REPORT TO THE PLANNING AND DEVELOPMENT COMMITTEE MEETING OF JUNE 23, 1980.
REPORT NO. : P-111-80
SUBJECT: Bowmanville Urban Area Plan
Copies of the Draft Plan will be distributed separately
BACKGROUND:
On February 11, 1980, the Town received the final copies
of the Bowmanville Urban Area Plan as prepared by the I.B.I. Group.
On February 14, 1980, the submitted Plan was circulated to a number
of external agencies, and Town Departments for comment. Staff have
reviewed all responses to the circulation and have made revisions to
the Urban Area Plan as considered necessary.
The comments received through the circulation are summarized
below, and are accompanied by the applicable staff response.
Town of Newcastle Public Works
a) Under Section 2. 7.2 (viii) it is felt that all off-street
parking areas should be paved.
(Staff note that as a result of our revisions, the referred
to Section is now 2.6.2 (viii) and that reference to park-
ing lot surfacing has been deleted as a matter more appropri-
ately dealt with through development agreements.)
b) Section 2.8.2 (vii) d) , it should be noted that rumble
strips are not permitted within the Town of Newcastle;
under the Town's Design Criteria and Standard Drawings,
the pavement widths and curves are standardized and con-
trolled.
(Staff note that this is now Section 2. 7.2 (vii)d) and that
the wording has been revised to make this section more dis-
cretionary than mandatory.) 7
2 -
c) Under "Public Works", Section 3. 7; this Department
requires an explanation of this Section.
(Staff have met with Public Works Department and ex-
plained the intent and basis of this Section.)
d) At the time of the Neighbourhood Plans, the Public
Works Department will comment further on the proposed
arterial and collector roads, relevant to their design
and location.
(Staff have met with the Works Department and discussed
the matter in an attempt to refine the location of roads
at the earliest possible opportunity.)
3) This Department was not aware of the existence of the
Storm Drainage Guidelines for the Bowmanville Urban Area
Plan and would appreciate being notified of the status
thereof.
(Staff have responded to the Works Department on this
matter.)
Town of Newcastle Community Services
The plan of having a neighbourhood park and school in each
area, along with a Local Central Area would give the Town
a good organized structure.
The plan stresses convenient foot and bicycle paths, which
are sadly lacking in Bowmanville and the Town of Newcastle
in general.
I have no problem with the Bowmanville Plan, for a matter of
fact it is about time we were upgrading the Official Plan with
objectives, policies and implementation of school sites, neigh-
bourhood parks, open space and recreation.
In closing, I have duly read the report on the Bowmanville
Plan, i.e. ; Schools, Parks, Recreation and open space and I
am in agreement with it.
(Staff note that as a result of our own review the Sections
dealing with parkland and open space have been revised to
more clearly identify a hierarchy of open space and to rectify
concerns of other agencies in respect of the terminology. We
note that the intent of this section remains the same.)
Newcastle Fire Department
Although a number of comments were provided, only those
directly related to the provision of fire protection services
have been repeated here.
3 -
Industrial - Policies appear to be well defined. Industrial
districts could require a fire flow of 4500 g.p.m. from the
piped water system.
Transportation - Main arterial roads to provide a clear fire
lane across the Town, minimum traffic congestion with fire
department control of traffic lights, collector roads to
local roads.
Servicing and Staging - Water supply system proposed feeder-
mains and pumping station would be adequate water supply for
fire protection.
Newcastle Building Department
No objections or comments.
Newcastle Treasurer's Department
As a citizen the plan reflects a reasonable framework from
which the growth and development of Bowmanville can be con-
trolled. The plan does not appear to impose any financial
burdens upon the Municipality and I would therefore advocate
its adoption.
Peterborough-Victoria-Northumberland and Newcastle Roman Catholic
Separate School Board
The following points are presented for your consideration:
1) The statement is significant namely that the former Town
of Bowmanville is the heart of the Town of Newcastle;
2) Our opinion is confirmed in the report namely that present
development is only 25% of the acreage of the Bowmanville
Urban Area Plan;
3) It is confirmed that earlier forecasts in respect to popu-
lation growth were optimistic. It is evident, at this date,
that some of the stimulus to growth expected for the area
did not develop.
