Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# 1 1�
Date: OCTOBER 5, 1992 Res. #
Report#:__WD_-3_7_-_9_2_ File#: _B_,01 A_9 . 008 By-Law
Subject: ROYAL PINES COURT SUBDIVISION, PLAN 1OM-837,
CERTIFICATE OF ACCEPTANCE,
STORM SEWER SYSTEM
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report WD-77-92 be received; and
2 . THAT the Director of Public Works be authorized to issue a
'Certificate of Acceptance' for the storm sewer system
constructed within Plan 1OM-837 .
----------------------------------------------------------------
REPORT
1.0 ATTACHMENTS
No. l: Key Map
2.0 BACKGROUND
2 . 1 On May 30, 1990, the Town entered into a subdivision agreement
with Nor-Arm Developments Inc. to develop lands by plan of
subdivision, located in Bowmanville, and described as Plan
1OM-837 (Attachment No. 1) . The agreement required the
developer to construct all roadworks including hot-mix paving,
curb and gutter, sidewalks, boulevard sodding and street
trees, a storm drainage system and street lights, hereinafter
referred to as the 'Works ' .
2
REPORT NO. : WD-77-91 PAGE 2
2 .2 The subdivision agreement provides for the separation of the
Works into two (2) stages:
a) Storm Sewer System; and
b) Roads and Above Ground Services .
2 .3 The Storm Sewer System was completed and a 'Certificate of
Completion' was issued dated August 31, 1990 . The system was
placed on a two year maintenance period which expired on
August 31, 1992 . The system was subsequently re-inspected and
found to be satisfactory.
2 .4 It is now appropriate to issue a 'Certificate of Acceptance'
for the Storm Sewer System. The subdivision agreement
provides for this certificate to be issued by the Director of
Public Works, subject to the approval of Council.
Respectfully submitted, Recommended for presentation
to the Committee,
alter A. Evans, P.Eng. , Lawrence E. Kot ef.f,
Director of Public Works Chief Administr ti/ve Officer
i
NC*ph
September 22, 1992
Attachment
I
I
I
i
i
i
I
OYAL JILVES c TRY
OM- 3
r �
0
r � �
r =
� U
�pO
ICTo
J
A. LIFIP I iln —
A.
® Wmoa O.Q
tl �
4O
JECTC: ATTACHS SUBD 10M837
❑C� A DRAWN BY: JM DATE: SEPT, 1992
0 K ATTACHMENT N0.
KEY MAP WD-77-92