should adjust their speed to compensate for the different road characteristics. Motorists on Enfield Road may experience difficult conditions in bad weather, but so do drivers on all concession roads. It should also be noted that often during bad weather, pavement markings are obscured and ineffective. 3.5 Offer to Share Costs The offer of the petitioners, none of which even live on this road section, to pay for the paint is impractical. The paint is only a small portion of the expenditure and once applied by the Municipality would become an annual expenditure to taxpayers. 4.0 CONCLUSIONS 4 . 1 From the above, it is concluded that there are several roads in Clarington which meet the warrants for centreline painting which are not being done because of lack of funds which have a higher priority than Enfield Road between Concession Roads 8 and 9 . Respectfully submitted, Reviewed by, i G Walter Evans, P.Eng. W. H. Stockwell Director of Public Works Chief Administrative Officer RDB*ph May 25, 1995 Attachments I i 10'04 REPORT NO. : WD-25-95 PAGE 5 Patricia McLellan 1733 Concession Road 9 R.R. #2 Blackstock, Ontario LOB 1B0 I I i 1005 I I I I I I I I I I I I I I I I I I I I I o I I I I I I CONC SSION ROAD 9 N NFIE I_I � o I I I I ( Utl A4KE C EN ERLINL o ICL Rl�GI ONI D I 1V E AS�ILL6 l a I I I I I I I I W R GION NL R D J V) QI I I I I I I I t o I I U o I I ( ( MjkRKED IC NTERL E I W 0Lr RE G1 NA RA[� I I mit s I II II I J �.N ESSIOJ RO 7 Q n ch o z I I I I I I LLI S o w � z w I MIL ROAD J 0 Q I < X J0 IS I d' j 0 C NCESSI N RO D 6 Is INA W A N ol TCkLL� I I z 11 � J 3 0 (n REGIO AL RIJD 4 I i C:\ATTACHS\DARL\ENRDPVMT.DWG DRAWN BY: JM DATE: MAY 1995 ATTACHMENT N0, 1 WD-25-95 1006 its G 2 zo r�i1 '95 1d �6 I 6o fill All q mk y DIS TRIBUTION # CLERK # 1 ACK. PY....... D�-RUNAL TD: COPIES TO: YJ • ����'.�t L alt ":t't �.r7- --: ! f ATTEI\ITiOr � "`--r'. hlliJ(d...iPR.;_i ! w— — . j- - f'OPIES To ATTACHMENT N0. 2 WD-25-95 1007 I I �)t 1 i TO; Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario LIC 3A6 We the undersigned, wish to present to the Municipality of Claringtvr� our need for a yellow line to be painted on the Enfield Road between concession 8 and concession 9. On the abovementivned road, during line and bad weather, we have no guiding this has caused quite a few accidents. the majority of us have telephoned the Municipality to requestindividuthat strip of road, only to be told Provide funds for t a yellow line be painted on this that there are not sufficient funds for this. We request that ifv.1 the he paint, will the Municipality please provide he and labour to effe accident. ct same, before there is a fatal / NAME ADDRESS , _. SIGNAL URE �/G yJ:� d o g f/1�vl�Za aS S^��C ✓ , Lr-7- U n / 7 y 2 3 Y s C // / ' I - 1008 TO. Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario L1C 3A6 We the undersigned, wish to present to the Municipality of •Clarington our need for a yellow line to be painted on the Enfield Road between concession 8 and concession 9. On the abovementioned road, during bad weather, we have no guiding line and this has caused quite a few accidents. As individuals, the majority of us have telephoned the Municipality to request that a yellow line be painted on this strip of road, only to be told that there are not sufficient fdnds for this. We request thatifAe provide funds for the paint, will the Municipality please provide the machinery and labour to effect same, before there is a fatal accident. NAME ADDRESS SIGNATURE 2 </+c/>'yTC,G �feu /1. 1009 TOWN OF NEWCASTLE "!� • •t . REPORT �; File # •� •�^���. Res. # _ - —- By-Law # ,fTING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE )ATE: JULY 8, 1991 REPORT #: WD-63-91 FILE #: D.00.00. 17 U&ECT: FEASIBILITY AND COST OF PAINTING CENTERLINES ON CONCESSION ROADS :.ECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-63-91 be received; 2 . THAT only concession roads which meet the warrants listed in the Manual of Uniform Traffic Control Devices be considered for centerline painting; and 3. THAT provision be made in the 1992 Budget, for Council's consideration, for centerline and edge line painting all roads which meet the warrants. -------------------------------------------------------------------- REPORT 1.0 ATTACHMENTS No. l: Line Marking Schedules - Total Warranted Locations i • i i ATTACHMENT N0. 3 WD-25-95 1 i 1010 REPORT NO. : WD-63-91 PAGE 2 2.0 BACKGROUND 2 . 1 At a meeting held on July 16, 1990, Council passed Resolution #GPA-551-90: "That staff investigate the feasibility and cost factor of painting centerlines on the Town's Concession Roads . " 3.0 REVIEW AND COMMENT 3. 1 A survey was conducted of other municipalities in the Region regarding line painting Concession Roads. CITY OF O5HAWA• The City of Oshawa follow guidelines listed in the Manual of Uniform Traffic Control Devices . Centerline paint exists on 3.6 km (2 .2 miles) of the 70.3 km (43 . 7 miles) of paved rural roads. PICKERING AND AJAX: Pickering and Ajax do not provide centerline painting on rural roads . TOWN OF WHITBY• The Town of Whitby provides centerline painting on 19 km (11.8 miles) of rural roads which are considered main collector rural roads with heavy traffic volumes. 3 .2 Pavement markings have definite functions to perform in a proper scheme of traffic control. Pavement markings warn of any unusual or hazardous condition and serve to organize and control motorists through a hazardous or congested zone. They are used to supplement the regulations or warnings of other devices such as traffic signs or signals. In some cases, such as turning lanes, they may serve by themselves to convey warnings in an effective manner. I i . . .3 1 09 0 , 1011 REPORT NO. : WD-63-91 PAGE 3 3. 