CORPORATION OF THE TOWN OF NEWCASTLE ;
PUBLIC WORKS DEPARTMENT R. DUPUIS, P. ENG., DIRECTOR
HAMPTON,ONTARIO TEL.(416)263-2231
LOB 1J0
987-5039
REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
MEETING OF JUNE 28, 1982.
REPORT NO. WD-52-82
SUBJECT: MILL STREET BRIDGE REPAIR AT GRAHAM CREEK.
BUDGET ITEM 7206-000-081
RECOMMENDATION:
I It is respectfully recommended:
1. That this report be received and,
2. That Totten, Sims, Hubicki Associates Limited be
retained to administer and supervise qualified bridge
repair contractors on a `cost plus payment basis) in
the repair of the Mill Street Bridge spanning Graham
Creek.
BACKGROUND AND COMMENT:
In 1981, while performing routine inspection of the Mill Street
Bridge spanning Graham Creek in Newcastle Village, Town staff
noted several large cracks in the abutment wall . Totten, Sims,
Hubicki Associates were directed to review the bridge structure
and carry out a detailed study.
The Ministry of Transportation and Communications advised that
plans of the existing concrete bridge were not available, making
it extremely difficult and costly to carry out a proper assessment
of the structure.
4�\
J
WD-52-82
- 2 -
Further field inspection revealed serious undermining and cracking
of the east abutment footing with voids up to 3 feet in size.
It is recommended that, in order to prevent further settlement
and erosion of the footings, the voids be filled with mass concrete.
The areas to be filled are under water and the work will be co-
ordinated with the Ganaraska Conservation Authority in order to
protect the investment in this structure. The repairs must be
completed this summer.
Respectfully s bmitted,
R. G. Dupuis, P. Eng. ,
Director of Public Works.
I
June 23, 1982
DTG/cc
`tom, t_UKt'UKA I IUN Ut- I tit I OWN OF NEWCASTLE 0 PUBLIC WORKS Pate No, 267
• TRANSPORTATION SERVICES
1982 CURRENT BUDGET � BRIDGE & CULVERT MAINTENANCE
Project Detail Sheet
�— 4. CAPITAL COST 7. FINANCING
2. PROJECT NUMBER 7206-000-081
2. PROJECT LOCATION & DESCRIPTION Land,Buildings& major Improvements $ Tax Levy S 4,000
Mill Street Bridge at Graham Creek Furniture& Equipment Revenue from Users
Needs Study Bridge Location # 93003 Construction Services: Subsidy & Contributions:
80%
Contractor 20,000
Regional
Engineering Total Subsidy & Contributions
Debentures:
Temporary Financing Tax Supported
Non Tax Supp.
Total Debentures
TOTAL COST$ 20'000 TOTAL FINANCING S 20'000
3. KEY PLAN 5. RELATED PROJECTS 8.Pfoj( b1.,rl .f.,,e
`TO�oi�ro — 7205-000-731 Mill Street Reconstruction
CLIFTON T 6.
NEED/EXPLANATION OF PROJECT
U 1981 Bridge Appraisal recommended remedial work be performed in 1982 to
prevent further damage to the existing structure.
Footings are being undermined and require grouting and shoring-up.
Mork to be performed by qualified specialty contractor on 'Cost Plus '
KE ST basis.
METCA
Q
S
a
page no.
Pace No. 266
CORPORATION OF THE TOWN OF NEWCASTLE
�==
1982 CURRENT BUDGET p
Function: Transportation Services
a
Department: PUBLIC WORKS Maintenance
Account iffier Description 1981 Budget 1981 Actual 1982 Budget
7206-000-081 Mill Street (Village of Newcastle) -
Bridge Repair at Graham Creek 20,000
Total Expenditure _ 20,000
Cost Estimate - based on 1981 Bridge Appraisal .
Remedial work required to save structure.