HomeMy WebLinkAboutTR-66-86 YJ 3 . (e) TOWN OF NEWCASTLE tp REPORT File # Res. By-Law # METING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE MEETING DATE: September 2, 1986 REPORT #: TR-66-86 FILE #: W&JECT: TOWN HALL CUPOLA REMOVAL RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the fallowing : 1 . That this report be received; and 2. That the procedures set out in the Purchasing By-Law #82-92, Section 5, paragraph 04, be waived for this particular transaction owing to the uniqueness of the work required; and 3. That a purchase: order in the amount of $20,874.00, for the removal of the cupola from the Town Hall be awarded to Gerr Construction Limited, Bowmanville, Ontario ; and 4. That the funds expended be provided from the approved account. #7007-04054-9. BACKGROUND AND COMMENT: The structural engineer, M.S. Yolles, has recommended the immediate removal of the cupola from the roof of the Town Hall. Due to the uniqueness of the work and at the! suggestion of the Architects, A.J. Diamond and Partners , a site meeting was arranced with four (4) area contractors being invited. Representatives from both M.S. Yolles and A.J. Diamond and Partners were in attendance at this meeting. The invited contractors and their respective bids were tabulated as follows : BIDDER BID AMOUNT Partak Limited $ 8,340.00 * does not include demolition COBOURG, Ontario permit or the removal of the cupola from the site after being lowered by the crane V/ Page - 2 - TR-66-86 TOWN HALL CUPOLA REMOVAL Gerr Construction Limited $20,874.00 BOWMANVILLE, Ontario Brian Barton Building Corp. $22,185.00 WHITBY, Ontario Bowman Construction Declined to Bid BOWMANVILLE, Ontario Upon review of the low bid from Partak Limited, it was revealed that it was incomplete in that it did not include a demolition permit or the removal of the cupola from the site after being lowered by the crane. The representatives from both M.S. Yolles and A.J. Diamond and Partners feel that the low bidder does not have a full understanding of the work required. After review of the other bids submitted, it was agreed that the second low bidder, Gerr Construction Limited, Bowmanville, Ontario , be recommended for the contract to remove the Town Hall Cupola. See the attached letter from A.J. Diamond and Partners , recommending this award, as well as a copy of the bid from Gerr Construction Limited. Gerr Construction Limited are a reputable contractor who have satisfactorily performed numberous contracts for the Town of Newcastle. Respectfully submitted, a J.R. Blanchard, Treasurer. r i D.W. Oakes, B.A. ,A.M.C.T. ,C.M.O. , Clerk/Administrator. /hjm Attachments A.J. Diamond and Partners Architects and Planners �v�- 3 2 Be t dey Street ��). 1 )i,in ica id I"15A ZW3 I'�u it ��y�i it 16)£362 8800 A. (-,it let, (-(mi >holl(�t Adriwn Di C asiri I)A 1-Janson AUG 14 1986 Vilaoi s Jaunkalns At Lessard TOV4x Ur' I� .��1�AJ1L �cr cd< Revin ton Wednesday August 12, 1986 pURcHASI1vG DEPARTMENT Corporation of the Town of Newcastle Treasury Department 40 Temperance Street Bowmanville, Ontario L1C 3A6 Attn: Lou Ann Birkett Dear Lou Ann; Re: Town of Newcastle, Town Hall Cupola Removal We have reviewed the bids for the removal of the cupola from the Town Hall with our structural consultant Helmut Microys, and recommend that Gerr Construction be retained for the work. The removal of the cupola should begin as soon as possible, please advise me when the contractor has approval. Yours truly, X---- - Pat Hanson PH/tn C.C. D. Oakes, Town Clerk/Administrator Helmut Microys GERR CONSTRUCTION LIMITED R.R. 3, Bowmanville, Ontario L1C 3K4 579.8323 July 31, 1986. UTA Town of Newcastle, 1 19 G 40 Temperance Street, Bowmanville, Ontario. L 1 3A6 PU!%(-[iA& !G DE-E A" '-;1FN'F Attention: Ms. L. Birkett Re: Town Hall Cupola Removal, Bowmanville,Ontario. Madam: WP are pleased to submit one quotation on the amount of Twenty Thousand, eight hundred and seventy four dollars ($ 20,874.00) to provide all necessary labour, plant, and materials to perform the following work: - remove cupola and masonry walls above roof line as discussed on site with representatives of A.J. Diamond & Associates and MS Yoles on July 17/86. - provide temporary wood framing,plywood sheathing and asphalt shingles to provide watertight roof at area of demolition. - provide all necessary hoarding and protection as required by safety regulations Note: 1. Cupola to be either a) removed intact and hoisted to ground west of building for storage by others or b) demolished and removed from site. There will be no difference in cost for these alternatives . 2, Work to be performed during regular working hours . Work will commence within 2 weeks of receipt of order and completed approximately three weeks thereafter. Yours truly, GERR CONSTRUCTION LIMITED resident Ge-r Gerrits P. Eng. JG/mg