HomeMy WebLinkAboutCOD-008-01
,
".
REPORT #2
.
Clw:-!lJgron
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
COUNCIL
MONDAY, SEPTEMBER~ 2001
COD-008-01 File #: A r .()u .
By-law #:
Date:
Resolution #:G 5^d-.C(-o I
Report #:
Subject:
CL2001-35, SIDEWALK CONSTRUCTION - VARIOUS LOCATIONS
MUNICIPALITY OF CLARINGTON
Recommendations:
It is respectfully recommended to Council the following:
1. THAT Report COD-008-01 be received;
2. THAT Aloia Bros. Concrete Contractors Ltd., Toronto, Ontario, with a tbtal bid in the amount
of $91 ,716.93 (including G.S.T.), being the lowest responsible bidder meeting all terms,
conditions and specifications of Tender CL2001-35, be awarded the contract for the
Sidewalk Construction - Various Locations, as required by the Engineering Services
Department;
3. THAT funds required in the amount of $89,757.65 (including net G.S.T. and Contingencies)
be drawn from the Engineering Services Department Capital Budget Account #7212-96002-
0261;
4. THAT the remaining funds in the amount of $4,242.35 (Consulting) be drawn from the
General Engineering Design Account #7205-87000-0260; and
5. THAT the attached By-law marked Schedule "A", authorizing the Mayor and Clerk to execute
the agreement be approved.
Reviewed Q "aJZQ~ R.
Franklin Wu, M.C.I.P.
Chief Administrative Officer
Submitted bll
rie Marano, H.B.Sc., AMCT
Director of Corporate Services
~~~
Director of Engineering Services
MMIlABILMUm
REPORT NO.: COD-008-01
PAGE 2
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Sidewalk Construction-
Various Locations within the Municipality of Clarington, as required by the Engineering Services
Department.
Tenders were advertised in the local papers, as well as the Daily Commercial News. Subsequently,
tenders were received and tabulated as per Schedule "B" attached.
For the information of Council, three (3) contractors picked up tender packages, but only (1) tender was
received. The poor response to the tender call is identified in the letter from Totten Sims Hubicki
Associates, marked Schedule "C".
The total project cost, including Project Administration, as detailed in the letter from Totten Sims Hubicki
Associates, marked Schedule "C", is estimated at $94,000.00.
Funds in the amount of $89,757.65 will be drawn from the 2001 Engineering Services Department Capital
Budget Account #7212-96002-0261, and are within the budget allocation of $100,000.00 for Sidewalk
Construction - Various Locations, as identified on Page 146 of the 2001 Capital Budget. The remaining
funds required in the amount of $4,242.35 for Consulting will be drawn from the General Engineering
Design Account #7205-87000-0260.
Although the low bidder has not previously performed work for the Municipality of Clarington, they have
recently completed similar work for the City of Oshawa, and the Town of Georgina in York Region.
The Director of Finance has reviewed the funding requirements and concurs with the recommendation.
Queries with respect to department needs, specifications, etc., should be referred to the Director of
Engineering Services.
After further review and analysis of the bids by Engineering Services, Totten Sims Hubicki Associates and
Purchasing, it was mutually agreed that the low bidder, Aloia Bros. Concrete Contractors Ltd., Toronto,
Ontario, be recommended for the contract for the Sidewalk Construction - Various Locations within the
Municipality of Clarington.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-4169
2
"SCHEDULE An
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW #2001-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Aloia Bros.
Concrete Contractors Ltd., Toronto, Ontario for the Sidewalk
Construction - Various Locations within the Municipality of
Clarington.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS
AS FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a contract
between Aloia Bros. Concrete Contractors Ltd., Toronto, Ontario and said
Corporation; and
2. THAT this agreement attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
,2001.
By-law read a third time and finally passed this day of
.2001.
John Mutton, Mayor
Patti L. Barrie, Municipal Clerk
SCHEDULE "B"
BID SUMMARY
CL2001-35
SIDEWALK CONSTRUCTION - VARIOUS LOCATIONS
Bidder
Aloia Bros. Concrete Contractors Ltd.
Toronto, ON
Total Bid Amount
$91,716.93
DN:WP51DATAlBIDSUMMlCL01-35
Municipality of Clarington
Sidewalk Construction
Various Locations
Cost Apportionment Based on Low Bid By Aloia Bros. ConCR!te Contractors Lid.
Contract Cl.2001-35
17 -Sap-01
T.S.H. Project 12-29079
Description Total Comments
Account Number 1212-96002-0261
Construction Co&ts Contract CL2001-35 585.716.76
Account Number 7205-87000.0260
Prepare Tender Documents TSH Project Number 12-29079 $4,242.35 Charged to Genem' Engineertng Design Account
Estimated Construction Administration (TSH #112-29074) $0,00 By Clarington Staff
Sub-Total Estimated Project Costs (excl. contingencies) S89.959.11
Net G.S.T. (3%) (exel. contingencies) $2,698.77
Contingencies [incL G.5.T_) $1.342.12
Total Estimated Project Costs $94.000.00
G:\Pro;eClS\lDSI2\Construc\Low Bid Cost apportionment
9/18101
.
lilt
SCHEDULE "C"
Totten Sims Hubick:i Associates
513 Division Street,
Cobourg, Ontario, Canada K9A 5G6
(90S} 372-2t21 Fax: (905) 372-3621
E-mail: cobourg@tsh.ca www.tsh.ca
engineers
architects
planners
September 17, 2001
Ms. Lou Ann Birkett, CPP, AMCT
Purchasing Manager
Corporation of the Municipality of Clarington
40 Temperance Street
BOWMANVILLE, Ontario.
LlC 3A6
Fax: 905-623-4169
Dear Ms. Birkett:
Re: Contract No. CL2001-35, Sidewalk Construction Various Locations,
Municipality of CIarington
Tenders for the above project were opened at the municipal offices on Wednesday, September 12,
2001, at 2:00:00 p.m. The bids received inclusive of GST are summarized as follows:
Bidder
T,otalBid Amount
Aloia Bros. Concrete Contractors Ltd., Toronto, Ont.
$91,716.93
While three contractors picked up tender packages, only one bid was received. The poor response to
the tender call is thought to be related to the relatively small value of work included in the tender and
the fact that most contractors involved with the concrete trade are busy at this time of year trying to
complete work before freeze up. In addition, the work is not suited to larger contractors because it
involves small amounts of work over a large geographic area making it difficult to coordinate crew
activities. The price received from Aloia Bros. is consistent with the Engineer's Estimate for the
project and within the amount budgeted for the project by C1arington Staff.
The bidder's submitted tender has been reviewed and is in order. Aloia Bros. Concrete Contractors
Limited has recently completed work for the City of Oshawa and for the Town of Georgina in York
Region. These projects were similar in nature to the subject contract and references contacted indicated
their perfonnance was acceptable. We, therefore, recommend acceptance of the low bid on this
Contract.
.
.
,
Municipality of Clarington
June 8, 2001
2
The deposit securities received from Aloia Bros. Concrete Contractors Ltd. should be retained until
successful execution of the Contract..
Should you require any further information, please contact the undersigned.
Yours truly,
~A /l1~~
William McCrae, P.Eng.
Senior Project Engineer
WMc/jg
PI29079/Conesp/18790.doc
pc: F. Horvath
A.S. Cannella
K. Rand
lIH