HomeMy WebLinkAboutCOD-46-02 -!. , ~ q~gron l REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Report #: COD-46-02 File# ArOtt GIIl-3gc( -():;l By-law #l(X);L.-//;O y Date: October 7th, 2002 Subject: Tender CL2002-34, Reconstruction of Prestonvale Road Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-46-02 be received; 2. THAT Cobourg Development Services Ltd, Cobourg, Ontario with a total bid in the amount of $1 ,665,276.74 (Including G.S.T.), being the lowest responsible bidder meeting all terms, conditions, and specifications of Tender CL2002-34, be awarded the contract for the Reconstruction of Prestonvale Road, as required by the Engineering Department; 3. THAT the total funds required in the amount of $1,468,000.00 ($1,665,276.74 less Region of Durham portion, plus design, administration, utility relocations, contingency and net G.S.T.) be drawn from the Engineering Capital Account # 7205-02008-0261; and 4. THAT the attached By-law marked Schedule "An authorizing the Mayor and the Clerk to execute the necessary agreement be approved. Submitted by: arie Marano, H.B.Sc., C.M.O. Dd?T~ A.S. Cannella, C.E.T. Director of Engineering Services Reviewed by: O'~...:...-~ Franklin Wu, Chief Administrative Officer 1206 MMIASC\LAB\km -' REPORT NO.: COD-46-02 PAGE 2 BACKGROUND AND COMMENT Tender specifications were provided by SRM Associates for the Reconstruction of Prestonvale Road, as required by the Engineering Department. Tenders were advertised in local papers, as well as the Daily Commercial News. Subsequently, tenders were received and tabulated as per Schedule "B" attached. The total price cost, including a final design and tendering, contract administration, utility relocations, contingency and G.S.T., less ~he Region of Durham portion, is as detailed in the letter from SRM Associates, marked Schedure "B" is estimated at $1,468,000.00. Included in the total tendered price is work to be completed on behalf of the Region of Durham, for which they will be invoiced separately. It is recommended that the required funds be drawn from the Engineering Capital Budget Account # 7205-02008-0261 as reflected on page 246 of the 2002 Capital Budget. Although the low bidder has not previously performed work for the Municipality of Clarington, they have recently completed similar work for the Town of Whitby, City of Peterborough and City of Quinte West. The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Engineering Services. After further review and analysis of the bids by the Engineering Department, SRM Associates and Purchasing, it was mutually agreed that the low bidder, Cobourg Development Services Lid, of Cobourg, Ontario, be recommended for the contract for the Reconstruction of Prestonvale Road. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T(905)623-3379 F (905)623-4169 1207 . -.--' SCHEDULE "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2002- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Cobourg Development Services Ltd, Cobourg, Ontario, to enter into agreement for the Reconstruction of Prestonvale Road. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between Cobourg Development Services Ltd, Cobourg, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of ,2002. By-law read a third time and finally passed this day of ,2002. John Mutton, Mayor Patti L. Barrie, Municipal Clerk 1208 . . land Development Engineering Land Development Planning Municipal Engineering Services Transportation & Transit Planning Utility Infrastructure Design Water Resources Engineering SCHEDULE "B" S~M b.SSOCIb.TES f1 J7JemberoPThe SemasIJrau{)lnc September 23, 2002 110 Scotia Court Unit 41 Whitby, ON L1N 8Y) T. 905. 686.6402 F .90H3n877 srmassociates.org FACSIMILE AND DELIVERY The Corporation of the Municipality of ClaringtQn 40 Temperance Street Bowmanville, Ontario L 1C 3A6 Attention: Ms. Lou Ann Birkett, C.P.P., A.~ .