Loading...
HomeMy WebLinkAboutTR-22-01 Addendum ~ "",.. . , ~ 10 ,/ ~,/" /" THE CORPORATION OF TIlE MUNICIPALITY OF CLARINGTON Meeting: REPORT GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File #FJfll:---- Date: May 7, 2001 Res. #17;1-- "307-0/ - Report No.: ADDENDUM TO REPORT TR-22-01 By-Law # Subject: CONTRACT CL2001-11, CENTRE STREET AND GRANT LANE RECONSTRUCTIONILOWE STREET AND BEECH AVENUE STORM SEWERS, BOWMANVILLE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Addendum to Report TR-22-01 be received; and 2. THAT Report TR-22-01 be lifted from the table and the recommendations in Report TR-22- 01 be approved, FORTHWITH. REPORT 1.0 ATTACHMENTS No.1: Key Map - Proposed Lowe Street and Beech Avenue Storm Sewer Improvements No.2: Report TR-22-01 2.0 BACKGROUND 2.1 At the April 30, 2001 Council meeting, the following resolution was passed: "THAT Report TR-22-01 be tabled and leave be granted for the Director of Public Works to report back to Council on the repercussions of not completing the subject work at this time, the costs related to the delaying of . ' , / REPORT NO.: ADDENDUM TO REPORT TR-22-0l PAGE 2 ./ , /" the tender award and the possibility of future expansion of the parking lot at the Clarington Beech Centre." 2.2 Hydro Conversion On April 30, 2001 Council requested additional information regarding costs related to converting overhead hydro to an underground system if the conversion were to be completed after the reconstruction of Centre Street. Based on information provided by Veridian, and estimates prepared by TSH, the following net additional costs have been identified: . Additional Directional Boring Costs . Sidewalk Restoration . Restoration Related to House Service Trenches $32,800 $4,500 $9,800 $47,100 2.3 The original estimate for the hydro conversion was $270,000. It was calculated based on the following assumptions: . Estimate assumes work is coordinated with the reconstruction of Centre Street; . Includes 34 house services, 11 street lights and poles, 4 pad mount transformers, 7 concrete encased road crossings; . Based on 50% directional bored and 50% open trench installation; . House services torpedoed from main trench; . Minor restoration works (assumes full restoration under Centre Street works); and . Excludes connection charges at the individual homes (i.e. "stack" removal and associated repair) estimated at $600 per house. 2.4 Lowe Street and Beech Avenue Storm Sewer WOIks Provisional works included in Contract CL200l-ll for Lowe Street and Beech Avenue are shown on Attachment No. 1. They include storm sewers, associated appurtenances and " REPORT NO.: ADDENDUM TO REPORT TR-22-01 PAGE 3 trench restoration. Bill Humber, in his delegation on behalf of the Old Bowmanville Neighbourllood Association, requested the removal of this provisional item. The reasons for the inclusion of the Beech Avenue and Lowe Street storm sewers were to: . Correct a storm sewer deficiency on Lowe Street and avoid the unnecessary installation of a temporary manhole on Lowe Street; . Allow the Municipality some flexibility in its dealings with the Clarington Beech Centre parking and drainage issues. The proposed storm sewer works on Beech Avenue provide a potential outlet for any drainage works that may be required at the Clarington Beech Centre. The works are not solely for the purpose of providing an outlet for the Clarington Beech Centre as they will also be required to provide a drainage outlet for the future improvements on Beech Avenue and Lowe Street, scheduled for 2003; and . Realize the financial benefit of having the works included in a large contract. Should the works be constructed independently, or as part of a smaller contract for the Clarington Beech Centre, it is estimated that the costs could be increased by up to 25% ($10,000 - $12,000). Should the provisional Beech Avenue storm sewer works not be approved, the works would then terminate in the south boulevard of Lowe Street, opposite Beech Avenue, and result in a reduction of $34,322.59 from the total tender amount. 