3 Pavement markings have definite limitations . They may be entirely obliterated by snow or sand, they are not clearly visible when wet, they have limited durability on surfaces exposed to heavy traffic and require repainting more than once per year. In spite of the limitations they have the advantage under favourable conditions of conveying warning or information to the motorist without diverting his attention from the roadway. 3.4 Pavement markings have no legal authority and are only a guide to supplement other regulatory warnings or devices . A driver on a rural road cannot be charged for straddling a centerline. If the motorist interferes with other traffic the driver could then be charged with failing to share the road. This charge could be laid with or without the centerline being present. 3.5 The Ministry of Transportation of Ontario publishes the Manual of Uniform Traffic Control Devices. The manual lists warrants and guidelines for direction dividing lines on rural roads as follows: C 2 . 02 . 01 (A) Two Lane Rural Highways Dividing Lines: ( 1) Throughout their length where the pavement is 6 m (19.7 ft) or over in width and they carry two way peak hour volumes of 200 vehicles or more; (2) Throughout their length where the pavement is 5 .5 m (18. 0 ft) to 6 m ( 19.7 ft) in width and they carry two way peak hour volumes of 100 vehicles or more; (3) Throughout their length where the pavement is 5 m ( 16.4 feet) to 5.5 m (18.0 feet) in width and they carry two way peak hour volumes of 50 vehicles or more; i (4) In sections where the accident record indicates a need for defining the division of the roadway between traffic travelling in opposite directions; . . .4 I ^ .. 1 012 �: REPORT NO. : WD-63-91 PAGE 4 (5) In areas where the roadway is likely to be obscured frequently by atmospheric conditions . 3 . 6 In addition to the yellow centerline, the Manual also lists guidelines for white edge lines on ,rural roads . C 2 . 05 Pavement Edge Lines• Line markings to delineate the pavement edge or in instances where the shoulder is paved, to separate the shoulder from the travelled lane shall be used on sections of highways. (A) Where the shoulder is paved; (B) In advance of and over all bridges; (C) 150 m (492 feet) in advance of, and around all curves having an advisory speed less than the posted speed limit; (D) On merging or diverging lanes; (E) On pavement width transitions; (F) Where obstructions on the shoulder are within 60 cm (2 feet) of the pavement edge or edge of the travelled lane and thus may constitute a hazard to the motorist; (G) Where there are peculiar physical conditions or frequent occurrences of fog. 3.7 There are disadvantages to line painting rural roads which do not meet the warrants. If limited funds are spent on unwarranted locations the hazardous locations may not receive the required markings. If an entire road is centerlined painted it detracts from the more serious hazards of curves or bridges . Line Painting unwarranted locations puts an unnecessary financial burden on the tax payer. 