Loading...
HomeMy WebLinkAboutTR-90-92 THE CORPORATION OF THE TOWN OF NEWCASTLE REPORT Meeting: GENERAL PURPOSE & ADMINISTRATION COMMITTEE File# Date: October 5, 1992 Res. # Report#: TR-90-92 File#: By-Law Subject: 1992 Budget Reallocation Request - Computer Software Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. That report TR-90-92 be received, 2 . That the 1992 Computer Software Budget identified for a Geographic Information System ( G. I.S. ) software application in the amount of $ 25,000 be approved for reallocation to allow the following: a) purchase of appropriate hardware capable of running a G. I .S. software application, b) the updating of system software licences to reflect the current operating status while at the same time updating the word processing application from wordperfect 5 .0 to the 5. 1 version. 3 . That the G. I .S. software be rebudgeted in the 1993 capital budget. Background: 1. 1992 Software Budget 1.1 The 1992 Capital Budget - Information System Software (copy attached as Schedule 1) identifies $25,000 for implementation of the Geographic Information System for Corporate use. 1.2 This allocation was anticipated to provide sufficient funds to allow for the implementation of the G. I .S. on the Town's existing network. In order to run the G. I .S. software however, specific 2 TR-90-92 Page 2 computer hardware is required. The Planning Department does not currently have this technology, and therefore the hardware requirement is the first step in the implementation of the G. I.S. This hardware purchase, with minor modifications to the existing configuration, will also allow the Planning Department to use, in 1992, the AutoCAD software currently in use by the Public Works Department on a stand alone computer. The AutoCAD software and existing plotter will provide both departments the ability to create computerized drawings (ie. parcel fabric, street maps etc . ) of the Town currently done manually. This existing software can also be used in conjunction with G.I .S. Software in 1993. 1.3 The cost of the specific G. I.S. software is estimated to be at the value budgeted in 1992, ie. $25,000. The second stage of the process would be to rebudget the software in the 1993 budget, with the understanding by all staff that the computer requirements for 1993 will be dedicated to G.I .S. implementation and system support only. 2. Software/Node Updates 2.1 Currently, Wordperfect 5 . 0 is running on stand alone and network units . The software application of Wordperfect 5 . 0 is somewhat outdated in terms of technology and in addition budgetary requests did not provide for appropriate updating of the network applications as additional nodes were added to the network. This requires various software/node updates. 2.2 In reviewing the overall organizational requirements and the technological efficiency of the system, it is recommended that the word processing application and updates for existing nodes be upgraded at this time. 3.0 Organizational Requirements 3.1 With the above budget reallocation request, the overall 1992 Capital Budget requirements for software and hardware can be achieved and the foundation set for the G. I.S. implementation. 3.2 The Systems Manager has reviewed the overall organizational requirements in conjunction with the above, with the goal of minimizing future additions of hardware. It is anticipated that . . .3 i I TR-90-92 Page 3 the life of the existing system can be prolonged within the 1992 budgetary allocations combined with reallocations of some existing computer resources, with minimal if any immediate future hardware requirements . Respectfully submitted, Recommended for presentation to the Committee, tit){ y j ( j MaIrle- A. Marano, H.BSc. , AMCT Lawrence E. K6tse4f Treasurer Chief Administrative Officer < F MAM/PP ATTACH: Schedule 1 I i I I i I i i SCHEDULE 1 11 - T H E C O R P O R A T I 0 N O F T H E T O W N N E W C A S T L E PAGE k: DEPARTMENT: General Government 1992 CAPITAL BUDGET AND FOUR YEAR FORECAST DIV. PAGE REF.N: 6 PROJECT DETAIL P R O J E C T / L O C A T I O N M A P P R O J E C T C O S T / F I N A N C I N G I C O S T Division: Information Services Account #: 7009-x-502 ' Account Name: Info Serv. - Software I-Land Description: Software required to maintain or enhance current network/mainframe or to finish initiatives carried over from previous year. I-Building Location: I-Consulting I ( Details/Needs: Network, Mainframe ' 8,300 I-Construction Community Services - Pagemaker, Link 2,600 I Public Works - engineering software 4,600 I-Equipment/Furniture I I Fire - Dispatch Software 6,900 GIs - Geographical Information I-Software I 52,100 I System - Corporate Use 25,000 I I I I TOTAL I $52,100 I I--------------------i I F I N A N C I N G I I 47,400 GST/PST 4,700 i Account Name I I-Res./Res. Funds Tech. Equip. Reserve I 27,200 I I Planning/Finance I I 52,100 I-Other: I (Net) ( I I I I i I I-Subsidy i I I I I I-Debenture I I-Tax Levy I 24,900 I I I spy I $52,100 I II--------------------I I I I � I