4) A close analysis of the population forecast and the expected
yield per household would indicate that the increase in en-
rolment of pupils in separate schools will be conservative.
5) We have considered the subject urban area plan in conjunction
with the School Board's future plans for the former Village
of Newcastle and with the realization that pupils are pre-
sently transported from the Village to Bowmanville.
6) This School Board subscribed to the philosophy in planning
of green belts and large open areas many years ago. We would
agree with the concept of a local central area and shared
facilities in respect to all those institutions suggested except
supermarkets and personal service shops.
1\
- 4 -
7) The consultants do not make reference to St. Stephen's
school in respect to a park/school site. It is the hope
of the School Board that past planning will remain in
effect, whereby the school site may be enlarged and the
property to the north will be developed as open public
parkland.
8) The proposal in respect to the acquisition of public land
is very interesting. It may be contrary to the new Planning
Act. Anything that would delay the need for a School Board
to make a definitive decision, in respect to a school site,
at the time of subdivision approval would be helpful.
It has been necessary to consider the subject urban area
plan in conjunction with the future school needs in the
planning areas of the Village of Newcastle and Courtice.
A major unknown is the priority that the Town may establish
in respect to the three major development areas.
Assuming that the sequence of development will be in accord
with the numerical sequence of the Planning Areas detailed
on Schedule 3, and having some regard to the other two major
planning areas in the Town, this School Board could have an
interest in a site in Areas No. 3, located near Nash Road.
The School Board will have representation present should the
Town's Planning and Development Committee schedule a public
meeting to consider the noted subject.
Northumberland and Newcastle Board of Education
Although written comments have not been received at the time
of writing, discussions with the Board's administrative staff
have indicated that they will be recommending that the Board
advise the Town that they have no objections. However, upon
receipt of the Board's decision in respect of this matter, we
shall take their concerns, if any, into consideration prior
to finalizing the plan.
Central Lake Ontario Conservation Authority
Exhibits 4, 7 and 11 of the Background Report and Schedule 1
of the plan have greatly under represented the extent of the
regional storm floodplain of the Bowmanville Creek, north
and south of Baseline Road on the west of the creek and south
of Baseline Road, on the east. On the attached copy of Exhibit
4, we have indicated those areas which should be included in the
"flood plain" category on each of the exhibits and the schedule
mentioned above. The "Special Purpose Commercial" and the
"Industrial Lands" designations on the affected ares of the
Bowmanville Creek and Soper Creek respectively (Exhibits 7 and
11 of the Background Report and Schedule 1 of the Plan) , should
be amended accordingly. These changes, in addition to recognizing
existing constraints to development, are essential to ensure that
the exhibits and Schedule conform to Section 2.3.2 (ii) a) , "Major
- 5 -
Open Space", of the Urban Area Plan. This subsection states
that; "The Major Creek System comprises those lands within the
fill and construction limits of the Bowmanville and Soper Creek
system". Since the fill and construction limits are always at
a higher elevation than the Regional flood elevation, the area
of the floodplain, now designated for development, should be
redesignated in a manner which restricts development. Schedule
1, so amended, would provide a general indication of the location
of hazard lands within the study area, in accordance with Policy
2.4.2 (iv) b) of the plan.
We find the method of describing Major Open Space and Hazard
Lands under the environment section confusing in that, according
- - - ---- -to--the--text,-Schedule-1 p-r-o-vides-n-indi-cation=o-f=-the=bounda-r-ies-/ ---
extent, as applicable, of each of the designations. However, no
differentiation is made on Schedule 1 between the two, and it is
therefore not possible to determine if a property is within Major
Open Space, Hazard Lands, or both. Further, the text refers to
"physical hazards and their effects" (Hazard Lands) , and the Open
Space Network", another description in the text, but not on Schedule
1, includes Major Open Space, Neighbourhood Parks and linkages
between these and other major land uses. All of these provisions
are included in one designation on Schedule 1 - "Hazard Lands and
Major Open Space". These sections of the plan and schedule 1 should
be changed to ensure ease of interpretation. For example, we can
find no information which could substantiate normal Hazard Land
restrictions to development in the area on Schedule 1 bounded by
Regional Road 57, the C.P.R. Line and Highway #2.