-'-- Purchasing Manager Dear Madam: Re: Tender Closing Reconstruction of Prestonvale Road Municipality of Clarington Contract CL2002-34 Our Proiect No. 01261/ 02056 Tender submissions for the above noted project were received and opened on Friday, September 6, 2002 at 2:00 p.m. The following is a summary, excluding Contingency Items and G.ST, of the six (6) tenders received. Arithmetic and / or extension errors have been made as noted below. Tenderer Total Tendered Amount (Excluding G.S.T.) 1. Cobourg Development Services Lid. 2. Miwell Construction Lid. 3. Hard-Co Construction Lid. 4. B.N. Fenton Construction Lid. 5. Ron Robinson Lid. 6. Elirpa Construction and Materials * Error in Calculation ** Error in Extension $1,556,333.40 * $1,579,439.43 $1,581,144.56 ** $1,663,991.10 * $1,708,499.08 $1,764,600.46 The six (6) tender submissions have been examined and found to be complete and in compliance with the general tender requirements. Furthermore, we have analyzed the unit prices on the three (3) lowest tenders and a copy of our summary comparing the three (3) low tenders is attached for your information. We have concluded our tender analysis of the three lowest tenders for Contract CL2002-34 and provide the following comments. The Engineer's Estimate for the tendered work, (including Addendum revisions and excluding Contingency items and G.S.T.), was $1,863,129.25. In comparison to the Engineer's Estimate, the lowest tender represents a decrease of $306,795.85 or approximately 16.5%. 1209 SCHEDULE "B" //;fA. ................ .... -- .... - .... ~ Ms. Lou Ann Birkett, C.P.P., A.M.C.T., Purchasing Manager The Corporation of the Municipality of Clarington September 23, 2002 Page 2 When comparing Cobourg Development Services Lld.'s submission to that of the second lowest bidder, Miwell Constrction Lid., there is a $23,106.03 or approximately 1.5% reduction in the overall tender price, exclusive of contingencies and G.S.T. We have reviewed Cobourg Development Services Lld.'s tendered unit rates and they appear to be reasonable and balanced. Also, we are familiar with past work completed by Cobourg Development Services Lid. and believe that they are capable of fulfilling the requirements of Contract CL2002-34. The contract is open for acceptance for a period of ninety (90) days following the tender closing date of September 6, 2002. The contract work is scheduled for completion within twenty (20) weeks after the date of Official Notification to Commence. Based upon the lowest tender received, that of Cobourg Development Services Lid., the apportionment of Estimated Project Costs is appended as Attachment NO.1. The Municipality of Clarington's cost of the Contract (Account No. 7205-02008- 0261), including a contingency allowance, is under budget by approximately $54,600.00. With regard to the above information, we therefore recommend acceptance of the low tender and award of the contract to Cobourg Development Services Lid. subject to the requisite approvals. Trusting the above is to your satisfaction. Yours truiy, SRM ASSOCIATES ~ ~)/' ...j; j .~..I,'J/_'.:V (_, Darrell' ~ P.Eng. Manager, Municipal Projects Ben Davies, B.Sc.Eng. Contracts Administrator /bd Encl. cc: Municipality of Clarington, Attn: Mr. A. Cannella Region of Durham, Attn: Mr. P. Gillespie Mr. G. Chartier Totten Sims Hubicki, Attn: Mr. W. McCrae SRM Associates, Attn: Mr. R. Weldon 1210 . , . Schedule "6" ATTACHMENT NO.1 APPORTIONMENT OF ESTIMATED PROJECT COSTS PRESTONV ALE ROAD RECONSTRUCTION Approximately 40m south of Glenabbey Road to approximately 700m south of Bloor street (Regional Road 22), Courtice MUNICIPALITY OF CLARINGTON CONTRACT CL2002-34 SECTION 7205-02008-0261 ,:.;.;-:.,.,-;.;.;.:.,.:.,.:.;.,.,.:-,-,-:-,-:-:-:.:.:.:.:.:.:.:.,,:.:-:-:.:.:-:-;.; )i!l$.AJ:tIN~tlllNi i ii.....~~IIllNn.)I 1. GRADING, DRAINAGE, GRANULAR BASE, HOT MIX PAVING... $1,070,312.40 $1,009,216.40 $57,808.00 $3,288.00 3. WATERMAIN $268,708.00 $157,313.00 $60,000.00 $40,599.42 $268,708.00 $157,313.00 $19,400.58 2. SANITARY SEWERS 4. GENERAL ITEMS SUBTOTAL CONSTRUCTION $1 556 333.40 $1 049 815.82 $503 229.58 $3.288.00 ADD: ENGINEERING (incl. Disb.) (i) DESIGN & TENDER (to Sept. 28/02) $54,300.00 $54,300.00 (ii) CONTRACT ADMIN. $166,500.00 $112,663.38 $53,836.62 (iii) TRAFFIC & GEOTECHNICAL REPORTS $37,950.00 $37,950.00 ADD: UTILITY RELOCNS (Estimated incl. Disb.) $115,347.00 $112,397.00 $2,950.00 $1 930430.40 1 367 126.20 $560 016.20 $3 288.00 NET G.S.T. (3% excl. Cant.) $57,912.92 $41,013.79 $16,800.49 $98.64 ADD: CONTINGENCY (incl. G.S.T.) $91,156.68 $59,860.01 $31,183.31 $113.36 TOTAL ESTIMATED PROJECT COSTS $2,079,500.00 $1,468,000.00 $608,000.00 $3,500.00 "NOTE: 1. General Items pro-rated based on construction costs from Low Bid. 2. Contract administration cost estimated based on Low Bid & includes Geotechnical material testing during construction. 3. Sub-consultantfee estimate reflects "design" components. 4. Utility relocation estimates: Bell - $25,347: Hydro One - $90,000. 5. GST is not included in the subconsuKant, utility relocation and engineering amounts. Low Bid CA PAGE-1 1211