Loading...
HomeMy WebLinkAboutCOD-008-01 , ". REPORT #2 . Clw:-!lJgron REPORT CORPORATE SERVICES DEPARTMENT Meeting: COUNCIL MONDAY, SEPTEMBER~ 2001 COD-008-01 File #: A r .()u . By-law #: Date: Resolution #:G 5^d-.C(-o I Report #: Subject: CL2001-35, SIDEWALK CONSTRUCTION - VARIOUS LOCATIONS MUNICIPALITY OF CLARINGTON Recommendations: It is respectfully recommended to Council the following: 1. THAT Report COD-008-01 be received; 2. THAT Aloia Bros. Concrete Contractors Ltd., Toronto, Ontario, with a tbtal bid in the amount of $91 ,716.93 (including G.S.T.), being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL2001-35, be awarded the contract for the Sidewalk Construction - Various Locations, as required by the Engineering Services Department; 3. THAT funds required in the amount of $89,757.65 (including net G.S.T. and Contingencies) be drawn from the Engineering Services Department Capital Budget Account #7212-96002- 0261; 4. THAT the remaining funds in the amount of $4,242.35 (Consulting) be drawn from the General Engineering Design Account #7205-87000-0260; and 5. THAT the attached By-law marked Schedule "A", authorizing the Mayor and Clerk to execute the agreement be approved. Reviewed Q "aJZQ~ R. Franklin Wu, M.C.I.P. Chief Administrative Officer Submitted bll rie Marano, H.B.Sc., AMCT Director of Corporate Services ~~~ Director of Engineering Services MMIlABILMUm REPORT NO.: COD-008-01 PAGE 2 BACKGROUND AND COMMENT Tender specifications were provided by Totten Sims Hubicki Associates for the Sidewalk Construction- Various Locations within the Municipality of Clarington, as required by the Engineering Services Department. Tenders were advertised in the local papers, as well as the Daily Commercial News. Subsequently, tenders were received and tabulated as per Schedule "B" attached. For the information of Council, three (3) contractors picked up tender packages, but only (1) tender was received. The poor response to the tender call is identified in the letter from Totten Sims Hubicki Associates, marked Schedule "C". The total project cost, including Project Administration, as detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "C", is estimated at $94,000.00. Funds in the amount of $89,757.65 will be drawn from the 2001 Engineering Services Department Capital Budget Account #7212-96002-0261, and are within the budget allocation of $100,000.00 for Sidewalk Construction - Various Locations, as identified on Page 146 of the 2001 Capital Budget. The remaining funds required in the amount of $4,242.35 for Consulting will be drawn from the General Engineering Design Account #7205-87000-0260. Although the low bidder has not previously performed work for the Municipality of Clarington, they have recently completed similar work for the City of Oshawa, and the Town of Georgina in York Region. The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Engineering Services. After further review and analysis of the bids by Engineering Services, Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Aloia Bros. Concrete Contractors Ltd., Toronto, Ontario, be recommended for the contract for the Sidewalk Construction - Various Locations within the Municipality of Clarington. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-4169 2 "SCHEDULE An THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW #2001- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Aloia Bros. Concrete Contractors Ltd., Toronto, Ontario for the Sidewalk Construction - Various Locations within the Municipality of Clarington. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington with the Corporation Seal, a contract between Aloia Bros. Concrete Contractors Ltd., Toronto, Ontario and said Corporation; and 2. THAT this agreement attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of ,2001. By-law read a third time and finally passed this day of .2001. John Mutton, Mayor Patti L. Barrie, Municipal Clerk SCHEDULE "B" BID SUMMARY CL2001-35 SIDEWALK CONSTRUCTION - VARIOUS LOCATIONS Bidder Aloia Bros. Concrete Contractors Ltd. Toronto, ON Total Bid Amount $91,716.93 DN:WP51DATAlBIDSUMMlCL01-35 Municipality of Clarington Sidewalk Construction Various Locations Cost Apportionment Based on Low Bid By Aloia Bros. ConCR!te Contractors Lid. Contract Cl.2001-35 17 -Sap-01 T.S.H. Project 12-29079 Description Total Comments Account Number 1212-96002-0261 Construction Co&ts Contract CL2001-35 585.716.76 Account Number 7205-87000.0260 Prepare Tender Documents TSH Project Number 12-29079 $4,242.35 Charged to Genem' Engineertng Design Account Estimated Construction Administration (TSH #112-29074) $0,00 By Clarington Staff Sub-Total Estimated Project Costs (excl. contingencies) S89.959.11 Net G.S.T. (3%) (exel. contingencies) $2,698.77 Contingencies [incL G.5.T_) $1.342.12 Total Estimated Project Costs $94.000.00 G:\Pro;eClS\lDSI2\Construc\Low Bid Cost apportionment 9/18101 . lilt SCHEDULE "C" Totten Sims Hubick:i Associates 513 Division Street, Cobourg, Ontario, Canada K9A 5G6 (90S} 372-2t21 Fax: (905) 372-3621 E-mail: cobourg@tsh.ca www.tsh.ca engineers architects planners September 17, 2001 Ms. Lou Ann Birkett, CPP, AMCT Purchasing Manager Corporation of the Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario. LlC 3A6 Fax: 905-623-4169 Dear Ms. Birkett: Re: Contract No. CL2001-35, Sidewalk Construction Various Locations, Municipality of CIarington Tenders for the above project were opened at the municipal offices on Wednesday, September 12, 2001, at 2:00:00 p.m. The bids received inclusive of GST are summarized as follows: Bidder T,otalBid Amount Aloia Bros. Concrete Contractors Ltd., Toronto, Ont. $91,716.93 While three contractors picked up tender packages, only one bid was received. The poor response to the tender call is thought to be related to the relatively small value of work included in the tender and the fact that most contractors involved with the concrete trade are busy at this time of year trying to complete work before freeze up. In addition, the work is not suited to larger contractors because it involves small amounts of work over a large geographic area making it difficult to coordinate crew activities. The price received from Aloia Bros. is consistent with the Engineer's Estimate for the project and within the amount budgeted for the project by C1arington Staff. The bidder's submitted tender has been reviewed and is in order. Aloia Bros. Concrete Contractors Limited has recently completed work for the City of Oshawa and for the Town of Georgina in York Region. These projects were similar in nature to the subject contract and references contacted indicated their perfonnance was acceptable. We, therefore, recommend acceptance of the low bid on this Contract. . . , Municipality of Clarington June 8, 2001 2 The deposit securities received from Aloia Bros. Concrete Contractors Ltd. should be retained until successful execution of the Contract.. Should you require any further information, please contact the undersigned. Yours truly, ~A /l1~~ William McCrae, P.Eng. Senior Project Engineer WMc/jg PI29079/Conesp/18790.doc pc: F. Horvath A.S. Cannella K. Rand lIH