CUSTOMER SERVICE/RECEPTION AREA
Recommendations:
1. THAT Report COD-014-01 be received;
2. THAT Council authorize the Director of Corporate Services the authority to
initiate the tendering process for the construction of the recommended Customer
Service/Reception Area; and,
3. THAT an electronic message board be included in the Customer
Service/Reception Area at an approximate cost of $20,000; and,
4. THAT the Customer Service/Reception Area technological and telephone
upgrades required to service the newly constructed unit be provided at an
approximate cost of $20,000; and
5. THAT the necessary funds be drawn from the General Municipal Reserve Fund.
Submitted by:
arie Marano
Director, Corporate Services
R"'ewed.Q ~~
ranklin Wu
Chief Administrative
Officer
MM/JJC/jv
915
REPORT NO.:COD-014-01
PAGE 2
1.0 BACKGROUND
1.1 Council has identified "excellence in customer service" as an integral part of the
Municipality's overall Business Plan. A key part of the customer service strategy is
the reception area that is located in the lobby area of the Municipal Administration
Centre.
1.2 Report ADMIN-02-01 NEW ORGANIZATIONAL STRUCTURE provided for the
construction of the ground floor reception area in order to advance the customer
service program.
2.0 DISCUSSION
2.1 The function of the current reception area is evolving into a comprehensive
Customer Service/Reception Area. It is planned that this area will provide a "one-
stop" information service for individuals arriving at the Municipal Administrative
Centre in search of general information regarding the services, programs and
facilities of the Corporation of the Municipality of Clarington. Information available
from Customer Service Clerks, the municipal website (internet) and intranet will be
available at this area. General information brochures and publications - such as
the Community Guide, Visitors Guide and Municipal Directory of Service - will
also be available at this location.
2.2 Given the future function of this area, it has been necessary to rethink the
physical set-up of the existing workstation. Currently the duties at the reception
area are performed by one full-time and one part-time (24 hourslweek)
Communications Clerks. These individuals are the Municipality's "greeters" to
those arriving in person or by telephone. The space allows for one computer
workstation and one Mitel Superconsole 1000. It does not allow for both staff to
work in this space, comfortably, at the same time.
2.3 Attached is the proposed design for the new Customer Service/Reception Area.
Utilizing the existing reception area, it will incorporate the following attributes:
. 2 computer workstations with network and internet access;
. Raised platform so that Communications Clerks are at eye-level
with people making inquiries;
. Dedicated space for a large digital message board;
916
REPORT NO.:COD-014-01
PAGE 3
. 2 Mitel Superconsole 1000 - allowing staff to answer more than
one call at anyone time; and,
· Bulletin boards and pamphlet holders for the display of information
brochures & publications
The new Customer Service/Reception Area is intended to deliver a positive
message to those individuals entering the Municipal Administrative Centre. The
plan includes the "dressing" of the large pillars in the lobby area - local artists will
be contacted to consider their suggestions.
2.4 The construction of the Customer Service/Reception Area was removed from the
building tender (MAC Expansion) in order to advance the customer service
program. At that time the architect was requested to provide a cost estimate
(Attachment # 1). The estimated costs, provided by Shoalts and Zaback
Architects Limited, includes the removal of the existing reception desk,
construction of the new Customer Service/Reception Area and applicable taxes.
The total project cost is estimated to be $65,000.00. The digital message board
is a separate item not included in the estimated project cost. Although formal
quotes would be required, it is estimated that the installation of the digital
message board would be about $20,000.00. As approved in the reorganization,
REPORT ADMIN 02-01, the funds to reconfigure the Customer
Service/Reception Area are to be drawn from the General Municipal Reserve
Fund.
3.0 ACCOMMODATING EXPANSION
3.1 The removal of the existing desk and the construction of the Customer
Service/Reception Area must be timed to limit the impact to the level of service
expected by the public. With Council's approval to take this project to tender, it
will be necessary to temporarily relocate the Communications staff. In addition,
as the expansion of the Clarington Public Library and Municipal Administrative
progresses, it is anticipated that other services and staff may need to be
relocated. To this end, the Corporate Services Department suggests the
following plan. The Communications & Tourism Division (3 full-time staff) will be
temporarily relocated to the Boardroom Area offered by the existing Clarington
Public Library. This move would be initiated in December 2001 in order to have
917
REPORT NO.:COD-014-01
PAGE 4
,
the least amount of impact to the daily work requirements and clients of this
Division. This move, however, will not be implemented until computer network
and telephone/fax issues are dealt with in order to reduce any
impact/inconvenience to the public.
3.2 Once the existing space used by the Communications & Tourism Division is
available, it is suggested that the Communications Clerks assigned to the
Customer Service/Reception Area be temporarily relocated to this area. This will
allow for the least amount of service disruption while the new workspace is being
constructed. Finally, once the reception area is complete, the Communications
Clerks would be relocated to their new space leaving the former Communications
& Tourism area available for use by other municipal staff that would be negatively
impacted by the ongoing construction of the new library and expansion of the
Municipal Administrative Centre. Minor costs associated with this temporary
move such as wiring etc. will be included in charges to the General Municipal
Reserve Fund.
4.0 CONCLUSION
4.1 Modifying the existing reception area into a user-friendly Customer
Service/Reception Area is one of the many initiatives the Municipality will
undertake in the coming years to improve customer service - a priority item
identified in the Chief Administrative Officer's comprehensive Business Plan.
ATTACHMENTS:
Attachment #1 - Architectural drawing of proposed Customer Service/Reception Area
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET BOWMANVILLE, ONTARIO L 1C 3A6 T 905 623-3379 F 905 623-0584
918
lU/Ol/O! 15:J7 FAX
-
~
< t:;
rr:
"
Z
~ ~v.
8 '-"-
::r: (
'-'
~
I-
-'
'" \
~
lL'
{/)
Vl"
:s~
Clt:J
liD:
z\Ji
SHUAL'j'S
-'_ ~ZABACl(
-----I ~
iz:
iz:"''''
o~ffi
ff'o..;2
o
~::::Oa::
f-'-'w
l5 '" ::r:-3'~
-'01-
U1LL~O
w
~
~
:::;;
~
o~
~~
we.
~
f5 ~~
~ 11.0
~... -'
a:::_CLa.I
e5~ ~\
f5 ~~ ~
~1- 9
~za",
QJ~e
~~
Ie
g~U'
~g3
Di
C.06
CJ
'"
W
l-
X
W
o
;z:
::J
lL
W
Iii
g
a::
~
w
'"
~~
a::~
~O
:5~
0..0
~~
,z:::;;
!!:~
~~
03
~
~
-'
W
!Xl
~
~
B
G: .
o ~
ol/)~
~~o
-,"~'
w -
zzffi
<(01/)
0..1=
VlOO
~~f5
<)
919
w
w
If
a::
!:l:g ;
&1::>
-gj8
----4 /;'
I \
I
/
14] un:}! OUJ
"U
C
o
>-
.D.
.aC
o 0
.-J:;::
0-
.<1>
cow
Q)Q)..-
e>o=::...-
'^
c(
'"
1
I,)
Ij)