1013 REPORT NO. : WD-63-91 PAGE 5 3 .8 The Public Works Department operates its own paint spraying equipment which is used for the following line painting: pedestrian crosswalks school bus loading zones disabled person symbols stop bars direction arrows hatch marks parking stalls parking lots 3 .9 All centerline painting on Town streets is contracted to the Region of Durham who have the equipment for this type of work. During 1990 the Region painted 5.3 km of white edge lines and 31 km of centerline at a total cost of $15,400. The Region has provided an estimated 1991 cost to pre-mark and paint center lines of $588 per km ($946 per mile) for the first year. The second year pre-marking would not be required and the price would be $450 per km ($724 per mile) . Ordinarily all lines are painted once .per year and should be done in the spring. 3. 10 The cost to paint all centerlines and edge markings which meet the warrants would be $58,000 in the first year, and based on 1991 prices, would be $55,000 in the second year. 3.11 The cost to paint centerlines on all concession roads would be $236,000 in the first year and $189,000 in the second year. 3.12 The 1991 approved Budget provided for $27,000 for centerline and edge painting. . . .6 0 9 `� C 1014 REPORT NO. : WD-63-91 PAGE 6 4.0 CONCLUSIONS 4 . 1 Based on the above, it is concluded that centerline and edge line painting should be provided only at warranted locations . Respectfully submitted, Recommended for presentation to the Committee, AChief , ------------------ -------------------- Walter A. Evans, P.Eng. , Kotseff, Director of Public Works inistrative Officer RB*WAE*llv June 28, 1991 Attachment i I I Page 1 of 3 WARRANTED LOCATIONS FOR CENTRELINE AND EDGE LINE PAINTING FOR DIVISION #1, DARLINGTON STREET NAME FROM TO LENGTH REMARKS METRES ------- — ----- ------- DARLINGTON PARR ROAD COURTICE RD WESTERLY 620 CENTRE CURVE DARLINGTON PARR ROAD COURTICE RD WESTERLY 1240 EDGE CURVE SOUTH SERVICE ROAD REGION RD 34 WAVERLY 6000 TRAFFIC VOLUME BASELINE ROAD REGION RD #57 REGION RD 34 6000 TRAFFIC VOLUME * PRESTONVALE ROAD PRESTONVALE RD BASELINE RD 300 CENTRE CURVE * PRESTONVALE ROAD PRESTONVALE RD SOUTH OF BLOOR 365 CENTRE CURVE i * MAPLE GROVE ROAD HWY # 2 SOUTHERLY 200 CENTRE CURVE .,� NASH ROAD NASH RD EAST OF GREEN RD 410 CENTRE CURVE NASH ROAD NASH RD EAST OF GREEN RD 820 EDGE CURVE O� NASH ROAD NASH RD WEST OF REGIONAL RD # 57 740 CENTRE CURVE GREEN ROAD GREEN RD SOUTH OF REGIONAL RD # 4 410 CENTRE CURVE GREEN ROAD GREEN RD SOUTH OF REGIONAL ,RD # 4 450 CENTRE CURVE * CONCESSION ROAD 6 OLD SCUGOG RD HOLT RD 845 HILL/BRIDGE * CONCESSION ROAD 6 CONC RD 6 WEST OF OLD SCUGOG 640 BRIDGE t= --I I s m 0 H Page 2 of 3 STREET NAME FROM TO LENGTH REMARKS * CONCESSION ROAD 6 CONC RD 6 WEST OF SOLINA RD 320 BRIDGE * CONCESSION ROAD 6 CONC RD 6 WEST OF SOLINA RD 640 BRIDGE * CONCESSION ROAD 7 OLD SCUGOG