Loading...
HomeMy WebLinkAboutTR-29-93 THE CORPORATION OF THE TOWN OF NEWCASTLE REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# UL,` 2,?3� 7. Date: MAY 3, 1993 Res. #(-7+i, (?, )­. Report#k:__2R-_22_-23_ File#: By-Law# Subject: PURCHASE OF PAVEMENT MARKING SERVICES Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report TR-29-93 be received; 2 . THAT the procedures set out in the Purchasing By-law No. 82- 96, Section 5, Paragraph 06, be waived for this particular transaction; 3. THAT Council authorize the Region of Durham to provide pavement marking services at an estimated cost of $32,000; and 4 . THAT the funds be drawn from the 1993 approved Public Works Budget for Pavement Marking, Account 7208-00431-0249 . REPORT 1.0 ATTACHMENTS No. 1: Pavement Marking Locations REPORT NO. : TR-29-93 PAGE 2 2.0 BACKGROUND 2 . 1 The amount of pavement marking services which must be contracted out for 1993 is estimated at $32,000 which exceeds the $15,000 limit of Purchasing By-law No. 82-96 that requires a tender to be issued. Staff are recommending that By-law No. 82-96, Section 5, Paragraph 06, be waived for this particular transaction. 3.0 REVIEW AND COMENT 3. 1 The approved 1993 Public Works Department Budget for pavement marking is $44,000. This amount includes $12,000 for painting by Town of Newcastle staff and $32,000 to be contracted to an outside agency. 3 .2 Of the $32,000 to be contracted to an outside agency, approximately $24,000 will be spent on directional dividing lines. The locations include 7 .9 km of white edge line, 0.5 km of lane lines and 51.3 km of yellow centre line locations (Attachment No. 1) . The remaining $8,000 will be spent on transverse pavement markings such as stop bars, crosswalks and turn arrows . These markings will be applied by the contractor with a two part cold epoxy plastic which has a longer life than paint. These plastic markings are more expensive than paint to apply but, due to the durability in high volume areas, they have a "payback" period of only three (3) years . By using this high grade plastic, areas which were previously painted once or twice every year will no longer require continual maintenance resulting in a long term savings to the municipality. 3 . 3 The Region of Durham provides this high level, pavement marking service to all municipalities within its boundaries . The Region of Durham has provided this quality service to the Town of Newcastle since 1989 . The estimated price of applied I L i REPORT NO. : TR-29-93 PAGE 3 paint at $376 . 