As a final comment, it is recommended that Section 2.9.2 (iii)
be expanded to include storm water management techniques, at
the Neighbourhood Development Plan stage, which will minimize
or offset any future impacts on receiving watercourses.
(Staff note that as a result of our own revisions to the subject
sections, many of C.L.O.C.A. 's concerns have been dealt with.)
Local Architectural Conservation Advisory Committee
At this point, the members of the committee are appreciative
of the Draft Urban Area Plan for Bowmanville.
One of our chief and immediate concerns is the proposed build-
ing of one-storey buildings at the banking corners. This is
against the meaning and the spirit of the Baird Report.
What can be done about it?
(Staff have responded to L.A.C.A.C. 's question, advising them
of the details of the new bank buildings. It may be an appropri-
ate course of action to adopt the recommendations of the Baird
Report by means of a development plan for the Main Central Area.)
- 6 -
Bowmanville Business Centre
We have reviewed the Bowmanville Urban Area Plan and are
quite interested in the Baird Report with special attention
to the following Sections:
1.5 That the B.I.A. be extended Scugog to George Streets
as per recommendation;
47 Proposal i.e. parking provision;
5.3 Proposed pedestrian passages and parking areas;
- - 9- -- That Council undertake-to-re-furbish the-Cenotaph - -
Park; and
10.6 That Council reconsider your proposals re: traffic
operations implementing 10.4 a Municipal Parking
Authority.
(As noted above these concerns may best be addressed through
adoption of Baird Report by means of a development plan for
the Main Central Area.)
Newcastle Hydro Electric Commission
I have read with interest the copies of the Urban Area
Plan submitted and find them to be very informative.
However, as the material contained therein is directed
towards avenues other than electrical, our comments at
this time will be minimal other than to say the infor-
mation contained therein will assist the Commission in
their overall plans in the years ahead and we thank you for
keeping us informed.
Durham Regional Planning and Works Departments
As previously discussed with your staff, many of the
policies proposed in the draft plan for the Bowmanville
Urban Area are similar to those prepared by the I.B.I.
Group for the Courtice Urban Area. Therefore, it is sug-
gested that the draft plan be revised in light of the changes
made to Amendment 12 to the Official Plan of the former Plan-
ning Area of the Township of Darlington (Courtice Urban Area
Plan) as approved by the Region. It is most appropriate that
such revisions be made prior to the presentation of the Bow-
manville Urban Area Plan to the Newcastle Council.
On the basis of staff's review, I would like to indicate the
following additional comments. It is suggested that land uses
within the main central area designated on Schedule 1 be detailed
- 7 -
as part of the District Plan in order that the policies
proposed in Section 2.5.2 (i) conform with the appropriate
provisions of the Durham Regional Official Plan.
Section 2.5.2 (i) indicates that the total population shown
on Schedule 1 exceeds the population guideline established in
the Durham Regional Official Plan. It would appear that the
difference is 500 additional population in the Bowmanville
West Area (Nhbd's 3C, 3D and 3E) and in accordance with Section
17 of the Durham Regional Official Plan this would appear to be
a minor deviation. Therefore, it is suggested that reference
to the population on Schedule 1 exceeding the population guide-
line in the Durham Regional Official Plan should be deleted.
Section 2.5.2 (g) provides for the development of "small local
central areas" to a maximum gross retail and personal service
floor space of 1,500 square metres or approximately 17,000 square
feet. It is suggested that Section 2.5.2 (g) indicate that an
Official Plan Amendment to include such central areas would
include a retail analysis that would be required to establish
the need and that such Local Central Areas do not unduly affect
the viability of existing and proposed Local Central Areas in
accordance with Section 8.2. 3.4 of the Durham Regional Official
Plan.
