HomeMy WebLinkAboutWD-59-95 REPORT #5 Unfinished Business THE CORPORATION OF THE MUNICIPALITY OF CLARIWGTON REPORT Meeting: COUNCIL File# Date: DECEMBER 11, 1995 Res. #C�_) By-Law# Report#:__WD_-_9_q_-_q5_ File #: _F_JA)_02_ Subject: HAMPTON OPERATIONS CENTRE, BUILDING RENOVATIONS, 1995 Recommendations: It is respectfully recommended to Council the following: 1. THAT Report WD-59-95 be received for information. REPORT 1.0 ATTACHMENTS No. 1: 1995 Capital Budget and Four Year Forecast, Page 208B No. 2 : 1995 Capital Budget and Four Year Forecast, Page 55A No. 3: Information Report WD-56-95, Garage Doors (December 4, 1995) No. 4: Tender Report TR-49-95 (June 26, 1995) No. 5: Memorandum from Bill Stockwell to Joseph Caruana, dated April 25, 1995, "Public Works Depot Expansion Project" No. 6 : Chronological List and Attachments Regarding Garage Doors No. 7 : Hollinger Construction Credit/Extras Schedule 2.0 BACKGROUND 2 . 1 This information report is being provided to advise Council of the successful completion of the Hampton Operations Centre renovations . 1201 REPORT NO. : WD-59-95 PAGE 2 2 .2 At a meeting held on December 4, 1995, the Council of the Municipality of Clarington passed the following Resolution: "THAT Report WD-56-95 be received for information; and THAT staff review and report on the total cost of the renovations, including budgeting and actual costs . " 3.0 REVIEW AND COMMENT 3. 1 1995 Capital Budget and Four Year Forecast The 1995 Capital Budget and Four Year Forecast, as approved by Council, included Page 208B (Attachment No. 1) for building renovations ($285,000) and Page 55A (Attachment No. 2) for furniture ($15,000) . 3 .2 Recommendation of Chief Administrative Officer A memorandum dated April 25, 1995 (Attachment No. 5) , from Bill Stockwell, Chief Administrative Officer, to Joseph Caruana, Director of Community Services, recommended that Don Patterson, Manager of Operations, supervise the renovations because of his experience and familiarity with the requirements of the expansion. i 3. 3 Tenders for Hampton Works Depot Renovations Treasury Department Report TR-49-95 for Tender CL95-28, Hampton Works Operations Centre Renovations, was approved by Council as Resolution #C-491-95 on June 26, 1995 . Page 2 of the report includes the following paragraph: "Note, although this project has been identified in the Community Services Capital 1202 REPORT NO. : WD-59-95 PAGE 3 Budget, the Public Works Department will oversee the required renovations . " 3 .4 Garage Doors The three ( 3) garage doors, originally approved for the Orono Depot were installed at the Hampton Operations Centre, as detailed in Information Report WD-56-95. The change and cost benefit was discussed with Nancy Taylor, Deputy Treasurer, on August 31, 1995, and the Purchasing Division issued Purchase Order #015911 with the doors to be delivered and installed in Hampton on September 7, 1995 . Recognizing that Council was in Summer Recess at this time, our department feels that the Public Works and Treasury Departments took appropriate action regarding this budget reallocation. A chronological list of events regarding the overhead garage doors is shown as Attachment No. 6 . 3 .5 Cost Analysis A cost analysis of the renovations is as follows: Budget Item Estimate Actual Office Structural Renovations 165,000 141,211 Electrical 8,000 21,092 Consulting 20,000 20,000 Computer Wiring 6,000 7,937 Telephone Upgrade 800 2,589 Additional Metal Cladding 50,000 54,485 Three (3) Insulated Garage Doors 10,000 9,524 Contingency Items 25,200 Radio Upgrade 4,849 Blinds 1,399 Paint, etcetera 923 TOTAL PROJECT RENOVATIONS/DOORS 285,000 264,009 TOTAL HAMPTON FURNITURE 15, 000 14,894 TOTAL AMOUNT UNDER BUDGET 21,097 I 1203 REPORT NO. : WD-59-95 PAGE 4 3.6 Actual Expenses The actual expenses incurred were below the budgeted amount despite having to repair some unforeseen items as well as the inclusion of other upgrades which were considered cost effective to complete during construction. These items were listed from Hollinger Construction in their correspondence dated October 1, 1995 (Attachment No. 7) . 