82 per kilometre for 1993 is lower than in previous years ( 1991 estimated price was $450 per km and 1992 estimate price was $590 per km) . Respectfully submitted, Recommended for presentation to the Committee, Pfanr'116- Marano, H.B.Sc . ,AMCT Lawrence E. Kot a f, Treasurer Chief Administrative Officer Walter A. Evans, P. Eng. , Director of Public Works RDB*WAE*ph April 15, 1993 Attachment TOWN OF NEWCASTLE, PAVEMENT MARKING SCHEDULES SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE # PAINTING 376.82 PER KM PREMARK 158.32 PER KM LOCATION ROAD SECTION REMARKS APP (M) WHITE (M) WHITE (M) YELLOW PREMARK COST LANE LINE EDGE LINE CENTRE LINE $0.00 DARLINGTON DARLINGTON PARK RD COURTICE RD, WESTERLY 620M "S" BEND 1 1240 620 $700.89 DARLINGTON SOUTH SERVICE RD REGION RD 34 TO WAVERLEY RD VOLUME 1 6000 $2,260.92 DARLINGTON BASELINE RD REGION RD 57 TO REGION 34 VOLUME 1 6000 $2,260.92 DARLINGTON BASELINE/PRESTONVALE 150M EACH WAY FROM CORNER 90* CURVE/TRACKS 1 300 300 $160.54 DARLINGTON PRESTONVALE RD 280M TO 650M SOUTH OF BLOOR CURVE 1 370 370 $198.00 DARLINGTON MAPLEGROVE RD HWY 2 SOUTHERLY FOR 200M CURVES 1 200 $75.36 DARLINGTON NASH RD 100M EAST & WEST OF TRULLS INT 1 200 200 $107.03 DARLINGTON TRULLS RD 190M NORTH & SOUTH OF NASH RD INT 1 380 380 $203.35 DARLINGTON TRULLS RD PEBBLESTONE RD 1200M NORTHERLY HILL 1 0 1200 1200 $642.17 DARLINGTON TRULLS RD PEBBLESTONE RD TO 180M SOUTHERLY CURVE 1 180 180 $96.33 DARLINGTON NASH RD GREEN RD TO REGION 57 CURVES 1 0 1460 690 $659.40 DARLINGTON GREEN RD 940 TO 1350M SOUTH OF REGION RD 4 CURVE 1 410 $154.50 DARLINGTON GREEN RD 1970 TO 2420M SOUTH OF REGION RD 4 CURVE 1 450 $169.57 DARLINGTON CONC. RD 6 OLD SCUGOG RD TO HOLT RD HILLS/BRIDGE 1 0 830 $312.76 C DARLINGTON CONC. RD 6 310 TO 630M WEST OF SOLINA RD BRIDGE/HILL 1 0 320 $120.58 DARLINGTON CONC. RD 7 OLD SCUGOG RD TO HOLT RD BRIDGE/HILL 1 0 800 $301.46 DARLINGTON CONC. RD 7 N.J. OSHAWA TOWNLINE TO 900M EAST CURVE/HILL 1 900 $339.14 DARLINGTON LANGMAID RD REGION RD 3 SOUTHERLY 500M CURVE 1 0 500 $188.41 DARLINGTON LANGMAID RD 780 TO 1180M SOUTH OF REGION RD 3 CURVE 1 400 $150.73 DARLINGTON CONC. RD 9 590 TO 1365M EAST OF ENFEILD RD CURVE 1 775 $292.04 DARLINGTON CONC. RD 9 CURVE #2 L28/29 EAST OF ENFEILD CURVE 1 270 $101.74 DARLINGTON CONC. RD 9 CURVE #3&4 L24/25 EAST OF ENFEILD CURVE 1 700 $263.77 DARLINGTON CONC. RD 9 CURVE #5 L20/21 EAST OF ENFEILD CURVE 1 285 $107.39 DARLINGTON CONC. RD 9 CURVE #6 L20/21 EAST OF ENFEILD CURVE 1 305 $114.93 �H H DARLINGTON OLD SCUGOG RD 250M SOUTH & 215M NORTH OF CONC 9 CURVE/INT 1 465 $175.22 r-') 1-3 DARLINGTON OLD SCUGOG RD REGION RD 3 TO 170M