HomeMy WebLinkAboutTR-81-94 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
REPORT HAND OUT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File #
Date: TUESDAY, SEPTEMBER 6, 1994 Res. # C)P'W
Report#: TR-81-94 File#: By-Law# _2_e?4 7�7
Subject: TENDER CL94-37, LAWSON ROAD RECONSTRUCTION, COURTICE
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1 . THAT Report TR-81-94 be received;
2 . THAT Esposito Brothers Construction Ltd. , Toronto, Ontario,
with a total bid in the amount of $413,,842 . 30, being the
lowest responsible bidder meeting all terms, conditions and
specifications of Tender CL94-37, be awarded the contract for
the Lawson Road Reconstruction, Courtice, as required by the
Department of Public Works; and
3 . THAT the attached By-law marked Schedule "All be forwarded to
Council for approval;
4 . THAT the Municipality of Clarington's share of the total
project cost be drawn from the Public Works Lot Levy Reserve
Funds;
5 . THAT the additional funds required of approximately
$37,815 . 94, be interim financed from the Public Works Lot Levy
Reserve Fund; and
6 . THAT staff be authorized to make application to the Canada
Ontario Infrastructure Works Program to reallocate any surplus
funds from the approved municipal allotment to repay the Lot
Levy Reserve Fund; FORTHWITH.
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki
Associates for the Lawson Road Reconstruction, Courtice, as
required by the Department of Public Works and as approved under
the Canada Ontario Infrastructure Works Program.
s,,,4a y.........n
REPORT NO. : TR-81-94 PAGE 2
TENDER CL94-37
Tenders were advertised in the local papers, as well as the Daily
Commercial News . Subsequently, tenders were received and tabulated
as per Schedule "B" attached.
The total project cost as detailed in the letter from Totten Sims
Hubicki Associates, marked Schedule "C" is estimated at $337,815 . 94
($413,842 . 30 Contract plus $66,475.33 Engineering, Construction
Administration, Utility Relocation, Soils Report, Contingency minus
$142,501. 69 Region of Durham Portion) .
The Municipality of Clarington's share of the total project cost
will be drawn from account #1110-00157-0000, Public Works Lot Levy
Reserve Fund.
i
As a result of underestimating the Municipality's total project
cost of $337,815.94 is over the Canada Ontario Infrastructure Works
Program application amount of $300,000 .00. It is therefore
recommended that once the final costs of all the approved
Infrastructure projects are known, application be made for any
surplus funds to be reallocated to offset the additional funds
required of approximately $37,815.94, from the Municipality's total
allotment to this project. It is recommended that the additional
funds required be drawn from the Public Works Lot Levy Reserve Fund
on an interim basis until the final infrastructure costs are known.
I
As this tender includes the construction of Sanitary Sewers for the
Region of Durham, it is necessary that this project proceed as soon
as possible, subsequently a FORTHWITH approval is requested.
The Treasurer has reviewed the funding requirements and concurs
with the recommendation.
Queries with respect to the department
needs, specifications, etc. , should be referred to the Director of
Public Works .
i
I
I
I
I
i
REPORT NO. : TR-81-94 PAGE 3
TENDER CL94-37
The low bidder has previously performed satisfactorily for the
Municipality of Clarington.
Respectf lly submitted, Reviewed by,
t 4x r
r
M i
/-M -[-.BSc--. ,AMCT. W.H. Stockwell, '
Treasurer Chief Administrative Officer
W.A. Evans, P.Eng.
Director of Public Works
MM*LB*ld
i
i
I
SCHEDULE "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW #
Being a By-law to authorize a contract between the Corporation
of the Municipality of Clarington and Esposito Brothers
Construction Ltd., Toronto, Ontario for the Reconstruction of
Lawson Road, Courtice.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY
ENACTS AS FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a contract
between Esposito Brothers Construction Ltd. and said Corporation.
By-law read a first and second time this day of September, 1994.
By-law read a third time and finally passed this day of September, 1994.
