Subject: RFP2001-12, FIRE MASTER PLAN, CONSULTING SERVICES
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-011-02 be received;
2. THAT Dillon Consulting Limited, Toronto, Ontario with a total bid (including
disbursements) in the amount of $68,800.00 + GST, being the lowest responsible bidder
meeting all terms, conditions and specifications of RFP 2001-12 be awarded the contract
for the Fire Master Plan, Consulting Services;
3. THAT the total funds required be drawn from account # 7102-00001-0247, and
4. THAT the attached By-law, marked Schedule "B" authorizing the Mayor and Clerk to
execute the agreement be approved,
Submitted by:
arie Marano, H's,Sc" C,M.O,
Director of Corporate Services
Reviewed b0 ~~
Franklin Wu,
Chief Administrative Officer
, J )
._~~L,,,-- --- Ik iU(~C-<?t)J<'1
Mi hael Creighton, A.M,t.T., C.M.M.II
Director of Emergency Services I Fire Chief
MMILABIMClkm
1206
REPORT NO.: COO-011-o2
PAGE 2
BACKGROUND AND COMMENT
A Request for Proposal was issued with eleven (11) firms being invited to submit on providing
the consulting services for the preparation of a Master Fire Plan, Subsequently, seven (7)
proposals were submitted and tabulated as per Schedule "A" attached,
The scope of the project is to review the operations of the fire department and set key
objectives,
It will look at the next 20 year time frame and identify immediate needs as well as those required
in the 5 to 10 year and 10 to 20 year time frames and in which specific geographic area. It will
look at all areas including but not limited to staffing, station locations, construction, vehicles and
apparatus [new and replacement], equipment, training and computerization as well as the
issues of existing municipal By-laws, (Including: Municipality of Clarington, Regional Municipality
of Durham Official Plans) mutual aid and automatic aid agreements with neighbouring
municipalities. The Master Plan will include a recommendation for implementation including
approximate financial implications and timetable.
It will include analyzing both the Emergency Services Department Operations and the
Municipality of Clarington, as well as the population projections for the next 10 and 20 years to
anticipate needs.
With respect to Development Charges, the study shall include the following components:
Recommended methodology to allocate the future Capital needs of the Emergency
Services Department and identified within the Master Plan, between growth and non-
growth.
Recommend a methodology to allocate the growth related capital costs between the
residential and non-residential users of the service.
The completed Master Plan will be used as a basis for the next background study for
Development Charges,
1207
REPORT NO.: COD-011-02
PAGE 3
The time frame for the development of the plan is to start in March 2002 with completion and
presentation to Council in November 2002.
As stipulated in the proposal documents, proponents were evaluated based on the following
criteria:
.:. Qualifications and expertise provided by the project team members in their proposed
respective roles.
.:. Experience of the proponent I sub-consultants with projects of similar nature, size and
complexity.
.:. Experience of proponent I sub-consultants with respect to planning background and
development charges.
.:. The team concept of the proponent and compatibility with the owner.
.:. Problem solving skills and ability to work with various parties,
.:. Experience with Fire Master Plans.
.:. Referen~ews.
.:. propo~~_~nd hourly rates.
Bids were received and tabulated as per Schedule "A" attached,
Based on the above evaluation, the top three firms were interviewed by the selection committee:
Dillon Consulting Limited
Toronto, ON
IAO Municipal Consulting Services
Markham, ON
181 Group - Marvin Rubinstein
Toronto, ON
Although selected for an interview, the firm of IAO Municipal Consulting Services withdrew from
the process.
The selection committee consisted of the following staff:
Michael Creighton, Director of Emergency Services I Fire Chief
Lou Ann Birkett, Purchasing Manager
Larry Taylor, Manager of Development Review Branch, Planning Department
Nancy Taylor, Director of Finance
Grant Bradley, Fire Fighter, Emergency Services
1208
,
REPORT NO.: COD-011-02
PAGE 4
Of the three firms selected for an interview, the firm of Dillon Consulting Limited best meets the
criteria established in the Request for Proposal document and consequently scored the highest
in the evaluation process. Comments regarding the other submissions are provided in
Schedule "A".
After further review and analysis of the submissions, the firm Dillon Consulting Limited, Toronto,
Ontario are recommended for this project. Although the subject firm have not previously
provided service for the Municipality of Clarington, they have provided satisfactory service to the
Cities of Mississauga, Hamilton, Oakville and Burlington.
The funds required for the consulting services will be drawn from account # 7102-00001-0247
which provides for a $50,000,00 allocation. As this project is a growth related study, 73.9% or
approximately $54,402.00 will be financed from Development Charges, with the remaining
25.1 % or approximately $19,214.00 being drawn from account # 7102-00001-0247,
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
1209
~
Municipality of Clarington
FIRE MASTER PLAN
RFP2001-12
Schedule "A"
I va ua Ion ummal1
BIDDER PRICE COMMENTS
Morrison Hershfield Consulting Engineers $39,950.00 . No Planning experience
Ottawa, ON . No DC experience
. No working knowledge in
ClarinQton
IAO Municipal Consulting Services' $43,800.00 . Selected for interview - withdrew
Markham, ON from process
IBI Group - Marvin Rubinstein Associate' $49,850.00 . No Planning experience
Toronto, ON . Principle in charge has no DC
experience
. 2 of the main principles have
never worked tooether before
T,L, Powell & Associates Ltd. $55,375,00 . Very little Fire Master Plan
Toronto, ON experience
. Little experience as team
. Planning background met
minimum
Trow Consulting Engineers Ltd. $58,940.00 . No Fire Master Plan experience
Brampton, ON . No team experience
. No Planning experience
. No DC experience
. No working knowledge
Clarinaton
Dillon Consulting Limited' $68,800.00 . Good Fire Master Plan
Toronto, ON experience
. Good team experience
. Good Planning experience
. Excellent DC eXDerience
The Zeta Group Inc. $70,462.50 . Minimal Fire Master Plan
Ottawa, ON experience
. Minimal team experience
. No Planning experience
. No DC experience
. Minimal working knowledge in
ClarinQton
. Selected for Interview
Recommendation: Dillon ConsultinaLimited, Toronto, ON
B'd E
f
5
GST Extra to all above pricing
1210
Schedule "B"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2002-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Dillon
Consulting Limited, Toronto, Ontario, to enter into an
agreement for preparation of a Fire Master Plan Consulting
Services.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a contract
between Dillon Consulting Limited, Toronto, Ontario, and said Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
, 2002.
By-law read a third time and finally passed this
day of
2002.
John Mutton, Mayor
Patti L. Barrie, Municipal Clerk