HomeMy WebLinkAboutWD-53-93 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON XXXDENNaummumME)NXXXNMXNKDMKNKXXXMKXX REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# Date: DECEMBER 6, 1993 Res. # By-Law# Report#:__XD_-53_-93_ File #: -RU-.-LQM Subject: STATUS OF PUBLIC WORKS DEPARTMENT CAPITAL WORKS PROJECTS Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-53-93 be received for information. REPORT 1.0 ATTACHMENTS No. 1: Table showing status of Capital Works Projects 2.0 REVIEW AND COMMENT Some of the projects on the Table (Attachment No. 1) require an explanation. 2 . 1 Item 2: Traffic Signals, Bowmanville The $20,000 was included in the 1993 budget to complete the upgrading of the traffic signals on King Street. The cost was paid in 1992 between the time the budget was prepared and the accounts were closed out for 1992 . 2 .2 Item 4: Lakeshore Road Erosion Protection This project is $105,000 over the budget amount of $485,000. The reasons for this larger overrun are as follows: REPORT NO. : WD-53-93 PAGE 2 a) Granular 'B' Type 1 in Shoreline Embankment At the outset of construction the noticeable increased rate of erosion and wave action prompted a change in the material backfill to the revetment stone (rock protection on the slope) . It was agreed with the Contractor and the Owner that a switch to crushed rock material was required in order to ensure stability of the revetment. Granular 'B' Type 1 material was too difficult to place, in conditions where water levels fluctuated almost daily and the material would have washed out if the protective geotextile was inadvertently ripped or punctured during installation. i In addition to the increased cost of switching to crushed rock material the quantity of material required was considerably greater than the estimated quantity in the tender. This is directly attributable to the active ongoing erosion which occurred in the three months between tendering and commencement of I construction in which period an additional 750 m3 approximately was removed by wave action. In addition, excavation in the shoreline produced unexpectedly large volumes of topsoil (in excess of 1000 m3) and other debris not anticipated from the soils investigation report or our own investigations. $ 69, 100 b) Supply Material and Construct Splash Pad The revetment design, as approved by the Ministry of Natural Resources, called for U34 REPORT NO. : WD-53-93 PAGE 3 stone to be placed to the design elevation of 100 year storm plus wave uprush. In subsequent discussion with the Municipality and Ganaraska Region Conservation Authority, it has been agreed that a splash pad should be added to the construction to increase bank protection and reduce the extent of future maintenance. The splash pad has now been constructed of 300 mm sized rock placed to a depth of 600 mm and extending to an elevation of 78.80 m. 11,332 c) Earth Borrow This covers the use of material in constructing the embankment above the revetment and backfilling of sub-excavated areas within the new roadway. Again, due to erosion and excessive topsoil removal this item required more material. It is important to note that other than surplus topsoil, we have not removed any materials from the site which could be used j for fill purposes. 15,000 d) Geotextile The increased area of geotextile used under this Item results primarily from the introduction of the "splash pad" under Work Order No. 2 . Estimated overrun is $9,000. 91000 TOTAL $104,432 1US REPORT NO. : WD-53-93 PAGE 4 2 .3 Item 11: Williams Mill Road Bridge The purpose of this item is for the removal of the bridge after having passed the by-law to close the bridge. I will be submitting a report on this item to the General Purpose and Administration Committee early in the new year. 2 .4 Item 13: Unspecified Construction The expenditure under this item was for drainage work on Fices Road and for a survey at Middle Road and Concession Road 8. 2 .5 Item 22: Gravel Parking Lots This item was included in the budget to provide additional parking at the Hampton Depot in the event that students were hired during the summer months. No students were hired; therefore, the project was cancelled. 