Loading...
HomeMy WebLinkAboutCSD-016-15 F qt r l 6 Alr Community Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: General Government Committee Date of Meeting: November 30, 2015 Report Number: CSD-016-15 Resolution: ., LAv__ __ t File Number: N/A By-law Number: Report Subject: Clarington Fitness Centre Renovation-Request for Additional Fees Recommendations: 1. That Report CSD-016-15 be received; 2. That Council approve the invoice for additional work by Barry Bryan Associates in the amount of $70,000; 3. That the required funds be accessed from the Move Ontario Fund; and 4. That all interested parties listed in Report CSD-016-15 and any delegations be advised of Council's decision. Municipality of Clarington Report CSD-016-15 Page 2 Report Overview This Report provides Members of Council with details of the additional fees invoice received from Barry Bryan Associates project architects for the renovation of the Alan Strike Aquatic and Squash Centre. 1 . Background The Alan Strike Aquatic and Squash Centre was recently re-opened to the public after closing its doors for a major renovation. The construction project was originally estimated at $2,200,000; however, subsequent to awarding the contract for architectural services and after considerable public input, a revised project budget was approved at $3,036,424, increasing the project budget by $836,424. Request for Proposal (RFP) 2013-14 Architectural Services — Clarington Fitness Centre Renovation, Schedule (B) item 30 "Changes in the Work" states "the Municipality may, without invalidating the contract, direct the Company to make changes to the work. When a change causes an increase or decrease in the work, the contract price shall be increased or decreased by the application of unit prices to the quantum of such increase or decrease, or in the absence of applicable unit prices, by an amount to be agreed upon between the Municipality and the Company." 2. Additional Fees Barry Bryan Associates (the Architect) has submitted an invoice (Attachment 1) requesting additional fees as follows: Additional Design and Project Costing Work $ 8,000 Additional Committee Meeting Attendance $ 4,000 Increase in Construction Scope/Budget $53,000 Increase in Project Disbursements $ 5,000 Total $70,000 The approved RFP stipulated a total of three conceptual layouts for the project; as a result of the extensive public consultation process and at the request of Council, a total of six concepts, each with costing analysis, were prepared by Barry Bryan Associates for consideration towards the final approved design. This portion of the invoice represents $8,000. At the request of staff during the design process, Barry Bryan Associates was in attendance and available at two separate General Purpose and Administration meetings, and several design meetings with staff and members of the public. These meetings were Municipality of Clarington Report CSD-016-15 Page 3 in addition to the two presentations (to Council) agreed to in accordance with the Request for Proposal and are priced at $4,000. The Architect's approved fee of $189,000 was based on approximately 8.6% of the construction budget of $2,200,000. The construction budget was subsequently approved at $3,034,424, resulting in an increase of $836,424. The Architect is requesting an additional fee of $53,000, representing approximately 6.34% of the increase to the construction budget. The increase to the disbursement allowance is based on extra presentation materials, and preparation of additional design concepts and pricing totaling $5,000. 3. Concurrence This report has been reviewed by Nancy Taylor, Director of Finance, who concurs with the recommendations. 4. Conclusion The final total for additional fees has been discussed with and negotiated by staff. The invoice from Barry Bryan Associates is reasonable considering the extra time and increased scope of this project. Staff is recommending that Council approve the additional fees invoice in the amount of $70,000, payable to Barry Bryan Associates. 5. Strategic Plan Application Not applicable. Submitted by: - f- Reviewed by: ` ,;1 seph P. Caruana, Franklin Wu, 6'Director of Community Services Chief Administrative Officer Staff Contact: George Acorn, Manager of Facilities, 905-623-3379 ext. 2503 or gacorn @clarington.net Attachments: Attachment 1 — Invoice from Barry Bryan Associates The following is a list of the interested parties to be notified of Council's decision: Denny Bryan, Barry Bryan Associates JPC/GA/WG Attachment 1 to CSD-016-15 L IIl1'OICC Novernber 20,2015 BARRY BRYAN Project No: 13080 ASSOCIATES Invoice No: 015-925 Architects Engineers George Acorn Project Managers CORP.OF THE\4UNIC'IPALITY OF CLARINGI'ON 40 Temperance Street Bowmanville, ON LIC 3A6 Architectural Services for Clarington Fitness Centre Renovations,49 Liberty Street North,Bowmanville,Ontario Purchase Order No.07818 FOR SERVICES RENDERED for the Period:November I,2015 to November 30,2015 Percent Previous Fee Current Fee Billing Phase Fee Complete Earned Billing Billing Original Contract Fce 198,450.00 100.00 198,450,00 198,450.00 0.00 Additional Design& Project 8,000.00 100.00 8,000,00 0.00 8,000.00 Costing�Vork Additional Committee 4,000,00 100.00 4,000.00 0.00 4,000.00 Meeting Attendance Increase in Construction 53,000,00 100.00 53,000.00 0.00 53,000,00 Scope/Budget Increase in Project 5,000.00 100.00 5,000.00 0.00 5,000.00 Disbursements Total Fee 268,450,00 268,450.00 198,450.00 70,000.00 Total Fee 70,000,00 H.S.T.M H800706533 13,00%of 70,000.00 9,100.00 Total Tax 9,100.00 9,10(),00 'T'otal this Iuvoice $79,100,00 ayY�il'( Billings to Date Current Prior Total ttt J/ Fee 70,000.00 198,450.00 268,450.00 Oi 1 z moo $ Tax 9,100.00 25,798.57 34,898.57 IR - Cotals 79,100.00 224,248,57 303,348,57 250 Water Streot, Terms:Net Suite 201 Whitby,Ontario Canada l.1 N OG5 Tole:905.666.5252 Toronto:905.427-11496 Fax:905.666.5256 Email:hba @bba•archeng.conn www.hba-archeng.com