HomeMy WebLinkAboutTR-103-89 TOWN OF NEWCASTLE REPORT File # fr . . Res. # By-law # METING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE DATE: December 4, 1989 REPORT #: TR-103-89 FILE #: StJB,JECT: TENDER T89-39, CONSTRUCTION OF NORTHERN FIRE STATION RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. That Report TR-103-89 be received; 2 . That Gerr Construction, Bowmanville, Ontario, with a total bid in the amount of $580,000 .00, being the lowest responsible bidder meeting all terms, conditions and specifications of Tender T89-39, be awarded the contract for the Construction of the Northern Fire Station, as required by the Fire Department; 3. That the funds required in the amount of $300,000 . 00 be drawn from the approved 1989 Fire Department Capital budget, Account #7102-00006-0501; and 4 . That the balance of the funds required be included in the 1990 Fire Department Capital budget. » B Page - 2 - TR-103-89 TENDER T89-39, NORTHERN FIRE STATION BACKGROUND AND COMMENT: Tender specifications were provided by Phillips Barratt Kaiser for the construction of the Northern Fire Station, as required by the Fire Department. Tenders were advertised in the local papers, as well as the Daily Commercial News. Subsequently, tenders were received and tabulated as follows : Bidder Total Bid Amount Gerr Construction $ 580,000 . 00 Bowmanville, Ontario Partak Limited $ 619,900. 00 Cobourg, Ontario J. Velacich and Sons Construction $ 716,000 . 00 Scarborough, Ontario Tasis Contracting Ltd. $ 726,300 . 00 Pickering, Ontario Onbec Enterprises Ltd. $ 759,000. 00 Mississauga, Ontario Abco General Contracting $ 779,502 . 00 Richmond Hill, Ontario The original Engineer's estimate for the contract was $ 297, 000 . 00 . The low bid of $ 580,000. 00 is substantially over the 1989 budget allocation of $ 300,000. 00. Other associated costs are estimated at $ 26,700 . 00 for Engineering Services, $ 4,000. 00 miscellaneous testing and $ 2,000. 00 for Hydro services, which brings the total required funds to $ 612,700. 00 . 729 Page - 3 - TR-103-89 TENDER T89-39, NORTHERN FIRE STATION The construction of this facility is listed in the 1989 Capital Budget on Page 90, Item #1. The high bid prices are attributed to; winter construction, additional paving required, a busy construction season and the underestimating of the project on the part of the consultant. The low bidder has previously performed satisfactorily for the Town of Newcastle. The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Fire Chief. After further review and analysis of the bids by the Fire Chief, Phillips Barratt Kaiser and Purchasing, it was mutually agreed that the low bidder, Gerr Construction, Bowmanville, Ontario, be recommended for the contract for the Construction of the Northern Fire Station. See attached letter from Phillips Barratt Kaiser marked Schedule "A" . Respectfully submitted, Recommended for presentation to the Committee, Mar'e Marano, H.BSc . , awrence E. Kotseff, ' ! I (�� T r sur Chief Administrative Officer. M. Creigh on, Fire Chief. LAB/hjl Attachment 7 -30 SCHEDULE "A" . � Phillips Barrett Kaiser Engineering Ltd. 3430$oufh$ervida Road Ourlinpton, Ontario Telephone(416) 032.6300 Canada LTN 3T8 Teleoopler(418) 632.3883 November 28, 1989 THE CORPORATION OF THE TOWN OF NEWCASTLE 40 Temperance Street Bowmanville, Ontario L1C 3A6 Attention: Ms. Lou Ann Birkett Dear Madam; Reference: Contract T-89-39 This letter is to confirm that the firm of Gerr Construction Ltd. is qualified to perform the work on the above contract and we have reviewed his tender documents and find them in order. Yours very truly, PHILLIPS BARRATT KAISER ENGINEE , B.H. Sproule, P.Eng., MCSCE�- Manager of Facilities BHS:bdg 731 i