Loading...
HomeMy WebLinkAboutWD-63-82 -17 . 4 CORPORATION OF THE TOWN OF NEWCASTLE PUBLIC WORKS DEPARTMENT R. DUPUIS, P. ENG., DIRECTOR HAMPTON,ONTARIO TEL.(416)263-2231 LOB 1JO 987-5039 REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE MEETING OF SEPTEMBER 13, 1982. REPORT NO. WD-63-82. SUBJECT: KING STREET (HIGHWAY NO. 2) CONNECTING LINK. VILLAGE OF NEWCASTLE. RECOMMENDATION: It is respectfully recommended: 1 . That this report be received for information, and; 2. That a copy of Report WD-63-82 be forwarded to the District Municipal Engineer, Ministry of Transportation & Communications. REPORT: There have been ongoing discussions between the Town of Newcastle and the Ministry of Transportation & Communications related to reconstruction of the Highway No. 2 Connecting Link in the former Village of Newcastle. As late as March, 1982, the Town was advised that connecting link funds were not available for such work. More recently, however, we have been advised that funds in the amount of $20,000. 00 for Design, and $280,000. 00. , for Construction, have been allocated for the years 1982 and 1983 respectively. The Town is concerned that the above amounts are insufficient, in view of the Design Criteria and Preliminary Cost Estimates which were prepared and submitted to the Ministry in January of this year. 1.Cal WD-63 782 - 2 _ The Preliminary Cost Estimates showed costs in the order of $750,000 for the Connecting Link, with $600,000 to be provided by the Ministry; obviously these figures are far in excess of the $280,000 being provided. Accordingly, the attached letter was forwarded, by the Director of Public Works to the Ministry. In essence, the proposal is to proceed as follows : 1 . The District Municipal Engineer was notified on August 9, 1982, of the Town's concerns in regard to available funding, and advised that more accurate designs and cost estimates would be prepared, for further discussion and consideration. 2. The Town has engaged it's consultant to assemble the necessary base information, and prepare detailed designs and cost estimates. 3. The Town's consultant is presently performing these tasks. 4. Upon completion of the preparation of base information and plans, a meeting will be convened between: (i) The Town (ii) Newcastle B. I.A. (iii) M.T.C. District No. 6 Staff. (iv) M.T.C. Planning & Design Staff. At this time it is hoped that such a meeting will result in a mutually agreed upon design so that the detailed designs and cost estimates can be compiled. It is also expected that the works on behalf of the Newcastle B.I.A. can be incorporated into the Conn- ecting Link project. 5. M.T.C. will , hopefully, take whatever steps are necessary to ensure that sufficient connecting link funds are all- ocated to the project. Verbal discussions with the District Municipal Engineer have established that he is prepared to support the Town in an endeavour to secure additional funds, if such a request can be substantiated. WD-63-82 - 3 _ In summary: the Ministry of Transportation & Communications has been notified of the Town's concerns relative to the amount of funding being provided for the Village of Newcastle Connecting Link, and efforts are underway towards a request for additional allocations, if required. Respectfully submitted, R.G. Dupuis , P. Eng. , Director of Public Works. August 23, 1982. R