REPORT 1/5
Cly!-!llgron
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
COUNCIL
Date:
Friday, July 12, 2002
Report #: COD-037 -02
File # P'/?: D I{,
By-law ~;2 - J;;< b
Subject:
cL2002-21, SIDEWALK CONSTRUCTION - VARIOUS LOCATIONS
MUNICIPALITY OF CLARINGTON
Recommendations:
It is respectfully recommended to Council the following:
1. THAT Report COD-037-02 be received;
2. THAT Trisan Construction, Schomberg, Ontario, with a total amended bid in the amount
of $235,701.37($282,928.80 less Waterfront Trail $47,227.13) (including G.S.T.), being
the lowest responsible bidder meeting all terms. conditions and specifications of Tender
CL2002-21, be awarded the contract for the Sidewalk Construction - Various Locations,
as required by the Engineering Services Department;
3. THAT the Waterfront Trail, be dropped from the Tender and that the work be completed
by the Municipality of Clarington Operations Staff;
4. THAT funds required in the amount of $223,000.00 ($293,600.oo total funds less
$47,600.00 Waterfront Trail, less $30,500.00 Development Charges, plus $7,500.00
total levy surplus net $23.000.00 additional funding requirement, including G.S.T. and
contingencies) be drawn from the Engineering Services Department Capital Budget
Account #7204-02002-0261 and # 7204-02001-0261;
5. THAT the remaining funds in the approximate amount of $30.500.00 be provided from
the Developmental Charges Reserve Fund; and
6. By-law marked Schedule "N, authorizing the M
eement be approved.
Reviewed by:
V Franklin Wu,
....0 Chief Administrative Officer
Submitted b .
rie Marano, H.B.Sc., C.M.O.
~7
~~
ony Canne fa
Director of Engineering
MM/LABleoIkm
,
REPORT NO.: COO-037-02
PAGE 2
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Sidewalk
Construction - Various Locations within the Municipality of Clarington, as required by the
Engineering Services Department.
Tenders were advertised in the local papers, as well as the Daily Commercial News.
Subsequently, tenders were received and tabulated as per Schedule "B" attached.
In order to reduce the overall funds required and as the bid price for the Waterfront Trail is
substantially over budget, it is recommended that this location be removed from the contract
and that the work be completed by Operations staff. The $25,000.00 budget allocation for this
location is fell to be sufficient for staff to complete the work. (Page 273 Capital Budget)
The total project cost, including Project Administration, and costing allocation is as detailed in
the letter from Totten Sims Hubicki Associates, marked Schedule "CO and is estimated at
$246,000.00. (Total funds $293,600.00 less $47,600.00 total funds for Waterfront Trail). The
total funds required are within the budget amount for sidewalks, plus the additional allocation
for $30,500.00 (Page 263 Capital Budget $223,000.00 + $30,500.00 less tax levy surplus of
$7,500.00 totally $246,000.00).
AIlhough the low bidder has not previously performed work for the Municipality of Clarington,
they have recently completed similar work for the Town of Richmond Hill and the City of
Vaughan
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering Services.
After further review and analysis of the bids by Engineering Services, Totten Sims Hubicki
Associates and Purchasing, it was mutually agreed thai the low bidder, Trisan Construction,
Schomberg, Ontario, be recommended for the contract for the Sidewalk Construction - Various
Locations within the Municipality of Clarington.
CORPORATION OF THE MUNICIPALITY OF CLARlNGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1c 3A6 T(905)623-3379 F (905)623-3330
"SCHEDULE A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW #2002-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Trisan
Construction, Shomberg, Ontario for the Sidewalk
Construction - Various Locations within the Municipality of
Clarington.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a contract
between Trisan Construction, Schomberg, Ontario and said Corporation; and
2. THAT this agreement attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
,2002.
By-law read a third time and finally passed this day of
,2002.