3.0 REVIEW AND COMMENT 3.1 By delaying the approval ofTender CL2001-11, the Municipality has exceeded the 30 day period in which the Tender is open for acceptance. The Tender now may only be accepted with the consent of the successful Bidder. To date, Ron Robinson Limited has expressed their willingness to accept the award of the contract. REPORT NO.: ADDENDUM TO REPORT TR-22-01 PAGE 4 3.2 Should the contract be deferred to the point where it would have to be re-tendered, the Municipality would incur additional tendering costs of approximately $5,000. 3.3 An additional cost to the Municipality, which cannot be quantified but would have a long- term impact, is the cost of jeopardizing the Municipality ofClarington's credibility with the construction industry. This may result in less competition during the tendering process and/or higher overall pricing to compensate for the uncertainty associated with bidding in the Municipality of Clarington. 3.4 Historically, prices are lower for projects tendered early in the construction season and increase for projects tendered later in the year. If the hydro issue is not resolved until later this year, or sometime next year, and the Municipality decides to delay tendering until this time, it runs the risk of higher seasonal pricing. 3.5 It should be noted that it was the Region of Durham's need to replace deficient watermain and sanitary sewer on Centre Street that initiated the full reconstruction of the street. Should Contract CL2001-11 not be awarded, there is the possibility that the Region of Durham may proceed to tender their required improvements on Centre Street independent of the Municipality's road works. This would result in inconvenience to residents because two major reconstruction projects would take place on Centre Street. By installing the Region's services separately, this would still require Clarington's installation of storm sewers, curb, sidewalks and the remainder of the road, which is exactly what all stakeholders wanted to avoid. If the Region's and the Municipality's works were tendered as two independent projects, additional costs would be incurred. 4.0 CONCLUSION 4.1 The delay or cancellation of a municipal reconstruction project reduces staffs ability to effectively plan the Municipality's Capital Works program. 4.2 The Old Bowmanville Neighbourhood Association has said that they would not like the work on Centre Street to proceed unless it is done in conjunction with the overhead hydro REPORT NO.: ADDENDUM TO REPORT TR-22-01 PAGE 5 conversion on Centre Street. Since the underground wires will not be undertaken at this time, and directional boring will allow retroactive installation, it would be prudent to proceed with the tendered reconstruction at this time. Respectfully submitted, Reviewed by, ORIGINAL SIGNED BY ~e~ Director of Public Works ()r~ Franklin Wu, Chief Administrative Officer TSII*SJ\\f*~*ce 03/05/01 ~AY-02-01 WED 03:22 pn TSH COBOURG FAX NO, p, 02 oJ ~ " ') ...., LJ: '.. .. . / , I .-. ~ ..- _""""~,- 1...11I. 11,1I1"''''' EECH AVENUE ~f~ .~~ I -' ""11"'" , ,.~ . . .. .., . .' ~;~':V~n...(O, .. J'- . - .,..~- . ". l" . - ',' , I.' 1~ .~~ .' iV', .~_. 1I1UA It. ~.' \' . .. ; IDIOM 'l..f0- I ~ r ~; ,I ~ ~~!1 ," (~~~ . , .' r"' .. - , 'Pi lure""I'" . , -.- ~nf""" .. :. .. I '- ", ! i g '" !i ~ LOWE STREET & BEECH AVENUE i PROVISIONAL STORM SEWER WORK ~ ~ BOWMANVlLLE SCAI..E: 00NlRACT No.~ JllltUCT: 1:750 CL2001-11 12-10920 OIlA'MNG NO.: A TT ACHMENT No. 1 ADDENDUM TO REPORT NO.: TR-22-01 ON: TR.22-D1 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT #2 REPORT Meeting: Council File # Date: April 30th, 2001 Res. # Report #: TR-22-01 FILE#: By-law # Subject CL2001.11, CENTRE STREET, AND GRANT LANE RECONSTRUCTION I LOWE STREET AND BEECH AVENUE STORM SEWERS, BOWMANVILLE RECOMMENDATIONS: It is respectfully recommended to Council the following: 1. THAT Report TR-22-01 be received; 2. THAT Ron Robinson Limited., Bowmanville, Ontario, with a total bid in the amount of $824,725.39 (including G.S.T.), being the lowest responsible bidder meeting all terms, conditions and specifications ofTender CL2001-11, be awarded the contract for the Centre Street and Grant Lane Reconstruction I Lowe Street and Beech