With respect to Schedule 1 it is suggested that the following
revisions be considered:
(i) the existing water pollution control plant should be shown
as a utility designation in accordance with the Durham
Regional Official Plan;
(ii) the Major Open Space designation with Hazard Lands should
be changed to reflect Amendment No. 12 to the Official Plan
of the Township of Darlington (Courtice Urban Area Plan) as
adopted by Regional Council.
Staff of the Regional Works Department have provided the follow-
ing comments:
(a) The population allocations to the various proposed neigh-
bourhoods appear to conform with the population allocations
as set out in the Durham Sanitary Sewerage Plans;
(b) Statements contained in the plan will not adversely affect
the Region with respect to the timing of installations of
Regional Services to each of the neighbourhoods;
(c) More detailed Works Dept. comments based on a comprehensive
review will be made for each neighbourhood development plan
as it is received for review.
(Staff note that the Region's concerns have been addressed
through our review and revision of the draft Urban Area Plan.)
— s —
Ministry of Housing
Our major concern is the manner in which this Plan will be
integrated into the District Plan for Newcastle. As you
know, this Ministry does not endorse multiple district plans
for a municipality, each covering part of the Town. We, therefore,
were uncomfortable reviewing this plan in the absence of an over-
all district plan.
You recall that we had similar concerns in reviewing the
Courtice Urban Area Plan. However, in Courtice we were aware
of the time pressures in producing a plan which could be used
to support the Courtice concept. It was agreed that, in the
- - - in-ter=es=t -of -time-, the Courtice-Plan-would=be consider=ed as-
amendment to the Darlington Township Plan.
In the case of Bowmanville, similar time pressures are not pre-
sent. In addition, we understand that the District Plan - Part
I is presently in preparation. Therefore, we assume that the
same urgency which prompted the Courtice strategy does not exist
with the Bowmanville Plan. It is assumed that Council will not
adopt this Part II - Plan for Bowmanville, prior to adopting the
Part I Plan.
There is another alternative; that is, adopting the Bowmanville
Plan as an amendment to the Bowmanville Official Plan. This
procedure has some administrative problems which render it im-
practical.
First, the urban envelope defined by the Regional Plan, extends
beyond the boundaries of the former Town of Bowmanville Planning
Area into the former Township of Darlington Planning Area. There-
fore, in order to adopt this plan, one amendment to each of the
two official plans would be required. Obviously, any part or
all of both amendments would be subject to referral to the Ontario
Municipal Board. In addition, when the District Plan is completed
consolidating all the former area official plans (and amendments
thereto) and submitted for approval, the same portions of the plan
would be subject to referral to the O.M.B.
Since the Official Plans for the former Bowmanville Planning Area
and Darlington Planning Area were not being repealed in the process
described earlier, certain problems could arise through new land
use designations, definitions of terms, etc. in the amendments which
were not used in the parent documents. This same problem was pointed
out in the Courtice amendment to the Darlington Plan.
Our position therefore is that given the state of the district
plan, this plan for Bowmanville should be adopted as part of the
District Plan, not as amendments to two existing official plans.
- 9 -
We assume that Council will take this approach and adopt
the Bowmanville Plan as part of the district plan when it
is in place. Therefore, certain changes to the format of
this document will be necessary since it will not be a "free
standing" document.
(Staff note that while the Ministry's suggested course of
action represents the ideal situation, the fact that the
District Plan Part I still requires circulation and public
meetings means that considerable delay would occur between
finalization of the Bowmanville Urban Area Plan and its
actual approval. While the Ministry does not support in-
corporation of the Urban Area Plan as an amendment, we shall
be:L v stU=gat-ing the=possibi-Lily o-f--adop '' -
L 11 LL11�� Q� Q. LLGG
standing plan and repealing the existing Bowmanville Official
Plan and the applicable portions of the Darlington Official
Plan.)
