Loading...
HomeMy WebLinkAboutWD-91-92 THE CORPORATION OF THE TOWN OF NEWCASTLE REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE # fir Date: DECEMBER 7, 1992 Res. #6:1E 1 Report#: File#: Mm. 20 . 05 By.-Law By.-Law Subject: CONSTRUCTION OF SIDEWALKS ON HIGHWAY 2 ROUGH NEWTONVILLE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1 . THAT Report WD-91-92 be received; 2 . THAT $80,000 for the construction of sidewalks on Highway 2 through Newtonville be approved in advance of the Town's 1993 Capital Budget; 3 . THAT the funding for this project be included in the 1993 Budget either from the tax levy and/or the existing lot levy reserve fund as determined to be appropriate through the budget exercise; and 4 . THAT Ms . Ann Cataford, Ministry of Transportation, be advised of Council 's decision and be provided with a copy of Report WD-91-92 . ---------------------------------------------------------------- REPORT 1.0 ATTACHMENTS No. 1: Key Map. /2 i n REPORT WD-91-92 PAGE 2 2.0 BACKGROUND 2 . 1 The Ministry of Transportation is preparing a tender for the reconstruction of Highway 2 through Newtonville in 1993 . 2 .2 Staff have asked the Ministry of Transportation to include the construction of sidewalks in their tender. The proposed sidewalks, which are illustrated on Attachment No. 1, are estimated to cost $80,000 . There is no subsidy from the Ministry on the construction of sidewalks . 2 . 3 The Ministry of Transportation has requested that Council make a commitment now for the cost of the construction of the sidewalks in 1993 because the timing of the road construction by the Ministry will occur prior to the approval of the 1993 budget by Council. It should be noted that this project has been included in the 1993 draft budget prepared by staff. 2 .4 The Ministry has advised us that, for the sidewalk work to be included in their tender, they require a resolution of our Town Council at this time. 3.0 REVIEW AND COMMENT 3 . 1 The sidewalk work proposed consists of the installation of approximately 1370 metres of sidewalks on Highway 2 from Oven Road easterly to Payne Crescent and 100 metres on Regional Road 18 from Highway 2 southerly for 100 metres (Attachment No. 1) . 3 .2 It is recommended that an expenditure of $80, 000 for the cost of the sidewalk work be considered at this time and that Ms . Ann Cataford, Ministry of Transportation, be advised of Council's decision and be provided with a copy of Report WD- 91-92 . . . . /3 i REPORT WD-91-92 PAGE 3 3 . 3 The 1993 draft budget presents the project as part of the overall considerations for 1993 construction. The tax levy component will be determined in conjunction with the overall requirements and tax impact considerations of the Town for 1993 . 3 .4 The estimated cost provided above is inclusive of all engineering, design, and supervisory costs related to the project. Respectfully submitted, Recommended for presentation to the Committee, i 4 6-ZlY,A. Evans, P.Eng. , Lawrence E. Kots f, , Director of Public Works Chief Administr ti e Officer ASC:hj December 2, 1992 Attachments PC Ms . Ann Cataford Ministry of Transportation Planning & Design Section Atrium Tower 1201 Wilson Avenue Downsview, On M3M 1J8 o z o w '- W z CHURCH ST. . o HILL ST. J z D w -b > HIGHWAY NO 0 CRES. F9 w 70 o - DO o 0 JONES AVENUE Q Q 0 0 � J z Q w LEGEND o PROPOSED SIDEWALK w LENGTH OF SIDEWALK 1370 meters C:\ATfACHS\CLAPKE\NEWTSW DRAWN BY: JM DATE: NOV. 1992 ATTACHMENT N0. 1 WD-91-92