Loading...
HomeMy WebLinkAboutWD-86-82 4 CORPORATION OF THE TOWN OF NEWCASTLE PUBLIC WORKS DEPARTMENT R. DUPUIS, P. ENG., DIRECTOR HAMPTON,ONTARIO TEL.(416)263-2231 LOB 1JO 987-5039 REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE MEETING OF OCTOBER 12, 1982. REPORT NO. WD-86-82. SUBJECT: RECONSTRUCTION OF LIBERTY PLACE/ALEXANDER BOULEVARD, BOWMANVILLE. RECOMMENDATION: It is respectfully recommended: 1 . That this report be received, and, 2. That the Public Works Department be authorized to perform extra-ordinary maintenance activities in the reconstruction of Liberty Place and Alexander Boulevard, and, 3. That the cost of the reconstruction work be charged to the Liberty Place/Alexander Boulevard, Unspecified Road Con- struction, Account No. 7205-X-00179-X and 7205-X-00901-X. BACKGROUND AND COMMENT: Public Works' Staff have reviewed the reconstruction needs of Liberty Place and Alexander Boulevard and recommend that the necessary works be considered as an extra-ordinary maintenance activity, undertaken by Town forces. i The necessary work consists of removal and excavation of existing asphalt and substandard base materials, removal of sections of deficient sidewalk, repair of storm sewers, minor adjustments toy✓ the placement of utilities, shaping of a gravel base and hot asphalt0` paving. ,�� WD-86-82. - 2 - The estimated cost of under $35,000 (Thirty Five Thousand Dollars) is considerably less than the 1983 Capital Budget forecast of $114,000, and it is recommended that the expenditure be charged to the account for Liberty Place/Alexander Boulevard, and to Unspecified Road Construction. Dependent upon Council 's favourable acceptance, construction could commence immediately, with final paving by the end of November. Respectfully submitted, R.G. Dupuis, P. Eng. , Director of Public Works. October 6, 1982. DTG/RGD:vh i I i i I • CORPO-KATtON OF THE TOWN OF NEWCASTLE + �}j;j_yi �, _ Page iio. TU Major Projects • Transportation Services 1982 Capital Budget =' Road Construction. 7205-000-179 Project Detail-Sheet 4. CAPITAL COST 7. FINANCING 1. PROJECT NUMBER 7205-000-179 2. PROJECT LOCATION&DESCRIPTION Land,Buildings&Major Improvements $ Tax Levy $ 61 ,000 Alexander Boulevard Furniture&Equipment Revenue from Users Liberty Place, Bowmanville. Subsidy&Contributions: Construction Services' Contractor 116,000 50% S -6L 000 , Regional Engineering 6,000 Total Subsidy&Contributions Debentures: Temporary Financing Tax Supported S Non Tax Supp. Total Debentures TOTAL COST$ 122,000 TOTAL FINANCING 5 122,000 3. KEY PLAN 5. RELATED PROJECTS d.Vn.t nt.,rt u,n• , Iti o„� ,fi+ Iii ,,r.• r ,r a 0 1 6. NEED/EXPLANATION OF PROJECT Needs Study # 94179 - priority rating 21 . Project initiated by Resolutions WD-165-81 and C-785-81 . 1 aLVCxANMR Complete reconstruction to Urban Standard, including storm sewers, sidewalks, curb and gutter and utility locations. LIBER PLACE Page no. 1 Page No. 257 CORPORATION OF THE TOWN OF NEWCASTLE DEPARTMENT: PUBLIC WORKS 1982 CAPITAL BUDGET =� FUNCTION: Transportation Services 7205-000-179 Account Number Description 1981 Bud et 1981 Actual ctual 1982 Budget 7205-000-179 Alexander Place/Liberty Boulevard (Bowmanville) - Engineering & Design _ 8,000 I i Total Expenditure _ 8,000 F E i k Reconstruction moved to 1983 - $114,000