Loading...
HomeMy WebLinkAboutOPD-009-02 ~ ~ . ClaL- Leading the Way REPORT OPERATIONS DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: May 21, 2002 Report #: OPD-009-02 File#: /tIC( ifl/-):5S- ();)- By-Law #: Subject: Bowmanville Branch Library/MAC Expansion Recommendations: 1. THAT Report OPD-009-02 be received as information Submitted by: eviewed by: ( / {~--.:.. C;-.::5c....... rvath, B.A., R.D.MR, R.R.F.A. Franklin Wu, M,C,I.P. operations Chief Administrative Officer 801 ~ ~ REPORT NO.: OPD-009-02 PAGE 2 BACKGROUND Council approved at their meeting of June 25, 2001 the award of the general contract for the construction of the addition to the Municipal Administrative Centre and renovations to the existing building to Aquicon Construction. The contractor commenced work on the site the week of August 12, 2001 and has made considerable progress in accordance with the approved schedule submitted to the Building Committee on October 31, 2001. Site meetings are held every other week to review work progress, site details and construction co ordinations. Both the Director of Operations and the Library Director are part of the Building and Project Committee and h.ave been actively involved with the design and site meetings since 2000. The new addition will comprise of four floors, penthouse and a mezzanine area. The Clarington Library will occupy the first two floors and mezzanine. Planning Services and Engineering Services will occupy the third floor of the new addition. The fourth floor will include Library Administration and Clarington Information Technology Department. There is approximately 2,200 square feet of unassigned municipal space on the fourth floor for further municipal administration expansion. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905) 263-2292 F (905) 263-4433 802 " REPORT NO.: OPD-009-02 PAGE 3 CONSTRUCTION SCHEDULE The approved construction schedule indicates a total project completion by April 15, 2003. Due to the fact that the project will be handled in two phases the new addition including the Library and MAC Administrative space is expected to be completed substantially by early December 2002. The renovations and connecting corridors to the existing MAC will be completed by April 2003. We are continually reviewing the schedule with the Contractor to minimize inconveniences to our Municipal operations, as well as to explore opportunities in fast tracking the project. we have been fortunate to relocate staff outside of the MAC during construction allowing the contractor some flexibility in fast tracking various areas. Further to report OPD-001-02, February 4, 2002, the following Departmental/Division relocates have or will be occurring: 1. Marketing & Tourism - Lower level of existing Library - Complete 2. Purchasing Division - Upper Floor 166 Church Street - Complete 3. Community Services - GBR complex - Complete 4. Engineering Department - Lower level of existing Library - June The only change from the previous report is that Community Services has decided to relocate to the meeting room at the Garnet B. Rickard Centre instead of 23 Silver Street. There is a possibility that some of the Municipal operations may be reallocated to the main floor of the addition once it has met all approvals to expedite the completion of the project. This will be reviewed in June and October by both the Director of Operations and the Library Director and will advise Council and the Library Board accordingly. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE. ONTARIO L 1C 3A6 T (905) 263-2292 F (905) 2634433 80S .. \. REPORT NO.: OPD-009-02 PAGE 4 PROJECT PROGRESS As of May 10, 2002 the project is on schedule. The structure is complete and the brick veneer installation has started. Windows are being installed as the brickwork is being completed. Metal studs are installed for approximately 90% of the walls and mechanical and electrical rough ins within the walls and ceilings are approximately 50%complete. Major mechanical equipment including generator, chiller and main heat recovery units are installed with the penthouse but yet to be connected. By the end of June the building envelope will be substantially complete and the interior drywall installation will begin. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905) 263-2292 F (905) 263-4433 804