HomeMy WebLinkAboutTR-70-94 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File C= Date: MONDAY, JULY 18, 1994 Res. # Report#: File #: By-Law# Subject: TENDER CL94-14, LIBERTY STREET SIDEWALK CONSTRUCTION Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report TR-70-94 be received; 2 . THAT Miwel Construction, Stouf fville, Ontario, with a total bid in the amount of $133,435 .42, being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL94-14, be awarded the contract for the Liberty Street Sidewalk Construction, as required by the Department of Public Works; and 3 . THAT the funds required in the amount of $197,000. 00 ($133,435 .42 Contract + $63,564 .58 Engineering Contract Administration Land Purchase, Utility Relocation Contingency) be drawn from the approved 1994 Public Works Capital Budget, account #7212-94002-0261. BACKGROUND AND COMMENT: Tender specifications were provided by Totten Sims Hubicki Associates for the Liberty Street Sidewalk Construction as required by the Department of Public Works. Tenders were advertised in the local papers, as well as the Daily Commercial News . Subsequently, tenders were received and tabulated as per Schedule "A" attached. The total project cost as detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "B" is estimated at $197,000. 00 which is within the budget allocation of $210,000. 00, as reflected in the 1994 Capital Budget, Page 57 . 799 ELCYCL" PAPER (&L-C" IL I ISIS PRLffEDCS4 RECYCLED PAPER REPORT NO. : TR-70-94 PAGE 2 TENDER CL94-14 It is proposed that the required funds in the amount of $197,000 .00 be drawn from the Public Works Capital Budget, account #7212-94002- 0261. The low bidder has previously performed satisfactorily as a sub- contractor for the Municipality of Clarington. They have provided excellent service for the Town of Stouffville, the City of Peterborough and the Region of York. The Treasurer has reviewed the funding requirements and concur with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Director of Public Works. After further review and analysis of the bids by Public Works, Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Miwel Construction Limited, Stouffville, Ontario, be recommended for the contract for the Liberty Street Sidewalk Construction. Respectfully submitted, Reviewed by, I i � arie Marano, H.BSc. ,AMCT. , W.H. Stockwell, Treasurer Chief Administrative Officer i .A. Evans, P.Eng. Director of Public Works MM*LB*ld I 799 i1 SCHEDULE "A" BID SUMMARY CL94-14, LIBERTY STREET SIDEWALK CONSTRUCTION BIDDER BID AMOUNT Empire Paving Ltd. Rejected* North York, Ontario Miwel Construction $133,435.42 Stouffville, Ontario Esposito Bros . Construction $140,303 .75** Ltd. Toronto, Ontario Dorline Construction Ltd. $141,651. 63 Ajax, Ontario * Rejected, no Agreement to Bond ** Error in extension C I / 99 I JUG-1�'-U4 IUD u8: 44 'FISH WRUNG FAX NO. UU5 J(� J6111 P. U I//U2 SCHEDULE "B" m`i�i .,;' gtWE`r.-•;::; .I' , 513 DIVI*IQN :STREET, W.U. BOX 91U. C08OUH ONTARIO, CA14AUA K9A 4W4 molten sitins hubicki associates (996)372-212 FAX(905)072.3-21 Mrs. Lou Ann Bi><kett, Parchasiug & Supply Agent Corporation of the Municipality of Clarington FAX NO. 905-623-4169 Municipal Administration Centre 40 Temperance Street PCWMANVILLE, Ontario L1C 3A6 July 11, 1994 Dear Mrs. Birkett: TW Contract No. CL94-14. SidewaW Construction Liberty Street, Eastside (Regional Road #14) Two Locatiorvy! Kitxg Street to Concession St.r.eef. And )r eniilck Avenue to 280 Metres Southerly, Mmiicipality of Clarington Tendcrs for the above project were opened at the Municipal Administration Centre on Pridgy, July S, 19)4. The bids received inclusive of GST charges are surrunar.ized as follows: Empire Paving Lrr)iiCed $123,795,79 Miwel Construction Limited 133,435.42 Esposito Brothers Construction Limited 140,303.75 Dorline Construction Limited 14l.651.63 ;Engineer's Estimate $150,000.00 Tender contained a niathernatical error which was corrected. The low bidder, Empire Paving Limited, failed to provide ail Agre-ei►sent to Bond resulting in a rc jection of their tender. We have check(A the second low bidder's tender and all requirements have been met. An Agreement to Bond was supplied alone with a tender deposit cheque of$9,000, i Miwel Construction has worked as a subcontractor on a member of previous Clarington contracts. Their, work recurd oil these. projccts was acceptabic, We have contacted references from tho Town of Stouffville, C!.ty of Peterborough and Region of York, All people contacted rated Miwel as a good Comrac(or and would have no reservations in main retaining their service. i ENGINEERS ARCHITECTS AND PLANNERS 79 9 r� I lu , I JL tw:,4�1 16ti UUI;UUf u t Hn Hu, jUu j f c- )OL t Mrs. Lou Aran Sirkett Jul'/ 11, 104 2 Th-. total value of work chargeable to thu Municipality of Clarington is now estimated as follows: 1. By Contract $124,706.00,tG3T.^ 2. Contingency Allowance 7,594.42 3. Preliminary Design (Dec. 26/93 - April 16/94) 3,042.66 4. Final Design and Tendering (April 17/94 - June 25/94) 12,172.44 S. Construction Administration 14 000.00 6, Land Purchase (Bell Canada) 20,000,00 7. Utility Relocation 3,000.00 GST (Item 1, 3-7) 12.384.48 TOTAL $147,000.00 None of the above casts are cligiblc for subsidy by the Ministry of Transportation. All deposit oheques other than those submitted with the second and third low bids may be released, Yours truly, tolten rims hubicki associates William,McC rae, P,Eng. Design Engineer WMC/lr t✓2 f E/SlSStMOX pc: Mr, W.A. Evans, P.Eng., Director of Public Works Mr, A.S, Carmella, CET, Manager of Engineering Mr. D. Patterson, GET, Manager of Operations Ms, Kane Rand, Works Department Ms. Lori Gordon, Treasury Department f c� �� % totten sirns hubicki associates i