NORTHERLY CURVE 1 170 $64.06 �O C1 DARLINGTON CONC. RD 10 230 TO 1410M WEST OF ENFEILD RD CURVES 1 0 1180 $444.65 �O DARLINGTON CONC. RD 10 515 TO 930M EAST OF GRASSHOPPER RD CURVE 1 0 415 $156.38 W z DARLINGTON MIDDLE RD 150M NORTH & SOUTH OF CONC. RD 4 CURVE/INT 1 300 300 $160.54 z 0 • PRINTED 13-Apr-93 TOWN OF NEWCASTLE, PAVEMENT MARKING SCHEDULES SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE # PAINTING 376.82 PER KM PREMARK 158.32 PER KM LOCATION ROAD SECTION- REMARKS APP (M) WHITE (M) WHITE (M) YELLOW PREMARK COST LANE LINE EDGE LINE CENTRE LINE $0.00 DARLINGTON MIDDLE RD 150M NORTH & SOUTH OF CONC. RD 3 CURVE/INT 1 300 300 $160.54 DARLINGTON MEARNS AVE 790 TO 1135M NORTH OF CONC RD 4 CURVE 1 0 345 $130.00 DARLINGTON BETHESDA RD CONC RD 4 TO STEPHEN MILL RD CURVES 1 0 965 150 $387.38 DARLINGTON CONC. RD 4/LAMBS RD 150M WEST AND SOUTH OF INT. CURVE 1 0 350 $131.89 BOWMANVILLE LAKE RD REGION RD 14 TO BRITTON CT BRIDGE/CURVE 1 0 825 $310.88 BOWMANVILLE PORT DARLINGTON RD LAKE RD TO 125M SOUTHERLY 1 125 $47.10 BOWMANVILLE WEST BEACH RD 195 AND 810M WEST OF PORTDARLINGTON BRIDGES/CURVE 1 1230 615 $695.23 BOWMANVILLE BASELINE RD REGION 57 EASTERLY TO RAINES ST VOLUME 1 2490 $938.28 BOWMANVILLE SIMPSON AVE KING ST SOUTHERLY 135M TO HOBBS DR VOLUME 1 135 135 $101.74 BOWMANVILLE SPRY AVE LAWRENCE CRES TO LOSCOMBE DR 1 280 $105.51 BOWMANVILLE WAVERLEY RD REGION RD 57 NORTH TO ROENIGK DR 1 1180 $444.65 BOWMANVILLE ROENIGK DR WAVERLEY ST TO KING ST CURVES/HILL 1 700 350 $395.66 BOWMANVILLE QUEEN ST KING ST TO TEMPERANCE ST CURVE/VOLUME 1 280 280 $149.84 BOWMANVILLE QUEEN ST TEMPERANCE ST TO ONTARIO ST VOLUME 1 415 415 $222.08 cz� BOWMANVILLE QUEEN ST ONTARIO ST EAST TO ST GEORGE ST VOLUME 1 575 0 $216.67 �, BOWMANVILLE' ST GEORGE ST QUEEN ST TO KING ST 1 125 125 $66.89 4_T i BOWMANVILLE FRANK ST KING ST SOUTHERLY 125M 1 200 100 100 $128.88 BOWMANVILLE TEMPERANCE ST QUEEN ST NORTHERLY TO CHURCH ST VOLUME 1 250 $94.21 BOWMANVILLE DIVISION ST QUEEN ST NORTHERLY TO CHURCH ST VOLUME 1 250 $94.21 BOWMANVILLE BROWN ST QUEEN ST NORTHERLY TO KING ST 1 125 $47.10 BOWMANVILLE ONTARIO ST KING ST SOUTHERLY TO REGION 14 1 1000 1000 $535.14 BOWMANVILLE SCUGOG ST KING ST NORTHERLY TO REGION 57 VOLUME 1 2700 1420 $1,242.23 BOWMANVILLE SCUGOG ST KING ST TO 80M NORTH TURN LANE 1 80 $30.15 BOWMANVILLE SCUGOG ST CHURCH ST TO 80M NORTHERLY TURN LANE 1 80 $30.15 BOWMANVILLE CHURCH ST SCUGOG ST TO DIVISION ST VOLUME 1 460 $173.34 BOWMANVILLE CHURCH ST DIVISION ST TO GEORGE ST 1 115 $43.33 BOWMANVILLE CHURCH ST GEORGE ST TO REGION 14 1 390 $146.96 BOWMANVILLE