HomeMy WebLinkAboutTR-87-92 J " '° TOWN OF NEWCASTLE fifi 1 r � REPORT File #r1Y) 3 -}7 • 4 Res. #C fh Cf By-Law # MEETING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE DAME: October 5, 1992 REPORT #: TR-87-92 FILE #: SUB,ECT: TENDER NW92-35, HERITAGE FARM ESTATES, TIMBERLANE COURT PAVING AND DITCHING RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report TR-87-92 be received; 2 . THAT Bennett Paving and Materials, Oshawa, Ontario, with a total bid in the amount of $23,407 .42, being the lowest responsible bidder meeting all terms, conditions and specifications of Tender NW92-35, be awarded the contract for Heritage Farm Estates, Timberlane Court Paving and Ditching, as required by the Department of j Public Works; and 3 . THAT the funds be drawn from the Subdividers Deposits, Account #2015-00001-0000; FORTHWITH. BACKGROUND AND COMMENT: In accordance with Council Resolution #GPA-552-92 (see Schedule "A" attached) , tender specifications were provided by Totten Sims Hubicki Associates for Heritage Farm Estates, Timberlane Court Paving and Ditching. i Page - 2 - TR-87-92 TENDER NW92-35, HERITAGE FARM ESTATES, TIMBERLANE COURT PAVING AND DITCHING Subsequently, tenders were advertised and issued with bids being submitted as follows: Bidder Total Bid Amount Bennett Paving and Materials $ 23,407 .42 Oshawa, Ontario Harnden & King Construction $ 25,383 .50 Whitby, Ontario Cobourg Development Services $ 31,739 .41 Cobourg, Ontario Based on the low bid, the overall costs are summarized as follows: By Contract $ 21,876 . 10 Contract Preparation & Advertising 2,000. 00 Contract Administration 3,000 .00 Contingencies 1,723 . 90 G.S.T. (excluding contingencies) 1,881. 33 Total Cost $ 30,481. 33 In accordance with Resolution #GPA-552-92, the irrevocable letter of credit from P.K. Developments Inc. , in the amount of $35,377 . 91 was drawn down. The required funds will therefore be drawn from the Subdividers Deposits, Account #2015-00001-0000 . I Due to the sensitive nature of this contract, a forthwith approval is requested. The low bidder has previously performed satisfactorily for the . Town of Newcastle. The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Director of Public Works . i Page - 3 - TR-87-92 TENDER NW92-35, HERITAGE FARM ESTATES, TIMBERLANE COURT PAVING AND DITCHING After further review and analysis of the bids by Public Works, Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Bennett Paving and Materials, Oshawa, Ontario, be recommended for the contract for Heritage Farm Estates, Timberlane Court Paving and Ditching. * A letter from Totten Sims Hubicki Associates is attached marked Schedule "B" . Respectfully submitted, Recommended for presentation to the Committee, M 'e Marano, H.B.Sc . , AMCT. , Lawrence E. Kotse , Treasurer. Chief Administra i e'/Officer. i Officer. W.A. Evans, P.Eng. , Director of Public Works . LAB/hjl Attachments I I i i i i i Schedule "A" P.K Developments Resolution #GPA-552-92 Inc., Plan 10M-774, Completion of Moved by Councillor O'Toole, seconded by Councillor Hooper Outstanding Works THAT Report WD-64-92 be received; THAT the Director of Public Works be authorized to issue a 'Final Notification Letter', to P. K Developments Inc. (Plan 1OM-774), and their solicitor, stating a completion deadline of August 29, 1992 for all outstanding works; THAT upon expiration of the aforementioned deadline, the Director be authorized to take all necessary actions to correct and complete all outstanding works at the full expense of the developer; THAT funds required for such works be recovered by drawing down the developer's Letter of Credit, in accordance with the terms and conditions provided for in the Subdivision Agreement between P. K Developments Inc. and the Corporation of the Town of Newcastle; and THAT P. K Developments Inc. and the Royal Bank of Canada be advised of Council's decision and be provided with a copy of Report WD-64-92, FORTHWITH. "CARRIED" I I i I THE CORPORATION OF THE TOWN OF NEWCASTLE REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# Date: JULY 20, 19 9 2 Res. # Report#: WD-64-92 File#: DD.0'3.. � .003 By-Law# Subject: P. K. DEVELOPMENTS INC. , PLAN IOM-774, COMPLETION OF OUTSTANDING WORKS Recommendations: f It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-64-92 be received; 2 . THAT the Director of Public Works be authorized to issue a 'Final Notification Letter' , FORTHWITH, to P. K. Developments Inc. (Plan 1OM-774) , and their solicitor, stating a completion deadline of August 29, 1992 for all outstanding works; 3. THAT upon expiration of the aforementioned deadline, the Director be authorized to take all necessary actions- to correct and complete all outstanding works at the full expense of the developer; 4. THAT funds required for such works be recovered by drawing down the developer's Letter of Credit, in accordance with the terms and conditions provided for in the Subdivision Agreement v between P. K. Developments Inc. and the Corporation of the Town of Newcastle; and 5. THAT P. K. Developments Inc. and the Royal Bank of Canada be . advised of Council's decision and be provided with a copy of ° Report WD-64-92. oE AEC—ED®R E-CL CYt IE X116 6 PiVN1EDEN gEC1ClF.D PAP[q ♦ •4 REPORT NO. : WD-64-91 PAGE 2 REPORT 1.0 ATTACHMENTS No. 1: Key Map 2.0 BACKGROUND 2 . 1 The Corporation of the Town of Newcastle entered into a Subdivision Agreement, registered April 25, 1986, with P. K. Developments Inc. to develop lands by plan of subdivision,. located in Courtice and described as Plan IOM-774 (Attachment No. 1) . The agreement required the developer to construct all roadworks including hot-mix paving, gravel shoulders, topsoil and sodding of ditches, storm sewer system, streetlighting and street trees, hereinafter referred to as the 'Works ' . 2 .2 The initial roadworks were completed by the developer in 1986 . Since that time, there has been no significant activity to complete or maintain the works . 2 .3 The outstanding works include, but are not necessarily limited to, storm sewer work, minor base asphalt repairs, reshaping, topsoiling and sodding of ditches, gravel shoulder improvements, improvements to the turning circle at the south limit and surface asphalt paving. 2.4 In addition, there are numerous snowploughing invoices dating back several years that have not been paid by this developer. Attempts have been made by registered and regular mail to collect these outstanding amounts but no response has been received to date. 2.5 The same developer, under the company name 'Gearing Farms Limited' , defaulted in his obligations relating to a nearby development, Plan 1OM-751, in 1989. The Town completed the works at that time at the developer's full expense. . . . /3 1"y') ri REPORT NO. : WD-64-92 PAGE 3 2 .6 The existing Letter of Credit was calculated in 1988 dollars for Performance/Maintenance amounts. Taking into consideration the accumulation of, outstanding invoices to date, the inflation since 1988 and the lack of positive communication from this developer, it is felt .that the Town should act expeditiously to complete the works at this time. 2 .7 Under Section 5. 17 of the Subdivision Agreement the Director of Public Works has the authority to order the work completed at the expense of the developer, subject to the approval of Council and upon written 'Notice' being given to the developer and his surety. 2 .8 In the event the developer does not complete all outstanding requirements by August 29 , 1992, the Town will proceed with these works at the full expense of the developer. The. Town currently holds a Performance/Maintenance Guarantee to ensure the completion of these works, in the form of an' irrevocable Letter of Credit in the amount of $35,377 .91. Respectfully submitted, Recommended for presentation to the Committee, ----------------------- ------------- - --------- Walter A. Evans, P.Eng. ; Lawrence E. Rots f , �- Director of Public Works Chief Administr i e Of NC*WAE*ph*hj N July 8, 1992 f: Attachment i t ' l REPORT NO. : WD-64-92 PAGE 4 pc: P.R. Developments Box 12, R.R. #3 Bowmanville, Ontario L1C 3R4 The Royal Bank of Canada Ontario International Centre Royal Bank Plaza 180 Wellington Street West Toronto, Ontario M5J 1J1 ail PEBBLESTONE ROAD o P .K.DEVELOPMENTS 3 INC . - IOM-774 io 5 +,-U LU 7 � g k . i rmW-MTO a Rao _ i ►(HBLESTONE RD. • k � � i� KRmtA • 5 U- -B"TJ PLJ C? . 