REPORT
CORPORATE SERVICES DEPARTMENT
Date:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
GfA -07D-6)
Meeting:
NOVEMBER 19, 2001
Report #: COD-016-01
File #hfSTfr
By-law # ~ ) - ,;Lo.3
Subject: CL2001-40, STREET AND WALKWAY LIGHTING AT VARIOUS
LOCATIONS
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee recommend
to Council the following:
1. THAT Report COD-016-01 be received;
2. THAT Langley Utilities Contracting, Bowmanville, with a bid in the amount of $64,163.62,
including GST, being the lowest responsibie bidder meeting all terms, conditions and
specifications of Tender CL2001-40, be awarded the contract for Street Lighting and
Walkway Lighting at Various Locations;
3. THAT funds in the amount of $89,500.00 ($64,163.62 less GST Rebate + design,
administration, contingencies and work by Hydro One) be drawn from the Engineering
Capital Account #7230-00210-0000; and
4. THAT the attached By-law marked Schedule "B" authorizing the Mayor and Clerk to execute
the agreeme approved.
Submitted by'
Reviewed by:
rie Marano, H.B.Sc., AMCT
Director of Corporate Services
~/
A.S. Cannella, C.E.T.,
Acting Director of Engineering Services
ft',.
an lin Wu, M.C.I.P.
Chief Administrative Officer
MMlLABIASClkm
908
.
REPORT NO.: COO-016-01
PAGE 2
BACKGROUND AND COMMENT
Plans were provided by Totten Sims Hubicki Associates and publicly advertised for the installation of
Street and Walkway Lighting at Various Locations, as required by the Department of Engineering.
Subsequently tenders were received and tabulated as per Schedule "A" attached.
The total project cost, including final design and tendering, contract administration and design, Hydro
One charges and GST, (less GST Rebate), as detailed in the letter from Totten Sims Hubicki
Associates, marked Schedule "C" is estimated at $89,500.00.
It is recommended that the required funds be drawn from the Engineering Capital Budget Account
#7230-00210-000 as reflect on pages 141, 142 and 143 of the 2001 Capital Budget ($100,000.00
allocated).
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be referred
to the Acting Director of Engineering.
The low bidder, Langley Utilities Contracting, Bowmanville, Ontario, have previously completed a
number of similar contracts in type and value for the Municipality.
Attachment #1, Schedule "A", Bid Summary
Attachment #2, Schedule "B", By-law
Attachment #3, Schedule "C", Letter from Totten Sims Hubicki
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOW MANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-6506
909
,
SCHEDULE "A"
BID SUMMARY
TENDER CL2001-40
Street Lighting - Various Locations
Bidder Total Bid Amount
Langley Utilities Contracting $64,163.62-
Bowmanville, ON
Guild Electric Ltd. $66,208.95
Toronto, ON
AGI Traffic Technology $94,559.32
Weston, ON
Ron Robinson Ltd. $105,006.85
Bowmanville, ON
Whitby Hydro Energy Services Corporation Rejected
- Bid amended - Extension Error
. 910
i ,
Schedule "B"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2001-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Langley
Utilities Contracting, Bowmanville, Ontario, to enter into an
agreement for the Street and Walkway Lighting at Various
Locations.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS
AS FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a contract
between Langley Utilities Contracting, Bowmanville, Ontario, and said Corporation;
and
2. THAT the contract attached hereto as Schedule "B" form part of this By-law.
By-law read a first and second time this day of
, 2001.
By-law read a third time and finally passed this
day of
2001.
John Mutton, Mayor
Patti L. Barrie, Municipal Clerk
911
NOV 09 01 FRI 11:57 AM TSH COBOURG
II
tilt
FAX NO. p, 01/03
Schedule "e"
.
"
,-_.~
engineers
architects
planners
Totten Sims Hubickl A!>sociates
613 Division Street,
CObourg. Ontario, Canlldn K9A 5G6
19051372-2121 Fox: 19051372-3621
E-mail: eobourg@tsh,Cll www.tsn.cll
Novembcr 7. 2001
Ms. 1.0\1 AIIII Birkett, CPl', AMCT
Pm'chasin/{ Manager
Corporation of the Municipality of Clarington
40 Temperance Slrcct
nOWMANVILLE, Ontario. LlC 3A6
Fax: 905-623-4169
Dear Ms, Birkett:
Re: Contract No. CL2001-40, Street alld Walkway Lighting ImprO'felllents
PlIrt A _ Walkway Lighting, Robed Adams Dr. to Whittaker Ave., Courtice
Part)J . Walkway Lighting, GIenabbey Park, Courtiee
Pllrt C _ Street Ughting, 'lruDs Road, South of Avondale Dr., Courtice
Part D _ Street Ughting, Soliua Rood, SOlltb of Hwy, 2
Part E _ Street Lighting, B'lsellnc Road, West Side Dr. to Martin Rd., Bowmallville
Part F . Street Lighting, Mearns Avenue, Concession St. to CPR Crossing, BOWIDlIDville
Tcnders fot" the above project wcre opencd at the municipal offices on Friday, November 2, 200 I, at
2:00:00 p.m. nle bids received inclusive of GST arc summarized as follows:
r--"- .
Bidder Total Bid Amount
,."
