SUB.JECT: NORTHERN FIRE STATION
RECOMMENDATIONS:
1.) THAT Fire Department Report 17-89 be received;
2.) THAT approval be given to the report and conceptual drawings
prepared by Phillips Barratt Kaiser Engineering Ltd. (copy attached)
pertaining to the northern fire station; and
3.) THAT any costs incurred in excess of the amount budgetted for
this project in 1989, be allocated in the 1990 budget.
------------------------------------------------------------------------------
BACKGROUND AND COMMENTS
On September 21, 1989 a meeting was held with Mr. Ben Sproule of Phillips
Barratt Kaiser Engineering Ltd. to present the schedule for the design and
construction of the northern fire station, as attached.
Mr. Sproule has been advised that the time frame in this report would cause an
unacceptable delay in construction.
During discussions, Mr. Sproule advised that should approval be given to this
initial report and permission be given to start detailed drawings, the pro-
posed time frame could be improved to allow for tendering to take place and
construction to begin by the first of December. This timing would allow for a
tentative completion date in the early part of 1990 and would be in accordance
with the delivery of the vehicles required to equip the station.
Continued. . . .
FD17-89 - 2 -
It is therefore respectfully recommended that approval be given to Mr.
Sproule's report and that the costs in excess of the $300,000 budgetted for
this project in 1989, be allocated in the 1990 budget.
Respectfully submitted, Recommended for presentation
to Council
QMi G. C r e I ghton, La rence tsb eff,
Acting Fire Chief. Chief Adm n' trative Officer.
MC/sr
Encl.
September 21, 1989.
i
i
I
i
NORTH FIRE HAIL - INITIAL REPORT
i
TOWN OF NEWCASTLE
TABLE OF CONTENTS
1.0 BACKGROUND INFORMATION
2.0 DESIGN SCHEDULE
3.0 PRELIMINARY COST ESTIMATE
4.0 CONCEPTUAL WORK
Prepared by
Phillips Barratt Kaiser
Engineering Ltd.
September 20, 1989
PBK Project No. 89354
i
1.0 BACKGROUND INFORMATION
The Town of Newcastle has engaged the firm of Phillips Barratt Kaiser
Engineering Ltd. (PBK) to perform all architectural and design services
required to design tender and administer the construction of a new fire
building facility within the site on Regional Road 57 in the Town of
Newcastle.
The building should include the following features:
- 30 ft by 30 ft apparatus bay
- 15 ft by 15 ft office and radio room
- 20 ft by 15 ft training room
- 10 ft by 10 ft by 30 ft hose tower
- Washroom with single shower
- Racks for 15 sets of bunker gear
- Roof height of 20 ft apparatus bay and 10 ft office/training area
- 200 amp electrical service
- Forced air oil heating
The site work shall include:
10,000 gallon reservoir including well
Septic system
- Paved driveway and parking
The design should be attractive and functional. It should reflect the rural
nature of the community and be complementary to the site and
surrounding area.
2.0 DESIGN SCHEDULE
September 25 - Initial Report
October 16 - Conceptual Drawing Approval
Noyember 6 - Detailed Design and Tender Document Approval
December 4 - Tender Award
3.0 PRELIMINARY COST ESTIMATE
Building 21 5 ,O O O
Reservoir and well 16 ,000
Septic system 8 , O00
Parking and driveway G '?000
Landscaping and site work G, 000
Testing and permits 1 , 000
Design 272000.
Contingency 20,U00,
3-717000
4.0 CONCEPTUAL WORK