TENDER CL94-40, WILMOT CREEK PEDESTRIAN BRIDGE, CLARINGTON
Subject: WATERFRONT TRAIL
Recommendations:
I
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT report TR-101-94 be received for information and �
endorsed;
2 . THAT the attached By-law marked Schedule "A" be, forwarded
to Council for approval.
BACKGROUND AND COMMENT:
In accordance with Resolution #C-688-94, the Administrator and the
Treasurer awarded Tender CL94-40 Wilmot Creek Pedestrian Bridge,
Clarington Waterfront Trail.
A memorandum outlining the bids and award is attached (Schedule
III If )
Respect ully submitted, Reviewed by,
'e Marano, H.BSc. ,AMCT. , W.H. Stockwell.,
Treasurer Chief Administrative Officer
Art
A. Evans, P. Eng.
Director of Public Works
MM/LAB/hjl
Attachments
733
RECYCLED I
PA"R RECYCLE
RV ISI PRIMED LX!RECYCLED PAPER
SCHEDULE "I"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGT®N
Memorandum
Bill Stockwell, Chief Administrative Officer
To: Marie Marano, Treasurer
From: �
Lou Ann Birkett, Purchasing and Supply Agent
Date:
November 3, 1994
Subject:
TENDER CL94-40
WILMOT CREEK PEDESTRIAN BRIDGE,
CLARINGTON WATERFRONT TRAIL
In accordance with Report TR-97-94, Resolution #C-688-94, authorization is requested to
award the above noted contract to Ron Robinson Limited, Oshawa, Ontario in an amount
of $73,351.72.
Tender specifications were provided by Totten Sims Hubicki Associates for the Wilmot
Creek Pedestrian Bridge, Clarington Waterfront Trail, as required by the Department of
Public Works.
Tenders were advertised in local papers, as well as the Daily Commercial News.
Subsequently, tenders were received and tabulated as per Schedule "A" attached.
The total project cost as detailed in the letter from Totten Sims Hubicki Associates, marked
Schedule "B", is estimated at $95,000.00.
The funding for this project is as identified in Report TR-97-94, a copy of which is attached
marked Schedule "C".
The low bidder has previously performed satisfactorily for the Municipality of Clarington.
They have also provided excellent service for the City of Oshawa.
The Treasurer has reviewed the funding requirements and concur with the recommendation.
Queries with respect to department needs, specifications etc., should be referred to the
Director of Public Works.
/2
734
- 2 -
Bill Stockwell, Date
Chief Administrative Officer
6�dhie Marano, Date
Treasurer
Yours truly,
Lou Ann Birkett, A.M.C.T.(A)
Purchasing and Supply Agent
LAB*ld
cc: W. Evans, Director of Public Works
D. Patterson, Manager of Operations
C. Strike, Planner, Strategic Planning Branch
I�
i
735
I
i
SCHEDULE "A"
BID SUMMARY
CL94-40
WILMOT CREEK PEDESTRIAN BRIDGE
CLARINGTON WATERFRONT TRAIL
BIDDER TOTAL BID AMOUNT
Ron Robinson Ltd. $ 73,351.72
Oshawa, Ontario
812728 Ontario Ltd. $ 83,941.50
Oakville, Ontario
Snyder Construction $ 87 847.00
Whitby, Ontario
Gerr Construction $ 90,950.00
Bowmanville, Ontario
Elirpa Construction $96,019.68
Pickering, Ontario
Holloway Philp Construction $119,754.40
Milton, Ontario
* Bid amended, error in calculation
736
NOV-03-94 THU 09:52 TSH COBOURG
FAX N0. 905 3 i2 3621 F. 02/0 3
SCHEDULE "B" 1
513 DIVISION STREET, F.O. BOX 410. cosoURG
ONTARIO. CANADA }(9A 4W4
toitte n sims hubicki associates
(945)972-21Ei FAX(905)372.31121
Mrs. Loo Ann Birkett, Purchasing & Supply Agent
Corporation of the Municipality of Clarington
Municipal Administration Centre, 40 Temperance Street
13OWMANV ILLF,, Ontario L 1 C 3A6
NoN,cmber 2, 1994
Dear Mrs, Birkett:
R'n Wilmot Creel: Pedestrian Rridv;e, Clarington Waterfront Trail,
?1Iunicipality of Clarington, Contract. No. CL94-40
Tmiders for the above project. wore opened at the Municipal offices on Friday, October 28, 1994. The
bids received inclusive of GST charges are summarized as follows;
' :' �t71'rJ'.�A.CTtJ�t.• :I3l�.k'k�,ICt;:
