HomeMy WebLinkAboutTR-84-87 TOWN OF NEWCASTLE REPORT File # Res. _--- .4: �. By-Law # MEETING: GENERAL PURPOSE & ADMINISTRATION COMMITTEE DATE: November 2, 1987 REPORT #:TR-84-87 FILE #: SUBJECT: Tender T87-261 Nash Road Reconstruction (From Varcoes Road Easterly) RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. That report TR-84-87 be received; and 2. That Report TR-78-87 be lifted from the table and dealt with. BACKGROUND & COMMENTS: At the General Purpose and Administration Committee Meeting of October 19, 1987, Report TR-78-87 was tabled (copy attached) and referred to staff for further information and a cost breakdown. Attached, please find correspondence from the Deputy Director of Public Works, which addresses these concerns. Staff are of the opinion that the contract for Nash Road Reconstruction should not be awarded at this time, due to inflated prices being tendered. Respectfully submitted, Recommended for presentation to the Committee .R. Blanchard, /r)'hilef rence E Kotseff, Treasurer. m nistrative Officer. JRB/pp TOWN OF NEWCASTLE (:'F1 REPORT File # Res. # MEET ING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE DATE: October 19, 1987 REPORT #: TR-78-87 FILE #: SUBJECT: TENDER T87-26, NASH ROAD RECONSTRUCTION (From Varcoes Road Easterly) RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. That this report be received; and 2. That Tender T87-26, Nash Road Reconstruction not be awarded at this time; and 3. That funds to complete this project be included in the 1988 Public Works Capital budget. BACKGROUND AND COMMENT: Tender specifications were provided by Proctor and Redfern Limited, for the Nash Road Reconstruction as required by the Director of Public Works. Tenders were publicly advertised in the local papers, as well as the Daily Commercial News, with a closing date of August 12, 1987. Despite four (4) contractors picking up tender documents, there were no bids received. 2 - TR-78-87 TENDER T87-26, NASH ROAD RECONSTRUCTION (From Varcoes Road Easterly) All four (4) contractors were contacted by the Purchasing and Supply Agent with their responses being noted as follows: Company Comments Dagmar Construction - bad timing Markham, Ontario - would be interested if re-tendered Novacor Construction - not pleased with Town's actions Queensville, Ontario on past Tender award (T87-17) Harnden and King Construction - unable to secure sub-contractor Cobourg, Ontario for sewer portion of project Bennett Paving and Materials Limited - not pleased with some of the Oshawa, Ontario tender requirements ie. 1. 3% holdback 2. contingencies conditions not clear 3. too many items Subsequently, the tender requirements were reviewed by Purchasing, Public Works staff and the consultant, Proctor and Redfern Limited. It was mutually agreed that, in an effort to encourage bidding, the concerns of Bennett Paving and Materials Limited would be addressed. The tender requirements were revised and tenders were again publicly advertised. In addition to the original four (4) contractors being invited to bid, two (2) others requested specifications. Tenders closed on September 14, 1987 and were received and tabulated as follows: Bidder Bid Amount Bennett Paving and Materials Limited $505,701.36 Oshawa, Ontario The Engineer's estimate for this project was $317,447.00. The total amount allocated for this project in the 1987 Public Works Capital budget was $186,600.00. It should also be noted that the Engineer's fees would be in addition to the above bid amount. Page - 3 - TR-78-87 TENDER T87-26, NASH ROAD RECONSTRUCTION (From Varcoes Road Easterly) This tender has been discussed with the Region of Durham staff, as the Region's services form a substantial part of the contract, and they concur with our recommendations. As well, included in this tender was the widening and installation of concrete curbing on the west side of Varcoes Road, north of Nash Road, as requested by the neighbourhood residents. It is not practical to complete this work at this time, as the Region are experiencing deficiences on their services and have been excavating to make the required repairs. Clean-up