Loading...
HomeMy WebLinkAboutTR-19-94 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# Date: MONDAY, MAY 2, 1994 Res. #_(�t?I-'�° ' 9 'o 4 Report TR-19-94 File#: By-Law# - Subject: TENDER CL94-8, ASPHALT AND SURFACE TREATMENT PULVERIZING ReCOTUOVOONispectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report TR-19-94 be received; 2 . THAT the tie bid between Miller Paving Limited, Markham, Ontario and Roto Mill Services Ltd. , Brampton, Ontario, in the amount of $32,689 .36, be broken by means of a draw to take place at the Municipal Administrative Centre in the presence of the Clerk and the Purchasing and Supply Agent; 3. THAT the subject bidders be advised of the time, date and location of the draw and that they be invited to attend; 4 . THAT the contract be awarded to the winner of the draw; and 5. THAT the funds be drawn from the approved 1994 Department of Public Works Road Maintenance budget FORTHWITH. BACKGROUND AND COMONT: Tenders were publicly advertised in local papers, as well as the Daily Commercial News . Subsequently, bids were received and tabulated as follows: Bidder Total Bid Amount Miller Paving Limited $32,689 . 36 Markham, Ontario Roto Mill Services Ltd. $32,689 . 36 Brampton, Ontario Hard Rock Paving Company Limited $33,987 .27 Port Colborne, Ontario ./i10 ­'­1 4A II I I I 1 S 51 111 M 11VC1LLLO 1A PER REPORT NO. : TR-19-94 PAGE 2 TENDER CL-94-8 As the current purchasing by-law does not address how to deal with a tie bid, it is staff's recommendation that the tie be broken by means of a draw. This process is the most commonly used by Municipalities faced with this situation. Both bidders have agreed to this process. The total funds required for Tender CL94-8, Asphalt and Surface Treatment Pulverizing are included in the Department of Public Works Road Maintenance budget. The total funds allocated for the pulverizing contract plus the Prime and Surface contract is $920,000 . 00. Of this amount, $51,500.00 was estimated for the pulverizing portion. The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Director of Public Works . i The tendered unit prices represent an average sixteen percent ( 16%) decrease over the 1993 prices . See Schedule "A" attached for a copy of the 1994 schedule listing the roads requiring Asphalt and Surface Treatment Pulverizing. i Miller Paving Limited has previously performed satisfactorily for the Municipality of Clarington. Although Roto Mill Services has not previously provided this service to the Municipality of Clarington, they have provided satisfactory service to the Regional Municipality of Durham. Due to the amount of work to be completed on the roads this season a forthwith approval is requested. i J p I REPORT NO. : TR-19-94 PAGE 3 TENDER CL-94-8 Respectfully submitted, Reviewed by, IJ Marie Marano, H.BSc . ,AMCT. , W.H. Stockwell, Treasurer Chief Administrative Officer l 140-6,' �- 6, �. W.A. Evans, P.Eng. --Director of Public Works MM*LB*ld Attach. i i i / 12 SCHEDULE "A" 1994 PULVERIZING SCHEDULE REF. # LOCATION LENGTH WIDTH DEPTH' AREA COST PER m m mm sq. m sq. m TOTAL NOTES 1 Skops Court 490 6- 25 2,940 2 East Townline, Hwy. #2 to Conc. 1,800 6.6 25 Rd.3 11,880 Cost Sharing with 3 East Townline South - Westerly 600 6.6 Hope Township Section 25 3,960 4 Conc. Rd. 5, Shiloh Rd. to Regional Rd. 18 1.700 6.4 50 10,880 5 Reid Rd., Conc. Rd. 4 to 2,250 6.6 Conc. Rd. 5 25 14,850 6 Moffat Rd_, Conc. Rd. 3 to Conc. Rd. 4 2.100 6.6 35 13,860 7 Pollard Rd., Conc. Rd. 3 to Conc. Rd. 4 2,000 6.7 50 13,400 8 Conc. Rd. 3, Reg. Rd. #42 to 1,675 6.7 50 Providence Rd. 11,222 9 Rundle Rd., Nash Rd. -to Hwy.#2 1,000 6.5 75 6,500 10 Clarke-Darlington Townline Rd. 2,200 6.5 50 4, North 14,300 11 Scugog Rd., Conc. Rd. 6 to C1�6 Conc. Rd.7 2'100 6.6 50 13,860 12 Conc. Rd. 7, Reg. Rd. #57 to 790 6.6 50 Scugog 5,214 13 Pebblestone, Tooleys to 1,260 6_4 Townline S0 8,064 Subtotal 130,930 .1 7. �j (itiiiii j$:`;?.a<(ati%'<?ji?1 ;•1::]:1:'fi ;•,:;:::i�1iti 7 ::IF} pp ,} ;7 iii�i�i3`3i�<�c isisc'i�;:?i'ce:i'Ftii�i`-i�i�i3i?i'•i;i�i;'i:id�:�iii� :.3?i'i' .`,. 3 7, q i i :•}"ii3 ,3'i;'":':", Ji i :.,`• } }. :,•• ..F � is .?!:�' gg Idaa«•7a: i •i a �`a ) .). 7: i 3. 7. .•i. .`3``�•. 33,, 3, ,7 3. .3 3• ,?s73. .7 3: i. ) >, r ^i ,,3. r:•., . ,.. r SCHEDULE "A" 1994 PULVERIZING SCHEDIILE REP.# LOCATION LENGTH WIDTH, DEPTH AREA, COST PER TOTAL NOTES m m mm sq. in sq. in 14 Conc. Rd. 10, Mosport 1,600 7 75 11,200 Rd. to Townline Rd_ 15 Mosport Rd., Conc. 500 6.7 50 3,350 Rd. 10, Southerly Subtotal 14,550 TOTAL 145,480 iii?i;';ii:;i;'<;>�;`;:;i:`?,:;`iii�i�ii:i•. c�i;� t fi"�a•:<N'.:}l-':1f:':}irj:}i :j};y;.p:}i:i:}(: } :�2 3. ,3•:- �'ii' F. `7. ;is i}:gs<;:�;:, :,:`,•:i :3�:x'3:;:;7:a•.•. :3' 3..•• .337 `F. ,a.�' ,�• :•7` oc` r f :73%3 !: ``i117??: :ih::�:•:: ,713:3:3:•:•; }. ,3. �F r•' `�7 7. r•}i l ,7 .�, 1 1 F7i71` •,,; 3 3. )3. a. i; 3 a• ii:ji dI .3•s f•