HomeMy WebLinkAboutTR-72-92 :""Q'"'} ,_� TOWN OF NEWCASTLE
REPORT File #r= 7 , .; .
Res. #
(,'�`�_ ^ � �-�• By-Law #
hEETING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
DATE: July 20, 19 9 2
REPORT #: TR-72-92 FILE #:
SJUCT: TENDER NW92-81 RECONSTRUCTION OF PRESTONVALE ROAD
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report TR-72-92 be received;
2 . THAT Sora Excavating & Grading Company Ltd. ,
Woodbridge, Ontario, with a total bid in the amount of
$386,354. 85, being the lowest responsible bidder
meeting all terms, conditions and specifications of
Tender NW92-8, be awarded the contract for the
Reconstruction of Prestonvale Road, as required by the
Department of Public Works;
3 . THAT the funds be drawn from the approved 1992 Public
Works Capital budget, account #7205-92001-X; and
4 . THAT the Development Charge Reserve Fund - Public
Works, replenish the existing Lot Levy Reserve Fund for
the value of the contributions made to this project (as
identified in the body of this report) .
BACKGROUND AND COI-MNT:
Tender specifications were provided by D.G. Biddle & Associates
Limited for the reconstruction of Prestonvale Road as required by
the Department of Public Works.
Page -2 -
TR-72-92
TENDER NW92-5, RECONSTRUCTION OF PRESTONVALE ROAD
Tenders were advertised in the local papers, as well as the Daily
Commercial News. Subsequently, tenders were received and
tabulated as per Schedule "A" attached.
The Town of Newcastle's portion of the total project cost as
detailed in letter from D.G. Biddle & Associates Limited, marked
Schedule "B" is estimated at $408,380. 00. It is proposed that
the funds be drawn from the Public Works Capital Budget Account
#7205-92001-X.
The budgetary financing of this project (page 27 of the 1992
Capital Budget) identifies a Lot Levy Contribution of
$137,000 .00. These funds have not yet accumulated in the new
Development Charge Reserve Fund and it is therefore recommended
that the existing reserve funds be replenished from development
charges to be collected in the future, for the value contributed
to this project. This project has been identified in the
Development Charges report as a project with an apportionment of
ninety percent (90%) of the cost related to growth, and therefore
eighty-six percent (86%) of the net growth related capital cost
is to be financed from the Development Charge Reserve Fund.
Although the low bidder has not previously performed for the Town
of Newcastle, their references have been outlined in the attached
letter from D.G. Biddle & Associates Limited marked Schedule "B" .
The Treasurer has reviewed the funding requirements and concurs
with the recommendation. Queries with respect to department
needs, specifications, etc . , should be referred to the Director
of Public Works .
After further review and analysis of the bids by Public Works,
D.G. Biddle & Associates Limited and Purchasing, it was mutually
agreed that the low bidder, Sora Excavating & Grading Company
Ltd. , Woodbridge, Ontario, be recommended for the contract for
the Reconstruction of Prestonvale Road.
I
Page - 3 -
TR-58-92
TENDER NW92-5, RECONSTRUCTION OF EDWARD STREET
Respectfully submitted, Recommended for presentation
to the Committee,
MaH6 Marano, H.B.Sc . ,. AMCT. , Lawrence E. Kots f
Treasurer. Chief Administra i Officer.
W. A. Evans, P. Eng. ,
Director of Public Works
MM/HJL
Attachments
I
I
SCHEDULE "A"
BID SUMMARY
TENDER NW92-8, RECONSTRUCTION OF PRESTONVALE ROAD
Bidder Bid Amount
Sora Excavating & Grading Company Ltd. $386,354. 85 *
Woodbridge, Ontario
Hollingworth Construction Co. 440,844 .27 *
Gormley, Ontario
Fernview Construction Limited 442,790 .66 *
Bolton, Ontario
C.M. Dipede Group Limited 458,294 .52 *
Toronto, Ontario
Moretti Excavating Limited 461,086 .00 *
Concord, Ontario
Ron Robinson Limited 466,962 .40 *
Oshawa, Ontario
Hard-Co Construction Ltd. 467,040 .44 *
Whitby, Ontario
Elirpa Construction & Materials Ltd. 480,061.06 *
Pickering, Ontario
Calder Hill Contracting Limited 481, 350 .64 *
Thornhill, Ontario
Novacor Construction Ltd. 490,300.00 *
Thornhill, Ontario
Kamlu Construction Limited 558,822 .80 *
Aurora, Ontario
* amended bid - G.S.T. calculated on contingencies
i
i
i
SCHEDULE "B"
D.G. Biddle & Associates Limited
PF'11consulting engineers
6 KING ST. E., OSHAWA, ONTARIO Ll H 1 B6
consulting
(416) 576-8500 FAX (416) 576-9730
July 10 , 1992
The Corporation of the Town of Newcastle
40 Temperance St. ,
Bowmanville, Ontario
LIC 3A6
Attention: Lou Ann Birkett A. M. C . T.