There are certain technicial issues about the plan which we
would like to raise for your consideration:
Section 1 - Introduction should not be considered part of the
plan. It is not an operative section, merely a description
of the structure of the document. (Staff note that this con-
cern has been addressed through our review and revision.)
There is some confusion in the terminology used in Section
2.3.2 (ii) Major Open Space. Subsections (a) and (b) use
the term "major creek system", however, the relationship
between the major creek system and the major open space
system is not clear. If the intent is to use C.L.O.C.A. 's
regulation lines as limits to growth, then those lines should
be shown. In addition, the land use schedule, by combining
the "Major Open Space" and "Hazard Lands" designations under
one category may lead to some confusion since their appear to
be different policies applicable to each.
We would recommend that the term Major Open Space System not be
used. This term is also used in the Durham Regional Official
Plan and is quite explicit as to the uses permitted within the
Major Open Space Areas. In many cases, these uses are not
appropriate in an urban area. Therefore, to avoid such potential
complications, a different term should be used.
(Staff note that this concern has been expressed by other com-
menting agencies and has been addressed through our review and
revision. )
The policies of Section 2. 7, Industrial, deal with the environ-
mental consequences of industrial development. We would recommend
that the Ministry of the Environment be contacted for advice in
this area. (Staff note that Ministry of the Environment has advised
us that they will be unable to comment on Official Plans, unless
circulated by Housing, owing to their own workload.)
- 10 -
Section 2.8.2 (x) requires that bicycle and pedestrian
routes be provided as a condition of all new development
and redevelopment. This section should be reworded. As
you know, pedestrian and bicycle path concepts can only
be successful if the municipality is committed to a total
system. This would entail certain acitivity on the part
of the town in providing linkages between sections and
giving encouragement to their use. Unless the Town is
prepared to make such commitments, this section is not
implementable as proposed.
(Staff note that the wording of this section has been
revised.)
It is recommended that Section 2.9, Servicing and Staging,
recognize the commitments to development made under O.H.A.P.
agreements. These commitments should be fulfilled before con-
sidering development beyond the areas serviced through those
agreements. It is further recommended that M.N.R. and C.L.O.C.A.
be consulted regarding the stormwater managment policies con-
tained in this Section.
(Staff note that Section 2.9 has been revised accordingly.)
In certain cases our concerns may be satisfied by appropriate
policies in the District Plan. However, without such a plan
before the Minister, we cannot make such assumptions.
We recommend that Council direct its efforts toward a com-
prehensive district plan which would include policies for
the urban areas. Without such a document containing common
policies, it is difficult to evaluate this plan properly on
the context of planning in Newcastle.
Ministry of Natural Resources
We do not have major criticisms of the report. The point
we raised with our engineers was the feasibility of the
stream alterations in Appendix 3, the Gore and Storrie Ltd.
Report in terms of provincial criteria. Our engineers have
made only one comment regarding the background reports: "We
note Gore and Storrie Ltd. 's following statement on page 3,
paragraph 2, concerning modifications of local western creek -
"modifications, such as enclosing the watercourse through the
proposed industrial development appear feasible provided ade-
quate conveyance capacity and drainage management facilities
are incorporated into the development plan and are approved
by the Conservation Authority, the M.O.E. , M.N.R. and the Town."
The above statement is also applicable to the local eastern
creek. Therefore, a similar statement concerning modification
of this creek should be included in the report."
Other than that, our most important concerns in Bowman-
ville are the valleys of the Bowmanville and Soper Creeks,
which are important for their fisheries as well as the
potential flood and erosion hazards.
Both are good coldwater streams and support populations
of brook and rainbow trout in their watersheds. Within
the Town of Bowmanville there is some stress as a result
of urbanization and the downstream location in what is
primarily a cultivated watershed. Both streams have good
productivity and potential; and should not be discounted
because of the urbanization.
toteGoodr e dr---Pla L -, -
and Vanstone's Mill are probably the two most obvious,
correctable problems facing that fishery, as they block
the spawning runs from Lake Ontario. If these dams were
removed, or satisfactory fishways installed, it is probable
that the quality of the fishery in the watershed as a whole
would be improved.