of the boulevard will be completed by Town staff this fall. Staff will be reviewing alternatives to complete this work in a reasonable, economical manner -by late spring of 1988. After further review and analysis of the bid by Public Works and Treasury staff, and in view of the inflated prices, the fact that only one (1) bid was received and that the costs are significantly over budget, it was mutually agreed that the contract for Nash Road Reconstruction, not be awarded at this time. Respectfully submitted, Recommended for presentation to the Committee, ,'IT-R. Blanchard, wrenc Kotseff, ,; :reasu er, Chief nistrative Officer. T. G Deputy Dirt`r of Public Works. L,AB/hjm ,n s ` TOWN OF NEWCASTLE MEMORANDUM Mayor John Winters TO; Members of Council FROM: David T. Gray, Deputy Director of Public Works DATE; October 26, 1987 SUBJECT: TREASURY REPORT TR-78-87 NASH ROAD/ VARCOE ROAD CONSTRUCTION - TENDER T87-26 Treasury Report TR-78-87 presented to the October 26, 1987 G.P.A.C. was tabled to provide clarification and a more detailed cost break down in relation to the Region's and Town's share of the works. The attached memorandum to the Purchasing Department states our reasons for not recommending the award of the contract. The following summary of contract items indicates the cost breakdown estimates and budget allocation. Budget documentation is attached for your convenience. Contract Description of Items Underground Services Bid Estimate A Sanitary Sewers $ 60,290.45 $ 18,525.00 B Storm Sewers 79,760.45 372208.00 C Sanitary Manholes 3,795.00 2,875.00 D Storm Sewers 11 ,693.00 9,500.00 E Catch Basins 14,339.60 9,470.00 F Services 26,614.50 10,500.00 G Contingencies 38,030.00 382030.00 $234,523.00 $126,108.00 Road Works H Prep of Subgrade 43,115.70 16,208.00 I Rd Base,Curb,Asphalt 150,122.35 124,000.00 J Contingencies 16,131 .34 16,131 .34 $209,369.39 $156,339.00 Boulevard Works K $ 61 ,808.97 $ 35,000.00 $ 61 ,808.97 $ 35,000.00 TOTAL $505,701 .36 $317,447.00 ----------- ----------- ----------- ----------- . . . .2 u1 Page 2 Treasury Report TR-78-87 Nash Road/Varcoe Road Construction - Tender T87-26 Town's Share Region's Share Total ITEM A $ $ 60,290.45 $ B 79,760.45 C 3,795.00 D 11 ,693.00 E 14,339.60 F 13,307.25 13,307.25 G 19,015.00 19,015.00 Sub Total $ 138,115.30 $ 96,407.70 $234,523.00 H 43015.70 I 150,122.35 J 169131 .34 Sub Total $ 209,369.39 $209,369.39 K 61 ,808.97 61 ,808.97 Grand Total $ 409,293.66 $ 96,407.70 $505,701 .36 Funds Approved for Town's Share: Nash Road $ 160,000.00 Nash Road C/0 26,600.00 Varcoe Road 70,000.00 TOTAL $ 256,600.00 . . . .3 0 3 (d) Page 3 Treasury Report TR-78-87 Nash Road/Varcoe Road Construction - Tender T87-26 Varcoe Road ITEM H.003 $ 866.80 H.005 11516.90 H.007 9,576.00 $ 11 ,959.70 ITEM I.001 618 m x 14.80 $ 9,146.40 1.003 17,874.00 1.005 27,049.86 1.008 9,324.00 1.011 17,346.00 $ 80,740.26 ITEM K.004 50 % $ 13,156.00 K.006 5,508.00 K.007 7,884.00 $ 26,548.00 $119,247.96 PLUS 10 % Engineering Funds to provide the Town's share of the Nash Road portion of the road reconstruction and storm sewer work were budgeted in the 1987 Public Works Capital Budget as $160,000.00 from Lot Levy Reserve. As well, $26,600.00 was budgeted as a carry over item for the Town's share of the restoration of Nash Road from Varcoe Road to Townline Road and is not specifically part of this project. The contract prices for Varcoe Road put the cost at approximately $120,000.00 plus an additional 10 % for Engineering and Contract Administration. . . . .4 Page 14 Treasury Report TR-78-87 Nash Road/Varcoe Road Construction - Tender T87-26 In summary, the Town has had extreme difficulty in attracting competitive bids on this project and the prices submitted are extremely high. Deficiencies and repairs of the underground services on Varcoes Road do not provide a good basis for completing the Town works this fall. It also should be noted that by not proceeding with the project at this time, our subsidy allocation from the M.T.C. is not affected. A substantial portion of the road work is eligible for subsidy but was not included in that portion of the funding