HomeMy WebLinkAboutTM-44-80 i
T0: His Worship the ?Aki or and Members of Cotaoil
mg: A. C. Guiler, Town Manager
DATE: September Sth, 1980
�}GT:
Newcastle ni tness Centre
Attached for your info=ation are the Minutes of the Project Nesting
held July 27th, 1980.
1-_
t
i
Gerrolts Construction Co. LUC
R.R.No.3,BOWMANVILLE,ONTARIO $� 7
579-8323 1-1C31<4
NEWCASTLE FITNESS CENTRE,
LIBERTY STREET NORTH,
BOWMANVILLE j ONTARIO.
_
Minutes bf Project Meeting #8 held Wednesday July 27, 1980, at 9:30 A.M.
on site.
In attendance: Mr. R. Whitefleld - Totten Sims Hubicki
Mr. D. Trotter - Rybka, Smith & Ginaler
Mr. R. Cornish - Raycor Electric
Mr. S. Potben - Raycor Electric
Mr. B. Rohrer - Raycor Electric
Mr. J. Horton - Ford Mechanical
Mr. J, Gerrits - Gerrits Construction Co. Ltd.
Mr. T. Gerrits - Gerrits Construction Co. Ltd.
A. MINUTES OF PREVIOUS MEETING.- ACTION
The minutes of Project Meeting -# 7 were accepted by all those
present"as being correctly recorded.
B. GENERAL REMARKS:
1. The August progress billing will be reviewed following the
meeting.
2. Mr. J. Gerrits reported that inspection reports from
P. .Au (Structural) have been mailed; Mr. J. Horton submitted
to Mr. J. Gerrits an inspection report from Mr. M. Turner
(Mechanical). Raycor Electric are to expedite inspection
reports from Saldan. RAYCOR
3. Mr. J. Gerrits requested that the. Owner/Splash review their
remaining cash allowances (ie. furnishings and graphics)
and determine as soon as possible any expenditures to be made OWNER
in order that all products can be obtained prior to building SPLASH
completion.
C. SCHE'DULES & PROGRESS:
1. Mr. T. Gerrits advised that roofing work will commence
nextweek. POLLARD
2. Mr. J. Gerrits advised that the finishing schedule will
be updated shortly. GERRITS
(Cont'd. on page 2. )
NEWCASTLE- FITNESS CENTRE,
LIBERTY STREET NORTH,
BOWMANVILT.XL_ONTARIO.
1Page 2.
Amutes of Project Meeting # 8 held Wednesday July 27th, 1980, at 9:30 A.M.
on site.
D. SHOP DRAWINGS & SAMPLES- ACTION
1. Shop drawings submitted for approval are as follows:
a) Electrical fixture F2 submitted August 21, 1980. RS&G
b) Letter detail TSH
2. Shop drawings to be submitted as soon as possible.
a) Starters: Mr. S. Pothen advised that these would be
submitted prior to the next site meeting. RAYCOR
3. Current status of samples.
a) Caulking samples - Mr. R. Whitefield reported that be has
issued a letter to Gerrity outlining colour selections
(colour to match abutting surfaces) and requesting
additional colour samples. MCBRIDE
b) Paint Materials - Mr. R. Wbitefield requested details
on the proposed substitute for Pit Glaze. VANRO
c) Acoustic tile & suspension - samples to be submitted
this week. MULTIWALL
d)' Quarry tile, ceramic - samples to be submitted by
September 5th, 1980. Mr. J. Gerrits reported that delivery
of all materials is anticipated prior to September BROOKS
15th) 1980.
e) Resilient, wood flooring samples to be submitted G1211RITS
an soon as possible. MONTREAL
f) Skimmer Facegrille - Mr. D. Trotter advised that Mr.
M. Yates had found a product that will smUice and
should be within Ford's bud-get. Mr. J. Horton is to
check with his office whether the product information
has been received. FORD
(font'd. on page 3. )
NEWCASTLE FITNESS CENTRE,
LIBERTY STREET FORTH,
BOWMANVILLE. ONTARIO.
Page 3.
Minutes of Project Meeting # 8 held Wednesday July 27th, 1980, at 9:30 A.M.
on site.