Holloway Philp ('9115tnlUi6ta $119.754.40
Elirpa constmv(io" 96.019.68
Gerr Construction 90,9-1(1-00
1 >il�dEi uopstructio" 37.847,00*
812728 Ontario Ltd.
Ron Robitl5on Ltd, 733,351.72
Engineer's Estima[e �;90,950.(4U
;'Bid amended - error in calculation.
VJe have checked the low bidders tender and with to advise that all retlttlrements have been satisfactorily
addressed. An agreement to bond and a deposit eheoue in the amount of$2,000.00 accompanied the bid.
R'on Robinson Limited has undertaken a number of construction projects under the supervision of our
Company. The most recent being Penwest Subdivision, phase 4, in Bo` mianviile, tart electrical contract.
The works have been carried out in a satisfactory manner.
EN-}NCwn., WICNiTECTS AND PLANMERS J
i
NOV-W-U4 THU 09:53 TSH COBOURG RX 110. 905 372 3621 P, 03/03,
Al rs, Lou Arm Birkctt, hirchasu,g & Supply Agent
November 2, 1994
Related experience to this proiect includes the following c0n.tracts involving pedestrian bridge construction,
1. Peacc Park Pedestrian Bridge, Munlcipalil:Y of C:larington S 80,00(',
2. Avalon Subway and Pedestrian Bridge, Law Developments 100,001 .
3. Oshawa Creek Pedestrian Bridgc, City of Oshawa
4• Nor[hview 80'0
Pedestrian Bridge, City of Oshawa 18Q0 ,
0,00(),
have chCC K-"I the references supplied and we are advised that the work was carrier( out in a crnnpetent
Manner with good quality workmanship, All projects Were completed on schedule
nasnagenrent from the Contrlletor. � Jule wit,:, good site
On the basis of works eoryipleted and continents received we recommend acce
Robinson Ltd, ptance of the low bid of Ron
Th: total value of the project based on the low bid is as follows:
1. By Contract ${,B,�S;.oI
Preliminary Dosign and Agr.rzuy Approval,,. 4,553.01
Final Design alid Tendering 4,100.00
4, Contract Administration 6,1001)0
5, soils IrtvCstigation 1,650.00 1W
6, Contingencies 2,334,78
GST (ltcros 1,2,3,4 and 5) 6,Q62,21
Total, $95,000.0r)
All deposit cheques (other than those of [he lore and second low bids) lnay now be rele-sed.
Yours truly,
t0fl0r) Stets hUbicki associates
R.A. )::ernl)t� P,Fing.