Purchasing and Supply Agent
Re: Tender N.W. 92-8
Reconstruction of Prestonvale Road
Dear Lou Ann:
Pursuant to the above noted project, please find below our
recommendations for the contractor for the project and a
breakdown of all associated costs.
The low bidder, Sora Excavating & Grading Company Ltd . , is
situated in Woodbridge , Ontario and have been in business
for twenty years . The company has been primarily an
excavating and grading contractor and has only entered the
underground services industry in the last two years . We have
investigated the background of Sora and have contacted the
bonding company and a number of other references and
associates .
The bonding company, Laurentian Casualty Company of Canada,
have been doing business with Sora for three years and have
allowed a bonding limit of $1 , 000, 000 . 00 . The present limit
is under review at this time with the proposal of raising it
of a higher limit. The bonding company representative
Janice oehm, has stated that Sora has been a reputable
client with no claims or enquiries.
We have contacted Hr Roberto Leo of Rand Engineering and Mr
Alex Iskander of the Lathon Group for references . The
comments were positive in stating that the company and field
staff had proved to be cooperative, efficient and competent .
Please find enclosed a list of projects, equipment and brief
staff history.
In conclusion, from our investigation, Sora has been
reported to have an experienced and competent staff which
are capable of performing the work required
. . . . . . . continued
-2-
Therefore , our recommendation would be that upon reviewing
the tender and investigating their background, Sora
Excavating and Grading Company Limited be awarded the
contract.
Please find attached the total contract breakdown with
Region share and associated costs .
Should you require further information or clarification
please contact our office .
Yours truly,
D. G. BIDDLE & ASSOCIATES LIMITED
L. E . Tracey
Project Construction Manager
LET/pn
cc. W. A. Evans, Director of Public Works
Encl .
PRESTONVALE RD. RECONSTRUCTION
SUMMARY OF CONSTRUCTION & ASSOCIATED COSTS
ITEM TOTAL COST TOWN SHARE REGION
___________....----_-...._____-__...._________....__...._____w_w...._--_..-----..-------------..w___
SORA EXCAVATING
ROAD & SERVICES CONTRACT $386,355.00 $327,355.00 $59,000.00
LABOUR & MATERIALS BOND $1,500.00 $1,500.00
DESIGN ENGINEERING $26,160.00 $21,400.00 $4,760.00
SOILS INVESTIGATION $2,700.00 $2,700.00
LAND SURVEYING $2,200.00 $2,200.00
APPRAISAL FEES $1,600.00 $1,600.00
LAND AQUISITION FEES $1,200.00 $1,200.00
HYDRO RELOCATION $10,000.00 $10,000.00
CONSTRUCTION SUPERVISION $40,000.00 $33,000.00 $7,000.00
& ADMINISTRATION
MATERIALS INSPECTION $3,750.00 $3,175.00 $575.00
CONTINGENCIES $5.,000.00 $4,250.00 $750.00
$480,465.00 $408,380.00 $72,085.00
D.G. BIDDLE & ASSOCIATES LIMITED
Consulting Engineers
96 King Street East,
Oshawa, Ontario
L1H 1B6
July 10, 1992
i
11:41 0416 856 7934 fQZj 003
21 CASTER AVENUE, SUITE 1, WOODBRIDGE, ONTARIO L4L 521 •TEL: (416) 856-6848 • FAX: (416) 866-7934
SUPERVISORY STAFF
JOE'HAMADI, P. ENG.
Worked with: ANTON KIKAS - CONSULTING ENGINEERS
RADY PANTEK - CONSULTING ENGINEERS
GDLDMAR CONTRACTING
CARLO BALDASSARA
FIELD MANAGER - SORA EXCAVATING & GRADING LTD.
- 25 years experience
TONY VALEMPINI'
FIELD SUPERVISOR - GOLDMAR CONTRACTING & VALENTINE UNDERGROUND
- 25 years experience in sewers and roads
11:41 0416 856 7934 IM 002
21 CASTER AVENUE, SUITE 1, WOODBRIDGE, ONTARIO L4L 5Z1 •TEL: (416) 856-6646 • FAX: (416) 866-7934
LIST OF MOST RECENT PROJECTS
1992 JOB DESCRIPTION ENGINEER AMOUNT
PARK & SEWER RAND ENGINEERING $100,000.00
DETENTION.,POND & SEWER RAND ENGINEERING $200,000.00
50 L,OT SUB-DIVISION -
SEWERS & WATERMAIN LATHAM GROUP $300,000.00
CP EXPRESS & TRANSPORT RUNNYMEDE DEVELOPMENT $200,000.00
GRADING
LIST OF EQUIPMENT
2 - 235 EXCAVATORS
2 - 977 LOADERS
2 - RUBBER TIRE LOADERS
2 - 955 DOZER/LOADERS
2 - 6-WAY BLADE DOZERS
1 D7 DOZER
2 - SHEEPSFOOT PACKERS
1 - SMOOTH DRUM ROLLER
2 - DUMP TRUCKS
1 - FLOAT
°� '9