RD HOLT RD 810 BRIDGE/HILL * CONCESSION ROAD 7 CONC RD 7 WEST OF SCUGOG ST 650 BRIDGE CONCESSION ROAD 7 OSHAWA TOWNLINE EASTERLY 900 CURVE/HILL * LANGMAID ROAD REGION RD #3 SOUTHERLY 500 CENTRE CURVE * LANGMAID ROAD REGION RD #3 SOUTHERLY 1000 EDGE CURVE * LANGMAID ROAD LANGMAID RD SOUTH OF REGION RD #3 400 JOG CONCESSION ROAD 9 CONC RD 9 EAST OF ENFEILD RD 930 CENTRE CURVE Q CONCESSION ROAD 9 CURVE # 2 EAST OF ENFEILD 320 CENTRE CURVE CONCESSION ROAD 9 CURVES 3 & 4 EAST OF ENFEILD 650 CENTRE CURVE CONCESSION ROAD 9 CURVE #5 EAST OF ENFEILD 320 CENTRE CURVE CONCESSION ROAD 9 CURVE #6 EAST OF ENFEILD 380 CENTRE CURVE OLD SCUGOG ROAD SOUTH CONC RD 9 NORTH OF CONC RD 9 530 CURVE/INTERSECTI * OLD SCUGOG ROAD SOUTH CONC RD 9 NORTH OF CONC RD 9 1060 EDGE CURVE OLD SCUGOG ROAD REGION RD #3 NORTHERLY 180 CENTRE CURVE CONCESSION ROAD 10 CONC RD 10 WEST OF ENFEILD RD 1100 CENTRE CURVES * CONCESSION ROAD 10 CONC RD 10 WEST OF ENFEILD RD 2200 EDGE CURVES * CONCESSION ROAD 10 CONC RD 10 EAST OF GRASSHOPPER PARK RD 400 CENTRE CURVE Page 3 of 3 STREET NAME FROM TO LENGTH REMARKS * CONCESSION ROAD 10 CONC RD 10 EAST OF GRASSHOPPER PARR RD 800 EDGE CURVE * MIDDLE ROAD MIDDLE RD SOUTH OF CONC RD 4 300 CENTRE CURVE/INT * MIDDLE ROAD MIDDLE RD SOUTH OF C`ONC RD 3 300 CENTRE CURVE/INT * MEARNS AVENUE MEARNS AVE NORTH OF CONC RD 4 340 CENTRE CURVE * MEARNS AVENUE MEARNS AVE NORTH OF CONC RD 4 680 * BETHESDA ROAD CONC RD 4 NORTHERLY 470 CENTRE CURVE * BETHESDA ROAD BETHESDA RD NORTH OF CONC RD 4 810 EDGE CURVE BETHESDA ROADBETHESDA RD NORTH OF CONC RD 4 380 CENTRE CURVE BETHESDA ROAD BETHESDA RD NORTH OF CONC RD 4 760 EDGE CURVE CON,C. RD, 4/ LAMBS RD. WESTERLY SOUTHERLY 350 co CENTRE CURVE CONC. RD. 4/ LAMBS RD. WESTERLY SOUTHERLY 700 EDGE CURVE DIVISION #1 DARLINGTON SUMMARY TOTAL LANE LINE PAINT 0 M TOTAL EDGE LINE PAINT 12740 M TOTAL CENTER LINE PAINT 25850 M TOTAL ESTIMATED COST $ 18,392 * WARRANTED LOCATIONS WHICH HAVE NOT RECEIVED PAVEMENT MARKINGS WARRANTED LOCATIONS FOR CENTRELINE AND EDGE LINE PAINTING Page 1 of 3 FOR DIVISION #2, BOWMANVILLE STREET NAME FROM TO LENGTH REEKS METRES LAKE ROAD REGION RD # 14 PORT DARLINGTON ROAD 425 CENTRE CURVE LAKE ROAD REGION RD # 14 PORT DARLINGTON ROAD 850 CENTRE CURVE PORT DARLINGTON ROAD LAKE RD SOUTHERLY 120 CENTRE CURVE * WEST BEACH ROAD WEST BEACH RD WEST OF PORT DARLINGTON RD 615 CENTRE CURVES * WEST BEACH ROAD WEST BEACH RD WEST OF PORT DARLINGTON RD 1230 EDGE CURVES BASELINE ROAD MARTIN RD WESTERLY 300 RESURFACED BASELINE ROAD REGION # 57 RAINES ST 2490 TRAFFIC VOLUME. L� * BASELINE ROAD HUNT ST WESTERLY 570 BRIDGE * BASELINE ROAD REGION RD # 14 WESTERLY 600 BRIDGE SIMPSON AVENUE BASELINE RD NORTHERLY 500 CENTRE CURVES SIMPSON AVENUE BASELINE RD NORTHERLY 1000 EDGE CURVES SIMPSON AVENUE KING ST SOUTHERLY 150 TRAFFIC VOLUME SIMPSON AVENUE KING ST SOUTHERLY 150 TRAFFIC VOLUME MARTIN ROAD BASELINE NORTHERLY 60 TRAFFIC VOLUME Page 2 of 3 STREET NAME FROM TO LENGTH REMARKS MARTIN ROAD PENFOUND DRIVE REGIONAL ROAD # 57 . 