Dc<ign Manager
RA<!ag
17c; W,A, Evans, P,Eng., Director of Public Works
D, Patterson, CET, Manager of Operations
C. Strike, Planning, Department
38
totted Sims huble{ci associates
SCHEDULE "C"
TIME CORPORATION OF THE MUNICIPALITY OF CLARINGTON
REPORT
Meeting: COUNCIL File #
Date: MONDAY, OCTOBER 24, 1994 Res. #
Report #: TR-97-94 File #: By-Law #
Subject: ACCEPTANCE OF TENDER CL94-40,
WILMOT CREEK PEDESTRIAN BRIDGE,
CLARINGTON WATERFRONT TRAIL
Recommendations:
It is respectfully recommended to Council the following:
1 . THAT Report TR-97-94 be received;
2 . THAT the Chief Administrative Officer and Treasurer or their
delegates be authorized to accept the lowest qualified tender
meeting all terms, conditions and specifications of Tender
CL94-40, Wilmot Creek Pedestrian Bridge, Clarington Waterfront
Trail, as required by the Municipality;
3 . THAT the Mayor and Clerk, subject to recommendation #2 above,
be authorized to execute the necessary contracts or
agreements;
4 . THAT an information report and the applicable By-law be
presented at the General Purpose and Administration Committee
Meeting, scheduled for November 21, 1994 , summarizing the
tender that has been awarded;
S . THAT $60, 000 . 00 of the Municipality' s contribution be drawn
from the 1994 approved Public Works Capital Waterfront Trail
Budget Account #7205-94003-0261; and
6 . THAT $4, 790 . 00 be drawn from the Planning Department' s 1994
Legal Account #7702-00000-0242 .
BACKGROUND AND COMMENT:
For the past several weeks, staff have been negotiating the details
of the Wilmot Creek Pedestrian Bridge, Claringto-r Waterfront Trail,
with representatives from the Province of Ontario.
One of the conditions for funding imposed by the Province is -hat
the work be substantially completed by the Sp-ring of 1995 . In
order to meet this deadline, it is necessary to award this contract
so that work can commence before there is frost in the ground.
®
13 9,
REPORT NO. : TR-97-94 PAGE 2
ACCEPTANCE OF TENDER CL94-40
Consequently, the tender has been issued, with bids closing Friday,
October 28, 1994 . As this tender closing is after the last formal
meeting of the current Council, it is recommended that the Chief
Administrative Officer and the Treasurer, or their delegates, be
authorized to accept the lowest qualified tender meeting all terms,
conditions and specifications of Tender CL94-40 , the Wilmot Creek
Pedestrian Bridge, Clarington Waterfront Trail, and that the Mayor
and Clerk be authorized to execute the necessary contract.
In some cases, the low bidder may not be the most qualified with
respect to reference or quality of product offered and in this
case, the most appropriate low bid would be selected.
This procedure is consistent with that adopted during the Council
August break. For the information of Council, staff have confirmed
with the Ministry of Municipal Affairs that establishing this
procedure is within Council' s authority.
The total estimated cost for Phase I is $2.59, 162 . 00 and for Phase
II is $65, 566 . 00 . Phase I will receive 75% subsidy and Phase II
will receive 100% from the Waterfront Regeneration Trust for a
total of $259, 938 . 00 . To date, the Municipality has received 50%
of the total subsidy available fo-- this project in the amount of
$129, 969 . 00 . The Municipality' s total contribution of up to
$60 , 000 . 00 will be drawn from the -994 Public Works Capital Budget
Account Waterfront Trail #7205-94003-0261 as identified on Page 40
of the Capital Budget . An additional $5 , 790 . 00 related to legal
costs associated with easement agreements has been provided for in
the Planning Department 1994 Legal Account #7702-00000-0242 .
Phase I includes the Waterfront Trail from Bowmanville to Bond Head
and Phase II from Darlington Provincial Park to Boamanville .
The estimated cost of this portion of Phase I, which includes the
Wilmot Creek Pedestrian Bridge is 580 , 000 . 00 . The balance of Phase
I , as well as Phase II will be tendered at a later date .
140
REPORT NO. : TR-97-94 PAGE 3
ACCEPTANCE OF TENDER CL94-40
The Treasurer has reviewed the funding requirements and concurs
with the recommendation. Queries with respect to department needs,
specifications, etc. , should be referred to the Director of Public
Works .
Respectfully submitted, Reviewed by,
Marie Marano, H.BSc. ,AMCT. , W.H. Stockwell,
Treasurer Chief Administrative Officer
W.A. Evans, P. Eng.
Director of Public Works