Loading...
HomeMy WebLinkAboutWD-33-81 TOWN OF NEWCASTLE PUBLIC WORKS DEPARTMENT Director's Report to Public Works Committee of February 17, 1981. ITEM: WD-33-81. DATE: February 16, 1981. SUBJECT: Public Works Department Organization. INFORMATION: Attached is a copy of a memorandum to the Treasurer, together with the Public Works Department (Personnel) Organization Chart and the Equipment Replacement Schedule. I This data is presented to Committee for information and discussion purposes in respect of the Current Budget. IAII I (� M E M O R A N D U M TO: K. DeGroot, 'Treasurer. FROM: J. Dunham, Director of Public Works . SUBJECT: Organizational Chart & 1981 Budget. DATE: February 10, 1981. Attached herewith is an Organizational Chart defining the needs for additional staff in the Public Works Department , which is forwarded to you for the Budget presentation plan. I have attempted to schedule the needs over a period of three years, on the assumption that interim office facilities will be available during the current year and until 1983, with the expectation that ultimate, permanent (one building) facilities will be a reality during 1983 . It is anticipated that, upon the resolution of the accommodation requirements, and the consolidation of offices in one location, the full complement of Public Works' staff relevant to engineer- ing, could be accomplished. I have not produced costs relevant to the attached, other than for 1981, as all projections are dependent upon facilities. It should be noted, however, that the matter of clerical assistance will require an in-depth review in tandem with any increase in technical staff. The Equipment Inventory and Replacement Schedule indicates re- placement through a five-year period. I have not projected any additional equipment , at this time, due to the uncertainty of development; it is suggested, therefore, that the schedule be updated annually. The original request for two (2) additional hourly employees is being deleted, as a result of which, and with the co-operation and assistance of supervisory staff, I intend to re-structure part of the outside operation. There are numerous items and/or projects which are not in the 1981 Budget Proposal, e.g. , Lakeshore Erosion Control, Sidewalk it 12 2 - Replacement, Clarke/Hope Boundary (a request for funds which was received just lately) , Pedestrian Underpass (Regional Road 57) , Metric Conversion of Design Standards, etc. The 1981 Proposed Budget has recognized, and does not exceed, the 1981 M. T.C. Subsidy Allocation relevant to Bridge & Culvert Construction, Road Construction and Maintenance, etc. Areas of concern could occur in Account No. 7212-000-000, where inclusions are items such as the Salt Storage Structure and Sidewalks on Maint Street in Orono (the total for these being $124 ,000. 