320 HILL/ CENTRE WAVERLY ROAD REGION ROAD # 57 ROENICK DRIVE 1180 TRAFFIC VOLUME ROENICK DRIVE WAVERLY ROAD KING ST 340 CENTRE CURVE ROENICK DRIVE WAVERLY ROAD KING STREET 680 EDGE CURVE * QUEEN STREET KING STREET TEMPERANCE' STREET 230 CENTRE CURVE QUEEN STREET BROWN STREET ST.GEORGE STREET 365 TRAFFIC VOLUME ST.GEORGE STREET KING STREET QUEEN STREET 125 TRAFFIC VOLUME FRANK STREET KING STREET SOUTHERLY 250 TRAFFIC VOLUME TEMPERANCE STREET QUEEN STREET CHURCH STREET 250 TRAFFIC VOLUME DIVISION STREET QUEEN STREET CHURCH STREET 250 TRAFFIC VOLUME N BROWN STREET KING STREET QUEEN STREET 125 TRAFFIC VOLUME O * ONTARIO STREET KING STREET REGION ROAD # 14 1000 TRAFFIC VOLUME SCUGOG STREET KING STREET REGION ROAD # 57 2900 TRAFFIC VOLUME SCUGOG STREET KING STREET NORTHERLY 80 TURNLANE SCUGOG STREET CHURCH STREET NORTHERLY 80 TURNLANE CHURCH�STREET DIVISION STREET GEORGE STREET 150 PREMARK CHURCH STREET TEMPERANCE STREET DIVISION STREET 250 LANES CHURCH STREET SCUGOG STREET REGION ROAD 14 980 TRAFFIC VOLUME ELGIN STREET FIRST STREET HORSEY STREET 315 BRIDGE/WIDTH Page 3 of 3 STREET NAME FROM TO LENGTH REMARKS ELGIN STREET FIRST STREET CONCESSION STREET 320 BRIDGE DIVISION #2, BOWMANVILLE SUMMARY TOTAL LANE LINE PAINT 560 M TOTAL EDGE LINE PAINT 5500 M TOTAL CENTRE LINE PAINT 13190 M TOTAL ESTIMATED COSTS $9,331 * WARRANTED LOCATIONS WHICH HAVE NOT RECEIVED PAVEMENT MARKINGS '7 J J...1 t WARRANTED LOCATIdNS FOR CENTRELINE AND EDGE LINE PAINTING Page 1 of 4 FOR DIVISION #3, CLARKE STREET NAME FROM TO LENGTH REMARKS METRES SUNSET BLVD RUDELL ROAD EASTERLY 370 CENTRE CURVE/IN" SUNSET BLVD CHURCH STREET WESTERLY 200 CENTRE CURVE MILL STREET TORONTO STREET SOUTHERLY 730 CENTRE CURVE MILL STREET TORONTO STREET SOUTHERLY 920 EDGE CURVE LAKESHORE ROAD PARR STREET EASTERLY 890 CENTRE CURVE * LAKESHORE ROAD PARK STREET EASTERLY 1780 EDGE CURVES LAKESHORE ROAD RILEY ROAD EASTERLY 455 CENTRE CURVE 0 * LAKESHORE ROAD RILEY ROAD EASTERLY 910 EDGE CURVES C=D _ LAKESHORE ROAD MORGANS ROAD EASTERLY 400 CENTRE CURVES * LAKESHORE ROAD JAYNES ROAD EASTERLY 345 CENTRE CURVES * LAKESHORE ROAD TRAIN TRACKS SOUTHERLY 395 CENTRE CURVE * LAKESHORE ROAD NEWTONVILLE ROAD WESTERLY 350 CENTRE CURVE * LAKESHORE ROAD NEWTONVILLE ROAD WESTERLY 700 EDGE CURVE Page 2 of 4 STREET NAME FROM TO LENGTH REMARKS * LAKESHORE ROAD LANCASTER ROAD EASTERLY 520 CENTRE CURVE * LAKESHORE ROAD PORT GRANDBY EAST/WEST OF BRIDGE 640 BRIDGE * LAKESHORE ROAD NICHOLS ROAD EASTERLY 665 CENTRE CURVE * LAKESHORE ROAD NICHOLS ROAD EASTERLY 1330 EDGE CURVE * NEWTONVILLE ROAD CONCESSION RD 1 NORTH/SOUTH 340 CENTRE CURVE CONCESSION ROAD 3 REGION ROAD #42 EASTERLY 825 CENTRE CURVE CONCESSION ROAD 3 POLLARD ROAD EASTERLY/WESTERLY 320 BRIDGE * CONCESSION ROAD 3 POLLARD ROAD EASTERLY/WESTERLY 640 BRIDGE * CONCESSION RD 5 OCHONSKI ROAD WESTERLY 300 BRIDGE * CONCESSION ROAD 