2 .6 Item 24: King Street Storm Sewer This project was included in the budget to provide for the possibility of supplemented funding being available from the Ministry of Transportation. No supplementary funding was available and the project did not proceed. I Council approved using $100,000 from this project to provide funding for additional repair work on the roads. I 2 . 7 Work in Subdivisions Council will recall that we were forced to take over and complete the work in three ( 3) subdivisions: i Newcastle Meadows - Bowmanville Trulls Delbert - Courtice Willowbrooke - Bowmanville i i i 1 (J 3 REPORT NO. : WD-53-93 PAGE 5 All of the work scheduled for completion in 1993 has been completed. 3.0 CONCLUSIONS 3. 1 Not including the construction of the King Street Storm Sewers, which was cancelled, we are about 9.6% under budget for the capital projects. Respectfully submitted, Recommended for presentation to the Committee, I Walter A. Evans, P.Eng. , Marie Marano, H.B.Sc. , AMCT Director of Public Works Acting Chief Administrative Officer WAE*ph November 29, 1993 Attachment I i i 1 � � 7 PUBLIC WORKS DEPARTMENT STATUS OF CAPITAL WORKS PROJECTS Page 1 of 3 ESTIMATED ITEM EXPENDITURE ESTIMATED NO. PROJECT DESCRIPTION 1993 BUDGET TO YEAR DIFF END ERENCE COMPLETION DATE 1. King St./ Mearns Ave. 1,058,000 11041,000 17,000 Completed 2. Traffic Signals - Bowmanville 20,000 0 20,000 Completed 3. Phair Avenue 20,000 10,000 10 000 Completed 4. Lakeshore Road Erosion Protection 485,000 590,000 (105,000) Completed 5. Prince Street 355,000 301,500 53,500 Completed 6. Prestonvale Road (Land Purchase) 100,000 75,000 25,000 December 13 7. Road Resurfacing (Mill Street, Orono) 136,000 114,900 21,100 Completed 8. SURFACE COURSE ASPHALT a Edward Street 68,500 38,133 30 367 Completed b) Concession Street 110,000 117,960 (7,960) Completed -� c Beaver/Robert Sts. 65,000 52,500 12P500 Completed d) Prestonvale Road 50,000 32,230 17,770 Completed e Rudell Road 50,000 42 290 7,710 Completed f) Baseline Road 47,000 20,480 26,520 Completed 9. Concession Road 7 Culvert 50,000 50 000 0 December 15 10. Aggregate Development 50,000 37,000 13,000 December 15 11. Williams Mill Road Bridge 3,500 0 3,500 Note 3 12. Bus Shelter 3,500 3,500 0 December 21 cn 13. Uns ecifiied Const. 10,000 5,000 5,000 w n Note 4 14. Road Needs Study 40,000 40,000 0 =December w M 15. Engineering Design 155,000 155,000 0 December 31 z 0 PUBLIC WORKS DEPARTMENT STATUS OF CAPITAL WORKS PROJECTS Page 2 of 3 ESTIMATED ITEM EXPENDITURE ESTIMATED NO. PROJECT DESCRIPTION 1993 BUDGET TO YEAR END DIFFERENCE COMPLETION DATE 16. SIDEWALKS a Hwy. 2 Courtice 200,000 192 000 8 000 Completed b) Hwy. 2, Newtonville - Sidewalk 80,000 70,000 10,000 Completed c Hwy. 2 Bowmanville - Sidewalk 250,000 235,000 15,000 Completed 17. STREET LIGHTING a Fourth/Westmore/L nwood 14,000 6 420 71-5-80- Completed b) Hart Ct./Sunset Blvd. 30,000 10,000 20,000 Completed c Reg. Rd. -17/Hwy. 35 7,000 2 660 4 340 Completed d) King Street 15,000 3,460 11,540 Completed e Hwy. 2, Newtonville 70,000 66,500 3,500 Completed f) Irwin & Winter Rd. 5,500 3,270 2,230 Completed Street Smart Program - WD-57-92 645 307 451,200 194,107 Completed 18. EQUIPMENT a) 1979 Ford Dump Replacement of 115,000 114,000 1 000 Ordered b) 1983 Ford Dump, Replacement of 115,000 114,000 1,000 Ordered c 1988 Champion Grader Replacement of 120,000 94 500 25,500 Ordered d) 1977 IHC Tractor, Replacement of 60,000 60,000 0 December 31 e) Misc. Small Equipment 20,000 20 000 0 December 31 f) 2 Ton Truck/Boom (New) 70,000 70,000 0 December 31 g Lubreel S stem (New) 20,000 19,500 500 Completed h) Fuel/Key Lock System (New) 30,000 30,900 (900) Completed 19. Hampton Yard Improvement Water Supply) 20,000 20,000 0 Completed 11, 20. Salt Shed/Orono 60,000 60,000 0 December 15 PUBLIC WORKS DEPARTMENT STATUS OF CAPITAL WORKS PROJECTS Page 3 of 3 ESTIMATED ITEM EXPENDITURE ESTIMATED N0. PROJECT DESCRIPTION 1993 BUDGET TO YEAR END DIFFERENCE COMPLETION DATE 21. Sign Shed Improvement, Hampton Depot 10,000 10,000 0 December 31 22. Gravel Parking Lot 15,000 0 15,000 Deleted - not required - Note 5 23. Depots/Doors Repair 8,000 8,000 0 December 31 SUB-TOTALS 4,856,307 4,387.903 46-8-140-4 9.6% under Budget 24. King Street Storm Sewer 540,000 100,000 440-10-0-0- Cancelled - Note 6 TOTALS 5 396,307 43487,903 908,404 December 6, 1993