HomeMy WebLinkAboutWD-76-91 THE CORPORATION OF THE TOWN OF NEWCASTLE
REPORT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File #
Date: OCTOBER 7, 1991 Res. #
Report#: WD-76-9-1 File#: RC.31. 06 By-Law#
Subject: UPGRADING OF TRAFFIC SIGNALS
KING STREET, BOWMANVILLE
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report WD-76-91 be received;
2 . THAT the procedure set out in the Purchasing By-law 82-2, Section
5, Paragraph 06, be waived for this particular transaction;
3 . THAT the Treasurer issue a Purchase Order to Durham Region in the
amount of $93, 137 .00 for the purchase and installation of the
hardware to upgrade the traffic signals on King Street in
Bowmanville, in accordance with the schedule (Attachment No. 1)
attached to Report W-76-91;
4 . THAT the funds be obtained from Account No. 1110-157-X, Public
Works Lot Levy Reserve Fund;
5 . THAT staff be authorized to make application to the Ministry of
Transportation for subsidy in the amount of approximately $38,500;
6 . THAT upon receipt of the subsidy from the Ministry these funds be
repaid to the Lot Levy Reserve Fund; and
/2
REPORT WD-76-91 PAGE 2
7 . THAT Mr. David McMullen be advised of Council 's decision.
-----------------------------------------------------------------
REPORT
1.0 ATTACHMENTS
No. 1: Correspondence dated September 9, 1991, from Mr. David
McMullen
2.0 BACKGROUND
2 . 1 Provision was made in the approved 1991 Capital Budget for the
upgrading of traffic signals on King Street in Bowmanville.
2 .2 The original budgeted cost of the project was $95, 000 (as detailed
on page 34 of the approved 1991 Capital Budget) . The financing for
the project assumed that there would be a subsidy from the Ministry
of Transportation of $61,000, with the remaining $34,000 to come
from the Lot Levy Reserve Fund.
2 . 3 Based on the information provided by Mr. McMullen (Attachment No.
1) , the Ministry has advised that the subsidy available would be
about $38,500 . The financing of the proposed project would now be
as follows:
Ministry of Transportation $ 38,500 . 00
Town of Newcastle 54,637 . 00*
93 , 137 . 00
* $20,000 .00 of this cost is for the supply and installation of
Opticon hardware which will make it possible for emergency
vehicles to operate the signals .
3.0 REVIEW AND COMMENT
I
3 . 1 The Region of Durham maintains the traffic signals on King Street
for the Town and bills us for labour and materials .
. . . /3
REPORT WD-76-91 PAGE 3
3 .2 The most efficient method of completing this project is to have the
Region perform the work and invoice the Town for their costs . It
should be noted that the Region has already purchased the
controllers and the modem and can invoice the Town for this
equipment on receipt of a purchase order.
3 . 3 Since the amount of the purchase order exceeds $15,000 . 00, it will
be necessary that the procedures set out in Purchasing By-law No.
82-2, Section 5, Paragraph 06, be waived for this particular
transaction.
Respectfully submitted, Recommended for presentation
to the Committee,
Lr--------------------- --------- ----------------
Walter A. Evans, P.Eng. , Lawrence E. Kotseff,
Director of Public Works Chief Admin'strative Officer
-��_=----------
arie Marano, H.B.Sc . , AMCT
Treasurer
I
WAE*ph j
DATE
Attachment
Mr. D. H. McMullen
Traffic Operations
Region of Durham
Works Department
Box 623
105 Consumers Drive
Whitby, Ontario
L1N 6A3
LE-1 C O P Y'
September 9, 1991
DURHAM
REGION
The Regional The Town of Newcastle
Municipality Department of Public Works
of Durham
40 Temperance Street
Works Department Bowmanville, Ontario
Box623 L1C 3A6 - '
105 Consumers dr.
Whitby,Ontario Attention: W. Evans P. En
Canada, L1 N 6A3 i g
(416)668-7721 Director of Public Works
Fax(416)668-2051
Dear Sir:
V.A.SILGAILIS, P.Eng.
Commissioner of Works
RE: Traffic Signal Control System - Bowmanville
Please quote our ref:
In reference to our earlier correspondence dated
December 7 , 1990 and recent telephone conversation
TRA-NEW-SYS regarding the expansion of the Region's Traffic Signal
Control System into the Town of Newcastle, I have
attached a summary of estimated labour, equipment and
material cost to complete the project.
The Region is prepared to undertake this work upon
confirmation from the Town and receipt of a purchase
order. Based on our current construction program, it is
anticipated that the majority of this work, with the
exception of Bell services and loop work, can be
completed this year. Invoicing of materials (traffic
controllers, modems, etc . ) 'which were purchased earlier
in the year can be billed in 1991. Those costs are
estimated at $50,600 . 00 and do not include contingencies
or the cost to install fire pre-emption which was
estimated at $4,000 . 00 per intersection.
Yours truly,
i
D.H. McMullen, Manager
BS/jm Traffic Operations
Encl.
pq , SE .J a ATTAC��P' JT N0, 1
Lv►r��
11L_7a-31 �
This paper contains recycled material.
TOWN ON BOWMANVILLE MTCS HARDWARE AND
COMMUNICATION COST 06-Sep-91
HARDWARE REQUIREMENTS
> LO......... . ..... .. ....... ............................... ..........
..... .... ..
...........
............
............ ..... ....
BA .... B
J
um
:.0 :Y:.
IN
. . ......
........ . .......
... ....... . . .......
. . ........
............ ....................
.......... ... ..-
.... .........
..... ... ....
C ............
.... ... ... ....X
...........
.........X.
:W.N
................ . ..............
.. ...... ............... ....
............ ... ..........
.... ...............
.............. ...... . .... ... ..
....... ...
............. ....... ....
......................................... ...............
.... ..... . ... .. .................................... .... . ...... ... ....
....................... . .. .. . .....
KING & SCUGOG LFE1 02 PEDESTAL KFT2400 SLAVE 6345.00 2430.00 1300.00 4000.00 14075.00
KING &TEMPERANCE E/M POLE KFT2400 SLAVE 6345.00 2430.00 1300.00 4000.00 14075.00
KING & DIVISION SP24/40 WOOD POLE KFT2400 MASTER 6345.00 2430.00 1300.00 4000.00 14075.00
KING & LIBERTY LFE102 PEDESTAL KFT2400 SLAVE 6345.00 2430.00 1300.00 4000.00 14075.00
KING & SIMPSON DM200 PEDESTAL ASC81 00 SLAVE 9000.00 2430.00 1300.00 4000.00 16730.00
UNIT COST = 34380.00 12150.00 6500.00 20000.00 73030.00
2 SYSTEM LOOPS 2000.00
BELL CANADA COST (avg. $800.00 per site) 4000.00
SUB-TOTAL HARDWARE COST = 79030.00
5% CONTINGENCY = 3951.50
TOTAL HARDWARE COST = 82981.50
10 % ADMINISTRATION COST 8298.15
7 % GOODS AND SERVICES TAX 5808.70
OVERALL COST 93136.86
NOTE: Cost of upgrading the traffic controller at Simpson Avenue can either be incurred under the System project or
the Road contract to reconstruct King Street between Mearns and Simpson.
Opticom cost DO NOT include the cost of equipping the Town's fire vehicles with transmitters.