John Mutton, Mayor
Patti L. Barrie, Municipal Clerk
Clare
Leading the Way
Municipality of Clarington
BID SUMMARY - SCHEDULE "B"
TENDER # CL2002-21
SIDEWALK CONSTRUCTION,
VARIOUS LOCATIONS
BIDDER TOTAL BID AMOUNT c"i
Trisan Construction $282,928.50
Schomberg, Ontario
Aloia Bros. Concrete Const. Ltd. $305,223.92
Toronto, Ontario
Brennan Paving & Construction Ltd. $325,629.08
Markham, Ontario
Miwel Construction Limited $363,000.00
Stouffville, Ontario
Warren Bitulithic Limited $414,254.72
Oshawa, Ontario
Fernview Construction Limited $424,008.90
Bolton, Ontario
DN:H:WP51 DATA/ BIDSUMM/2002-CL02-21
JUL-09-02 TUE 09:54 AM TSH COBOURG
FAX NO,
Schedule "C"
"
VH
engineers
architects
planners
.-J(! YL'<I/'.1
Totten Sims Hllbicki A!;5oeia1AS
513 Division Street,
Cobourg, Ontario, Canodo. K9A 5GG
(905) 372-2121 Fax: (905) 372-3621
E~mall; cnhourg@tstt.ca www.ttlh,1;a
July 9, 2002
Ms. Lull Ann Hil-l.eU, CI'P, AMCT
l'm','!l:ls;ul!: Manager
Corporation of the Municipalily of Claringlon
~O 'rcmp~rance Scrcct,
llOWMANVJLU1, Onlario LtC 3A6
Denr Ms. Birkctt:
Ite: Contract No. CI.2002-21, Sidewalk Construction VarioWi Locations,
Municipality of Cbtington
Tenders for thc above projcct were opened at the Municipal Offices on Wednesday, June 12, 2002, at
2:00 p.m. The bills received. inclusivc of GST, are summarizell as follows:
l'tisan Con~truction
:'i.chombcr~,_Ontario .
Aloia Bros. Concrete Consl. Ltd.
Toro!'Jo. Ontario .
Drennan Paving & COI\~truction Ll.d.
Mark~al11. Ontario _
Miwel Construction Limited
Stou[[villc, Ontario
Warren-aiiulirhic Limited
9J;~awa, OJlrari~..
remvicw Conslruction Limited
nollOtl, Ontario
$282928.50
$305 223.92
$325.629.08
$363,000.00
$414,254.72
$424 008.90
The bidder's submittcd render has been reviewed and is in order. Trisan Construction has rer.enlly
compl.te(l WOl'k for the Town of Richmond Hill and for the City of Vaughan. These projeels were
simil;u ill nature to the suhject eOllll'act and references contacted iudicated their performance was
"cc"plable.
This tender is composed of six different projcclS from the 2002 Capital Budget and Four Year Forecast.
JUL-09-02 TUE 09:55 AM TSH COBOURG
FAX NO,
Schedule "C.
CQrpor:ltlOU uf lhl! Munj<.:ip.1llty or CIl'rillr,tClll
My 9, 2002
2
A cost apportionment is attached detailing lhe estimated project costs based on the low bid for each
individ~"l budget project. or the six projects, four are estimated to be over budget and two under
bt.dget. 'I1te \Vaterfron! Trail work is considerably over budget for no apparent reason and engineering
staff recollullcnd that il be dropped from lhe tender and completed by operations staff. Removal of this
work will rcduce the total tender amount of $282,928.50 by $47,227.13, resulting in a tender award
umountinlJ to $235,701.37 (aU amounts inclusive of GSn. The olber three locaLions budget overruns
c~n be Iraced to a change iIllhe scope of work between tbe budget estimate and lhe tendered work as a
resull of dctaited design.
By dr(lpping the WaLerfront Trail, Item No.9 of the conlract, the total project costs wil1 be
approxhnatoly $23,000.00 over budget. When broken down funher it is estimated that the TaxLcvy
fill~llced COll1poneIll of the project is aClually approximately $7,SOO.00 under budget estimates,
resulting in a Development Ch3rge financing componcnt overnm of $30,500,00.