Mayor
Clerk
I
i
I
SCHEDULE "B"
BID SUMMARY
CL94-37, LAWSON ROAD RECONSTRUCTION, COURTICE
BIDDER TOTAL BID AMOUNT
Esposito Bros Construction $413,842 . 30*
Toronto, Ontario
Bennett Paving $423,482 . 65
Oshawa, Ontario
Boyle Excavations $451,762 .56
Bowmanville, Ontario
Calder Hill Contracting $493,676 . 60
Thornhill, Ontario
Ron Robinson Limited $495,968.58
Oshawa, Ontario
Hard-Co Construction Ltd. $497,346 . 97
Whitby, Ontario
Dagmak Construction $511, 111. 11
Markham, Ontario
*Bid Amended, Error in Extension
I
I
I
i
I
i
I
1 f. i
SCHEDULE "C"
513 DIV181014 .STREET, P.O. BOX 010, COBOUfiG
ONTARIO,CCNADA K9A-1W4
totter Sims huhicki associates
(905)3T2-9127 FAX(905)372.3621
Airs. Lou An-n Birkett
Purchasing and Suppler Agent
Corporation of the Municipality of Clarington FAX; 90`-�? -4Io9
AfUnicipal Administration Building
47 'Temperance Street
BOWMANVILLE, Ontario L1C 3A6
Sf,ptember 1, 1994
Dear Mrs. Birkett,
RE; Lawson Road Reconstruction, Courtice., Mludcipalitz of Clarington
Contract No. CL94-37.
TF.nders for the above project were opened at the Munic;ipai offices on Tuesday, Augu.:;t =G. 1994. The
bids received, inclusive of GST charges, are summarized as follows:
Esposito Brothers Constructioni Ltd. 5413,84130
Bennett Paving and Materials 423,482 65
Boyle Excavation 451,762.56
Caldcr Hill Contracting 493,676.60
Ron Robinson Limited 495,968.58
.?"Yard-Co Construction Ltd, 497,346,97
Dagrnar Construction 511,111.11
Engineer's Estimate $4147,000.00
Corrected total: All totals have been corrected for Omissions, errors of extension and
application of GST,
We have checked the low bidder's tender and wish. to advise that all requirements hare. been satisfactorily
addressed. An Agreement to Bond was supplied and a deposit cheque of $19,000 acco.-upanied the bid.
The; total rendered amount includes $142,501,69 {i;zclu)ive of GST'} for the construction of sanitarcj sewers
and water services beiltg funded by the Region of Durham:
Esposito Brothers Construction Ltd, have recentI-' Completed works for the Municipalit-i of Clarington
ii1volving the construction Of Concrete sidewalk anti curb and gutter on Regional Road ] 3 in NGtivtortville,
det4iled in Contract No. CL94.11, The work was perfom7icd expeditiously and in a professional manner,
Esposito Brothcrs Connstruction Ltd. have also completed contracts in the range of 5500,000 and of a
similar nature to the reconstruction of Lawson Road, f6T the City of Scarborou`h, Towrl 011 Newmarket
and Town of Gwillirnbury. The company was rated as an excellent Contractor by ail p;irties contacted.
I
We therefore recommend acceptance of the bid of Esposito Brothers Construction Ltd. for the contract.
ENGiNEEiNS ASC1-;1TEC TS AND PLANNERS
i
114x8- Lou Attu Birkett
S�ptem6cr 1, 1994
7
I,em 3,05.01 of Section 3 - "Watermaln" contai::is an apparent error in the unit price, The unit price
Stiould have been $30 and not$3,00 to give the total shown for this item, We understand the Municipality
has a By-law in place which indicates that the unit prices Hooted in. the tender will in all cases apply,
.��GCOrdl221}' the bidder shall be compelled to abide by the $3,00 tender unit price.
7'he total value of the contract chargeable to the Municipality of Glaritzgton is cstunatc3d as follow':
Road Works - ,Section 1 and General Items - Section 4
1• By Contract (Section 1)
2. By Contract (Section 4, Prorated) $249,887.50
3• Contingency Allowance (excluded from Tender 3,701,85
4. Final Design and Tendering (Juiie-Aug. 1994) I 27j 1000.00
S. Construction Administration ,000.00
6• Utility Relocation 25,000,00
7. Sails Deport 500.00
GST Items 1., 2, 4, 5, 6 and 7) 2'280,69
S21,445.90
TOTAL COST
$337,515,94
Al:! deposit cheques (other than those of the low and second low kids) may now be rcli!i5cd.
Yours truly,
torten Sims hubicki associates
R.A. Kempton, P.Eng.
Design Manager
RA,'12AK/lr
68M-'1'63/'0'_147
PC: Mr, W.A. Evam4, P,Eng,, Director of Public Works. Fax: 905-623-4169
ylr. D. Patterson, CET, Manager of Operations
Mr• A,S. Cannella: CET, Manager of Engineering
Mrs. Faye Rand, Works Department
Ms. Lori Gordon, Treasury Department
Mr, J,G. Baker, Manager of AdrainistrativG Services, Fax: 905-668-2051
Mr. Peter Nuridy, P-Eng,, Project Design Engineer. Fnx: 905-668-2051
totters sims 'lubicki assuciateS
i