Loading...
HomeMy WebLinkAboutWD-16-93 THE CORPORATION OF THE TOWN OF NEWCASTLE REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File # J1 9 Res, #,L- Date: APRIL 5, 1993 �Ic)�1 _ � By-Law# Report#: File#: -RC-31-11A, B. 0 1. 0 9 .0 9 Subject: CONTRACT NW 92-28, ADDITIONAL WORK ON KING STREET EAST BETWEEN KEARNS AVENUE AND HAINES ROAD, BOWMANVILLE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-16-93 be received; 2 . THAT the quotation from Novacor Construction Company Ltd. for additional work on King Street East in the amount of $88,425 .50 be accepted; 3 . THAT the additional cost of $4,478 . 10 over and above the funds provided for in the approved 1993 Budget be obtained from the Development Charge Fund; and 4 . THAT the attached By-law (Attachment No. 3) authorizing a purchase order to be issued to Novacor Construction Ltd. be approved. REPORT 1.0 ATTACHMENTS No. 1: Correspondence dated March 12, 1993, from Totten Sims Hubicki Associates No. 2 : Project Detail Sheet from the approved 1993 Capital Budget No. 3: Proposed By-law REPORT NO. : WD-16-93 PAGE 2 2 . 0 BACKGROUND AND COMMENT 2 . 1 In 1992, the Town entered into a contract with Novacor Construction Company Ltd. for the reconstruction of King Street East from Simpson Avenue to the West Branch of the Soper Creek and Mearns Avenue from King Street East to Orchard Park Drive. The contract is a two year contract, with completion in 1993. 2 .2 At a meeting held on March 23, 1992, Council passed Resolution #C-118-92 and #C-119-92 as follows: "THAT the correspondence received from Rev. Jake Binnema, regarding several recommendations contained in the CAUSE Report, be received for information and that it be referred to the Director of Public Works for review and preparation of a report back to the General Purpose and Administration Committee regarding the possibility of the installation of a sidewalk and/or path from the Bowmanville Mall to the Marantha Christian Reformed Church. " 2 .3 The Town's contract for the reconstruction of King Street East terminated 95 meters west of the East Branch of Soper Creek. The Ministry of Transportation's contract for the .reconstruction of Highway 2 started at Haines Street and ended at the west limit of Newcastle Village. This left a section of King Street/Highway 2, which was not considered either by the Town or the Ministry of Transportation for reconstruction or resurfacing. 2 .4 During the discussion with the Ministry of Transportation regarding the construction of a sidewalk on this section of road (as requested by Reverend Jake Binnema) , the Ministry asked the Town to extend our contract with Novacor Construction Company Ltd. to resurface this section of roadway. The items required for the construction of the sidewalk and for the resurfacing of King Street East are IJ90 REPORT NO. : WD-16-93 PAGE 3 listed on Attachment No. 1. The Town's share of this work is $48,278 . 10. 2 .5 The prices quoted are the same as those in the original contract, where applicable. The prices for the other items were negotiated. Council may be concerned that we are not in a very good position to negotiate prices with the contractor. All contracts contain a provision to carry out extra work on a time and material basis for those items for which a reasonable price cannot be negotiated. 2 . 6 At the time of preparing the 1993 Budget, the estimated cost of the project was $88,000 with a cost to the Town of $43,800. The Town's share of the cost, based on prices from the contractor, is $48,278. 