3. 7 Unexpected Major Roof Repair The roof of the Hampton Operations Centre had never been replaced since its original construction, approximately 33 years ago. During renovations, it was noticed that the roof had been leaking for some time and had never been detected by the Building Maintenance Department. The damage to the roof could not be repaired and resulted in replacement with a new roof at a cost of $18,645. This additional expenditure still did not result in the project going over budget. 3 . 8 Electrical Upgrades The renovation budget only included the basic wiring of the building, which was over budget by $2, 135. During construction, the electrical service required upgrading to 200 amps, and additional fixtures were purchased at a cost of $10, 957, for a total electrical over expenditure of $13,092 . 3 .9 Cleaning and Painting of Adjacent Garage Bays The three (3) garage bays adjacent to the new office area were degreased, cleaned and painted. This cosmetic work blended i the office renovations with the older portion of the garage to provide a finished appearance. I 1204 REPORT NO. : WD-59-95 PAGE 5 3 . 10 Computer Outlets The original budget provided for one ( 1) computer outlet within each office. It was agreed that the installation of two (2) computer outlets would be beneficial for future expansion. This would then accommodate new technology and any future relocation of equipment without added expense. 3. 11 Telephone/Paging/Radio Communication Systems In addition to the budgeted moving of the telephone lines, an additional two (2) telephone lines were added. These additional lines were required to better serve the public with the "roll over" feature when a line is busy. The additional lines also improve communications with the Municipal Administrative Centre. The telephone paging and radio systems also required upgrades. The upgrades joined into the existing pager system, with an amplifier, combined with additional speakers in the garage, and desk sets in the new offices . Respectfully submitted, Reviewed by, r1 ' Stephen A. Vokes, P.Eng. W. H. Stockwell Director of Public Works Chief Administrative Officer RDB*SAV*ph December 8, 1995 1205 T H E C O R P O R A T I O N O F T H E M U N I C I P A L I T Y O F C L A R I N G T 0 N 1995 CAPITAL BUDGET AND FOUR YEAR FORECAST BUILDING MAINTENANCE DEPARTMENT: COMMUNITY SERVICES Page reference: 13 1995 PROJECT / LOCATION MAP PROJECT COST/FINANCING Account #: 7029-00000-0501 COSTS Project Name: HAMPTON OPERATIONS CENTRE BUILDING RENOVATIONS RENOVATIONS 285,000 Location: 2320 TAUNTON ROAD HAMPTON Description/Details : TO PROVIDE FUNDS FOR BUILDING RENOVATIONS - OFFICES AT HAMPTON DEPOT. METAL CLADDING C/W INSULATION, SUPPLY AND INSTALL ON EXTERIOR OF HAMPTON WORKS DEPOT. ( 3) -GARAGE DOORS, SUPPLY AND INSTALL AT ORONO DEPOT. TOTAL COSTS: $ 285,000 FINANCING RESERVES P/W EQUIPMENT RES 285,000 !v Z� a CD H CT y � n H z 0 TOTAL FINANCING: $ 285,000 T H E C O R P O R A T I O N O F T H E M U N I C I P A L I T Y O F C L A R I N G T 0 N 1995 CAPITAL BUDGET AND FOUR YEAR FORECAST EQUIPMENT DEPARTMENT: PUBLIC WORKS Page reference: 5 1995 PROJECT / LOCATION MAP PROJECT COST/FINANCING Account #: 7203-00000-0506 COSTS Project Name: FURNITURE OPERATIONS CENTRE FURNITURE 15, 000 Location: 2320 TAUNTON ROAD HAMPTON Description/Details : TO PROVIDE FUNDS FOR OFFICE FURNISHINGS - ( 3) NEW OFFICES, AND MEETING ROOM AT HAMPTON DEPOT. TOTAL COSTS: $ 15,000 FINANCING RESERVES P/W EQUIPMENT RES 15,000 U H C�D Ul 9 U In 7 +-3 Z O N TOTAL FINANCING: $ 15,000 THE CORPORATION OF THE MUNICIPALITY OF' CLARINGTON REPORT Meeting: . GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# Date: DECEMBER 41 1995 Res.