As cOllStJ'\lction of' several of the sid~walks locations are essential to accommodate safe passage of
school children, it is recommended !hat the estimated required $30,500.00 in Developmcnt Charge
financing be obtained froln lhe Development Charges Reserve rund (Roads and Related) and that Lhe
low bid sublnitted by Trisun Construction be accepted, conditional upon the deletion of Item 9.
Tender doposits may be rcmrnetllo all contractors cxcept the low and second low bidders.
Should you require any additional information, please contact the undersigned.
Yours tru ly ,
'7'it:
./,/ ....
(, /. 'J:/'
ft/t'/?"o; ftt 0;;.<<.
WiIli:l1n McCrae, P.Eng.
Sc.nior Project TIngiuccr
WMc/yUl
P:~lJl~W('nrmpl19\tll.U.1C
Encl.
ce; Mr. A. S. Cannella, Municipality of Clarington
TIM
Cost ApportiOl1ment Based on Low Bid
Contract Cl2OO1-21
Description
Account Numbef'
Construction Costs Contract CLlOO1-40
Construction Cost
Contingencies (Provislonai Items)
Total Construction
<-':>"-;:- /,";:-r.f;1;.,;,::',;-~;;
,.,~t":"ClIIIITendei'~;(incruslwOfo8T)
Design and T endertng (to June 1, 2002) TSH
Project .12.29189
Tendering and Estimated Construction
Admlnistr.ltfon (TSH '12-29189)
SIIb-Total Estimated Project Coats (eJ:cl.
contingencies)
N4It G,8.T. (3%) (ocl. contlngenclea)
Contingencies (excI. G.S.T.)
Total Estimawa Project Coats
,-
,.-.. ,~.- ,..:.(
iiIIunleipality of Ciarlngton
Sidewalk Construction Various Locations
June 28, 2002
T.S.H. project: 12-29189
Statton St., Orono
Trolls Road Uberty...... Baseline Road Spry Averwe Church St. Orono . Waterfront Trail
Total George Reynolds to Clayton CrN, To L..ockhart Gate to Hunt 8aHIlne Rd, to Vk:torlaSt., Port of Newcutte
Dalsyfield Ave. Longworth Ave. S!. Loecombe Dr. Bowmanvflle
NorttI St., Newcastte
7204-02002.0261 7204-<12002...., 7~00261 7204-<12002...., 7204-02001 o02fi1 780300010300518
$247,599.16
$31,378.21
$21,602.60
$1,785.87
$23,388.47
;~
~,,'i". ,_,
$16,820.00
52,594.01
$1,205.29
525,076.86
526,000.00
$30,000.00
Budget Amount
Recommeoded for Removal from Contract CL2002-21
Prorated based on Engineer's estimate ($23,000) due 10 inftated cost of Item No.9 (Waterfront Trail Work).
$264,419.16
$33,972.22
_~.l~~.IO -f~../i~~;iso28
$12,731.90 $1,750.71
$5,000.00 $701.71
S282,15U16 $36,424.64
$8,464.53 $1,092.74
$2,984.41 $482.62
$293,600.00 $38,000.00
$248,000.00 $18,000.00
Comments
563,103.00
$5.216.67
$73,605.4
$6,084.90
$44,137.50
$0 00 Prorated Based on Construction
. """'"
i
;
i
,
1
,
i
IINI...---Olllr'.........
1nciIIcIiI4.II'I-......ofilal .."
__'-;t.:lf.>,:"~;i,:'!:i;"."'.-
$483.10
SM20.76 $768.41 54,106.73
$1,411.17 $307.99 $1,646.03
$73,251.60 $15,987. $85,443.11
$2,197.54 $479.62 $2,563.29
S550.86 $533.03 $993.60
$76,000.00 $17.000.00 $89,000.00
$60,000.00 $15,000.00 $100,000.00
$1 380 00 Prol'ated Based on ConstnJction
, . Casts
$450 00 Inspection Using Municipal Staff
. Malenal Testing By TSH
545,967.50
$752.31
$1,379.03
$170.83
$253.47
$47,600.00
525,000.00
~
I
File: server:\proiects\12-2918!konstruc\Low Bid CA rev2
Sheet: Cost Apportionment