E. STATUS OF CHANGES: ACTION
1. Proposal quotations to be submitted.
a) Revised founding depth of footings. GERRITS
b) Prop 6-12: Provide ceramic tile to walls of whirlpool
enclosure. BROOKS
2. Proposal quotations with the Arch/Owner for approval:
a) Prop 0-1: Relocate 6" water line
Prop 3-8: Relocate incoming water service
Mr. D. Trotter agreed to send a letter on the above
immediately. RS&G
b) Prop 1-3: Provide isolating transformer - Mr. D. Trotter
advised that this is required for underwater speakers to
be provided by the Owner; as Raycor could not anticipate
the type of equipment selected by the Owner, the above
should be an extra to their contract. Mr. R. Whitefield TSH/
authorized Raycor to proceed immediately with the work. RAYCOR
C) Prop 2-4: Provide ventilation and additional vapour
barrier in cavity walls.
Prop 4-5: Provide C.T. wall finish in pool area.
Mr. R. Whitefield advised that he has written to the
Owner requesting status of the above. OWNER
d) Prop 0-11: Provide additional fire dampers. TSH
F. S 1 TEWORK:
1. Mr. T. Gerrite advised that the installation of water
and gas services are to be performed during the second
week of September. FORD
G. STRUCTURAL WORK:
1. Mr. J. Gerrits advised that the support requirements for
the hot water tanks have been resolved.
(Cont'd. on page 4. )
e
NEWCASTLE FITNESS CENTRE,
LIBERTY STREET NORTH,
BOWMANVILLE, ONTARIO.
Dae 4.
Minutes of Project Meeting 8 bold Wednesday July 27th, 1980, at 9:30 A.M.
on site.
H. ARCHITECTURAL WORK: ACTION
1. Mr. R. Whitefield advised that all masonry joints are to
be cleaned, the vapour barrier is to be continuous between
the precast Vs. TRENT
2. Mr. J. Horton and Mr. B. Rohrer confirmed that theve are
no further clearance problems in the lobby ceiling/Stair, #2.
3. Mr. R. Whitefield requested that Mr. M. Brown discuss the
purchase of the chair lift with Totten Sims Hubicki AssociatesSPEASH/
Limited. TSH
I. MWHANICAL WORK:
1. Mr. J. Horton advised that the botwater tanks are scheduled
for delivery on September 8th, 1980. FORD
2. See Section J, Item 5.
J. ELECTRICAL WORK:
1. Mr. B. Rohrer advised that the P.A. panel is floor mounted
and is located directly below the mechanical equipment alarm
panel. (ie. west wall of General Office 1.03).
2. Mr. R. Whitefield advised that the multipurpose room pot lights
are to be bronze. RAYCOR
3. Mr. R. Cornish suggested that the clock on the 2nd floor be
mounted on the wall of the mechanical room. Mr. R. Whitefield
and Mr. D. Trotter agreed to this. RAYCOR
4. Mr. R. Whitefield advised that switches, receptacles, etc. are
to be ivory in all painted areas except definite service
rooms ie. mechanical rooms, storage, etc. , where brown may be
used. RAYCOR
5. Mr. R. Cornish advised that Paycor agree to perform, the
following control wiring:
a) All lineside wiring to motors and controls unless -
specified elsewhere.
(Cont I d. on Page 5.
NEWCASTLE FITNESS CENTRE,
LIBERTY STREET NORTH.,
DOW11ANVILLE ONTARIO.
Leage -
Minutes of Project Meeting # 8 held Wednesday July 27th, 1980, at 0:30 A.M.
on site.
J. ELECTRICAL WORK: (Contd. ) ACTION
b) All wiring for mechanical equipment alarm panel.
Raycor do not agree that they are responsible for
temperature controls ie. air, humidity, washrooms, as this
work is specified under Section 15C Execution.
Mr. J. Horton disagreed with the above. Mr. R. Whitefield
advised that since this project is a design proposal, it should
be the responsibility of the design engineers to determine
responsibility, and suggested that it should be In accordance
with normal trade practice.
Mr. J. Gerrits agreed to review the mtter and arrange a further FORD/
meeting if necessary. RAYCOR/
GERRITS
Meeting Adjourned.
The next site meeting will be held at 9:30 A.M., September 10th, 1980,
on site. If any of the contents of this meeting report differ in any
respect from your own recollection of the points discussed and decisions
reached, please notify us prior to the next meeting. In the meantime,
we will proceed in accordance with the understanding described herein.
End of Minutes.
cc: file, site, all present, action col. , Mr. A. Guiler, Mr. J. Holliday,
Mr. M. Brown.