at budget time. Staff are proceeding to make the necessary arrangements to complete the boulevard grading on Varcoe Road and to complete the granular base for the required widening. Curb and final asphalt would be completed in late spring (1988) when assurances are received from the Region that all underground repairs have been completed and the services have been accepted. Letters are to be forwarded to the residents advising them of the situation. D.T. Gray. DTG:jco cc: L.E. Kotseff, C.A.O. J.R. Blanchard, Treasurer A.S. Cannella, Engineering Supervisor TOWN OF NEWCASTLE NEMRAfM f�l TO: LOU ANN BIRKETT, PURCHASING AND SUPPLY AGENT FROM; DAVID T. GRAY, C.E.T., DEPUTY DIRECTOR OF PUBLIC WORKS DATE: 1987 10 05 SUBJECT: ENDER T87-26 HASH ROAD RECONSTRUCTION Please be advised that I have reviewed the tender prices for T87-26, as submitted by Bennett Paving and Materials Ltd., and find the prices bid on most items significantly high, almost double the Engineer's estimate. In view of these inflated prices, the fact that only one bid was received, and that the Tender costs are significantly over budget I am recommending that the Tender 87-26, for reconstruction of Nash Road from Varcoes Road easterly, not be awarded at this time. I have discussed this tender with the Region of Durham staff as the Region' s services form a substantial part of the contract and they concur with our recommendations. As well , included in this tender was the widening and installation of concrete curbing on the west -side of Varcoes Road, north of Nash Road, as requested by the neighbourhood residents. It is not practical to complete this work at this time as the Region are experiencing deficiences on their services and have been excavating to make the required repairs. Clean-up of the boulevard will be completed by Town staff this fall . Staff will be re iewing alternatives to complete this work in a s abl economical manner by late spring of 1988. D.T. Gra DTG:kd cc: A.S. Cannella, Engineering Supervisor J. Blanchard, Treasurer L. Kotseff, C.A.O. " 19. :ORPORATION OF THE TOWN OF NEWCASTLE DEPARTMENT: PUBLIC WORKS 987 CAPITAL BUDGET ACCOUNT NUMBER: 7205 ACCOUNT DESCRIPTION: ROAD CONSTRUCTION >ROJECT DETAIL SHEET 4. Capital Costs �. Pro ect Number Project Location -61: Description Land, Building & Major Improvanent $ Nash Road storm sewer and upgrading Furniture & Equipment Townline Rd. to Varcoe Rd. Construction Services: 26,600 Contractor Regional -- Engineering - 3. Key Plan Temporary Financing TOTAL COSTS $ 26,600' 5. Related Pro ect LL The Nash Road storm sewer and restoration project which began in the fall of 1986. [ � •[n YOR[ RR /py�/ipy�+ R.LR W.0 [TICK 4R[ O[ to C L[R GR[ TRIIG [ LT N. Jv OLDD _ 19. CORPORATION OF THE TOWN OF NEWCASTLE DEPARTMENT: PUBLIC WORKS 1987 CAPITAL BUDGET ACCOUNT NUMBER: 7205 PROJECT DETAIL SHEET ACCOUNT DESCRIPTION: ROAD CONSTRUCTION 6. Need/Explanation of Project 7. Financing In order to provide adequate storm sewer capacity for Tax Levy $ NIL the development north of Nash Rd. & east of Varcoe Rd. the developer was required to install a storm sewer on Revenue from Users Nash Rd. to Townline Rd. Subsidy & Contribution: The Town agreed to contribute to the project to provide D/C Lot Levies $ 14,800 for the oversizing of the storm and restoration of Nash Rd. MTC $ 11,800 to a reasonable level as opposed to restoring in kind as is the normal requirement. Total Subsidy & Contribution Debentures 26,600 Funds are required to cover the Town's share of the restoration works which were originally scheduled for late Tax Supported $ - fall of 1986 but were not completed due to persistent Non Tax. Supp.$ inclement weather. Total Debentures If the PRIDE application is approved a portion of these funds may be required to provide a temporary surface until TOTAL FINANCING $ 26,600 the design and tendering of the servicing and road constructio, can be completed. Approximately $12,000 must be allocated to complete works which were partially com-- pleted in 1986. It is recommended that $50,000 be allo- cated for this project in 1987. 