10, a difference of $4,478. 10 . It is recommended that the additional cost be financed from the Development Charge Fund. 2 . 7 This report has been reviewed with the Treasurer, who concurs with the recommendations. Respectfully submitted, Recommended for presentation to the Committee, `Walter A. Evans, P.Eng. , Lawrence E. Kot `e, f, Director of Public Works Chief Administrative Officer WAE*ph March 25, 1993 0 . I. . 1A KING STREET EAST, P.O. BOX 398, COBOURG ONTARIO, CANADA K9A 41-1 totten sims hubicki associates (416)372-2121 FAX(416)372-3621 Mr. W.A. Evans, P.Eng., Director of Public Works Corporation of the Town of Newcastle Municipal Building, 40 Temperance Street BOWMANVILLE, Ontario LiC 3A6 March 12, 1993 Dear Sir: Re: Contract N«'92-28; King Street and Mearns Avenue, Bowmanville, Town of Newcastle Further to our letter to Mr. Patterson of March 9th, we are now enclosing one copy of the Cost Apportionment for the above additional work, based on the Contractor's bid prices. With our letter to you dated November 24, 1992, we provided estimated costs for this work and we have tabulated below, both estimated totals as then provided, and those based on the Contractor's pricing, to include GST and all other allowances: Based on Original Estimate Contractor's Pricing Total Project Cost $88,000.00 $88,425.50 MTO Share 44,189.46 40,147.40 Total Town Cost 43,810.54 48,278.10 We will be pleased to receive the Town's instructions before proceeding further with this work. We have already received written approval from the Region of Durham on the sanitary and water works, and construction has commenced on the watermain. By copy of this letter and enclosures to Mr. Conforti, we also request his confirmation on connecting link subsidy eligibility, on the basis of approval by the Town. Yours very truly, totten sims hubicki associates H.D. Glennie HDG/ag sirzFJV2snan9ic ATTACHMENT NO. 1 encl. WD-16=93 PC: Mr. D. Patterson, Manager of Operations. Mr. F. Conforti, MTO, Downsview ENGINEERS ARCHITECTS AND PLANNERS ( l) CONTRACT No NW 92-28 ADDITIONAL WORK BETWEEN MEARNS AVE. AND HAINES ROAD PROJ. i12-10229-01 MARCH 11,1993 CONNECTING LINK in the TOWN OF NEWCASTLE being _KING STREET (HWY. No 2) from AND MEARNS AVENUE MEARNS AVENUE TO HAINES ROAD ESTIMATED SHAREABLE SHAREABLE CHARGEABLE TO CHARGEABLE TO DETAILS OF CONSTRUCTION GROSS COST UNDER EXPLANATION UNDER PART X CORPORATION REGION OF C.L. AGREEMENT OF THE ACT _ DURHAM -- — -- --- — SECTION '1' ROADWORKS --- — —- -- 1. Earth Excavation (Grading) $234.30 33 m3 @ $7.10 $234.30 FOR SIDEWALK 2. Earth Borrow $520.00 104 m3 @ $5.00 $520.00 FOR SIDEWALK 3• Hot Mix HL-1 $5,490.00 $5,490.00 120 t @ $45.75 4. Hot Mix HL-4 $1,465.80 42 t @ $34.90 $1,465.80 5. Granular 'A' $277.50 $277.50 30 t @ $9.25 6. Concrete Sidewalk $10,939.05 333 m2 @ $32.85 $10,939.05 7• Concrete Curb and Gutter $3,780.00 $3,780.00 All Types 126 m @ $30.00 8. 450mm CSP Storm Sewers, incl. $6,825.00 $6,825.00 Excavation, Type 2 Bedding and Native Backfill 39 m @ $175.00 9. 