Avenue Storm Sewers, Bowmanville as required by the Department of Public Works; 3. THAT funds required in the amount of $265,000.00 for Centre Street and Grant Lane Reconstruction be drawn from the Public Works Account #7205-00005-0261; and 4. THAT funds in the amount of $130,000.00 required for Centre Street and Grant Lane Reconstruction be drawn from the carried over 2000 Public Works budget; and 5. THAT funds in the amount of $63,000.00 required for the Lowe Street and Beech Avenue Storm Sewers be drawn from the Public Works Account #7205-01005-0261; and 6. THAT the additional funds required for Centre Street and Grant Lane, Reconstruction, in the amount of $37,000.00 be re-allocated from Lowe Street and Beech Avenue Storm Sewers Account #7205-01005-0261; and 7. THAT the attached By-law marked Schedule "A" authorizing the Mayor and Clerk to execute the agreement be approved. BACKGROUNC AND COMMENT Tender specifications were provided by Totten Sims Hubicki Associates for the Centre Street and Grant Lane Reconstruction I Lowe Street and Beech Avenue Storm Sewers, Bowmanville, as required by the Department of Public Works. ATTACHMENT NO.: 2 ADDENDUM TO REPORT NO.: TR-22-01 REPORT NO.: TR-22-01 PAGE 2 Tenders were advertised in the local papers, as well as the Daily Commercial News. Subsequently, tenders were received and tabulated as per Schedule "B" attached. The Municipality of Clarington's portion of the total project cost, including Project Administration, as detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "C" is estimated at $495,000.00. Included in the total tendered price is work to be completed on behalf of the Region of Durham for which they will be invoiced separately. Funds in the amount of $265,000.00 required for the Centre Street and Grant Lane Reconstruction will be drawn from the 2001 Public Works Capital Budget Account #7205- 00005-0261, as identified on page 124, with $130,000.00 being provided from the Public Works 2000 Capital Budget carry over for the project. Funds in the amount of $63,000.00 required for the Lowe Street and Beech Avenue Storm Sewers will be drawn from the Public Works Account #7205-01005-0261 as reflected on page 126 of the 2001 Capital Budget. As the amount is below the $100,000.00 allocated, it is recommended that the remaining funds of $37,000.00 be re- allocated to Centre Street and Grant Lane Reconstruction. Public Works have obtained a cost estimated of $75,000.00 for placing duct work to accommodate a possible future underground hydro supply. Recognizing that Public Works and Treasury Staff are not recommending that conversion to underground services be undertaken, the $75,000.00 for placement of duct work is not incluaed in the amount of this contract. Although the duct work is not presently included, it has been identified in the tender such that the work can be incurred in the later project stages if Veridian deems that the early placement of these ducts would be beneficial toward the future conversion of the existing overhead hydro distribution system to an underground system. The cost breakdown 'and overrun is addressed in the attached letter from Totten Sims Hubicki Associates. , " REPORT NO.: TR-22-01 PAGE 3 The low bidder has previously performed satisfactorily for the Municipality of Clarington in recent years. The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Public Works. After further review and analysis of the bids by Public Works, Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Ron Robinson Limited, Bowmanville, Ontario, be recommended for the contract for the Centre Street, and Grant Lane Reconstruction and Low Street and Beech Avenue Storm Sewers, Bowmanville. Respectfully submitted, Reviewed by, arie Marano, H.BSc., AMCT., Treasurer o ~_-0tc Frank Wu, M.C.I.P., R.P.P., Chief Administrative Officer ~1At- Stephen A. Vokes, P. Eng. Director of Public Works MM'LS'km '0. " Schedule "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2001- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Ron Robinson Limited, Bowmanville, Ontario, to enter into an agreement for the Centre Street, and Grant Lane Reconstruction and low Street and Beech Avenue Storm Sewers, Bowmanville. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOllOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington with the Corporation Seal, a contract between Ron Robinson Limited, Bowmanville, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of . , 2001. By-law read a third time and finally passed this day of , 2001. John Mutton, Mayor Patti L. Barrie, Municipal Clerk ~ , . , . , SCHEDULE "B" BID SUMMARY CL2001-11, CENTRE STEET, GRANT LANE AND LOWE STREET RECONSTRUCTION Bidder Total Bid Amount Ron Robinson Limited $824,725.39* Bowmanville, ON Miwel Construction Limited $847,136.97* Stouffville, ON Balterre Contracting Limited $912,748.89 Peterborough, ON Hardco Construction Ltd. $983,876.91* Whitby, ON B.N. Fenton Construction $997,839.20. Courtice, ON Pachino Construction Co. Ltd. $1,050,002.14* Stouffville, ON Elirpa Construction & Materials Ltd. $1,059,544.57 Pickering, ON . Bid amended - Extension Error DN:WP51DATAlBIDSUMMlCL01.11 .... . " . .' Schedule "C. . .. lilt II Totten Sims Hubicki Associates engineers 513 Division Street. Cobourg, Ontario, Canada K9A 5G6 architects (905) 372-2121 Fax: (905) 372-3621 planners E-mail: cobourg@tsh.ca www.tsh.ca April 19, 2001 Ms. Lou Ann Birkett, CPP, AMCT p~ Purchasing Manager Corporation of the Municipality of C1arington 40 Temperance Street APR 2 3 2001 BOWMANVILLE. Ontario. LlC 3A6 MUNICIPALITY OF CLARINGTON PURCHASING DEPARTMENT Dear Ms. Birkett: Re: Contract No. CL2001-11, Centre Street and Grant Lane Reconstruction and Lowe Street and Beech Avenne Storm Sewers, Bowrnanville Tenders for the above project were opened at the municipal offices on Wednesday, March 28, 200 1, at 2:00:00 p.m. The bids received inclusive of GST are summarized as follows: Bidder Total Bid Amount Ron Robinson Limited, Bowmanville, ant. $824,725.39 * Miwel Construction Limited, Stouffville. ant. $847,136.97 * Balterre Contracting Limited. Peterborou~h. ant. $912,748.89 Hardco Construction Ltd., Whitbv, ant. $983,876.91 * B.N. Fenton Construction. Courtice, ant. $997.839.20 * Pachino Construction Co. Ltd.. Stouffville, ant. $1,050,002.14 * Eliroa Construction & Materials Ltd., Pickerin~, ant. $1,059.544.57 * Bid amended - Extension Error The low bidders submitted tender has been reviewed and is in order. Ron Robinson Limited reconstructed Trulls Road for the Municipality of Clarington in 1995. They performed to an acceptable standard. In 2000 they completed a number of contracts for the Region of Durham and private developers. These projects were similar in nature to the subject contract and references contacted indicated their performance was acceptable. We, therefore, recommend acceptance of the low bid on this Contract. ~, A cost apportionment is attached which summarizes estimated project costs based on the low bid. Overall the project is on budget. The Centre Street and Grant Lane portion of the project is estimated to be approximately $37,000 over budget while the Lowe Street and Beech Avenue Storm Sewer section is $37,000 under budget. As both project components are to be funded by the tax levy, budget should be transferred between the two accounts to account for the revised project allocation. . . ~ -,. ~ Municipality of Claringron April 19, 2001 Schedule "C" 2 In addition to the above noted project components we have also included in the cost apportionment estimated costs for placing duct work to accommodate a possible future underground hydro supply. These works estimated at $75,000 were not included in the original project budget but may be incurred if Veridian deems that the early placement of these ducts would be beneficial toward the future conversion of the existing overhead hydro distribution system to an underground system. Deposit cheques may be returned to all contractors except the low and second low bidders. Should you require any further information. please contact the undersigned. Yours truly, :if-' 1/ / ~/--:7~ . U/ ~ " , ,/ V. / ~I ' / William McCrae, P.Eng. r Senior Project Engineer WMc/jg PI2904OIConapIl8SIJI24/2 pc: S.A. Vokes. P.Eng. A.S. Cannella, CET K. Rand .. VH