The fisheries are an asset to the community, and we hope
are not viewed as merely a program of Natural Resources,
which has no relation to the community. The stream valleys
could be used as the focal points of a recreational corridor
system with trails, parkland, outdoor educational resources
and environmental appreciation designed into the overall scheme.
Over the long term, land acquisition in the stream valleys might
be a valuable investment for the town or conservation authority.
The section III - 2 on pages 12 - 13 and 2.2 of Appendix 3,
give a negative impression on the stream valleys as constraints
to development. While it is true the constraint aspect is most
important, the potential benefits of good resource management
in the stream valleys should not be overlooked.
Pollution from all sources, including erosion of soil as a
result of construction, is detrimental to water quality in
the creek and, cumulatively, in Lake Ontario as a whole.
From the fisheries and recreation point of view, it would
be desireable to minimize erosion and siltation during the
planning and construction of new developments in the watersheds.
(Staff have noted the concerns relative the Gore & Storrie
Report and will not be revising said document since we are
not the authors.)
Ministry of Agriculture and Food
Staff of the Ontario Ministry of Agriculture and Food have
reviewed the plan, and consideration has been given to it
in view of the present goals and objectives of the Ministry
and the guidelines on land use which support these goals and
objectives.
Please be advised that we have no objection to the proposal at
this time.
- 12 -
Ministry of Transportation and Communication
This Ministry has carried out a study of Highway #401
in this area which indicated that an interchange in the
future could be provided At Cemetery Road when required.
The long range plans including the updating of Waverly
Road and the removal of the Liberty Street interchange
which will be replaced by the Cemetery Road location.
Should an alternate location, such as Training School
Road, be chosen by the municipality, this Ministry would
have no objections. It would be advisable for the munici-
pality to protect the property requirements at either location
----------
Ontario Hydro
It is my understanding, that a District Plan for the District
Planning Area of the Town of Newcastle is presently being pre-
pared. The Bowmanville Urban Area Plan will form an integral
part of the District Plan, it will not amend the Plan. The
District Plan, in turn, will be free standing and conform with
the Durham Regional Official Plan. It will not amend the Reg-
ional Plan.
The Regional Plan contains a Utilities Services policy relating
to electric power facilities. It is our desire to have a clear
policy statement regarding electric power facilities in all
Official Plan documents. You advise that the District Plan
will contain general policy statements similar to that of the
Regional Plan.
To be consistent and in conformity with the Regional Plan, we
request that the following paragraph or one of the same policy
intent be included in the District Plan:
"All existing electric power facilities and the development
of new facilities including all works as defined in the Power
Corporation Act, such as transmission lines, transformer stations
and distributing stations, shall be permitted throughout the
planning area provided that such development satisfies the pro-
visions of the Environmental Assessment Act, including regulations
made under the Act, and any other relevant statutes."
In view of the fact the Bowmanville Urban Area Plan is to be
an integral part of the District Plan and in conformity with
its policies, you advised that it would not be appropriate to
repeat the electric power facilities policy statement in the
Area Plan. On this basis we request that the above noted policy
be included in the District Plan only and not in the Urban Area
Plan.
13
Once we are in receipt of the District Plan, we will
be in a better position to understand, the interrelationship
of the District and Area Plan and provide further comments
on their treatment of our facilities.
We have no other comments to make on the proposed Area Plan
at this time.
(Staff note that our first draft of the District Plan - Part I
contains the requested policy statment.)
Canadian National Railway
I_hame�rcviewed- nA1_-_Can-_o-ffe_r-_n
constructive suggestion from the standpoint of this Railway.
The plan designates an adequate amount of land for industrial
uses in the south-east sector of the Urban Area lying between
our tracks and Highway 4401, which can be readily penetrated
with siding trackage if required by rail-oriented industry.
This plan also precludes all Institutional and Residential
uses in the vicinity of the C N Toronto-Montreal high speed
main line, in conformity with good planning practice.