600mm x 600mm Precast $2,600.00 $2,600.00 Catbasins, Type 'A' (OPSD - 705.02 mod.) 2 ea. @ $1,300.00 10. Removal of Asphalt Pavement $228.00 228 m2 @ $1.00 $228.00 FOR SIDEWALK 11. Removal of Asphalt Pavement $102.50 $102.50 Partial Depth 50 m2 @ $2.05 CONTRACT No. NW 92-28 ADDITIONAL WORK BETWEEN MEARNS AVE. AND HAINES ROAD PRO.T- #12-10229-01 MARCH 11,1993 CONNECTING LINK in the TOWN OF NEWCASTLE being KING STREET (HWY. No. 2) from MEARNS AVENUE TO HAINES ROAD AND MEARNS AVENUE ESTIMATED SHAREABLE SHAREABLE CHARGEABLE TO CHARGEABLE TO EXPLANATION DETAILS OF CONSTRUCTION GROSS COST UNDER UNDER PART X CORPORATION REGION OF C.L. AGREEMENT OF THE ACT DURHAM 12. Removal of Concrete Curb $25.00 $25.00 and Gutter 10 m @ $2.50 13. Removal of Pipe Culvert $80.00 $80.00 16 m @ $5.00 14. Removal of Steel Beam Guide $155.00 Rail $155.00 FOR SIDEWALK 31 m @ $5.00 15. Riprap with Geotextile $92.50 $92.50 5 m2 @ $18.50 16. Steel Beam Guide Rail $1,922.00 31 m @ $62.00 $1,922.00 FOR SIDEWALK 17. Placing Topsoil (stockpiled) $200.00 20 m3 @ $10.00 $200.00 FOR SIDEWALK 18. Sodding (Nursery, Unstaked) $465.00 300 m2 @ $1.55 $465.00 FOR SIDEWALK 19. Water for Sod $55.00 10 m3 @ $5.50 $55.00 FOR SIDEWALK SUB-TOTAL SECTION 1 $35,456.651 $20,738.30 $0.00 $14,718.35 $0.00 CONTRACT No. NW 92-28 ADDITIONAL WORK BETWEEN PRAT. #12-10229-01 MEARNS AVE. AND HAINES ROAD MARCH 11,1993 CONNECTING LINK in the TOWN OF NEWCASTLE being KING STREET (HWY. No 21 from MEARNS AVENUE TO HAINES ROAD AND MEARNS AVENUE DETAILS OF CONSTRUCTION ESTIMATED SHAREABLE SHAREABLE CHARGEABLE TO CHARGEABLE TO GROSS COST UNDER UNDER PA EXPLANATION PART X CORPORATION REGION OF C.L. SECTION 12' AGREEMENT' OF THE ACT DURHAM SANITARY SEWERS AND APPURTENANCES 2.01.00 Pipe 2.01.01 MH # 11-F to MH # 11-G 83.5 m @ $148.00 $12.358.00 $12,358.00 2.01.02 MH # 11-G to MH # 11-H $13,172.00 89 m @ $148.00 $13,172.00 2.03.00 Service Connections 2.03.01 100mm Diameter (2) $1,890.00 (� 14 m @ $135.00 $1,890.00 2.04.00 Manholes 2_04.07 M-H_ #11-G LUMPSUM $2,800.00 $2,800.00 $2,800.00 2.04.08 H.H. #11-H LUMPSUM $2,800.00 $2,800.00 $2,800.00 2.04.09 M.H. #11.F1 LUMPSUM $2,800.00 $2x800.00 $2,800.00 SUB-TOTAL SECTION 2 $35,820.00 $35,820.00 CONTRACT No. NW 92-28 ADDITIONAL WORK BETWEEN MEARNS AVE. AND HAINES ROAD PROJ. #12-10229-01 MARCH 11,1993 CONNECTING LINK in the TOWN OF NEWCASTLE being KING STREET (HWY. No. 2) from MEARNS AVENUE TO HAINES ROAD AND MEARNS AVENUE ESTIMATED SHAREA REGION OF SHAREABLE CHARGEABLE TO CHARGEABLE TO DETAILS OF CONSTRUCTION GROSS COST UNDER UNDER PART X CORPORATION EXPLANATION C.L. AGREEMENT OF THE ACT DURHAM SECTION '3' WATERMAINS AND APPURTENANCES 3.01.00 Pipe 3.01.03 200 mm PVC $50,115.00 257 m @ $195.00 $50,115.00 3.02.00 Extra over Item 3.01.00 3.02.03 Abandon Pipe Plugs $100.00 2 ea. @ $50.00 $100.00 -- 3.02.04 Remove Exist. Valve Box $50.00 lea. @ $50.00 $50.00 3.02.08 Install Plugs on $550.00 existing watermain $550.00 2 ea. @ $275.00 3.03.00 Valves c/w Valve Boxes 3.03.03 200 mm Gate $1,400.00 2 •a• @ $700.00 $1,400.00 3.04.00 Hydrants 3.04.02 New Hydrant with $6,200.00 Pump Nozzle - $6,200.00 2 ea. @ $3,100.00 3.04.05 Remove and Salvage $350.00 Existing Hydrant $350.00 1 ea. @ $350.00 3.05.00 Service Connections 3.05.01 19 mm Main Stop $1,100.00 - $1,100.00 PROD. #12-10229-01 CONTRACT No. NW 92-28 ADDITIONAL WORK BETWEEN MEARNS AVE. AND HAINES ROAD MARCH 11,1993 CONNECTING LINK in the TOWN OF NEWCASTLE being KING STREET (HWY. No. 2) from MEARNS AVENUE TO HAINES ROAD AND MEARNS AVENUE ESTIMATED SHAREABLE SHAREABLE CHARGEABLE TO CHARGEABLE TO EXPLANATION DETAILS OF CONSTRUCTION GROSS COST UNDER UNDER PART X CORPORATION REGION OF C.L. AGREEMENT OF THE ACT DURHAM 3.05.05 50 mm Main Stop $685.00 $685.00 lea. @ $685.00 3.05.06 19 mm Curb Stop and Box $370.00 $370.00 2 ea. @ $185.00 3.05.07 25 mm Curb Stop and Box $250.00 $250.00 lea. @ $250.00 3.05.10 50 mm Curb Stop and Box $300.00 $300.00 1 m @ $300.00 3.05.12 19 mm Copper Pipe $1,480.00 $1,480.00 74 m @ $20.00 3.05.15 50 mm Copper Pipe $710.00 $710.00 10 m @ $71.00 3.05.22 