5 OCHONSKI ROAD WESTERLY 600 BRIDGE * CONCESSION ROAD 5 OCKONSKI ROAD EASTERLY 470 CENTRE CURVE r. * CONCESSION ROAD 5 OCHONSKI ROAD EASTERLY 940 EDGE CURVES f� STATION STREET REGION ROAD #17 WESTERLY 570 ENBANKMENT Csi C_rJ * MORGANS ROAD CONCESSION ROAD 4 SOUTHERLY 540 BRIDGE. * MORGANS ROAD CONCESSION ROAD 4 SOUTHERLY 1080 BRIDGE * STAPLETON ROAD CONCESSION ROAD 4 SOUTHERLY 300 BRIDGE * STAPLETON ROAD CONCESSION RD 4 SOUTHERLY 600 BRIDGE * STAPLETON ROAD CONCESSION ROAD 3 SOUTH/NORTH 370 CENTRE CURVE * STAPLETON ROAD CONCESSION ROAD 3 SOUTH/NORTH 740 BRIDGE Page 3 of 4 STREET NAME FROM TO LENGTH REMARKS * REID ROAD CONCESSION RD 4 SOUTHERLY 300 BRIDGE * REID ROAD CONCESSION RD 4 SOUTHERLY 600 BRIDGE * REID ROAD CONCESSION RD 4 SOUTHERLY 300 BRIDGE * REID ROAD CONCESSION RD 4 SOUTHERLY 600 BRIDGE * REID ROAD CONCESSION RD 4 NORTHERLY 300 BRIDGE * REID ROAD CONCESSION RD 4 NORTHERLY 600 BRIDGE * CONCESSION ROAD 4 REGION ROAD 18 WESTERLY 350 BRIDGE * CONCESSION ROAD 4 REGION ROAD 18 WESTERLY 700 BRIDGE * STEWART ROAD CONCESSION RD 3 NORTHERLY 180 BRIDGE ---� * STEWART ROAD CONCESSION RD 3 NORTHERLY 360 BRIDGE * ELLIOT ROAD CONCESSION RD 3 NORTHERLY 300 BRIDGE * ELLIOT ROAD CONCESSION RD 3 NORTHERLY 600 �'= * CONCESSION ROAD 5 JEWEL ROAD PATTERSON ROAD 770 CENTRE CURVE * CONCESSION ROAD 5 WALSH ROAD EASTERLY 330 CENTRE CURVE * CONCESSION ROAD 6 JEWEL ROAD HILLEN ROAD 3625 FOG AREA * CONCESSION ROAD 6 GILMORE ROAD EAST SIDE OF CURVE 350 CENTRE CURVE * CONCESSION ROAD 6 GILMORE ROAD EAST SIDE OF CURVE 700 EDGE CURVES * THERTELL ROAD COLDSPRINGS ROAD WESTERLY 560 . CENTRE CURVES * THERTELL ROAD COLDSPRINGS ROAD WESTERLY 1120 EDGE CURVES Page 4 of 4 STREET NAME FROM TO LENGTH RENiA1tKS * DELL ROAD THERTELL ROAD SOUTHERLY 400 CENTER CURVES * DELL ROAD THERTELL ROAD SOUTHERLY 800 EDGE CURVES * CONCESSION ROAD 8 WHITE ROAD EASTERLY 400 CENTRE CURVES * CONCESSION ROAD 8 WHITE ROAD EASTERLY 800 EDGE CURVES * BEST ROAD REGION RD 4 NORTHERLY 250 CENTRE CURVES * BEST ROAD CONCESSION RD 7 NORTH/SOUTH 510 CENTRE CURVE * CONCESSION ROAD 7 LESKARD ROAD WESTERLY 435 BRIDGE * CONCESSION ROAD 7 LESKARD ROAD WESTERLY 620 BRIDGE 'v7 CONCESSION ROAD 8 TOWNLINE ROAD EASTERLY 825 CENTRE CURVE * CONCESSION ROAD 8 TOWNLINE ROAD EASTERLY 1700 EDGE CURVES * CONCESSION ROAD 8 LESKARD ROAD WESTERLY 300 BRIDGE CJ1 * CONCESSION ROAD 8 LESKARD ROAD, WESTERLY 400 BRIDGE * LESKARD ROAD SKELDING ROAD SOUTH/EAST 320 CENTRE CURVE DIVISION # 3 CLARKE SUMMARY TOTAL LANE LINE PAINT 0 M TOTALEDGE LINE PAINT 21050 M TOTAL CENTRE LINE PAINT 19590 M TOTAL ESTIMATED COST $20,398 * WARRANTED LOCATIONS WHICH HAVE NOT RECEIVED PAVEMENT MARKINGS SUMMARY LINE MARRING SCHEDULES TOTAL WARRANTED LOCATIONS TO BE CONTRACTED OUT Division #1 (Former Darlington) $18,392 Division #2 (Former Bowmanville) 9,331 Division #3 (Former Clarke) 20,398 SUBTOTAL $48,121 PAINTING APPLIED BY TOWN STAFF 10,000 TOTAL 58,121 ROUNDED 58 000 i 1026