8. Prop. Start Date 9. Prop. Comp. Date 10. O.M.B. Quota May, 1987 May, 1987 CORPORATION OF THE TOWN OF NEWCASTLE DEPARTMENT: PUBLIC WORKS ACCOUNT NUMBER: 7205 1987 CAPITAL BUDGET ACCOUNT DESCRIPTION: ROAD CONSTRUCTION PROJECT DETAIL SHEET i 4. Ca ital Costs 1. Pzo'ect Number or improvement $ 2. Project Location & Descriptions Building & Maj P —" Nash Rd. Reconstruction Furniture & Equipment Varcoe Rd. east to the existing curb and gutter section Construction Services: 150,000 west of Cherry Blossom Dr. Contractor Regional —""—� Engineering Temporary Financing - TOTAL COSTS $ 160,000 5. Related Pro•ect °-' In 1986 Nash Rd. was reconstructed to urban west +'+ 9 standards from Centerfield Drive to a point of Cherry Blossom Drive. In 1987 Nash Rd. from s Townline Rd. to Varcoe Rd. and Varcoe Rd. from �} Hwy. 2 to Nash Rd. and from Nash Rd. north to n" Centzefield Drive will be upgraded and asphalted. a R coca G"G 3 �� Y GT'� • TIWI l� f N1 ►Y N• P�� "a i rvw"VG •qq i t � Y r 2 . T CORPORATION OF THE TOWN OF NEWCASTLE DEPARTMENT: PUBLIC WORKS 1987 CAPITAL BUDGET ACCOUNT NUMBER: 7205 m,. PROJECT DETAIL SHEET ACCOUNT DESCRIPTION: ROAD CONSTRUCTION 6. Need/Explanation of Project 7. Financing The new pavement on all four sides of this section of Tax Levy $_ Nash Rd. make it a logical section to reconstruct. The Region of Durham has proposed funding for their work on Revenue from Users this section of Nash Rd. in their 1987 capital budget. ® Subsidy & Contribution: The reconstruction in 1987 will result in the new road and Reserve $ 160,000 (Lot Levies) sidewalks being in place in time for the opening of the Grants addition to the Courtice West (Sid Warden) Public School be on stream. Total Subsidy & Contribution Debentures 160,000 ® Tax Supported $ Non Tax. Supp.$ Total Debentures TOTAL FINANCING $ 160,000 8. Prop. Start Date 9. Prop. Comp. Date 10. O.M.B. Quota June, 1987 August, 1987 MEN 9 �. w• „k TOWN OF NEWCASTLE REPORT File # Res. # By-Law # MEETING: THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE DATE: June 1, 1987 REPORT #: WD-40-87 FILE #: SL&ECT: VARCOE ROAD CONSTRUCTION RECOMMENDATIONS: It is respectfully recommended: 1. That Report WD-40-87 ..be received; -and, . .. . .. ;-w-„:a!•;v,03,.;2:--'r;. .:f` (t{.. a,:° ..a'� :-:,. ,;,; `f” ., ,. `—. 2. That the urbanization:.of the west -side=.of- Varcoe:Road be. completed in conjunction with the Town's 1987 .Nash.. Road...reconstructidK project. 3. That the cost of,the urbanization. be'funded ;from .Public Works Lot Levies. G.P.A. Minutes - 12 - June 1 , 1987 PUBLIC WORKS Resolution #GPA-519-87 Varcoe Road Moved by Councillor Stapleton, seconded by Councillor McKnight Construction 18.2.110. 1. That Report WD-40-87 be received; and 2. Thht the urbanization of the west side of Varcoe Road be completed in conjunction;iwith the Town's 1987 Nash Road reconstruction project; 3. Thbt the cost of the urbanization be funded from Public Works Lot Levies. "CARRIED" 3 p/ r Page 2 Report No. WD-40-87 REPORT: As part of the Schleiss and Holland development, Varcoe Road north of Nash storm sewers and with curb and gutter, has been reconstructed complete with sidewalk and streetlighting on the east side of the road all at the expense of the developer. To complete the urbanization of the west side of Varcoe Road, curb and gutter and boulevard restoration is required. The estimated cost of the works required is $70,000.00. The option is 'to restore the. boulevard and leave the west .side of Varcoe Road with a rural cross section similiar to the situation that used to be on Martin Road north of Baseline Road and on West Townline Road north of Bloor Street. It is hereby. recommended that the urbanization of the ,west side of Varcoe Road be completed in conjunction with.the Town's 1987 Nash Road reconstruction project (ie:Nash Road east of Varcoe Road to the Sid ar n Public School ) which,' is/scheduled to take place in July 1987, and that lot -levies be used to .cover the cost of said works. Respectfully submitted, Recommended for presentation to the Committee, Gordon J. Ough, P. Eng. ,' Lawrence E. Kotseff, Director of Public Works Chief Administrative Officer. GJO:lly