# Report#: WD-56-g File#: F- 10-09 By-Law# Subject: HAMPTON OPERATIONS CENTRE, BUILDING RENOVATIONS, REALLOCATION OF GARAGE DOOR FUNDING FROM ORONO TO HAMPTON Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-56-95 be received for information; REPORT 1.0 ATTACHMENTS No. 1: Page 208B of the 1995 Capital Budget and Four Year Forecast 2.0 BACKGROUND 2.1 The 1995 Capital Budget and Four Year Forecast, as approved .by Council, included Page 208E (Attachment No. 1) . The amount of $285,000 was budgeted for building renovations at the Hampton Operations Centre and to have three (3) garage doors replaced. at the Orono Works Depot. Staff had originally scheduled the garage doors in Orono to be replaced during 1995 and then replace the doors in Hampton during 1996 . 3.0 REVIEW AND COMMENT 3. 1 During the renovations at Hampton, Public Works staff determined that the garage doors in Hampton were in very poor ATTACHMENT N0. 3 WD-59-95 1208 REPORT NO. :. WD-56-95 PAGE 2 condition. A number of benefits existed if replacement of-the three (3) garage doors was reallocated from Orono to Hampton: i) With the addition of the new doors and metal cladding along all exterior walls, the Hampton location would be completed aesthetically; and ii) The insulated doors would complete the Hampton Yard's energy efficiency efforts and reduce heating costs. 3.2 The installation of the three (3) garage doors in Hampton was awarded to Rivett Architectural Hardware Limited and completed in September of 1995 at a cost of $9,524. 3.3 The request to replace three (3) garage doors at the Orono Works Depot will be included, for Council's consideration, in the 1996 Capital Budget and Four Year Forecast. 3.4 Staff from Community Services, who maintain the Municipality's. buildings, support the recommendations of this report.. Respectfully submitted, Reviewed by, Stephen A. Vokes, P.Eng. W. H. Stockwell Director of Public Works Chief Administrative Officer RDB*ph November 29, 1995' 1209 T H E C O R P O R A T I O N O F T H E M U N I C I P A L I T Y O F C L A R I N G T 0 N 1995 CAPITAL BUDGET AND FOUR YEAR FORECAST BUILDING MAINTENANCE DEPARTMENT: COMMUNITY SERVICES Page reference: 13* 1995 PROJECT / LOCATION MAP PROJECT COST/FINANCING Account #: 7029-00000-0501 COSTS Project Name: HAMPTON OPERATIONS CENTRE BUILDING RENOVATIONS RENOVATIONS 285,000 Location: ,2320 TAUNTON ROAD HAMPTON Description/Details : TO PROVIDE FUNDS FOR BUILDING RENOVATIONS - OFFICES AT HAMPTON DEPOT. METAL CLADDING C/W INSULATION, SUPPLY AND INSTALL ON EXTERIOR OF HAMPTON WORKS DEPOT. (3) GARAGE DOORS, SUPPLY AND INSTALL AT ORONO DEPOT. TOTAL COSTS: $ 285,000 FINANCING RESERVES P/W EQUIPMENT RES 285,00.0 (V a O 1 N LA 1 tD .z H z o TOTAL FINANCING: $ 285,000 F�}'t7F�T #3 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: COUNCIL File # Date: MONDAY, JUNE• 26, 1995 Res. # Report#: TR-4 9-95 File#: By-Law# Subject: TENDER CL95-28, HAMPTON PUBLIC WORKS DEPOT - RENOVATIONS Recommendations: It is respectfully recommended to Council the following: 1 .. THAT Report TR-49-95 be received; 2 . THAT Hollinger Construction Ltd. , Pickering, with a total bid price of $128,400 . 00 + G.S.T. , be awarded the contract for the Hampton Public Works Depot, Renovations; 3 . THAT the total estimated funds required in an approximate amount of $174, 064 . 00 ($128,400 . 00 contract + $20, 000 . 00 consulting + $6, 000 . 00 computer wiring + $800 .00 moving of telephones + $8, 000 . 00 electrical + G.S.T. ) be drawn from the Community Services Capital Budget Account #7029-00000-0501. BACKGROUND AND COMMENT: A tender was publicly advertised and issued with the following bids being submitted: BIDDER TOTAL BID AMOUNT Hollinger Construction Ltd. $128, 400 . 00 Pickering, Ontario H.A. Dickison Contracting $139, 942 . 79 Oshawa, Ontario Peak Engineering & Const . Ltd. $142, 900 . 00 Brighton, Ontario Jeffrey G. Wallans Const . Ltd. $163, 400 . 00 Brighton, Ontario Snyder Construction $174, 700 . 00 Whitby, Ontario ATTACHMENT N0. 