HomeMy WebLinkAboutWD-24-93 THE CORPORATION OF THE TOWN OF NEWCASTLE REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# 7, 1993 Res. # Date: JUNE Report#: WD-24-93 F i I e#: _BU- 10-0 1 By-Law# Subject: REALLOCATION OF FUNDS IN THE PUBLIC WORKS DEPARTMENT BUDGET Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-24-93 be received; and 2 . THAT $100,000 of the $270,000 tax levy provided for in the approved 1993 Capital Budget for the construction of storm sewers on King Street East (Account No. 7205-93005-2061) be reallocated FORTHWITH to the Surface Treatment Program (Account No. 7208-00441-0261) . REPORT 1.0 ATTACHMENTS No. 1: Project Budget Detail Sheet for Storm Sewer Replacement on King Street East No. 2 : Graph Depicting the Annual Surface Treatment Expenditures Over the Previous Eleven Years 2.0 BACKGROUND 2 . 1 The breakup of roads during the spring of this year has been the most severe in recent memory. Provision was made in the approved 1993 Budget for an expenditure of $230,000 for surface treatment. This amount will not be adequate to REPORT NO. : WD-24-93 PAGE 2 restore the many sections of the roads which were damaged. 3.0 REVIEW AND COMMENT 3. 1 Provision was made in the approved 1993 Capital Budget for construction of storm sewers on King Street East from Ontario Street to Frank Street. As noted on the project detail sheet, Attachment No. 1, the funding for the project was to be $55,000 from normal subsidy, $215,000 supplementary subsidy and $270,000 from the tax levy. The Ministry of Transportation has advised that the $215,000 supplementary subsidy will not be available. It is proposed that $100,000 of the $270,000 tax levy budgeted for the storm sewer project on King Street East be re-allocated to the surface treatment program. 3.2 This report has been reviewed with the Treasurer who agrees with the recommendation. i Respectfully submitted, Recommended for presentation to the Committee, j Walter A. Evans, P.Eng. , Lawrence E. s'eff, Director of Public Works Chief Adminis r4tive Officer DP:ph May 18, 1993 Attachment I i ( VL � 1 C O R P O R A T I O N O F T H E T O W N O F N E W C A S T L E PAGE #: 1993 CAPITAL BUDGET AND FOUR YEAR FORECAST DEPARTMENT: t PROJECT DETAIL DIV. PAGE REF.#: 5 I P R O J E C T / L O C A T I O N M A P I P R O J E C T C 0 S T / F I N A N C I N G I I I C 0 S T Division: A. ROADS AND STRUCTURES (RECONSTRUCTION) Account #: 7205-93005-X Account Name: KING STREET (HIGHWAY #2) I I I Description: STORM SEWER REPLACEMENT The construction of this project is subject to the availability of Supplementary Subsidy from the Ministry of Transportation. Location: Ontario Street to Frank Street, (Bowmanville). I I I Details/Needs: Replacement of the existing storm sewer with a storm sewer sized I-Construction I 475,200 to accommodate the existing and future commercialization of I the Bowmanville downtown core. This work includes excavation I-Design and Construction Administration I 64,800 curb and gutter, hot mix asphalt and storm sewers. I I I Length: 581 m Cost Per Metre: $929 . 0 I TOTAL I $540,000 I ��~ 0 WMANVILLE Church Street I F I N A N C I N G I I I I Account Name I-Res./Res. Funds I I I d H U � I-Other: F-3 �> U I N � Q) W r I-Normal Subsidy ($55,000) I 270,000 y �y� Klrla Street I East I-Supplementary Subsidy ($215,000) I O I-Debenture O �� I-Tax Levy I 270,000 � r, TOTAL I $540,000 YEARLY COSTS FOR HIGH AND PRIME 600 - PRIVE ID i '- 1 DOES NCW ! M rM PULVEFUZIM 200 $100,000-00 AMITIOML FEAlX0CMGN FOR 1993 i I •�� �Y • C �• ��. •fit 98 988 90 99 1985 1987 1989 1991 1993 i