HomeMy WebLinkAboutTR-83-94 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
REPORT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File `
Date: MONDAY, SEPTEMBER 19, 1994 Res. #
By-Law#€ J �✓
Report#t:___ TR-83-94 File#: By-Law
Subject: TENDER CL94-13, CHURCH STREET RECONSTRUCTION, BOWMANVILLE
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report TR-83-94 be received;
2 . THAT Hard-Co Construction Limited, Whitby, Ontario, with a
total bid in the amount of $1, 151,009 .59 , being the lowest
responsible bidder meeting all terms, conditions and
specifications of Tender CL94-13, be awarded the contract for
the Church Street Reconstruction, Bowmanville, as required by
the Department of Public Works;
3 . THAT the attached By-law marked Schedule "A" be forwarded to
Council for approval;
4 . THAT the Municipality of Clarington's share of the total
project cost be drawn from the Public Works Lot Levy Reserve
Funds; and
5 . THAT the additional funds required of approximately
$137, 338 . 00 be financed from the Public Works Lot Levy Reserve
Fund; FORTHWITH.
BACKGROUND AND COMMENT:
Tender specifications were provided by Totten Sims Hubicki
Associates for the Church Street Reconstruction, Bowmanville, as
required by the Department of Public Works and as approved under
the Canada Ontario Infrastructure Works Program.
I
Tenders were advertised in the local newspapers, as well as the
Daily Commercial News . Subsequently, tenders were received and
tabulated as per Schedule "B" attached.
709
PAPS
ilIi51S f`IitP EU IX!FEUYU LCU PAPE q
REPORT NO. : TR-83-94 PAGE 2
TENDER CL94-13, CHURCH STREET RECONSTRUCTION
I
i
The total net project cost ($969,338.76 less $32,000 .00 GST
Rebate) , as detailed in the letter from Totten Sims Hubicki
Associates, marked Schedule "C" is estimated at $937,338. 00
( $1, 151, 009 .59 Contract plus $254,720. 00 Engineering, Construction
Administration, Utility Relocation, Soils Report, Contingency minus
I
$436,390 . 83 Region of Durham Portion, minus $32,000 . 00 GST Rebate) .
The Municipality of Clarington's share of the total project cost,
approximately $404,005 .00, will be drawn from account #1110-00157-
0000, Public Works Lot Levy Reserve Fund.
Under the original Infrastructure application, the Provincial/
Federal share of the $800, 00 .00 was $533,333.00 and the Municipal
share was $266,667 . 00 . The tender price increases the Municipal
contribution by $137,338 .00 to $404,005 .00 . The estimated balance
in the Public Works Reserve Fund after all the Infrastructure
Contribution, is approximately $1, 100,000 .00 .
As a result of underestimating the Municipality's total project
cost of $937,338 .00 is over the Canada Ontario Infrastructure Works
Program application amount of $800,000. 00 . It is recommended that
the additional funds required be drawn from the Public Works Lot
Levy Reserve Fund.
An information memo from the Director of Public Works has been
distributed under separate cover which outlines the subsidy the
Municipality would be entitled to if this project were to be
completed under the Ministry of Transportation of Ontario grant
process.
I
As this tender includes the construction of Sanitary Sewers for the
Region of Durham, it is necessary that this project proceed as soon
as possible, subsequently, a FORTHWITH approval is requested.
i
/ 10
REPORT NO. : TR-83-94 PAGE 3
TENDER CL94-13, CHURCH STREET RECONSTRUCTION
The Treasurer has reviewed the funding requirements and concurs
with the recommendation. Queries with respect to the department
needs, specifications, etc . , should be referred to the Director of
Public Works .
The low bidder has previously performed satisfactorily for the
Municipality of Clarington.
i
Respectfully submitted, Reviewed by,
C
ai6Marano, H.BSc . ,AMCT. , W.H. Stockwell,
Treasurer Chief Administrative Officer
i
W.A. Evans, P.Eng.
Director of Public Works
MM*LB*ld
i
I
i
i
SCHEDULE "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW #
Being a By-law to authorize a contract between the Corporation
of the Municipality of Clarington and Hard-Co Construction
Ltd., Whitby, Ontario for the Reconstruction of Church Street,
Bowmanville.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY
ENACTS AS FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a contract
between Hard-Co Construction Ltd. and said Corporation.
By-law read a first and second time this day of September, 1994.
By-law read a third time and finally passed this day of September, 1994.