4 WD-59-95 1211 REPORT NO. : TR-49-95 PAGE 2 TENDER CL95-28 The required funds in an approximate amount of $174, 064 . 00 ($128 , 400. 00 contract + $20, 000 . 00 consulting + $6, 000 . 00 computer wiring + $800 . 00 moving of telephones + $8, 000 .00 electrical + G.S.T. ) will be drawn from the Community Services approved 1995 Capital Budget Account ##7029-00000-0501 as identified in the 1995 Capital Budget, Page 208B, and are within the $285, 000 . 00 allocation. Note, although this project has been identified in the Community Services Capital Budget, the Public Works Department will oversee the required renovations . Not included as part of this tender but provided for in the $285, 000 . 00 budget allocation, is metal cladding to the exterior of the Hampton Depot and three garage doors required at the Orono Public Works Depot . The associated cost for these two items is estimated to be $60, 000 . 00 and will be tendered under a separate contract. Although the subject firm has not previously provided service for the Municipality of Clarington, they have provided satisfactory service for the Durham Board of Education and the Regional Municipality of Durham. See the attached letter from Totten Sims Hubicki Associates marked Schedule I After further review and analysis of the bids by Purchasing, Community Services, Public Works and the Consultant, Totten Sims Hubicki Associates, it is recommended that Hollinger Construction Ltd. , be recommended for the contract award for the Hampton Public Works Depot Renovations . I I The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to any specifications, etc. , should be referred to the Director of Public Works . 1212 j f I n REPORT NO. : TR-49-95 PAGE 3 TENDER CL95-28 Respec lly submitted, Reviewed by, r' Mari rano, H.BSc . ,AMCT. , W.H. Stockwell, Treasur Chief Administrative Officer Jo Caruana, Di' for of Community Services tephen A. Vokes, P.Eng. Director of Public Works MM*LB*ld I X21 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON Memorandum To: ' Joseph Caruana, Director of Community Services From: Date: Bill Stockwell, Chief Administrative Officer ' Subject: April 25, 1995 Public Works Depot Expansion Project I have considered the extent of the workload on your department with the approval of the 1995 Capital Budget, and the reduced human resources support available to you. In an effort to alleviate some of the pressure which would otherwise be absorbed by your Facilities Superintendent, I am recommending that the Public Works Depot expansion be carried out under the supervision of Don Patterson, Manager of Operations. I believe he has experience in this capacity, and he is also familiar with the requirements related to the expansion. I would also recommend that Mr. Patterson initial the progress certificates for concurrence with the work that has been completed, but you will be the final approval signature on the payment of any certificates or invoices. I will be asking Mr. Patterson to take the initial steps in getting the project started. If you have any major concerns with the above, please advise me immediately. Thank you 4-d� ------ ---- -- W.H. Stockwell, Chief Administrative Officer I cc: M. Marano, Treasurer D. Patterson, Manager of Operations ✓ ATTACHMENT N0. 5 WD-59-95 I i 1214 CHRONOLOGICAL LIST OF EVENTS REGARDING OVERHEAD DOORS August 16: Purchase requisition for Rivett Architectural Hardware Ltd. , to supply and install three (3) insulated overhead doors for Hampton, was sent to the Purchasing Department. August 23: Purchasing voiced concerns that the doors in the budget were for Orono and not Hampton. August 31: The Deputy Treasurer was at the Hampton and Orono Depots responding to the auditor's suggestion that the fuel dispensing system be reviewed. At that time, the Manager of Operations reviewed with the Deputy Treasurer the Purchase Requisition for the reallocation to Hampton of the three ( 3) doors previously approved for