00) . In keeping with the proposed schedule for Budget consideration I would recommend that the matter be reviewed at the February 17, 1981, Public Works Committee Meeting. I look forward, with interest, to your comments on the foregoing. ' I JD:vh att: PUBLIC WORDS DEPARTMENT ORGANIZATION CHART PUBLIC WORKS DEPARTMENT ORGANIZATIONAL CHART DIRECTOR OF PUBLIC WORKS ' SECRETARY Proposed (1983) Proposed (1982) J Technical I SENIOR I DEPUTY Staff _ - ' Technician DIRECTOR OF -i - _ PUBLIC WORKS Proposed (1983) iProposed (1981) i Technical Technician , i Staff - - - - _ - - SUPERINTENDENT I HAMPTON BOWMANVILLE ORONO PURCHASING ACCOUNTING FOREMAN FOREMAN AGENT/SHOP CLERK FOREMAN FOREMAN WORKS SANITATION Leadhand(1) Leadhand (1) [Labourers eadhand 1 Grader Ops. (3) ( ) Leadhand (1) Grader Oprs. (1) r. Driver (1) Grader Ops. (2} Mechanics (3) Tr. Drivers(6) Tr. Drivers (5) 3 ( ) Tr. Drivers (6) Gradall Operator(1 Alternates between all three Yards. r PUBLIC WORKS DEPARTMENT EQUIPMENT REPLACEMENT SCHEDULE PURL-C t-.'UR S Unit Description of Equipment Model Estimated 1981 ANNUAL REPLACEMENT SCHEDULE ($ Thousands) Number Year Cost - without - allowance for trade included - trade. 1981 1982 1983 1984 1985 GRADERS: 1515-001 Champion 210 h.p. 740 1978 75,000_ 0,02-001 Champion 205 h.p. 660 B 1973 45,000 140 1514-002 Champion 165 h.p. 660 B 1975 50,000 001-003 Wabco 165 h.p. 660 1970 30,000 130 002-003 Wabco 165 h.p. 555 1973 40,000 140 LOADERS: 003-001 Trojan 2 cu. yd. 1975 50,000 1509-001 Trojan 2 cu. yd. 1972 45,000 1508-003 Trojan 2 cu. yd. 1971 44,000 60.5 150-002 I.H.C. Crawler 1970 40,000 LIGHT TRUCKS: 1501-001 Chev 2 ton 1980 8,500 1502-001 Ford 2 ton 1979 7,500 7 1503-001 G.M.C. 2 ton 1978 6,000 6.5 1512-001 G.M.C. 2 ton 1978 6,000 6 1522-002 Ford 12 ton 1977 3 500 6.5 1532-003 Ford 12 ton 1979 7,500 7 •, _ __._�.ir•_i�. .� i.ti�. „�i � .ivuci Lj-l&LIU 1.,V5� l_L:Ol! Number = ? u ands Year without trade - allowance for trade included _ 1981 1982 1983 1984 . 1985 GRADALL: 1548-001 Warner Swasey 1979 128,000 HEAVY TRUCKS: 005-001 Ford L 900 (29,000 GVW) 1972 20,000 35 014-001 Ford L 900 (29,900 GVW) 1974 22,000 30 015-001 Ford L 900 (35,000 GVtd) 1976 25,000 30 016-001 Ford L 900 (35,000 GVW) 1976 25,000 31 ,017-001 I.H.C. Diesel 2070A(29,900GVG1)1976 30,000 35 1511-001 Ford L 900 Diesel (35,000 GVW)1979 35,000 016-002 I.H.C. 2010A (29,900 GVW) 1975 22,000 30 017-002 Ford L 900 (35,000 GVW) 1976 22,500 31 1524-002 G.M. C. (29,000 GVW) 1978 21,000 1540-002 Ford F350_(10,000 GVW) 1978 12,000 1528-002 Ford L 800 (27,500 GVW) 1980 20,000 018-003 Ford L 900 (34,000 GVW) 1971 18,000 35 023-003 Ford L 900 Auto (34,000 GVW) 1974 22,000 30 024-003 Ford L 900 (34,000 GVW) 1974 22,000 28 026-003 I.H.C. 2010A (29,900 GVW) 1975 22,000 32 027-003 I.H.C. 2070A Diesel(29,900GVW)1976 30,000 33 1538-003 Ford L 900 Diesel (35,000 GVW)1979 35,000 1541-003 I.H.C. 2010A (29,900 GVW) 1976 25,000 Unit Description of Equipment Model Estimated Cost (1981) ANNUAL REPLACEMENT SCHEDULE ($ Thousands) Number Year without trade - allowance for trade included - 1981 1982 1983 1984 1985 SNOW PLOWS & WINGS, GRADER MOUNTED: 1515-001 Champion V-Plow & Wing 1978 6,500 002-001 Champion V-Plow & Wing 1973 4,500 7.5 1514-002 Champion V-Plow/Wing & Frink One-Way 1975 5,000 �ff 001-003 Wabco V-Plow & Wing 1970 3,000 7 I � - 002-003 Wabco V-Plow & Wing 1973 