Mayor
Clerk
i
I
i
712
SCHEDULE "B"
BID SUMMARY
CL94-13, CHURCH STREET RECONSTRUCTION
CONTRACTOR BID PRICE
Hard-Co Construction Limited $1, 151,009 .59
Duntri Construction $1,296,346 . 73
Dagmar Construction $1,317,051.64
Empire Paving Ltd. $1,464,494 . 02
I
713
I
SEP-13-194 TUE 16:28 TSN CODOURG FAX NO, 905 372 3621 P. 02/03
I
SCHEDULE �,C�� i
� t E
V3 DIVISION STREET, P.O. BOX 910, COROURGI
t ONTARIO, CewAOA K9A 4W4
toner sires hubicki assoclafieso FAX (905)372.3621
N rs. Lou A= Birket.t, Purchasing and Supply Agent
Couporation of the Municipality of Clarington
Municipal Administration Centre
40 Temperance Street
BOWMANVIL LE, Ontario LIC 3A6
September 13, 1994
Dc,ar Mrs, Birkett:
Rot Church Street. Reconstruction, Tempertuice Street to Liberty Street, Bowrrian011e
Contract Nu. CL94-13
Tonders for the above project were Opened at the Municipal Offices on Friday, Septer.;.,ber 9, 1994. The
bids received inclusive of GST Charges are Summarized as follows:
CO�ttractor $id.;`1;'iCe ;
Empire Paving Lid, $1,464,494.02
Dagtnar Construction 51,317,051.64
Duntri Construction $1,296,346.73
Pard-Co Construction Limited 51,151,(109.59
Engineer's Fetim.,AA $1,263,000.00
We have checked the low bidder's tender and wish to advise that all requirements havoy been satisfactorily
laddressed, An Agreement to Build and a deposit cheque in the amount of $75,000,00 accompanied the bid,
Hard-Co Construction Limited has undertaken work under the supervision of of r cotrpnny, the most
recent projects being Brooklyn Road Improvements, $1,400,000.00 and Mary Street ]Load Improvements
$2.50,000.00, both contracts in 1994. 'In 1993 the company also completed contracts i'or the Region of
Durham, City of Oshawa and the Town of Ajax ;For a total value of approximately $2,000,000.00.
1:efercncc5 that we have checked Nvith the Region cif Durh.arll, City of Oshawa and Town of Ajax indicate I
tl at bard-Co is a competent Contractor and that the duality of workmanship is satisfactory, We are also
advised that the company is financially sound, We are also cautioned that this Contra.+rtor requires j
supervision by experienced staff and that claims :For extra payment are routine.
Can the basis of work completed and eommein n?ceived we rr conumnd acceptance'ot Me low Did of
Eard-Co Construction Limited.
GNaINEERS ARCHITFwTS AND PLANNERS
714
SEP-93-94 TUE 16:29 TSH OOBOURG FAX W. 905 372 3621 P- 03/03
1\1"nic-iNdity of Clarington CL94-13
t SC.?tCmber 13, 1994
The total value Of thew chargeable to th'e Municipality
Of Clarington is estimated Es follows;
4
1. section I Roadworks
$652,347.0 n]
2. Section 4 - General lterilS (prorated)
I `i
3.
Contingencies
$26,000.00
4. Design and Tendering(Jan. 1, 1904 to Sept. 72,500.00
17, 199,1)- CST included
Contract Administration
I
0
0
0
72,000,00
6. Utility Relocation 70,000.OQ
7. Soils Report
4_0_00.0
Sub-Total
$912,368,0o
GST on 1. 2, 5, 6 and 7
TOTAL
76
CST rebate on the above figure Of$969,QQU•00 is $32,000.00 approximately. This gil,'es overall
Vera.
COS-t of$937,000.00 which is the figure COMParable to the Infrastructure approve fi_qur�.- of$800,G00,00.
All deposit cheollf's
� - (other than those of the low and second low bids) inay now be released.
Yours truly,
W;tefl sims hubick! associates
R. A. Kempton, P,Eug,
"..K/rd
PC: Mr. W. A. Evans, P,Eng.
Mr. D, Patterson, CET
A., S. C.innella, CFT
Ms. K. Rand
Ms, Lori Gordon
715
totten aims hubirki associates
SEP-14-94 WED 13:48 TSH GOBOURG FAX 1,10. 905 3-12 3621 P. 02102
513 DIVIMoN vrAE<_r, p,O, BOX 910, COBUVEG
totter rims hubicki associdtes oNTApl h, CANi.DA K0q 4W4
(905)772.1121 FAX(905)372.365!1
i
M:r. J.G, Maker
Manager of Administrative Services
Rl,'yional Municipality of Durham : ~
P,O, Box 623, 105 Consumers Drive -
WHITBY, Ontario L1N 6A3
S(Vember 13, 1994
D.-ar Sir:
R.,,: Church Street Reconstruction, Temper2mce Street to Liberty Street, RoEN'Vja"VMe,
Municipality of Clarington, Contract No. CL94-13
Tenders for the above contract vkeTF'. opened at th(: Municipality of Clarington offices on Friday,
Soptember 9, 1994. A sunrtnary of the bids received and a copy of the tender advenis; ment is attached.
The summary of bids forms part of our report to 'the Municipality of Clarington, a cnf�;Y of which is
at:ached for your information.
The cost of the Region's works within the contract are summarized as follows,,
By Contract: Section 2, Sanitary Sewers $177,633.90
Section 3, Wwermain 2CU,729.x,
Section 4, Genera 1, lira-rated 9,479 00
Section 5, Contingency AllowancE: 20,000,00
Conmtruction Administration 40 000 00
Sub-Total $447,841,90
C.S.T. 31_ 3,_48 93
Total $479,190.83
The above estimate does not include engineering design costs previously invoiced.
,Y7ur approval of the award of the contract to Hard-Co Construction Ltd. is requested.
Y:)urs very truly
i
tatten sims hubicki associates
R.A. Kempton, P.Eng.
Design Manager
RAKIag
at 1.
P(;; Mr. W,A, Evans, P.Eng., Director of Public WUrks
Mr, A.S. Cannella, CET, Manager of Engineering
�vMr. D. Patterson, CET, Manager of Operations
F_N�1NI,ERS"�C tSC►a1 CT5 Me rp I>urNERinng & Supply Agent
634?E3±30iiU3.6ic