92 DRAWN BY:- J:Ml JULY 19~ SITE ATTACHMENT N0. �+ ATTACHMENT NO.1 iv'�1 lYllir WD-64-92 G.P.& A. Minutes - 17 - July 20, 1992 Final Report Resolution #GPA-551-92 of the Seniors' Activity Centre Moved by Mayor Hamre, seconded,by Councillor Hooper Feasibility Study THAT Mr. R. Martindale, Director of Planning, The Greer Galloway Group Inc. be thanked for his presentation pertaining to the Final Report of the Seniors Activity Centre Feasibility Study, THAT the Final Report of the Seniors Activity Centre Feasibility Study be referred to Staff for review and preparation of a report; and THAT Mr. R. Martindale be advised of Council's decision. "CARa�D" Councillor Hannah chaired this portion of the meeting. PUBLIC WORKS DEPARTMENT P.K. Developments Resolution #GPA-552-92 Inc., Plan 10M-774, Completion of Moved by Councillor O'Toole, seconded by Councillor Hooper Outstanding Works THAT Report WD-64-92 be received; THAT the Director of Public Works be authorized to issue a 'Final Notification Letter', to P. K. Developments Inc. (Plan 1OM-774), and their solicitor, stating a completion deadline of August 29, 1992 for all outstanding works; THAT upon.expiration of the aforementioned deadline, the Director be authorized to take all necessary actions to correct and complete all outstanding works at the full expense of the developer; THAT funds required for such works be recovered by drawing down the developer's Letter of Credit, in accordance with the terms and conditions provided for in the Subdivision Agreement between P. K. Developments Inc. and the Corporation of the Town of Newcastle; and THAT P. K. Developments Inc. and the Royal Bank of Canada be advised of Council's decision and be provided with a copy of Report WD-64-92, FORTHWITH. ` "CARRIED" Y , at onr-6u—OL Pal 11 -UL Ik)II, UUUVnu I*F111 n )1JYIUi i inn 1YU. nIU.+I�"IiUI Schedule "B" I. 1A KING STREET EAST,P.O, BOX 389,COBOURG ONTARIO, CAIJAOA KDA 4Li totten rims hubicki associates (416)372-2121 FAX(416)3724621 Biff No; 416-62,3-4169 Mrs, Lou Ann Blrkett, Purchasing & $upply Agent Corporation of the Town of Newcastle Municipal Building, 40 Temperance Street BOWMANVILLE, Ontario) L1C 3.46 September 25, 1992 Dear Mrs. Birkett: I Re:: Contract No. NIV92-350 Heritage Farm Estates, Thuberlane Court ;Paving and Ditching, Corporation of the Town of Newcastle Tenders for the above contract were opened at the Municipal offices on Thursday, September 24, 1992. The bids received are as follows: Bco nett Paving and Materials $23,407.42 Ha;rnden and Icing Construction $25,383,50 Co')ourg Development Services $31,739.41 Engineer's Estimate $27,440.15 We;have checked the low bidder's tender and wish to advise that all requirements have been duly completed. Bennett Paving and Materials have completed a nunter of contracts Under our supervision, including works for the Town of Newcastle. We have no hesitation in recommending acceptance of the low bid. Tho., Contract is scheduled to commence on Monday, October 1.9, 1992 with completion by Friday O(•:ober 30, 1992. EN,3INEERS ARCHITECTS AND PLANNERS % 7 i Mrn. Lou Ann Birkett, Purchasing&Supply Agent s Scpf6inbor 25, 1992 2 Based on the low bid the overall costs are summarized as follows: By Contract $21,876,10 Contract Preparation and Advertising $ 2,000.00 Contract Administration $ 3>OW,U0 Contingencies $ 1,723.90 G—S.T. (excluding contingencies) S 1,881.33 Total Cost $30,4$1,33 Low and second low bidder's deposit cheques should he retained until execution of the contract documents by Bennett Paving. 'Y'o,.irs very truly totten sims hubickl associates R.A. Kernpton,I ng. Prcject Manager R.AK/ag a7t51?1ir7naz VC PC. Mr, W,A, Evans, P.Eng., Director of Public Works Mr. D. Patterson, Manager of Operations Mr, AS, Cannella, CET, Manager of Englileering Mrs. Kaye Rand, Works Department Ms. Lori Gordon, Treasury I i i J .I totten sirns hubicki associates I