With regard to the location of future arterial roads, my
only concern is that the scheduled arterial extension of Liberty
Street southerly and easterly into the Industrial Area, and north
of the C. N. right-of-way, will be sufficiently flexible to per-
mit a variety of industrial lot sizes between our right-of-way
and the arterial road, and minimize the necessity for track cross-
ings over this road.
Canadian Pacific Railway
A review of the report indicates that our main track between
Toronto and Montreal passes through the area under consideration.
Rail traffic is reasonably heavy and given the tight energy situ-
ation, which we believe will continue, and general growth in the
economy, we expect the traffic to increase in the years ahead.
The proposal, as we read the report, is to have residential de-
velopment take place adjacent to our right-of-way. Because rail-
ways inevitably cause noise and vibration that affects the area
on either side, we believe what is proposed will create a situ-
ation in which there is a high probability of conflicts between
the railway and residents. This is undesirable to all concerned
including the municipality. We, therefore, believe you should
reconsider the proposal and, at the very least, provide that resi-
dential development next to the tracks develop in the later stages.
It is the opinion of C. P. Rail that vacant land adjacent to our
right-of-way should be reserved for industrial development. If,
however, this is not possible, we would request that certain con-
ditions be imposed on any developer to ensure the safety and com-
fort of adjacent residents and to mitigate, as much as possible,
- 14 -
the inherent adverse environmental factors.
(Staff note that C. P. Rail have provided a list of con-
ditions, which would approriately be included within
Development Agreements. We also note that the designations
of the Urban Area Plan conform to the Durham Regional Official
Plan, however, Council may, if it so desires, include appropriate
industrial designations within Residential areas subject to
Section 8.1.2.1 (b) of the Durham Regional Official Plan.)
COMMENTS:
Staff have reviewed all responses to the circulation and
ave_r(WaPVise -t -e - ra t—Bowmariw e-Urlian. Area plan-'accordn.gly.have also also made revisions in accordance with our own departmental review.
Of these revisions, the two which are the most noteworthy are;
the removal of the Pine Ridge Training School from within the urban area;
and the expansion of the major open space designations for both the Bow-
manville and Soper Creeks in the vicinity of Baseline Road.
In the first case, the Pine Rodge Training School site is
designated "Institutional" by the Durham Regional Official Plan but lies
outside of the residential areas of Bowmanville. As the training school
is no longer in use and as the final disposition of the property has not
yet been determined, staff feelthat it would be appropriate to exclude
the site from the urban area.
In the second case, the Central Lake Ontario Conservation
Authority requested the revisions as a result of their review which indi-
cated a major discrepancy between the Authority's floodplain mapping and
the designations shown on the first draft of the Urban Area Plan.
We note that both of the above revisions will require amendments
to the Durham Regional Official Plan, and these should be initiated upon
approval, by both the Town and the Region of the Urban Area Plan.
- 15 -
We are now in a position to recommend that public input
be obtained, and suggest that a series of two or three public meetings
be held, and/or a public display set up. Owing to budget constraints,
we cannot support publication of the entire plan, as was done in the
case of Courtice. However, we are reasonably confident that public notices,
meetings and displays will achieve a high degree of public visibility and
result in the desired level of public involvement.
RECOMMENDATIONS:
That the Planning and Development Committee recommend to
Council, the following:
1. That Report P-111-80 be received; and that
2. The draft Bowmanville Urban Area Plan be placed on
public display at the following locations:
Newcastle Town Hall
Newcastle Public Library (Bowmanville Branch)
Newcastle Planning Department (Hampton offices)
and that
3. Staff be authorized to arrange public meetings for the
purpose of presenting the draft Bowmanville Urban Area
Plan to the public; and that
4. Staff be authorized to place a general notice in local
papers, advising the public of the location of displays
and the time and dates of public meetings, and inviting
public input.
Respectfully submitted,
A��-tl- .
TTE:lb D. N. Smith, M.C.I.P.
June 16, 1980 Director of Planning