Langley Utilities Contracllng, Bowmallville, Ont. $64,163,62'
--
Guild Electric Ltd, Toronto, Onto $66,208.95
AOl Traffic Technology Weston, On!. $94,559.32
Ron Rubinson Ud. Ilowmanvllle, Ont. $105,006,85
Whitby Hydro Energy Services Corporation Rcjccted
..
. Bid amended - R.tcnsion Error
The low bidder' s suhmitted tender has been reviewcd and is in order. Langley Utllities Contracting
currently I13S the Municipality of Clarington's Sf1'cet lighting maintenance contract and in the past have
complclcd severnl other projects for the Municipality including the lighting of the Darlington Soccer
Field,. and strcet lighting on Hwy. No.2 in the Bowmanville West Main Central Area. TIley
completed the work to an acceptable standard_ They have also completed a number of contracts for
varioll~ public utility companies and private devclopers, All references contacted indicated their
performance WI'S acceplablc. We, therefore, recommend acceptance of the low bid on this Contract
and that Langley Utilities Contracting be awarded the Contract.
912
NOV 09 01 FRI 11:57 AM TSH COBOURG
FAX NO.
P. 02/03
Schedule "e"
, ,
Municipality or Cloringlon
Nowmbcr 7. 2001
2
A detailed breakdown of the estimalcd project costs is provided below.
Work by Hydro One 5,027.00
Sub-total $83,413.36
--- ..
Net GST (3%) (excl. contingencic~) 2,502.40
1-.
Contingencies (inel. GSn 3,584.24
..
Total Estimated Project Co~fs $89,500.00
The tOUlI eSlimated project Co~ls are within the allotted budget. for rhe various sites as shown on the
altachcd cost apportlomnent.
Any deposit cheques received from ContraclOrs may llOW be returned.
Should you relluire any further information. please contact tltc undersigned.
Bcst rega rd.
. ) ttcf-----
/,-- It /~-
Ron Albri~ht, P.Bog.
Project Engineer
RAljg
P/2t){',41CorrL';rIJ R1I91.dtll:
pc: A S. Cannella
K. Rand
'UH
913 -~..- -
Item
Constll1ction Costs Contract CL2001-38
Preliminary and Detailed Design and Pnblic Contact
Tendcring and Contract AdmInistration (cslimaled)
Cost
$59,966.00
6,420.36
12,000.00
Munfc:ipallt}' of Clatington
Street Ughting Improvements
Cost ~nment Based IOn: La.,'! Sid
Co:1tTactCt..200f-4-0
N:r.remb!!r 07, 2001
T.5.H. Project: 12-2Sv"54
is
<
,
<:>
<0
,
:=
~
Desc:-iption Total PartA J Parte Part 0 PartE PartS PartF Comments
Walk.....2',' Ugh~g S~e! u,p~:n; . Street ligh~ir.!l ~ S~tL.~ttC:1g.
Street Wgtrting- Ba9.eltne Road. Walkl...'3Y l..1ghlIng Mearns Avenue.
I Rol:lert Adams Or. Trolls Road. SoJina Road., West Sic!e Dr_ !.o Glaf1.a.bbey Park. Concession Sl to
to V/hlttaker Ava.. South of Avondale
Courtice Dr.. Courtit:e Soulh 01 Hwy. 2 MertinRoad. Co"""" CPRCrcs:s;ng,
Bowmanvil.!e SowmarMT.
Str99t Lighting Insla.tJation Unspeeified
CCDunt Number 7231J.00210..{JOC!C 72:!O...oa210~Ol) 723C...oo21~OOO
Construction Costs Contract Cl.2lJ01-40
Total Construction CQst $59.966.00 $4,969.00 $2,.400_00 53.540.00 $4.,130.00 S10,685.!l0 ~..241.00
rrsH Projllct Number 12.29013 12-29Q54 ,....D54 12-29054 12-29Q54 lNllD54
Preliminary Design, DetaIled Design and $6,42035 $.532.01 $256.96 $379.02 $442.19 $1,144.11 $3,556.07 Prorated Based on low Bid
Approvals (to Oct. 5, 2IID1)
Tendering ana EsUmatad Construction $Z2,ClOO.lJ-J $1,000.00 $470.00 .$710.00 $820.00 $2,200.00 $6,800.0.
AdmlnistraHon (TSH;:: 12.29054)
Other Costs
Improvernents by Hydro One Req\Jil'l."d to $5,027.00 $3,473.00 $1.554.01
Ao:ommod'ab! Ughtir19
Sub-Telal Other Coats $5,027.00 $0.00 $0.00 $3,473.00 $1,554.QO $0.00 $0.00
Sub-Total Esllm.teci Project Costs (excl. $83,413.36 $6,50LOl $3,126.96 $8,102.02 $6,946.19 $14,030.1J $44,7CJ7.D
contlnllsncleli)
NetG.S.T. (3%) {axe!. contingenciesl $2,502.40 $195.03 $93.81 $2.43.Q6 $208.39 $421'-50 $l.,341.2
CCll:ltingendM (excl. G.S.T.l $3,584.24 $203.96 $279.23 $254.92 $345.43 $S48.9B $1.951.7-
frofa6 Estimated Project Costs $39,500.00 $6,900.00 $3,500.00 $8.600.00 $7/500.00 $1S,OOO.oo $48,000.00
$26.soo.00
BUdgs.t Ameunt $]00,000.00 $30,000.00 -15 I~" c..,;.,.....\l...Jj<1 $20,000.00 $5O,~o.OO