CORPORATION OF THE TOWN OF NEWCASTLE
PUBLIC WORKS DEPARTMENT R. DUPUIS, P. ENG., DIRECTOR
HAMPTON,ONTARIO TEL.(416)263-2231
LOB 1JO 987-5039
REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
MEETING OF OCTOBER 12, 1982.
REPORT NO. WD-86-82.
SUBJECT: RECONSTRUCTION OF LIBERTY PLACE/ALEXANDER
BOULEVARD, BOWMANVILLE.
RECOMMENDATION:
It is respectfully recommended:
1 . That this report be received, and,
2. That the Public Works Department be authorized to perform
extra-ordinary maintenance activities in the reconstruction
of Liberty Place and Alexander Boulevard, and,
3. That the cost of the reconstruction work be charged to the
Liberty Place/Alexander Boulevard, Unspecified Road Con-
struction, Account No. 7205-X-00179-X and 7205-X-00901-X.
BACKGROUND AND COMMENT:
Public Works' Staff have reviewed the reconstruction needs of Liberty
Place and Alexander Boulevard and recommend that the necessary works
be considered as an extra-ordinary maintenance activity, undertaken by
Town forces.
i
The necessary work consists of removal and excavation of existing
asphalt and substandard base materials, removal of sections of
deficient sidewalk, repair of storm sewers, minor adjustments toy✓
the placement of utilities, shaping of a gravel base and hot asphalt0`
paving. ,��
WD-86-82. - 2 -
The estimated cost of under $35,000 (Thirty Five Thousand Dollars)
is considerably less than the 1983 Capital Budget forecast of
$114,000, and it is recommended that the expenditure be charged
to the account for Liberty Place/Alexander Boulevard, and to
Unspecified Road Construction.
Dependent upon Council 's favourable acceptance, construction could
commence immediately, with final paving by the end of November.
Respectfully submitted,
R.G. Dupuis, P. Eng. ,
Director of Public Works.
October 6, 1982.
DTG/RGD:vh
i
I
i
i
I
• CORPO-KATtON OF THE TOWN OF NEWCASTLE + �}j;j_yi �, _ Page iio. TU
Major Projects • Transportation Services
1982 Capital Budget
=' Road Construction. 7205-000-179
Project Detail-Sheet
4. CAPITAL COST 7. FINANCING
1. PROJECT NUMBER 7205-000-179
2. PROJECT LOCATION&DESCRIPTION Land,Buildings&Major Improvements $ Tax Levy $ 61 ,000
Alexander Boulevard Furniture&Equipment Revenue from Users
Liberty Place, Bowmanville.
Subsidy&Contributions:
Construction Services'
Contractor
116,000 50% S -6L 000 ,
Regional
Engineering 6,000 Total Subsidy&Contributions
Debentures:
Temporary Financing Tax Supported S
Non Tax Supp.
Total Debentures
TOTAL COST$ 122,000 TOTAL FINANCING 5 122,000
3. KEY PLAN 5. RELATED PROJECTS d.Vn.t nt.,rt u,n• , Iti o„� ,fi+ Iii ,,r.• r ,r
a 0 1 6. NEED/EXPLANATION OF PROJECT
Needs Study # 94179 - priority rating 21 .
Project initiated by Resolutions WD-165-81 and C-785-81 .
1
aLVCxANMR Complete reconstruction to Urban Standard, including storm sewers, sidewalks,
curb and gutter and utility locations.
LIBER
PLACE
Page no.
1 Page No. 257
CORPORATION OF THE TOWN OF NEWCASTLE
DEPARTMENT: PUBLIC WORKS
1982 CAPITAL BUDGET
=� FUNCTION: Transportation Services
7205-000-179
Account Number Description 1981 Bud et 1981 Actual
ctual 1982 Budget
7205-000-179 Alexander Place/Liberty Boulevard (Bowmanville)
- Engineering & Design _
8,000
I
i
Total Expenditure _
8,000
F
E
i
k
Reconstruction moved to 1983 - $114,000