CHURCH ST TEMPERANCE ST TO DIVISION ST 1 250 $94.21 BOWMANVILLE ELGIN ST FIRST ST, SOUTH TO HORSEY ST BRIDGE 1 0 325 $122.47 BOWMANVILLE BENNETT RD HWY 2 SOUTHERLY TO 401 BRIDGE SENIORS 1 1000 $376.82 PRINTED 13-Apr-93 TOWN OF NEWCASTLE, PAVEMENT MARKING SCHEDULES SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE # PAINTING 376.82 PER KM PREMARK 158.32 PER KM LOCATION ROAD SECTION REMARKS APP (M) WHITE (M) WHITE (M) YELLOW PREMARK COST LANE LINE EDGE LINE CENTRE LINE $0.00 CLARKE SUNSET BLVD 80 & 450M EAST OF RUDELL RD CURVES 1 370 $139.42 CLARKE SUNSET BLVD 50 & 250M WEST OF CHURCH ST CURVES 1 200 $75.36 CLARKE MILL ST TORONTO ST TO METCALF ST CURVE/SUBWAY 1 1500 750 $847.85 CLARKE LAKESHORE RD MORGANS RD TO 160M WESTERLY CURVE/INT 1 160 $60.29 CLARKE LAKESHORE RD 140 & 490M EAST OF JAYNES RD BANK L 12 1 350 $131.89 CLARKE LAKESHORE RD 700 AND 1070M EAST OF JAYNES RD CURVE L 11/12 1 370 370 $198.00 CLARKS LAKESHORE RD 1380 AND 1780M EAST OF JAYNES RD CURVE 1 400 0 $150.73 CLARKE LAKESHORE RD 1975 AND 2420 EAST OF JAYNES RD CURVE 1 445 445 $238.14 CLARKS LAKESHORE RD 2420 AND 2770M EAST OF JAYNES RD CURVE/BRIDGE L10 1 700 350 $395.66 CLARKE LAKESHORE RD 380 & 915M EAST OF LANCASTER RD GRANBY BRIDGE 1 640 535 $442.76 CLARKS LAKESHORE/TOWNLINE RD 425 AND 945M EAST OF NICHOLS RD CURVE 1 0 520 $195.95 CLARKE NEWTONVILLE RD 170M NORTH & SOUTH OF CONC. RD 1 CURVE/INT 1 340 340 $181.95 CLARKE CONC. RD 3 REGION RD 42 EASTERLY 825M CURVE 1 825 $310.88 CLARKE CONC. RD 3 100M WEST AND 220M EAST OF POLLARD BRIDGE 1 640 320 $361.75 C' CLARKE CONC. RD 5 250 & 550M WEST OF OCHONSKI RD BRIDGE 1 0 300 $113.05 C\ CLARKE CONC. RD 5 270 & 740M EAST OF OCHONSKI RD CURVES 1 0 270 $101.74 CLARKE STATION ST REGION 17 WESTERLY 285M EMBANKMENT 1 570 $214.79 CLARKE BEST RD REGION RD 4 NORTHERLY 250 CURVE 1 500 250 $282.62 CLARKE BEST RD 260M SOUTH & 250M NORTH OF CONC 7 CURVES/INT 1 510 $192.18 CLARKE CONC. RD 7 LESKARD RD TO 440M WESTERLY HILL/BRIDGE 1 0 440 $165.80 CLARKS CONC. RD 8 DARL/CLARKS LINE, 825M EASTERLY CURVE 1 825 $310.88 CLARKE CONC. RD 8 LESKARD RD TO 300M WESTERLY BRIDGE 1 0 300 $113.05 PRINTED 13-Apr-93 TOWN OF NEWCASTLE, PAVEMENT MARKING SCHEDULES SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE # PAINTING 376.82 PER KM PREMARK 158.32 PER KM LOCATION ROAD SECTION REMARKS APP (M) WHITE (M) WHITE (M) YELLOW PREMARK COST LANE LINE EDGE LINE CENTRE LINE $0.00 $23,871.01 TOTAL COST OF APPLIED PAINT ON TOWN ROADS 7211-00431-0249 545 TOTAL LANE LINES (M) 7920 TOTAL EDGE LINES (M) 51285 TOTAL CENTRE LINES (M) 8565 TOTAL PREMARKING REQUIRED (M) �t