Orono. The Manager of Operations explained that, since Council was in summer recess, and since the doors at both locations were identical, savings were to be realized by having the doors installed at Hampton as part of the renovations. It would not make economic sense to finish the cladding around the existing door frames, only to be redone again the following year at the time the doors were replaced. The Deputy Treasurer suggested that an information memo be sent to either the Treasurer or Council. September 7: Purchase Order #015911 was issued and confirmed to Rivett Architectural Hardware Ltd. , by the Purchasing Manager, to supply and install three (3) doors at the Hampton Operations Centre. I November 10: The Facility Superintendent was advised of the above arrangements, by E-Mail, along with the 1996 Budget requests . December 4: Information Report to Council. I I ATTACHMENT N0. 6 WD-59-95 i I 1215 tE CORPORATION OF THE MUNICIPALITY OF CLARINGTON PURCHASE REQUISITION P.O.NUMBER_ _ DATED VENDOR pU6 � SHIPTO SHIP VIA F.O.B. DEPARTMENT ACCT.NO. ��-Y Wasp/ TERMS I QUANTITY DESCRIPTION(SPECIFICATIONS,MODEL NO.,SIZE,COLOUR,ETC.) UNIT PRICE EXTENSIONS Auto Glorr UXBRIDGE, Douglas Rd. &Hwy. 47 -(905) 852-5382 BOWMANVILLE, Church&Silver-(905) 623-4225 PORT PERRY-(905) 985-0738 OSHAWA-(905) 571-7852 WHITBY, Dundas St.-(905) 434-9655 Out of Town Call Collect •3� �� /��� ( /6t REQUISITI NED BY ALITHORIZED BY IN A �..�. N F D E S T H Y I z " E G L D - A S tS S Mobile Service 1 1 h tI GENERAL PURCHASE ORDER CORPORATION OF THE MUNICIP,Q►LITY OF,CLARINGTONk P.O.NUMBER 40 TEMPERANCE STREET' a BOWMANVILLE, ONTARIO 015911 TELEPHONE (905)623-3379 FAX: (905) 623-4169ORDER DATE VENDOR CODE SHIP;T6R �1 04 1 8160 tR RIVETT ARCHITI`CTUt411- HARDWARE Mi.Anicipal.ity,.of GXarlingt*orl Ili INDUSTRIAL DRIVE, Publ. l.c_W6rl(,% Depot UNIT 41 i'.'';.�; x-1320 Taunton . head WHITBYl- ONTARIO' Hampton, Ontario TO BE USED FOR REO.DATE DEPT. REQUESTED BY APPROVED BY 95 09,-,08, 600 1 BILL WERRY _ DON PATTERSON Z_ALD0. MA I N i, QUANTITY DESCRIPTION UNIT PRICE TOTAL AMOUNT du- POLY'AND INSTALL 1 LOQ' OF 3, 161 16' X 14' T175 STL--EL INSULATE=D 9524. 00 95 0(11 OVER14EAD DOOMS, .a" TRACK, ANGLE MOUNT, SOILED SHA{=T,. ACRYLIC WINDOWS TO REMOVE .OLD DOORS '(41,4D DISPOSE: CONTACT BILL'. WERRY TO CON[ IRM 1,3171- GIST AMOUNT CONFIRMATION ALEX SSET)TE:MBE-'R 71 199'5 70 "i0000>7�1 501 9, 524. 6'0 7200000001001 68 � r 4 1 J i I COUNCIL APPROVAL: r F i 'I1 1',-A s TE ;'OkJR DU%hIVERY L)F-1,T 1:NA T 10N 1`IE::T 3FD t?AY`:•_, NOTES: 1) THE VENDOR WILL SUPPLY AND DELIVER GOODS AND/OR SERVICES TO THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON IN ACCORDANCE WITH �' { TERMS AND CONDITIONS ON BOTH SIDES HEREOF. 217 2) NO CHARGES WILL BE ACCEPTED FOR PACKING,CRATING,OR CARTAGE UNLESS OTHERWISE SPECIFIED. PURCHASING AND SUPPLY AGENT j SEND INVOICES IN DUPLICATE TO: THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON,TRFAPD"Y-ACCOUNTS I PAYABLE, 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO LIC 3A6 I I I M CONST. LTD. PHONE NO. 905 619 0628 P03 ;T �i Hollinger P.O. Box 356, Pickering, Ont. L1 V 2R6 CONSTRUCTION LIMITED Tel. 686-1544 Fax 619-0628 October 1 , 1995 Credits/Extras Schedule COPY Credits 1 . Cash allowance $20,000.00 2. Counter door & associated work 4,036.00 3. Doors & frame deleted 420.00 4. Delete east side steel minus mat'1 left 6,325.00 $30,781 . 10 Extras 1. Steel siding-west side $ 8,450.00 --east side 7,645.00 2. Carpet in room 204 805.00 3. Level floor in room 104 1,393. 80 4. Additional demolition, studing, insulate, -------- drywall and painting 2, 236.75 5. Chairail in room 204 631 .99 6. Storage cabinet in room 202 567. 24 7. Roofing as per drawing 18,645.00 8. Rivett Hardware a) hardware. as per sr'hPduitz 2,750.00 b) computer room lock 339.00 c) closer & repair to frame # 1 128.00 $43,591 .78 Net Pxtr.as Difference $12, 810. 68 ATTACHMENT NO. 7 WD-59-95 CONTRACTORS SINCE 1947 1218 i