HomeMy WebLinkAboutTR-58-92 TOWN OF NEWCASTLE
REPORT File #
Res. # _
By-Law #
MEETING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
DATE: June 15, 1992
REPORT #: TR-58-92 FILE #:
SIJB.JECT: TENDER NW92-51 RECONSTRUCTION OF EDWARD STREET
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1 . THAT Report TR-58-92 be received;
2 . THAT Fernview Construction Limited, Bolton, Ontario,
with a total bid in the amount of $273,034 .52, being
the lowest responsible bidder meeting all terms,
conditions and specifications of Tender NW92-5, be
awarded the contract for the Reconstruction of Edward
Street, as required by the Department of Public Works;
3 . THAT the funds in the amount of $250,000.00 be drawn
from the approved 1992 Public Works Capital budget,
account #7205-92003-X;
4 . THAT the additional funds required be drawn from the
approved 1992 Public Works Capital budget, Unspecified
Construction, Account #7205-01001-X; and
4 . THAT the Development Charge Reserve Fund - Public
Works, replenish the existing Lot Levy Reserve Fund for
the value of the contributions made to this project (as
identified in the body of this report) .
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki
Associates for the reconstruction of Edward Street as required by
the Department of Public Works .
Page -2 -
TR-58-92
TENDER NW92-5, RECONSTRUCTION OF EDWARD STREET
Tenders were advertised in the local papers, as well as the Daily
Commercial News . Subsequently, tenders were received and
tabulated as per Schedule "A" attached.
The Town of Newcastle's portion of the total project cost as j
detailed in letter from Totten Sims Hubicki Associates, marked
Schedule "B" is estimated at $310,473 .52 . It is proposed that
the funds in the amount of $250,000.00 be drawn from the Public
Works Capital Budget Account #7205-92003-X and that the
additional funds required in an amount of $60,473 .52 be drawn
from the Public Works Capital Budget Account for Unspecified
Construction, #7205-01001-X.
The budgetary financing of this project (page 29 and 32 of the
1992 Draft Capital Budget) identifies a Lot Levy Contribution of
$116,000 . 00 and $86,000.00 respectfully. These funds have not
yet accumulated in the new Development Charge Reserve Fund and it
is therefore recommended that the existing reserve funds be
replenished from development charges to be collected in the
future, for the value contributed to this project. This project
has been identified in the Development Charges report as a
project with an apportionment of ninety percent (90%) of the cost
related to growth to be financed from the Development Charge
Reserve Fund.
Although the low bidder has not previously performed for the Town
of Newcastle, their references have been outlined in the attached
letter from Totten Sims Hubicki Associates marked Schedule "B" .
The Treasurer has reviewed the funding requirements and concurs
with the recommendation. Queries with respect to department
needs, specifications, etc. , should be referred to the Director
of Public Works .
After further review and analysis of the bids by Public Works,
Totten Sims Hubicki Associates and Purchasing, it was mutually
agreed that the low bidder, Fernview Construction Limited,
Bolton, Ontario, be recommended for the contract for the j
Reconstruction of Edward Street.
i
i
I
i
Page - 3 -
TR-58-9.2
TENDER NW92-5, RECONSTRUCTION OF EDWARD STREET
Respectfully submitted, Recommended for presentation
to the Committee,
/ L P
Ma ie Marano, H.B.Sc. , AMCT. , Lawrence E. Kots f,
Treasurer. Chief Administr the Officer.