4,000 8 HOPPER/SANDERS: I ; 005-001 Hanover 5 cu. yd. 1973 4,000 6.5 014-001 Hanover 5 cu. yd. 1975 4,500 7 015-001 Hanover 5 cu. yd. 1976 4,800 016-002 Hanover 5 cu. yd. 1976 4,800 1524-002 Hanover 5 cu. yd. 1975 4,500 8 1528-002 King Seagrave 5 cu. yd. 1968 3,000 6.5 026-003 Hanover 5 cu. yd. 1978 5,000 018-003 King Sea -rave 5 cu. yd. 1973 4,000 7 k" t` 023-003 Hanover 5 cu. d. 1975 4500 i - , 8 is f,,q i :1 t f� I Unit Description of Equipment Model Estimated Cost(1981) ANNUAL REPLACEMENT SCHEDULE ($ Thousands) Number Year without trade - allowance for trade included - 1981 1982 1983 1984 1985 SNOW PLOWS & WINGS, TRUCK MOUNTED: - 1511-001 Sumner One-Way Plow & Wing & V-Plow 1979 6,500 017-001 Frink One-Wa /Wing/V-Plow 1978 6,500 016-001 Frink One-Way & Wing 1972 4,000 8 014-001 Frink One-Way 1970 1,200 Frink V-Plow 1962 800 Frink V-Plow 1963 1,000 1528-002 Frink Reversible Plow 1978 3,500 017-002 Frink One Way/Wing 1976 5,000 016-002 Frink One-WaX 1975 1,500 027--003 Frink One-Wa /Win /V-Plow 1968 2 500 7 024-003 Frink One-Wa /Win /V-Plow 1974 5,000 1538-003 Sumner One-Way/Wing 1979 6,500 1538-003 Frink V-Plow 1975 1,500 1541-003 Frink One-Wa /Win /V-Plow 1968 2,500 1514-001 Underbody Plow 1975 2,000 1524-002 Underbody Plow 1975 2,000 TRACTORS: 007-001 1-H. C. Loader &, Mower 2400 1977 10,000 010-002 I.H.C. Loader & Mower 434 1968 8,000 013-003 I.H.C. Loader & Mower 434 1967 8,000 019-003 Case Loader & Backhoe 580E 1972 15,000 / Unit Description of Equipment Model Estimated Cost (1981) ANNUAL REPLACEMENT SCHEDULE ($ Thousands) Number Year without trade - allowance for trade included - 1981 1982 1983 1984 1985 MISCELLANEOUS: 1542-001 S.M.I. 2200 Snow Blower 1979 12,000 013-001 Calsa Weed Sprayer (400 gall) 1964 5,000 021-003 Bean Weed Sprayer (600 gall) 1973 8,000 1552-001 Asplundh Brush Chipper 1979 10,000 1543-001 Chain Saw - Pioneer 3071 1972 400 -001 Chain Saw - Pioneer P. 40 1977 500 -001 Chain Saw - Pioneer P. 28 1978 500 -002 Chain Saw - Pioneer P. 40 1978 500 -003 Chain Saw - Stihil 510 1979 500 -003 Chain Saw - Stihil 085 1969 300 -001 Water Tank/Spray Bar (1,200g) 1972 1,000 -003 Water Tank/Spry Bar (1,OOOg) 1971 1,000 012-001 Simcoe Steamer 1962 8,000 001-002 Simcoe Steamer 1968 9,000 022-003 Simcoe Steamer 1969 10,000 002-002 ___ .Wayne Street Sweeper 1971 10,000 005-002 Mobil Street Sweeper 1977 30,000 003-002 S.M.I. Leaf Vacuum 1977 8,000 008-002 Craig Low-Bed Float 1970 8,000 1550-001 Power-Washer, Barton Earl 1979 1,500 -001 Electric Welder - Miller 1972 500 2 -002 Electric Welder - Miller 1975 800 -003 Electric Welder - Miller 1971 500 1546-001/2/3Acetylene Torches 1968-70 3,000 1553-001 Compressor - 3 h.p. Gilbarco 1963 600 2.6 1554-000 Overhead Crane/Chain Hoist NEW UNIT 7 Unit Description of Equipment Model Estimated Cost (1981) ANNUAL REPLACEMENT SCHEDULE ( $ Thousands) Number Year without trade - allowance for trade included - 1981 1982 1983 1984 1985 GARBAGE PACKERS: 012-002 I.H.C. 20 cu, yd. Heil 1974 28,000 60 029-002 I.H.C. 20 cu. yd. Heil 1976 30,000 1527-002 Ford T.D. Diesel 25 cu.yd. High Density 1980 54,000