Connection to Existing $250.00 $250.00 Water Service 1 ea. @ $250.00 3.05.23 Remove 25mm Curb Stop $50.00 $50.00 lea. @ $50.00 3.05.24 Remove 50mm Curb Stop $50.00 $50.00 1 ea. @ $50.00 SUB-TOTAL SECTION 3 $64,010.00 $64,010.00 CONTRACT No. NW 92-28 ADDITIONAL WORK BETWEEN MEARNS AVE. AND HAINES ROAD PROJ. #12-10229-01 MARCH 11,1993 CONNECTING LINK in the TOWN OF NEWCASTLE being KING STREET (HWY. No. 2) from MEARNS AVENUE TO HAINES ROAD AND MEARNS AVENUE ESTIMATED SHAREABLE SHAREABLE CHARGEABLE TO CHARGEABLE TO DETAILS OF CONSTRUCTION GROSS COST UNDER UNDER PART X CORPORATION REGION OF EXPLANATION C.L. AGREEMENT OF THE ACT DURHAM SECTION '7.1' STRUCTURES, SOPER CREEK EAST BRIDGE WIDENING 1. Removal of Asphalt from $165.00 $165.00 Concrete Surface 11 m2 @ $15.00 2. Removal and Disposal of $3,500.00 $3,500.00 Existing Sturcture FOR SIDEWALK LUMPSUM $3,500.00 3. Scarifying $900.00 $900.00 18 m2 @ $50.00 FOR SIDEWALK 4. Removal of Concrete $1,000.00 $1,000.00 2 mz a $soo_oo FOR SIDEWALK 5. Sandblasting $760.00 $760.00 38 m2 @ $20.00 6- Patch Repair South Parapet Wall $5,400.00 $5,400.00 40 1 @ $135.00 7. Modifications of Deck Drains $300.00 $300.00 3 ea @ $100.00 FOR SIDEWALK 8. Deck Drains $1,200.00 2 ea @ $600.00 $1,200.00 FOR SIDEWALK 9. Dowels into Concrete a)Size 15 $551.00 58 ea @ $9.50 $551.00 FOR SIDEWALK b)Size 25 $492.00 6 ea @ $82.00 $492.00 FOR SIDEWALK 10. Cncrete Overlay $600.00 $600.00 l m3 @ $600.00 FOR SIDEWALK 11. Concrete in Sidewalk Widening $5,400.00 I $540000 9m3 @ $600.00 $5,400.00 FOR SIDEWALK C 0 R P 0 R A T I 0 N O F T H E T 0 W N O F N E W C A S T L E PAGE #: 31 1993 CAPITAL BUDGET AND FOUR YEAR FORECAST I PROJECT DETAIL DEPARTMENT: I I DIV. PAGE REF.#: 3 L P R O J E C T / L O C A T I O N M A P P R O J E C T C O S T / F I N A N C I N G I I I C O S T Division: A. ROADS AND STRUCTURES (RECONSTRUCTION) Account #: 7205-89013-X Account Name: KING STREET (HIGHWAY 42) I 1 I Description: ROAD WIDENING INCLUDING SIDEWALK I I I I I I Location: From 95 metres west of Soper Creek Drive east1to Haines Road. 1 (Bowmanville). I I I I I-Construction I 77,440 Details/Needs: Road widening (south side only) to an urban road standard including I grading, granular base and sub-base, curb and gutter, hot mix asphalt I-Design and Construction Administration I 10,560 I �I and the construction of a concrete sidewalk. 1 �I. I I Length: 249 m Cost Per Metre: $353 I TOTAL I $86,000 I CRFFk BO 174 N 17ILLE I I ^i H F I N A N L I N G I > I I I I. Account Name I-Res./Res. Funds Development Charge I 18,834 I King Street I I i a �Ilo- I-other: y I rn 0 I-Subsidy I 44,200 ' I wy I I F I-Debenture I I I o I Iv (n '-Tax Levy I 24,966 QJ I TOTAL I $88,000 1 THE CORPORATION OF THE TOWN OF NEWCASTLE BY-LAW NUMBER 93- Being a By-law to authorize the issuance of a purchase order to Novacor Construction Company Ltd. in respect to an addition to Contract NW 92-28 for the construction of curb and gutter, sidewalks, hot mix paving and other related work. NOW THEREFORE, the Council of The Corporation of the Town of Newcastle enacts as follows: 1. THAT the Purchasing and Supply Agent be authorized to issue a Purchase Order to Novacor Construction Company Ltd. in the amount of $88,425.50 for an extension to Contract NW 92-28. 2. THAT the Purchase Order to Novacor Construction Company Ltd. , attached hereto as Schedule "A", form part of this By-law. BY-LAW read a first and second time this 13th day of April, 1993. BY-LAW read a third time and finally passed this 13th day of April, 1993. MAYOR CLERK 100 ij