W. A. Evans, P. Eng. ,
Director of Public Works
MM/HJL
Attachments
I
I
I
I
i
1 4 /f
SCHEDULE "A"
BID SUMMARY
TENDER NW92-51 RECONSTRUCTION OF EDWARD STREET
BIDDER TOTAL BID AMOUNT
Fernview Construction Limited $273,034 .52
Bolton, Ontario **
Rabito Sewer and Watermain $285,883 . 99 **
Contractors Limited
Markham, Ontario
Harnden and King Construction $286, 113.98 **
Brooklin, Ontario
Hard Co Construction Ltd. $291,477 .41 **
Whitby, Ontario
Coboug Development Services Ltd. $301,875 . 79 **
Coboug, Ontario
Hollingworth Construction Co. $307,097 . 00 **
Gormley, Ontario
Mar-King Construction Company Limited $308,723. 39 **
Concord, Ontario
Calder Hill Contracting Limited $313, 109 . 60 **
Thornhill, Ontario
Moretti Excavating Limited $313,345.00 **
Concord, Ontario
Ron Robinson Limited $313,767 . 18 **
Oshawa, Ontario
Balterre Contracting $324,731. 90 **
Peterborough, Ontario
Miwel Construction Limited $328,507 . 97 **
Scarborough, Ontario
Dagmar Construction Inc . $333,054 .47 **
Markham, Ontario
i
Boyle Excavating Ltd. $336,481. 61 **
Bowmanville, Ontario
Ontario Paving Company Ltd. $338,322 .01 **
Concord, Ontario
Novacor Construction Ltd. $379,674 . 94
**
Queensville, Ontario
* amended bid - extension error
** amended bid - G.S.T. calculated on contingencies
p
/ `')
SCHEDULE "B"
1 1A KINO STREET EASY,P.O, BOX 388, COSOIIRO
ONTARIO,CANADA K9A 40
totten sims hubicki associates (416) 372.2121 FAX(416)372.3621
Mrs. Lou Ann Di.rkett FAX NO. 416-62
Purebasing & Supply Agent
Corporation of the Town of Newcastle
Municipal Building, 40 Temperance Street
SOWNANVILLE, Ontario L1C 3A6
Juno 4, 1992
be$1: Mrs. Birkett:
Re: Contract No. NW92-5, Edward Street Reconstruction Newcastle,
Corporation of the Town of Newcastle, TSH Project No. 10066
Fenders for the above project were opened at the Municipal offices on Friday,
May 29, 1992. The list of bids received are as follows!
Novacor Construction Ltd. $379,674.94
Ontario Paving Company Ltd. 338,322.01
Hoyle Excavating Ltd. 336,481.61
Dagmar Construction Ltd. 333,054.47
Miwel Construction Ltd. 328,507.97
Balterre Contracting 324,731.90
Ror. Robinson Ltd. 313,767.18
Moretti. Excavating Ltd. 313,345.00
Calder Hill Contracting Ltd. 313,109.60
Mar-King Construction Company Ltd. 308,723.39
Hollingworth Construction Company 307,097.00
Cobourg Development Services 'Ltd. 301,875.79 �
Hard Co Construction Ltd. 291,477.41
Harnden & King Construction 286,113.98
Rabito $ewer and Watermain 285,883.99
Fe;znview Construction Ltd. 273,034.52*
Enj�ineer's Estimate. $359,878.45
*Corrected total
We have checked the low tender and wish to advise that all requirements have been
satisfactorily addressed, The Agreement to Bond has been executed and a deposit
cheque in the amount of $19,000. accompanied the tender. Note that 7% CST has
been deleted from all bids on the $10,000. Contingency item for R�!gion. Works as
per your directions.
I
Y
NhJEH
ENGINEERS ARCH1TECrS AND PL/i
2
Mrs. Lou Ann Birkett
Jut, 4, 1992
Fernview has completed construction on several contracts under the Erupervision of our
firm in recent years and they have carried out the work in a satisf,ictory manner.
Site; cooperation has been good. Similar comments have been received from other
Con4iultants from Durham Region Works Department on works undertaken by Fernview
for the Region and from other Municipalities. Value of major contracts completed by
Feruview in the past two years exceeds $6.5 million.
Based on our research, we recommend that the contract be awarded to Fernview Construction
Limited,
The total, cost of the works based on the low bid is now estimated as follows:
Desi,.ription Total Cost Subsi.dizabl.e Town Region of Durham
Roa4works $221,421.45 178,166.35 41,085.04 2,170.06
Waterworks 24,405.20 - 240405.20
Sub-'total: $245,826.65 17$,166.35 41,085.04 26,575.26
Utility _ -
Rel.ocation 20,000.00 20,000.00
Soils Report & - -
Test Fits 4,564.05 4,564,05 2,100.00 3,300.00
Design. 19,300.00 13,900.00
Construction 2 900.00
5
Administration 27,100.00 1 ,700.00 4, 00 �
Contingencies 16,577.00 5,345.00 1,2232.32-00 100000.00
0.S.T. (Exe- 543.13 3 337.95 2,294.27
contingencies) __22,175-35 16, --_ —
'MUL: $355,543.05 $258,218.53 $52.1254.99 $45,069.53
The items removal,indicated wysidewalk, Transportation as Total.
si��ewalk removal, ne
cost to the Town will be $310,473.52.
All deposit cheques other than those for the low and second low bidders may now
i
be released.
Yosrs very truly,
tatten aims hubicki associates
I
R.A. lRempton, P.E S•
pl7o j ect Manager
Rt�K/$g
4226/C5 Director of Public Works
Mr. W.A. Evans! F .Eng. ,
Mr. D. Patterson, Manager of Operations
Mr. ,A.S. Cannella, C.E.T'• , Manager of Engineering
Mrs. mays Rand, Works Department ,T
Ms. Lori Gordou, Treasury Department